Road Tankers
Rail Tankers
Water Carriers
ADVANTAGES OF TRANSPORTATION BY PIPELINESADVANTAGES OF TRANSPORTATION BY PIPELINES
 Safer mode of transportation
 Environment friendly
 Least energy requirement
 Lowest maintenance costs
 Minimal impact on land use pattern
 Negligible loss of product in transit
 High reliability
 Multi-productTransportation
6
Oil Pipelines in South India
PETRONET CCK LIMITED
Corporate Office – Irimpanam, Cochin
Petronet CCK Limited, a subsidiary of M/s. Bharat Petroleum Corporation Limited,
has laid a petroleum product pipeline from BPCL Irimpanam Terminal to Karur via
Coimbatore for transportation and downstream distribution of petroleum products MS, SKO
and HSD.
8
PCCK- Milestones
PIPE LINE LAYING STARTED DECEMBER 1999
MECHANICAL COMPLETION FEBRUARY 2002
PROJECT PERIOD (ACTUAL) 3 YEARS 8 MONTHS
TRIAL RUNS MARCH 2002
COMMERCIAL OPERATION SEPTEMBER2002
9
Pipes being laid along the route Work in river
Horizontal Directional Drilling across the Periyar Foundation setting for pump
10
WELL BEGUN IS HALF DONE
Appropriate engineering design
Adopting state of the art technology
Ensuring quality in men, material and methods
Strict adherence to standard practices
Building a strong organizational safety culture

FACILITIES – DESIGN
PCCKL
LENGTH OF PIPELINE 292 KM
SIZE OF PIPELINE
o
COCHIN TO IRUGUR 450 MM (18”)
o
IRUGUR TO KARUR 350 MM (14”)
GRADE AND THICKNESS
(a) 18” API 5L Gr. X 65 of thick. 6.4, 7.9, 9.5, 12.7 mm
(b) 14” API 5L Gr. B of Thick. 6.4, 7.9 mm
THROUGHPUT 3.3 MMTPA in Phase – 1 and
4.0 MMTPA in Phase – 2
PRODUCTS HANDLED MS / HSD / SKO
PUMPING STREAM HOURS 8000 Hrs Per Annum

FACILITIES
DESPATCH TERMINAL IRIMPANAM
RECEIVING TERMINAL KARUR
TAP OFF POINTS IRUGUR
SV STATIONS
12 MOV STATIONS ( 10 IN C-I SECTION AND 2 IN I-K SECTION)
5 HOV STATIONS IN C-I SECTION
ROU WIDTH
18 M (in cross country portion)
Have restricted ROU's at select locations and forest areas.

FACILITIES AT PETRONET
Main Pumping Station at Cochin.
Receipt Terminal at Karur and tap off at Coimbatore.
182.500 Kms 18” underground Pipeline from Cochin
to Coimbatore.
110.000 Kms 14” underground Pipeline from
Coimbatore to Karur.
12 Motor operated Sectionalising Valve Stations and
5 Hand Operated Valve (HOV) Stations along the
Pipeline route.
300 Kms dedicated Optic Fiber Communication System.
An Operating Manual has been drawn up in consultation
with BPCL based on the provisions made in the Off Take
Agreement
It describes the activities and responsibilities of all terminals of
PCCKL and BPCL on the following
Planning and Scheduling
Product Quality
Operational Activities at Cochin, Irugur and Karur.
Product Quality Certification
Batch Reconciliation
Slop Management
Product Loss Management
Operating Manual

FACILITIES AT PETRONETFACILITIES AT PETRONET

FACILITIES AT PETRONET

FACILITIES AT PETRONET
PIPELINE PROFILE (ELEVATION)PIPELINE PROFILE (ELEVATION)
PCCKLPCCKL
0
25
50
75
100
125
150
175
200
225
250
275
300
325
350
375
400
425
450
0
4
8
12
16
20
24
28
32
36
40
44
48
52
56
60
64
68
72
76
80
84
88
92
96
100
104
108
112
116
120
124
128
132
136
140
144
148
152
156
160
164
168
172
176
180
183
187
191
195
199
203
207
211
215
219
223
227
231
235
239
243
247
251
255
259
263
267
271
275
279
283
287
291
Cochin (5m)
Irugur
(375m)
Karur
(150m)
0kms
182 kms 292 kms
415m
Peak(415m)
Kuthiran (150m)
80 kms
Five Characteristics of World Class Safety Management System
Leadership - Lead by example (promote risk awareness,
encourage the team, ensure compliance and involve)
Integrated system approach - Integrating safety into all
functions of the organization
Performance measurement - Continuous monitoring to
promote safety performance
Alignment to core organizational goals - Aligning safety
along with organizational goals, objectives and values
Off the job safety - Extending safety efforts to employees
and community outside the work
Petronet CCK Ltd. has implemented the Integrated
Management System – IMS with effect from 01st
October 2008 consisting the following standards:
ISO 9001:2008-Quality Management System (QMS),
ISO 14001:2004-Environmental Management System
(EMS) and OHSAS 18001:2007.
The certification was done by M/s Det Norske Veritas
(DNV) Certification B.V., The Netherlands.
IMS POLICY AT PCCKL

Real time data acquisition and monitoring through SCADA system
Application software including Leak Detection System - LDS
Emergency Shutdown System - ESD
12 numbers of motorised remotely operated Sectionalizing Valves
IP based day/night Video Surveillance System
OPERATIONAL SAFETY FEATURES AT PETRONET

Daily line patrolling by Line Patroller's
Internal Inspection of Pipeline using PIGS
Cathodic Protection by ICCP and Galvanic Protection
Operational Control Procedures - OCP
Work Permit and audit system
Fire Hydrant System, Foam Trolleys, Fire Extinguishers, MCP’s, Fire Alarm
System.
OPERATIONAL SAFETY FEATURES AT PETRONET
PREPAREDNESS MEASURESPREPAREDNESS MEASURES
As part of emergency preparedness, following measures are adoptedAs part of emergency preparedness, following measures are adopted::
Emergency Drills and Mock Exercises
The effectiveness and thoroughness of ERDMP is evaluated through regular
table top exercises covering all potential scenarios on rotation basis in safety
meetings. Safety meetings are held at a frequency of once in a month
Training
Training on basis / advanced firefighting is extended to all employees on
yearly basis. The guards & LPMs, are also provided with fire and safety
training on a yearly basis.
Mutual aid associations are in place at Cochin, Coimbatore and Karur with
nearby units of oil PSUs and other major industrial units. The mutual aid
members meet on quarterly basis and discuss common areas of interest and
also participate in the DCMP drills of each unit.
Mutual Aid
The Inspector of Factories and Boilers suggested
in the mutual aid meeting held on 30/05/2011
at Petronet CCK Limited that the Mutual Aid
Group of Irimpanam should have a name
and it was unanimously decided that the group
shall be named as “ IMAG –IMAG –
Irimpanam Mutual Aid GroupIrimpanam Mutual Aid Group”.
Irimpanam Mutual Aid group (IMAG) has been
formulated and an agreement signed with the
neighboring oil companies like BPCL, IOCL, HPCL, HP Gas
and IOC LPG bottling plant as members.
IMAG members meet once in a quarter to discuss on
common issues among the oil companies and also the
safety of the public in the nearby areas.
The motive of IMAG is to mutually assist the members
by sharing resources during an emergency.
Organization
Emergency Contact
Number
Contact Person and
phone number
Terminal In charge and
phone number
Control Room
0484 2778145
9446427555
Ratheesh R
Engineering Executive
9495315882
Jalin K Thampi
Sr. Terminal Manager
9447640105
Control Room
0484 2778316
Tirumala Srinivas M
Asst. Manager (HSSE)
9447356143
Somasundaram M
Sr. Installation Manager
8547831573
Control Room
0484 2114327
Arun Anto
Asst. Manager (HSSE)
9645660823
R Kumar
Chief Terminal Manager
9447498266
Control Room
0484 2114847
Radha Krishnan
Sr. Officer(HSSE)
9847625470
K A Devan
Chief Installation Manager
9177443322
Control Room
0484 2775407
Deepak E D
Safety Officer
8156844411
Muhammed Tajib Sait
Sr. Plant Manager
9605001969
Control Room
0484 2791848/2458
Nibil P S
Officer (LPG - Safety)
9539711199
N Manoharan
Chief Plant Manager
9446312888
IMAG MEMBER LIST
MUTUAL AID AGREEMENTMUTUAL AID AGREEMENT
SIGNING CEREMONYSIGNING CEREMONY
EMERGENCY RESPONSE ANDEMERGENCY RESPONSE AND
DISASTER MANAGEMENT PLANDISASTER MANAGEMENT PLAN
 An elaborate ERDMPERDMP is in place describing various emergency scenarios
to assist all personnel engaged in the operation and maintenance of the
pipeline network to deal with emergencies of different kind.
 ERDMP also describe the on-site and off-site emergency plans and also
defines the roles and responsibilities of the Crisis Coordinators and
various other coordinators, line patrolling man, security guards, external
agencies like Police, Fire force, medical services, water & irrigation,
public works department, pollution control board etc…
MAINLINE EMERGENCY RESPONSEMAINLINE EMERGENCY RESPONSE
EQUIPMENTSEQUIPMENTS
 Emergency Rescue Vehicle-ERV.
 Oil Spill Care Equipment's.
 Skimmers.
 Booms.
 Oil Dispersants.
 Leak Clamps.
1. Oil Spill Care Kits
2. ERV
3. Booms
MAINLINE EMERGENCY RESPONSE EQUIPMENTS
1. Oil Skimmers
2. Leak Clamps
MAINLINE EMERGENCY RESPONSE EQUIPMENTS
WORK PERMIT SYSTEM
 Work Permit System in accordance with OISD 105 is
religiously in place.
 Hot Work Permit, Cold Work Permit, Electrical Isolation and
Energisation Permit is strictly issued by the authorized
personnel only.
 Trainings on Work Permit System is given to all employees,
contract staff, contractors and labourers, security guards and
line patrol man.
 Work Permits are issued, renewed and closed judiciously.
 Work permits are tracked and reviewed every morning.
AUDIT SYSTEMS AT PETRONET FOR
ENSURING SAFETY COMPLIANCE
Half yearly internal audits for the continual improvement
and maintenance of IMS system.
Yearly IMS audit by external third party agency.
Technical cum Safety audits done by qualified internal
auditors.
Third party safety audits done through NSC.
OISD audit.
Internal OISD standards review and GAP analysis.
Petroleum and Natural Gas Regulatory Authority
Compliance audit
SYSTEM OF ACCIDENT MONITORING,
INVESTIGATION AND CORRECTIVE ACTION
Any near miss, incident or accident shall be reported,
investigated by a constituted committee, corrective action to
be taken based on the committee recommendation to avoid
such near misses, incidents, accidents in future. Such incidents
and further corrective actions taken shall be communicated
down the line.
Any near miss, incidents or accidents should be reported to
the concerned TM/COO immediately. For all near miss
reported TM shall constitute a committee with two engineers
as members within 24 hours of the occurrence of the near miss
and the committee shall submit their report within 5 working
days to TM.
Integrity checks
of pipelines to
ensure all round
safety

 Intelligent PIG Survey
 Close Interval Potential Survey (CIPS)
 Current Attenuation Testing (CAT)
 Direct Current Voltage Gradient Method (DCVG)
 Soil Resistivity Survey
 Cover Survey
PIPELINE INTEGRITY MANAGEMENT SYSTEM
Requirements
 Pipeline Cleaning
 Displacement
 Internal Inspection
 Batching
Types of Pigs
 Brush pigs
 Gauge Pigs
 Spheres
 Intelligent Pigs
Cleaning pigs Gauge Pigs Spheres
Intelligent Pig
(MFL)
 Intelligent pigging provides a method of evaluating the
performance/effectiveness of the pipe line and helps to
determine the healthiness of a pipeline.
 The main advantage of IPS is that a pipeline can be
assessed to its full length without interrupting the
pipeline operation. It further serves as the foundation
for a pro-active maintenance program to safeguard
against the consequences of failures.
 Intelligent Pigging can determine pipeline ovality,
dents, Surface pitting and corrosion, as well as cracks
and weld defects in steel/ferrous pipelines.
1. MFL PIG
2. Caliper PIG
 Close Interval Potential survey (CIPS)
To determine level of cathodic polarisation along the pipeline
and to identify suspected holiday spots
 Current Attenuation Testing (CAT)
Method to locate faults and poor coating that is draining the
current, resulting in improved potentials and minimizing
damaging side effects.
Direct Current Voltage Gradient (DCVG)
Carried out for verification of the Coating defects identified
during Close Interval Potential Logging Survey and Current
Attenuation Test.
CIPS / CAT / DCVG SURVEYCIPS / CAT / DCVG SURVEY
LINE WALKSLINE WALKS
Also GPS based personnel tracking system in place
at PCCKL for close monitoring of LPM and integrity
of line walking.
Line walks are done by the employees at frequent
intervals in the ROU to ensure safety and security
of the pipeline and to avoid encroachment in the
ROU of mainline.

Technological Advancements in pipelineTechnological Advancements in pipeline
monitoringmonitoring
GPS based personnel tracking system has put in place at PCCKL
for close monitoring of LPM and to ensure integrity of line
walking.
SAFETY COMMITTEESAFETY COMMITTEE
Safety Committee is headed by the Sr. Terminal Manager
as Chairman and a nominated Engineering Executive as
Safety Officer and one Operator as Worker
Representative and all technical staff as its members.
Safety meetings are done once in a month for reviewing
different safety related issues and requirements.
Near miss incidents as well as identification of risks are done
and discussed in detail in the meeting.
The deliberations are minuted and time bound action is
initiated to close the same.
Safety Awards are distributed to all members
annually to encourage accident free working.
Various kinds of safety awareness programs/trainings are
conducted periodically for employees, contract labours,
security guards, line patroller’s like industrial safety,
home safety, road safety etc.
Reward based safety suggestion scheme is in place to
motivate the employees to identify work related hazards
and mitigate them.
Safety week is observed every year and competitions
like safety poster design, safety slogans, safety quiz,
essay writing etc… are held among employees
along with their families to create awareness
on safety at work as well as home.
SAFETY COMMITTEE MEETINGS
FIRE & SAFETY TRAININGS
ONSITE AND OFFSITE MOCK DRILLS
SAFETY WEEK CELEBRATIONS
ENVIRONMENT DAY CELEBRATIONS
PROGRAMMES CONDUCTED BY
SAFETY COMMITTEE
SAFETY COMMITTEE MEETINGS
Safety meetings are done once in a month to review
and discuss issues related to safety and implement the
suggested improvements.
Safety committee is headed by the Sr. Terminal
Manager as chairman and a nominated Engineering
Executive as safety officer and one Operator as worker
representative and all technical staff as its members.
∗ Fire & Safety workshops are conducted in house as well as
by external agencies like IFAST, BPCL-Kochi Refinery
Fire & Safety department.
∗ Separate training sessions are provided to employees as well
as contract staff, LPM’s and Security guards.
FIRE & SAFETY TRAININGSFIRE & SAFETY TRAININGS
FIRE & SAFETY TRAINING GIVEN TO EMPLOYEES
FIRE & SAFETY TRAINING GIVEN TO EMPLOYEES

Training programme on First-Aid, CPR and
Basic Disaster Management
MOCK DRILLS
 On-site mock drills are carried out periodically.
 Off-Site emergency mock drills are conducted once in a year involving
external agencies and other statutory authorities like factory
inspectorate, police, fire force, local panchayats etc…
OFFSITE MOCK DRILLS SCENARIOSOFFSITE MOCK DRILLS SCENARIOS
 Water logged area scenario.
 Open field scenario.
 Valve station scenario.
OFF-SITE MOCK DRILL ATAT WATER LOGGEDWATER LOGGED
AREAAREA
OFF-SITE MOCK DRILL AT WATER LOGGED AREAOFF-SITE MOCK DRILL AT WATER LOGGED AREA
OFF-SITE MOCK DRILL AT WATER LOGGED AREAOFF-SITE MOCK DRILL AT WATER LOGGED AREA
OFF-SITE MOCK DRILL AT WATER LOGGED AREAOFF-SITE MOCK DRILL AT WATER LOGGED AREA
OFF-SITE MOCK DRILL AT VALVE STATIONAT VALVE STATION
OFF-SITE MOCK DRILL AT VALVE STATIONOFF-SITE MOCK DRILL AT VALVE STATION
OFF-SITE MOCK DRILL AT VALVE STATIONOFF-SITE MOCK DRILL AT VALVE STATION
OFF-SITE MOCK DRILL AT VALVE STATIONOFF-SITE MOCK DRILL AT VALVE STATION
ENVIRONMENT DAY CELEBRATIONSENVIRONMENT DAY CELEBRATIONS
PROTECTING NATURE
TREE PLANTATION AT CUSAT CAMPUS
Following CSR schemes implemented in Kerala during the year 2015-16 & 2016-17:
• Renovation of one number of anganwadi center and distribution of indoor play
equipments for 31 numbers of aganwadis in Parakkadavu, Ernakulam.
• Renovation of three numbers of anganwadi centers and distribution of indoor play
equipments for 31 numbers of aganwadis in Annamanada, Thrissur.
• Rehab on wheels with RIPMR at Thrissur.
• Electrification of six class rooms and completion of parapet wall in Govt. Girls High
School, Alathur in Palakkad District.
• Potable water (water purifier) to six Government Lower Primary Schools in
Pudussery Panchayat.
• Sanitation & Potable water (water purifier) to Government primary health centre,
Kanjikode in Pudussery Panchayat.
• Computers to six Government Lower Primary Schools in Pudussery Panchayat.
• Quality improvement project of assembly/play area at Govt. lower primary school,
Kanjikode.
DISTRIBUTION OF TOYS TO ANGANWADIS IN ANNAMANADA GRAMA PANCHAYAT
RENOVATED ANGANWADI CENTER IN ANNAMANADA GRAMA PANCHAYAT
Rehab on Wheels
SAFETY ACHIEVEMENTS
eceived Outstanding Safety Performance AwardOutstanding Safety Performance Award from ….National
Safety Council - Kerala Chapter for the last ….five
years (2012, 2013, 2014, 2015 & 2016)
eceived Outstanding Safety Performance AwardOutstanding Safety Performance Award
….from Factories and Boilers Department - Kerala for the
….year 2012 , 2014 & 2016
RECEIVING SAFETY AWARD - 2016 FROM NATIONAL SAFETY COUNCIL
FOR OUTSTANDING SAFETY PERFORMANCE
RECEIVING SAFETY AWARD -
2014 FROM DEPARTMENT OF
FACTORIES AND BOILERS,
FOR OUTSTANDING SAFETY
PERFORMANCE
The industry’s safety record is a demonstration of our
members’ steadfast commitment to operating the
pipeline systems in a way that safeguards workers,
the public and the environment.
Safety is our industry’s highest priority, and will always
lie at the core of everything we do.
Safety of cross country pipelines

More Related Content

What's hot

Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Mohamed Mustafa
 
Piping engineer cv
Piping engineer cvPiping engineer cv
Piping engineer cv
Muhammad Ali
 
Demand Analysis And Selection Of City For Cgd Network Establishment On Propos...
Demand Analysis And Selection Of City For Cgd Network Establishment On Propos...Demand Analysis And Selection Of City For Cgd Network Establishment On Propos...
Demand Analysis And Selection Of City For Cgd Network Establishment On Propos...Subodh Maithani
 
Precommissioning and Commissioning
Precommissioning and CommissioningPrecommissioning and Commissioning
Precommissioning and CommissioningWendy Soerachman
 
Commissioning of Offshore Installations
Commissioning of Offshore InstallationsCommissioning of Offshore Installations
Commissioning of Offshore Installationswan saiful arini
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpSURENDRA BABU
 
Rig inspection, Sigve Hamilton Aspelund
Rig inspection, Sigve Hamilton AspelundRig inspection, Sigve Hamilton Aspelund
Rig inspection, Sigve Hamilton Aspelund
Sigve Hamilton Aspelund
 
Sample wbs for_upstream_epcic_project
Sample wbs for_upstream_epcic_projectSample wbs for_upstream_epcic_project
Sample wbs for_upstream_epcic_project
ignitetribes
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanicalShaik Ghouse
 
Regulation for cgd_technical_standard_071.8
Regulation for cgd_technical_standard_071.8Regulation for cgd_technical_standard_071.8
Regulation for cgd_technical_standard_071.8Nikhil Nangia
 
Cross country pipeline construction steps visual guide
Cross country pipeline construction steps visual guideCross country pipeline construction steps visual guide
Cross country pipeline construction steps visual guide
Chukwuma Anyanwu, PMP, CCP
 
Aramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeAramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector Resume
Robin Parayil
 
Resume of jaison varkey QA/QC Inspector welding,coating
Resume of jaison varkey QA/QC Inspector welding,coatingResume of jaison varkey QA/QC Inspector welding,coating
Resume of jaison varkey QA/QC Inspector welding,coating
jaison varkey
 
City Gas Distribution
City Gas DistributionCity Gas Distribution
City Gas Distribution
Joydeep Mukherjee
 
Process Safety Management in Design, Construction & Commissioning | Lalit K...
Process Safety Management in Design, Construction &  Commissioning | Lalit  K...Process Safety Management in Design, Construction &  Commissioning | Lalit  K...
Process Safety Management in Design, Construction & Commissioning | Lalit K...
Cairn India Limited
 
Construction of CNG station project final report.
Construction of CNG station project final report.Construction of CNG station project final report.
Construction of CNG station project final report.
Hagi Sahib
 

What's hot (20)

Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 
Piping engineer cv
Piping engineer cvPiping engineer cv
Piping engineer cv
 
Demand Analysis And Selection Of City For Cgd Network Establishment On Propos...
Demand Analysis And Selection Of City For Cgd Network Establishment On Propos...Demand Analysis And Selection Of City For Cgd Network Establishment On Propos...
Demand Analysis And Selection Of City For Cgd Network Establishment On Propos...
 
Precommissioning and Commissioning
Precommissioning and CommissioningPrecommissioning and Commissioning
Precommissioning and Commissioning
 
Commissioning of Offshore Installations
Commissioning of Offshore InstallationsCommissioning of Offshore Installations
Commissioning of Offshore Installations
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years Exp
 
Rig inspection, Sigve Hamilton Aspelund
Rig inspection, Sigve Hamilton AspelundRig inspection, Sigve Hamilton Aspelund
Rig inspection, Sigve Hamilton Aspelund
 
Sample wbs for_upstream_epcic_project
Sample wbs for_upstream_epcic_projectSample wbs for_upstream_epcic_project
Sample wbs for_upstream_epcic_project
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanical
 
Regulation for cgd_technical_standard_071.8
Regulation for cgd_technical_standard_071.8Regulation for cgd_technical_standard_071.8
Regulation for cgd_technical_standard_071.8
 
Construction Engineer(Oil&GasResume
Construction Engineer(Oil&GasResumeConstruction Engineer(Oil&GasResume
Construction Engineer(Oil&GasResume
 
SENTHIL PANDIAN CV
SENTHIL PANDIAN CVSENTHIL PANDIAN CV
SENTHIL PANDIAN CV
 
Cross country pipeline construction steps visual guide
Cross country pipeline construction steps visual guideCross country pipeline construction steps visual guide
Cross country pipeline construction steps visual guide
 
Aramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeAramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector Resume
 
Resume of jaison varkey QA/QC Inspector welding,coating
Resume of jaison varkey QA/QC Inspector welding,coatingResume of jaison varkey QA/QC Inspector welding,coating
Resume of jaison varkey QA/QC Inspector welding,coating
 
City Gas Distribution
City Gas DistributionCity Gas Distribution
City Gas Distribution
 
RAJU CV
RAJU  CVRAJU  CV
RAJU CV
 
Process Safety Management in Design, Construction & Commissioning | Lalit K...
Process Safety Management in Design, Construction &  Commissioning | Lalit  K...Process Safety Management in Design, Construction &  Commissioning | Lalit  K...
Process Safety Management in Design, Construction & Commissioning | Lalit K...
 
AGL Report
AGL ReportAGL Report
AGL Report
 
Construction of CNG station project final report.
Construction of CNG station project final report.Construction of CNG station project final report.
Construction of CNG station project final report.
 

Similar to Safety of cross country pipelines

4.ASL_Kovvur_Safety-Audit-Report.pdf
4.ASL_Kovvur_Safety-Audit-Report.pdf4.ASL_Kovvur_Safety-Audit-Report.pdf
4.ASL_Kovvur_Safety-Audit-Report.pdf
hit2020
 
Yokogawa's Vigilant Plant | Success Stories | (petro)chemical industry
Yokogawa's Vigilant Plant | Success Stories | (petro)chemical industryYokogawa's Vigilant Plant | Success Stories | (petro)chemical industry
Yokogawa's Vigilant Plant | Success Stories | (petro)chemical industry
Yokogawa
 
Renaissance industrial smart city
Renaissance industrial smart cityRenaissance industrial smart city
Renaissance industrial smart city
Renaissance Industrial Smart City
 
COMPANY PRESENTATION
COMPANY PRESENTATIONCOMPANY PRESENTATION
COMPANY PRESENTATIONSilvia Iovu
 
OH&S Audit Report- JSW Nandyal.doc
OH&S Audit Report- JSW Nandyal.docOH&S Audit Report- JSW Nandyal.doc
OH&S Audit Report- JSW Nandyal.doc
Mirza Saifullah Baig
 
Yokogawa's Vigilant Plant | Success Stories | Oil & Gas Industry
Yokogawa's Vigilant Plant | Success Stories | Oil & Gas IndustryYokogawa's Vigilant Plant | Success Stories | Oil & Gas Industry
Yokogawa's Vigilant Plant | Success Stories | Oil & Gas Industry
Yokogawa
 
Vipin Kumar dip.chemical
Vipin Kumar dip.chemicalVipin Kumar dip.chemical
Vipin Kumar dip.chemicalVipin Kumar
 
Paper 8 - SoHELP presentation SMI 2017 2.pdf
Paper 8 - SoHELP  presentation SMI  2017 2.pdfPaper 8 - SoHELP  presentation SMI  2017 2.pdf
Paper 8 - SoHELP presentation SMI 2017 2.pdf
asnawisulongmohd
 
Uran plant presentation jounalist (6-7-2007)
Uran plant presentation    jounalist (6-7-2007)Uran plant presentation    jounalist (6-7-2007)
Uran plant presentation jounalist (6-7-2007)ajishdileep
 
IHM Presentation
 IHM Presentation IHM Presentation
IHM Presentation
GreenMaritime
 
HALDEN LAB PRESENTATION (Updated).pptx
HALDEN LAB PRESENTATION (Updated).pptxHALDEN LAB PRESENTATION (Updated).pptx
HALDEN LAB PRESENTATION (Updated).pptx
uchechukwu6
 
Final Project-Simran Singh.pdf
Final Project-Simran Singh.pdfFinal Project-Simran Singh.pdf
Final Project-Simran Singh.pdf
someone464249
 
Vishal oil and gas conservation
Vishal oil and gas conservationVishal oil and gas conservation
Vishal oil and gas conservation
Vishal Choudhary
 
TRAINNING PPT (1).pptx
TRAINNING PPT (1).pptxTRAINNING PPT (1).pptx
TRAINNING PPT (1).pptx
amitkumarsahu57
 

Similar to Safety of cross country pipelines (20)

Bpcl kochi refinery
Bpcl  kochi refineryBpcl  kochi refinery
Bpcl kochi refinery
 
4.ASL_Kovvur_Safety-Audit-Report.pdf
4.ASL_Kovvur_Safety-Audit-Report.pdf4.ASL_Kovvur_Safety-Audit-Report.pdf
4.ASL_Kovvur_Safety-Audit-Report.pdf
 
Yokogawa's Vigilant Plant | Success Stories | (petro)chemical industry
Yokogawa's Vigilant Plant | Success Stories | (petro)chemical industryYokogawa's Vigilant Plant | Success Stories | (petro)chemical industry
Yokogawa's Vigilant Plant | Success Stories | (petro)chemical industry
 
Renaissance industrial smart city
Renaissance industrial smart cityRenaissance industrial smart city
Renaissance industrial smart city
 
COMPANY PRESENTATION
COMPANY PRESENTATIONCOMPANY PRESENTATION
COMPANY PRESENTATION
 
OH&S Audit Report- JSW Nandyal.doc
OH&S Audit Report- JSW Nandyal.docOH&S Audit Report- JSW Nandyal.doc
OH&S Audit Report- JSW Nandyal.doc
 
GTC546 HSE PPT
GTC546 HSE PPTGTC546 HSE PPT
GTC546 HSE PPT
 
Yokogawa's Vigilant Plant | Success Stories | Oil & Gas Industry
Yokogawa's Vigilant Plant | Success Stories | Oil & Gas IndustryYokogawa's Vigilant Plant | Success Stories | Oil & Gas Industry
Yokogawa's Vigilant Plant | Success Stories | Oil & Gas Industry
 
Profile kumaresan
Profile        kumaresanProfile        kumaresan
Profile kumaresan
 
Vipin Kumar dip.chemical
Vipin Kumar dip.chemicalVipin Kumar dip.chemical
Vipin Kumar dip.chemical
 
JND CV 2016
JND CV 2016JND CV 2016
JND CV 2016
 
Paper 8 - SoHELP presentation SMI 2017 2.pdf
Paper 8 - SoHELP  presentation SMI  2017 2.pdfPaper 8 - SoHELP  presentation SMI  2017 2.pdf
Paper 8 - SoHELP presentation SMI 2017 2.pdf
 
Uran plant presentation jounalist (6-7-2007)
Uran plant presentation    jounalist (6-7-2007)Uran plant presentation    jounalist (6-7-2007)
Uran plant presentation jounalist (6-7-2007)
 
IHM Presentation
 IHM Presentation IHM Presentation
IHM Presentation
 
HALDEN LAB PRESENTATION (Updated).pptx
HALDEN LAB PRESENTATION (Updated).pptxHALDEN LAB PRESENTATION (Updated).pptx
HALDEN LAB PRESENTATION (Updated).pptx
 
Final Project-Simran Singh.pdf
Final Project-Simran Singh.pdfFinal Project-Simran Singh.pdf
Final Project-Simran Singh.pdf
 
RAMESH CV
RAMESH CVRAMESH CV
RAMESH CV
 
Vishal oil and gas conservation
Vishal oil and gas conservationVishal oil and gas conservation
Vishal oil and gas conservation
 
TRAINNING PPT (1).pptx
TRAINNING PPT (1).pptxTRAINNING PPT (1).pptx
TRAINNING PPT (1).pptx
 
Oms
OmsOms
Oms
 

More from ajal jose

NEET NATIONAL ELIGIBILITY CUM ENTRANCE TEST
NEET    NATIONAL ELIGIBILITY CUM ENTRANCE TESTNEET    NATIONAL ELIGIBILITY CUM ENTRANCE TEST
NEET NATIONAL ELIGIBILITY CUM ENTRANCE TEST
ajal jose
 
ICAR ADMISSION GUIDANCE
ICAR ADMISSION GUIDANCE ICAR ADMISSION GUIDANCE
ICAR ADMISSION GUIDANCE
ajal jose
 
BASICS OF CIVIL ENGINEERING
BASICS OF CIVIL ENGINEERINGBASICS OF CIVIL ENGINEERING
BASICS OF CIVIL ENGINEERING
ajal jose
 
Kvpy
KvpyKvpy
Kvpy
ajal jose
 
Drink
DrinkDrink
Drink
ajal jose
 
Ajal
AjalAjal
Ajal
ajal jose
 
Factories act
Factories actFactories act
Factories act
ajal jose
 
Bhopal gas disaster
Bhopal gas disasterBhopal gas disaster
Bhopal gas disaster
ajal jose
 

More from ajal jose (8)

NEET NATIONAL ELIGIBILITY CUM ENTRANCE TEST
NEET    NATIONAL ELIGIBILITY CUM ENTRANCE TESTNEET    NATIONAL ELIGIBILITY CUM ENTRANCE TEST
NEET NATIONAL ELIGIBILITY CUM ENTRANCE TEST
 
ICAR ADMISSION GUIDANCE
ICAR ADMISSION GUIDANCE ICAR ADMISSION GUIDANCE
ICAR ADMISSION GUIDANCE
 
BASICS OF CIVIL ENGINEERING
BASICS OF CIVIL ENGINEERINGBASICS OF CIVIL ENGINEERING
BASICS OF CIVIL ENGINEERING
 
Kvpy
KvpyKvpy
Kvpy
 
Drink
DrinkDrink
Drink
 
Ajal
AjalAjal
Ajal
 
Factories act
Factories actFactories act
Factories act
 
Bhopal gas disaster
Bhopal gas disasterBhopal gas disaster
Bhopal gas disaster
 

Recently uploaded

CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
veerababupersonal22
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 

Recently uploaded (20)

CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 

Safety of cross country pipelines

  • 1. SAFETY OF CROSS COUNTRY PIPELINESSAFETY OF CROSS COUNTRY PIPELINES
  • 2. SAFETY OF CROSS COUNTRYSAFETY OF CROSS COUNTRY PIPELINESPIPELINES
  • 4. ADVANTAGES OF TRANSPORTATION BY PIPELINESADVANTAGES OF TRANSPORTATION BY PIPELINES  Safer mode of transportation  Environment friendly  Least energy requirement  Lowest maintenance costs  Minimal impact on land use pattern  Negligible loss of product in transit  High reliability  Multi-productTransportation
  • 5.
  • 6. 6 Oil Pipelines in South India
  • 7. PETRONET CCK LIMITED Corporate Office – Irimpanam, Cochin Petronet CCK Limited, a subsidiary of M/s. Bharat Petroleum Corporation Limited, has laid a petroleum product pipeline from BPCL Irimpanam Terminal to Karur via Coimbatore for transportation and downstream distribution of petroleum products MS, SKO and HSD.
  • 8. 8 PCCK- Milestones PIPE LINE LAYING STARTED DECEMBER 1999 MECHANICAL COMPLETION FEBRUARY 2002 PROJECT PERIOD (ACTUAL) 3 YEARS 8 MONTHS TRIAL RUNS MARCH 2002 COMMERCIAL OPERATION SEPTEMBER2002
  • 9. 9 Pipes being laid along the route Work in river Horizontal Directional Drilling across the Periyar Foundation setting for pump
  • 10. 10 WELL BEGUN IS HALF DONE Appropriate engineering design Adopting state of the art technology Ensuring quality in men, material and methods Strict adherence to standard practices Building a strong organizational safety culture
  • 11.  FACILITIES – DESIGN PCCKL LENGTH OF PIPELINE 292 KM SIZE OF PIPELINE o COCHIN TO IRUGUR 450 MM (18”) o IRUGUR TO KARUR 350 MM (14”) GRADE AND THICKNESS (a) 18” API 5L Gr. X 65 of thick. 6.4, 7.9, 9.5, 12.7 mm (b) 14” API 5L Gr. B of Thick. 6.4, 7.9 mm THROUGHPUT 3.3 MMTPA in Phase – 1 and 4.0 MMTPA in Phase – 2 PRODUCTS HANDLED MS / HSD / SKO PUMPING STREAM HOURS 8000 Hrs Per Annum
  • 12.  FACILITIES DESPATCH TERMINAL IRIMPANAM RECEIVING TERMINAL KARUR TAP OFF POINTS IRUGUR SV STATIONS 12 MOV STATIONS ( 10 IN C-I SECTION AND 2 IN I-K SECTION) 5 HOV STATIONS IN C-I SECTION ROU WIDTH 18 M (in cross country portion) Have restricted ROU's at select locations and forest areas.
  • 13.  FACILITIES AT PETRONET Main Pumping Station at Cochin. Receipt Terminal at Karur and tap off at Coimbatore. 182.500 Kms 18” underground Pipeline from Cochin to Coimbatore. 110.000 Kms 14” underground Pipeline from Coimbatore to Karur. 12 Motor operated Sectionalising Valve Stations and 5 Hand Operated Valve (HOV) Stations along the Pipeline route. 300 Kms dedicated Optic Fiber Communication System.
  • 14. An Operating Manual has been drawn up in consultation with BPCL based on the provisions made in the Off Take Agreement It describes the activities and responsibilities of all terminals of PCCKL and BPCL on the following Planning and Scheduling Product Quality Operational Activities at Cochin, Irugur and Karur. Product Quality Certification Batch Reconciliation Slop Management Product Loss Management Operating Manual
  • 18. PIPELINE PROFILE (ELEVATION)PIPELINE PROFILE (ELEVATION) PCCKLPCCKL 0 25 50 75 100 125 150 175 200 225 250 275 300 325 350 375 400 425 450 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 100 104 108 112 116 120 124 128 132 136 140 144 148 152 156 160 164 168 172 176 180 183 187 191 195 199 203 207 211 215 219 223 227 231 235 239 243 247 251 255 259 263 267 271 275 279 283 287 291 Cochin (5m) Irugur (375m) Karur (150m) 0kms 182 kms 292 kms 415m Peak(415m) Kuthiran (150m) 80 kms
  • 19. Five Characteristics of World Class Safety Management System Leadership - Lead by example (promote risk awareness, encourage the team, ensure compliance and involve) Integrated system approach - Integrating safety into all functions of the organization Performance measurement - Continuous monitoring to promote safety performance Alignment to core organizational goals - Aligning safety along with organizational goals, objectives and values Off the job safety - Extending safety efforts to employees and community outside the work
  • 20. Petronet CCK Ltd. has implemented the Integrated Management System – IMS with effect from 01st October 2008 consisting the following standards: ISO 9001:2008-Quality Management System (QMS), ISO 14001:2004-Environmental Management System (EMS) and OHSAS 18001:2007. The certification was done by M/s Det Norske Veritas (DNV) Certification B.V., The Netherlands.
  • 21. IMS POLICY AT PCCKL
  • 22.  Real time data acquisition and monitoring through SCADA system Application software including Leak Detection System - LDS Emergency Shutdown System - ESD 12 numbers of motorised remotely operated Sectionalizing Valves IP based day/night Video Surveillance System OPERATIONAL SAFETY FEATURES AT PETRONET
  • 23.  Daily line patrolling by Line Patroller's Internal Inspection of Pipeline using PIGS Cathodic Protection by ICCP and Galvanic Protection Operational Control Procedures - OCP Work Permit and audit system Fire Hydrant System, Foam Trolleys, Fire Extinguishers, MCP’s, Fire Alarm System. OPERATIONAL SAFETY FEATURES AT PETRONET
  • 24. PREPAREDNESS MEASURESPREPAREDNESS MEASURES As part of emergency preparedness, following measures are adoptedAs part of emergency preparedness, following measures are adopted:: Emergency Drills and Mock Exercises The effectiveness and thoroughness of ERDMP is evaluated through regular table top exercises covering all potential scenarios on rotation basis in safety meetings. Safety meetings are held at a frequency of once in a month Training Training on basis / advanced firefighting is extended to all employees on yearly basis. The guards & LPMs, are also provided with fire and safety training on a yearly basis. Mutual aid associations are in place at Cochin, Coimbatore and Karur with nearby units of oil PSUs and other major industrial units. The mutual aid members meet on quarterly basis and discuss common areas of interest and also participate in the DCMP drills of each unit. Mutual Aid
  • 25. The Inspector of Factories and Boilers suggested in the mutual aid meeting held on 30/05/2011 at Petronet CCK Limited that the Mutual Aid Group of Irimpanam should have a name and it was unanimously decided that the group shall be named as “ IMAG –IMAG – Irimpanam Mutual Aid GroupIrimpanam Mutual Aid Group”.
  • 26. Irimpanam Mutual Aid group (IMAG) has been formulated and an agreement signed with the neighboring oil companies like BPCL, IOCL, HPCL, HP Gas and IOC LPG bottling plant as members. IMAG members meet once in a quarter to discuss on common issues among the oil companies and also the safety of the public in the nearby areas. The motive of IMAG is to mutually assist the members by sharing resources during an emergency.
  • 27. Organization Emergency Contact Number Contact Person and phone number Terminal In charge and phone number Control Room 0484 2778145 9446427555 Ratheesh R Engineering Executive 9495315882 Jalin K Thampi Sr. Terminal Manager 9447640105 Control Room 0484 2778316 Tirumala Srinivas M Asst. Manager (HSSE) 9447356143 Somasundaram M Sr. Installation Manager 8547831573 Control Room 0484 2114327 Arun Anto Asst. Manager (HSSE) 9645660823 R Kumar Chief Terminal Manager 9447498266 Control Room 0484 2114847 Radha Krishnan Sr. Officer(HSSE) 9847625470 K A Devan Chief Installation Manager 9177443322 Control Room 0484 2775407 Deepak E D Safety Officer 8156844411 Muhammed Tajib Sait Sr. Plant Manager 9605001969 Control Room 0484 2791848/2458 Nibil P S Officer (LPG - Safety) 9539711199 N Manoharan Chief Plant Manager 9446312888 IMAG MEMBER LIST
  • 28. MUTUAL AID AGREEMENTMUTUAL AID AGREEMENT SIGNING CEREMONYSIGNING CEREMONY
  • 29. EMERGENCY RESPONSE ANDEMERGENCY RESPONSE AND DISASTER MANAGEMENT PLANDISASTER MANAGEMENT PLAN  An elaborate ERDMPERDMP is in place describing various emergency scenarios to assist all personnel engaged in the operation and maintenance of the pipeline network to deal with emergencies of different kind.  ERDMP also describe the on-site and off-site emergency plans and also defines the roles and responsibilities of the Crisis Coordinators and various other coordinators, line patrolling man, security guards, external agencies like Police, Fire force, medical services, water & irrigation, public works department, pollution control board etc…
  • 30. MAINLINE EMERGENCY RESPONSEMAINLINE EMERGENCY RESPONSE EQUIPMENTSEQUIPMENTS  Emergency Rescue Vehicle-ERV.  Oil Spill Care Equipment's.  Skimmers.  Booms.  Oil Dispersants.  Leak Clamps.
  • 31. 1. Oil Spill Care Kits 2. ERV 3. Booms MAINLINE EMERGENCY RESPONSE EQUIPMENTS
  • 32. 1. Oil Skimmers 2. Leak Clamps MAINLINE EMERGENCY RESPONSE EQUIPMENTS
  • 33. WORK PERMIT SYSTEM  Work Permit System in accordance with OISD 105 is religiously in place.  Hot Work Permit, Cold Work Permit, Electrical Isolation and Energisation Permit is strictly issued by the authorized personnel only.  Trainings on Work Permit System is given to all employees, contract staff, contractors and labourers, security guards and line patrol man.  Work Permits are issued, renewed and closed judiciously.  Work permits are tracked and reviewed every morning.
  • 34. AUDIT SYSTEMS AT PETRONET FOR ENSURING SAFETY COMPLIANCE Half yearly internal audits for the continual improvement and maintenance of IMS system. Yearly IMS audit by external third party agency. Technical cum Safety audits done by qualified internal auditors. Third party safety audits done through NSC. OISD audit. Internal OISD standards review and GAP analysis. Petroleum and Natural Gas Regulatory Authority Compliance audit
  • 35. SYSTEM OF ACCIDENT MONITORING, INVESTIGATION AND CORRECTIVE ACTION Any near miss, incident or accident shall be reported, investigated by a constituted committee, corrective action to be taken based on the committee recommendation to avoid such near misses, incidents, accidents in future. Such incidents and further corrective actions taken shall be communicated down the line. Any near miss, incidents or accidents should be reported to the concerned TM/COO immediately. For all near miss reported TM shall constitute a committee with two engineers as members within 24 hours of the occurrence of the near miss and the committee shall submit their report within 5 working days to TM.
  • 36. Integrity checks of pipelines to ensure all round safety
  • 37.   Intelligent PIG Survey  Close Interval Potential Survey (CIPS)  Current Attenuation Testing (CAT)  Direct Current Voltage Gradient Method (DCVG)  Soil Resistivity Survey  Cover Survey PIPELINE INTEGRITY MANAGEMENT SYSTEM
  • 38. Requirements  Pipeline Cleaning  Displacement  Internal Inspection  Batching Types of Pigs  Brush pigs  Gauge Pigs  Spheres  Intelligent Pigs Cleaning pigs Gauge Pigs Spheres Intelligent Pig (MFL)
  • 39.
  • 40.  Intelligent pigging provides a method of evaluating the performance/effectiveness of the pipe line and helps to determine the healthiness of a pipeline.  The main advantage of IPS is that a pipeline can be assessed to its full length without interrupting the pipeline operation. It further serves as the foundation for a pro-active maintenance program to safeguard against the consequences of failures.  Intelligent Pigging can determine pipeline ovality, dents, Surface pitting and corrosion, as well as cracks and weld defects in steel/ferrous pipelines.
  • 41. 1. MFL PIG 2. Caliper PIG
  • 42.
  • 43.
  • 44.  Close Interval Potential survey (CIPS) To determine level of cathodic polarisation along the pipeline and to identify suspected holiday spots  Current Attenuation Testing (CAT) Method to locate faults and poor coating that is draining the current, resulting in improved potentials and minimizing damaging side effects. Direct Current Voltage Gradient (DCVG) Carried out for verification of the Coating defects identified during Close Interval Potential Logging Survey and Current Attenuation Test. CIPS / CAT / DCVG SURVEYCIPS / CAT / DCVG SURVEY
  • 45. LINE WALKSLINE WALKS Also GPS based personnel tracking system in place at PCCKL for close monitoring of LPM and integrity of line walking. Line walks are done by the employees at frequent intervals in the ROU to ensure safety and security of the pipeline and to avoid encroachment in the ROU of mainline.
  • 46.
  • 47.
  • 48.  Technological Advancements in pipelineTechnological Advancements in pipeline monitoringmonitoring GPS based personnel tracking system has put in place at PCCKL for close monitoring of LPM and to ensure integrity of line walking.
  • 49. SAFETY COMMITTEESAFETY COMMITTEE Safety Committee is headed by the Sr. Terminal Manager as Chairman and a nominated Engineering Executive as Safety Officer and one Operator as Worker Representative and all technical staff as its members. Safety meetings are done once in a month for reviewing different safety related issues and requirements. Near miss incidents as well as identification of risks are done and discussed in detail in the meeting. The deliberations are minuted and time bound action is initiated to close the same.
  • 50. Safety Awards are distributed to all members annually to encourage accident free working. Various kinds of safety awareness programs/trainings are conducted periodically for employees, contract labours, security guards, line patroller’s like industrial safety, home safety, road safety etc. Reward based safety suggestion scheme is in place to motivate the employees to identify work related hazards and mitigate them. Safety week is observed every year and competitions like safety poster design, safety slogans, safety quiz, essay writing etc… are held among employees along with their families to create awareness on safety at work as well as home.
  • 51. SAFETY COMMITTEE MEETINGS FIRE & SAFETY TRAININGS ONSITE AND OFFSITE MOCK DRILLS SAFETY WEEK CELEBRATIONS ENVIRONMENT DAY CELEBRATIONS PROGRAMMES CONDUCTED BY SAFETY COMMITTEE
  • 52. SAFETY COMMITTEE MEETINGS Safety meetings are done once in a month to review and discuss issues related to safety and implement the suggested improvements. Safety committee is headed by the Sr. Terminal Manager as chairman and a nominated Engineering Executive as safety officer and one Operator as worker representative and all technical staff as its members.
  • 53. ∗ Fire & Safety workshops are conducted in house as well as by external agencies like IFAST, BPCL-Kochi Refinery Fire & Safety department. ∗ Separate training sessions are provided to employees as well as contract staff, LPM’s and Security guards. FIRE & SAFETY TRAININGSFIRE & SAFETY TRAININGS
  • 54. FIRE & SAFETY TRAINING GIVEN TO EMPLOYEES
  • 55. FIRE & SAFETY TRAINING GIVEN TO EMPLOYEES
  • 56.
  • 57.  Training programme on First-Aid, CPR and Basic Disaster Management
  • 58. MOCK DRILLS  On-site mock drills are carried out periodically.  Off-Site emergency mock drills are conducted once in a year involving external agencies and other statutory authorities like factory inspectorate, police, fire force, local panchayats etc…
  • 59. OFFSITE MOCK DRILLS SCENARIOSOFFSITE MOCK DRILLS SCENARIOS  Water logged area scenario.  Open field scenario.  Valve station scenario.
  • 60. OFF-SITE MOCK DRILL ATAT WATER LOGGEDWATER LOGGED AREAAREA
  • 61. OFF-SITE MOCK DRILL AT WATER LOGGED AREAOFF-SITE MOCK DRILL AT WATER LOGGED AREA
  • 62. OFF-SITE MOCK DRILL AT WATER LOGGED AREAOFF-SITE MOCK DRILL AT WATER LOGGED AREA
  • 63. OFF-SITE MOCK DRILL AT WATER LOGGED AREAOFF-SITE MOCK DRILL AT WATER LOGGED AREA
  • 64.
  • 65.
  • 66.
  • 67.
  • 68.
  • 69. OFF-SITE MOCK DRILL AT VALVE STATIONAT VALVE STATION
  • 70. OFF-SITE MOCK DRILL AT VALVE STATIONOFF-SITE MOCK DRILL AT VALVE STATION
  • 71. OFF-SITE MOCK DRILL AT VALVE STATIONOFF-SITE MOCK DRILL AT VALVE STATION
  • 72. OFF-SITE MOCK DRILL AT VALVE STATIONOFF-SITE MOCK DRILL AT VALVE STATION
  • 73.
  • 74.
  • 75.
  • 76.
  • 77.
  • 78.
  • 79.
  • 80. ENVIRONMENT DAY CELEBRATIONSENVIRONMENT DAY CELEBRATIONS PROTECTING NATURE
  • 81. TREE PLANTATION AT CUSAT CAMPUS
  • 82.
  • 83.
  • 84.
  • 85.
  • 86. Following CSR schemes implemented in Kerala during the year 2015-16 & 2016-17: • Renovation of one number of anganwadi center and distribution of indoor play equipments for 31 numbers of aganwadis in Parakkadavu, Ernakulam. • Renovation of three numbers of anganwadi centers and distribution of indoor play equipments for 31 numbers of aganwadis in Annamanada, Thrissur. • Rehab on wheels with RIPMR at Thrissur. • Electrification of six class rooms and completion of parapet wall in Govt. Girls High School, Alathur in Palakkad District. • Potable water (water purifier) to six Government Lower Primary Schools in Pudussery Panchayat. • Sanitation & Potable water (water purifier) to Government primary health centre, Kanjikode in Pudussery Panchayat. • Computers to six Government Lower Primary Schools in Pudussery Panchayat. • Quality improvement project of assembly/play area at Govt. lower primary school, Kanjikode.
  • 87. DISTRIBUTION OF TOYS TO ANGANWADIS IN ANNAMANADA GRAMA PANCHAYAT
  • 88. RENOVATED ANGANWADI CENTER IN ANNAMANADA GRAMA PANCHAYAT
  • 90. SAFETY ACHIEVEMENTS eceived Outstanding Safety Performance AwardOutstanding Safety Performance Award from ….National Safety Council - Kerala Chapter for the last ….five years (2012, 2013, 2014, 2015 & 2016) eceived Outstanding Safety Performance AwardOutstanding Safety Performance Award ….from Factories and Boilers Department - Kerala for the ….year 2012 , 2014 & 2016
  • 91. RECEIVING SAFETY AWARD - 2016 FROM NATIONAL SAFETY COUNCIL FOR OUTSTANDING SAFETY PERFORMANCE RECEIVING SAFETY AWARD - 2014 FROM DEPARTMENT OF FACTORIES AND BOILERS, FOR OUTSTANDING SAFETY PERFORMANCE
  • 92. The industry’s safety record is a demonstration of our members’ steadfast commitment to operating the pipeline systems in a way that safeguards workers, the public and the environment. Safety is our industry’s highest priority, and will always lie at the core of everything we do.