The document discusses the safety of cross-country pipelines. It provides details about Petronet CCK Limited, a subsidiary of BPCL that has laid a 292 km petroleum product pipeline from Cochin to Karur via Coimbatore. It describes the design, facilities, operational safety features, emergency preparedness measures, mutual aid agreements, and emergency response and disaster management plan of the pipeline to ensure safety during transportation of products.
Quality Control & Quality Assurance of MS pipelineIEI GSC
This presentation re. QC & QA of M S pipelines was made at Gujarat State Centre of the Institution of Engineers (India) at Ahmedabad by Er. Manoj Raghavan of SGS (India) Ltd.
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync
Successful commissioning new or starting-up revised equipment and systems requires meticulous planning, organizing and controlling. Careful methodical, detailed planning – early – is the key to the success of any commissioning.
Quality Control & Quality Assurance of MS pipelineIEI GSC
This presentation re. QC & QA of M S pipelines was made at Gujarat State Centre of the Institution of Engineers (India) at Ahmedabad by Er. Manoj Raghavan of SGS (India) Ltd.
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync
Successful commissioning new or starting-up revised equipment and systems requires meticulous planning, organizing and controlling. Careful methodical, detailed planning – early – is the key to the success of any commissioning.
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningMohamed Mustafa
Highly ambitious and self-motivated Project Management Professional with over 10 years in the Oil & Gas Industry in the fields of Project Construction & Commissioning. All experience enhanced by multi-functional business trips in United Arab Emirates, Oman, Algeria and Egypt for large scale EPC projects with Major EPC and Petroleum companies’ region.
JDs of Piping Engineer
1. Review of Bid documents, scope of work & client specification to kick off the project.
2 Designing of complete Skid mounted modular packages for complete EPCC Job as per Project Specifications and applicable codes and standards
3 Review of vendor documents to make sure compliance of Client Specifications and applicable codes & standards e.g. data /cut sheets of manual valves/instruments etc.
4. Preparation of package data sheets, reflecting all technical & vendor data for Client submission.
5. Leading and assigning piping tasks to team of design engineers & draftsmen.
6. Dealing with vendors to transmit technical requirements and closing of vendor’s TQ(s) specially piping material including valves, rupture discs, strainers, isolation kits etc.
7. Coordination with Client for approval for vendor data
8. 3D Modeling of the skids as per PID, project specifications, applicable codes (B31.3, API & ASME) and good industrial practices(PIPs).
9. Design Calculation for skid mounted modular packages and incorporation of changes in 3-D Model (if any) based on process requirements.
10. Issuing complete MTO(s) and MR(s) for entire modular packages.
11. Follow Up with Engineering Team for all Engineering Deliverables as per Project Specifications.
12. Follow up with engineering and fabrication team to meet the project schedule.
13. Piping Layout Drawings, Top View Equipment Layouts & Piping General Arrangement Drawings.
14. Making sure issuance of Piping Fabrication Drawings (Isometrics) with respect to correct rating, schedule and material.
15. Stress analysis based on project specifications and ASME B31.3.
16. Modify and revise designs to correct operating deficiencies or to reduce production problems.
17. Modification drawings of revamp project(s)
18. As building of Modular Packages.
19 Pre Commissioning Activities at Nigeria Site. Mechanically Hand Over of Skid Packages to Commissioning Team.
A step by step visual guide of a typical cross-country pipeline construction. Useful for a beginner project team to get acquainted with pipeline laying stages.
Resume of jaison varkey QA/QC Inspector welding,coatingjaison varkey
I have over 11 years of work experience as QA/QC Inspector in Oil and Gas fields both offshore and onshore Construction and installations. focus on PQT/PQR, WQT, NDT, Destructive testing, Inspections of welding and Filed joint coating of Subsea Pipelines, Risers, Tie‐in spools, lateral joints, Jackets, Topside, and Pile pipes. Installation inspection of Pile driving, SPM, PLEMs, I&J tubes, Jackets & top sides.
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningMohamed Mustafa
Highly ambitious and self-motivated Project Management Professional with over 10 years in the Oil & Gas Industry in the fields of Project Construction & Commissioning. All experience enhanced by multi-functional business trips in United Arab Emirates, Oman, Algeria and Egypt for large scale EPC projects with Major EPC and Petroleum companies’ region.
JDs of Piping Engineer
1. Review of Bid documents, scope of work & client specification to kick off the project.
2 Designing of complete Skid mounted modular packages for complete EPCC Job as per Project Specifications and applicable codes and standards
3 Review of vendor documents to make sure compliance of Client Specifications and applicable codes & standards e.g. data /cut sheets of manual valves/instruments etc.
4. Preparation of package data sheets, reflecting all technical & vendor data for Client submission.
5. Leading and assigning piping tasks to team of design engineers & draftsmen.
6. Dealing with vendors to transmit technical requirements and closing of vendor’s TQ(s) specially piping material including valves, rupture discs, strainers, isolation kits etc.
7. Coordination with Client for approval for vendor data
8. 3D Modeling of the skids as per PID, project specifications, applicable codes (B31.3, API & ASME) and good industrial practices(PIPs).
9. Design Calculation for skid mounted modular packages and incorporation of changes in 3-D Model (if any) based on process requirements.
10. Issuing complete MTO(s) and MR(s) for entire modular packages.
11. Follow Up with Engineering Team for all Engineering Deliverables as per Project Specifications.
12. Follow up with engineering and fabrication team to meet the project schedule.
13. Piping Layout Drawings, Top View Equipment Layouts & Piping General Arrangement Drawings.
14. Making sure issuance of Piping Fabrication Drawings (Isometrics) with respect to correct rating, schedule and material.
15. Stress analysis based on project specifications and ASME B31.3.
16. Modify and revise designs to correct operating deficiencies or to reduce production problems.
17. Modification drawings of revamp project(s)
18. As building of Modular Packages.
19 Pre Commissioning Activities at Nigeria Site. Mechanically Hand Over of Skid Packages to Commissioning Team.
A step by step visual guide of a typical cross-country pipeline construction. Useful for a beginner project team to get acquainted with pipeline laying stages.
Resume of jaison varkey QA/QC Inspector welding,coatingjaison varkey
I have over 11 years of work experience as QA/QC Inspector in Oil and Gas fields both offshore and onshore Construction and installations. focus on PQT/PQR, WQT, NDT, Destructive testing, Inspections of welding and Filed joint coating of Subsea Pipelines, Risers, Tie‐in spools, lateral joints, Jackets, Topside, and Pile pipes. Installation inspection of Pile driving, SPM, PLEMs, I&J tubes, Jackets & top sides.
Renaissance Industrial Smart City presents India’s first industrial Smart City spread over proposed 422 acres out of which 269 is already RERA approved. Intelligently designed with world class infrastructure and facilities. Built-to-suit developments allow clients to fully meet their operational and corporate needs including function, image, and workplace strategy. A space for manufacturing as well as living. Be a part of the First 100% Legal integrated Industrial Area (IIA project) . Now Fast forward your business and get effective returns. A smart city for a better work and better life.
Do you know about IHM? Are you aware of the requirements? GMT is here to help! Our IHM department can advise you regarding the necessary steps for the compliance of your fleet and arrange all the procedure: from survey to Class ΙΗΜ certificate.
Click the below presentation for more details! Feel free to contact us directly at ihm@gmtech.gr, where we would be more than happy to assist you!
NEET NATIONAL ELIGIBILITY CUM ENTRANCE TESTajal jose
NATIONAL ELIGIBILITY CUM ENTRANCE TEST The National Testing Agency (NTA) will release the admit cards for National Eligibility Entrance Test (NEET) 2021 on September 9. NEET 2021 admit card will contain the dress code, Covid guidelines, and other instructions for exam day.
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSveerababupersonal22
It consists of cw radar and fmcw radar ,range measurement,if amplifier and fmcw altimeterThe CW radar operates using continuous wave transmission, while the FMCW radar employs frequency-modulated continuous wave technology. Range measurement is a crucial aspect of radar systems, providing information about the distance to a target. The IF amplifier plays a key role in signal processing, amplifying intermediate frequency signals for further analysis. The FMCW altimeter utilizes frequency-modulated continuous wave technology to accurately measure altitude above a reference point.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
HEAP SORT ILLUSTRATED WITH HEAPIFY, BUILD HEAP FOR DYNAMIC ARRAYS.
Heap sort is a comparison-based sorting technique based on Binary Heap data structure. It is similar to the selection sort where we first find the minimum element and place the minimum element at the beginning. Repeat the same process for the remaining elements.
Using recycled concrete aggregates (RCA) for pavements is crucial to achieving sustainability. Implementing RCA for new pavement can minimize carbon footprint, conserve natural resources, reduce harmful emissions, and lower life cycle costs. Compared to natural aggregate (NA), RCA pavement has fewer comprehensive studies and sustainability assessments.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Forklift Classes Overview by Intella PartsIntella Parts
Discover the different forklift classes and their specific applications. Learn how to choose the right forklift for your needs to ensure safety, efficiency, and compliance in your operations.
For more technical information, visit our website https://intellaparts.com
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
4. ADVANTAGES OF TRANSPORTATION BY PIPELINESADVANTAGES OF TRANSPORTATION BY PIPELINES
Safer mode of transportation
Environment friendly
Least energy requirement
Lowest maintenance costs
Minimal impact on land use pattern
Negligible loss of product in transit
High reliability
Multi-productTransportation
7. PETRONET CCK LIMITED
Corporate Office – Irimpanam, Cochin
Petronet CCK Limited, a subsidiary of M/s. Bharat Petroleum Corporation Limited,
has laid a petroleum product pipeline from BPCL Irimpanam Terminal to Karur via
Coimbatore for transportation and downstream distribution of petroleum products MS, SKO
and HSD.
8. 8
PCCK- Milestones
PIPE LINE LAYING STARTED DECEMBER 1999
MECHANICAL COMPLETION FEBRUARY 2002
PROJECT PERIOD (ACTUAL) 3 YEARS 8 MONTHS
TRIAL RUNS MARCH 2002
COMMERCIAL OPERATION SEPTEMBER2002
9. 9
Pipes being laid along the route Work in river
Horizontal Directional Drilling across the Periyar Foundation setting for pump
10. 10
WELL BEGUN IS HALF DONE
Appropriate engineering design
Adopting state of the art technology
Ensuring quality in men, material and methods
Strict adherence to standard practices
Building a strong organizational safety culture
11.
FACILITIES – DESIGN
PCCKL
LENGTH OF PIPELINE 292 KM
SIZE OF PIPELINE
o
COCHIN TO IRUGUR 450 MM (18”)
o
IRUGUR TO KARUR 350 MM (14”)
GRADE AND THICKNESS
(a) 18” API 5L Gr. X 65 of thick. 6.4, 7.9, 9.5, 12.7 mm
(b) 14” API 5L Gr. B of Thick. 6.4, 7.9 mm
THROUGHPUT 3.3 MMTPA in Phase – 1 and
4.0 MMTPA in Phase – 2
PRODUCTS HANDLED MS / HSD / SKO
PUMPING STREAM HOURS 8000 Hrs Per Annum
12.
FACILITIES
DESPATCH TERMINAL IRIMPANAM
RECEIVING TERMINAL KARUR
TAP OFF POINTS IRUGUR
SV STATIONS
12 MOV STATIONS ( 10 IN C-I SECTION AND 2 IN I-K SECTION)
5 HOV STATIONS IN C-I SECTION
ROU WIDTH
18 M (in cross country portion)
Have restricted ROU's at select locations and forest areas.
13.
FACILITIES AT PETRONET
Main Pumping Station at Cochin.
Receipt Terminal at Karur and tap off at Coimbatore.
182.500 Kms 18” underground Pipeline from Cochin
to Coimbatore.
110.000 Kms 14” underground Pipeline from
Coimbatore to Karur.
12 Motor operated Sectionalising Valve Stations and
5 Hand Operated Valve (HOV) Stations along the
Pipeline route.
300 Kms dedicated Optic Fiber Communication System.
14. An Operating Manual has been drawn up in consultation
with BPCL based on the provisions made in the Off Take
Agreement
It describes the activities and responsibilities of all terminals of
PCCKL and BPCL on the following
Planning and Scheduling
Product Quality
Operational Activities at Cochin, Irugur and Karur.
Product Quality Certification
Batch Reconciliation
Slop Management
Product Loss Management
Operating Manual
19. Five Characteristics of World Class Safety Management System
Leadership - Lead by example (promote risk awareness,
encourage the team, ensure compliance and involve)
Integrated system approach - Integrating safety into all
functions of the organization
Performance measurement - Continuous monitoring to
promote safety performance
Alignment to core organizational goals - Aligning safety
along with organizational goals, objectives and values
Off the job safety - Extending safety efforts to employees
and community outside the work
20. Petronet CCK Ltd. has implemented the Integrated
Management System – IMS with effect from 01st
October 2008 consisting the following standards:
ISO 9001:2008-Quality Management System (QMS),
ISO 14001:2004-Environmental Management System
(EMS) and OHSAS 18001:2007.
The certification was done by M/s Det Norske Veritas
(DNV) Certification B.V., The Netherlands.
22.
Real time data acquisition and monitoring through SCADA system
Application software including Leak Detection System - LDS
Emergency Shutdown System - ESD
12 numbers of motorised remotely operated Sectionalizing Valves
IP based day/night Video Surveillance System
OPERATIONAL SAFETY FEATURES AT PETRONET
23.
Daily line patrolling by Line Patroller's
Internal Inspection of Pipeline using PIGS
Cathodic Protection by ICCP and Galvanic Protection
Operational Control Procedures - OCP
Work Permit and audit system
Fire Hydrant System, Foam Trolleys, Fire Extinguishers, MCP’s, Fire Alarm
System.
OPERATIONAL SAFETY FEATURES AT PETRONET
24. PREPAREDNESS MEASURESPREPAREDNESS MEASURES
As part of emergency preparedness, following measures are adoptedAs part of emergency preparedness, following measures are adopted::
Emergency Drills and Mock Exercises
The effectiveness and thoroughness of ERDMP is evaluated through regular
table top exercises covering all potential scenarios on rotation basis in safety
meetings. Safety meetings are held at a frequency of once in a month
Training
Training on basis / advanced firefighting is extended to all employees on
yearly basis. The guards & LPMs, are also provided with fire and safety
training on a yearly basis.
Mutual aid associations are in place at Cochin, Coimbatore and Karur with
nearby units of oil PSUs and other major industrial units. The mutual aid
members meet on quarterly basis and discuss common areas of interest and
also participate in the DCMP drills of each unit.
Mutual Aid
25. The Inspector of Factories and Boilers suggested
in the mutual aid meeting held on 30/05/2011
at Petronet CCK Limited that the Mutual Aid
Group of Irimpanam should have a name
and it was unanimously decided that the group
shall be named as “ IMAG –IMAG –
Irimpanam Mutual Aid GroupIrimpanam Mutual Aid Group”.
26. Irimpanam Mutual Aid group (IMAG) has been
formulated and an agreement signed with the
neighboring oil companies like BPCL, IOCL, HPCL, HP Gas
and IOC LPG bottling plant as members.
IMAG members meet once in a quarter to discuss on
common issues among the oil companies and also the
safety of the public in the nearby areas.
The motive of IMAG is to mutually assist the members
by sharing resources during an emergency.
27. Organization
Emergency Contact
Number
Contact Person and
phone number
Terminal In charge and
phone number
Control Room
0484 2778145
9446427555
Ratheesh R
Engineering Executive
9495315882
Jalin K Thampi
Sr. Terminal Manager
9447640105
Control Room
0484 2778316
Tirumala Srinivas M
Asst. Manager (HSSE)
9447356143
Somasundaram M
Sr. Installation Manager
8547831573
Control Room
0484 2114327
Arun Anto
Asst. Manager (HSSE)
9645660823
R Kumar
Chief Terminal Manager
9447498266
Control Room
0484 2114847
Radha Krishnan
Sr. Officer(HSSE)
9847625470
K A Devan
Chief Installation Manager
9177443322
Control Room
0484 2775407
Deepak E D
Safety Officer
8156844411
Muhammed Tajib Sait
Sr. Plant Manager
9605001969
Control Room
0484 2791848/2458
Nibil P S
Officer (LPG - Safety)
9539711199
N Manoharan
Chief Plant Manager
9446312888
IMAG MEMBER LIST
29. EMERGENCY RESPONSE ANDEMERGENCY RESPONSE AND
DISASTER MANAGEMENT PLANDISASTER MANAGEMENT PLAN
An elaborate ERDMPERDMP is in place describing various emergency scenarios
to assist all personnel engaged in the operation and maintenance of the
pipeline network to deal with emergencies of different kind.
ERDMP also describe the on-site and off-site emergency plans and also
defines the roles and responsibilities of the Crisis Coordinators and
various other coordinators, line patrolling man, security guards, external
agencies like Police, Fire force, medical services, water & irrigation,
public works department, pollution control board etc…
33. WORK PERMIT SYSTEM
Work Permit System in accordance with OISD 105 is
religiously in place.
Hot Work Permit, Cold Work Permit, Electrical Isolation and
Energisation Permit is strictly issued by the authorized
personnel only.
Trainings on Work Permit System is given to all employees,
contract staff, contractors and labourers, security guards and
line patrol man.
Work Permits are issued, renewed and closed judiciously.
Work permits are tracked and reviewed every morning.
34. AUDIT SYSTEMS AT PETRONET FOR
ENSURING SAFETY COMPLIANCE
Half yearly internal audits for the continual improvement
and maintenance of IMS system.
Yearly IMS audit by external third party agency.
Technical cum Safety audits done by qualified internal
auditors.
Third party safety audits done through NSC.
OISD audit.
Internal OISD standards review and GAP analysis.
Petroleum and Natural Gas Regulatory Authority
Compliance audit
35. SYSTEM OF ACCIDENT MONITORING,
INVESTIGATION AND CORRECTIVE ACTION
Any near miss, incident or accident shall be reported,
investigated by a constituted committee, corrective action to
be taken based on the committee recommendation to avoid
such near misses, incidents, accidents in future. Such incidents
and further corrective actions taken shall be communicated
down the line.
Any near miss, incidents or accidents should be reported to
the concerned TM/COO immediately. For all near miss
reported TM shall constitute a committee with two engineers
as members within 24 hours of the occurrence of the near miss
and the committee shall submit their report within 5 working
days to TM.
40. Intelligent pigging provides a method of evaluating the
performance/effectiveness of the pipe line and helps to
determine the healthiness of a pipeline.
The main advantage of IPS is that a pipeline can be
assessed to its full length without interrupting the
pipeline operation. It further serves as the foundation
for a pro-active maintenance program to safeguard
against the consequences of failures.
Intelligent Pigging can determine pipeline ovality,
dents, Surface pitting and corrosion, as well as cracks
and weld defects in steel/ferrous pipelines.
44. Close Interval Potential survey (CIPS)
To determine level of cathodic polarisation along the pipeline
and to identify suspected holiday spots
Current Attenuation Testing (CAT)
Method to locate faults and poor coating that is draining the
current, resulting in improved potentials and minimizing
damaging side effects.
Direct Current Voltage Gradient (DCVG)
Carried out for verification of the Coating defects identified
during Close Interval Potential Logging Survey and Current
Attenuation Test.
CIPS / CAT / DCVG SURVEYCIPS / CAT / DCVG SURVEY
45. LINE WALKSLINE WALKS
Also GPS based personnel tracking system in place
at PCCKL for close monitoring of LPM and integrity
of line walking.
Line walks are done by the employees at frequent
intervals in the ROU to ensure safety and security
of the pipeline and to avoid encroachment in the
ROU of mainline.
46.
47.
48.
Technological Advancements in pipelineTechnological Advancements in pipeline
monitoringmonitoring
GPS based personnel tracking system has put in place at PCCKL
for close monitoring of LPM and to ensure integrity of line
walking.
49. SAFETY COMMITTEESAFETY COMMITTEE
Safety Committee is headed by the Sr. Terminal Manager
as Chairman and a nominated Engineering Executive as
Safety Officer and one Operator as Worker
Representative and all technical staff as its members.
Safety meetings are done once in a month for reviewing
different safety related issues and requirements.
Near miss incidents as well as identification of risks are done
and discussed in detail in the meeting.
The deliberations are minuted and time bound action is
initiated to close the same.
50. Safety Awards are distributed to all members
annually to encourage accident free working.
Various kinds of safety awareness programs/trainings are
conducted periodically for employees, contract labours,
security guards, line patroller’s like industrial safety,
home safety, road safety etc.
Reward based safety suggestion scheme is in place to
motivate the employees to identify work related hazards
and mitigate them.
Safety week is observed every year and competitions
like safety poster design, safety slogans, safety quiz,
essay writing etc… are held among employees
along with their families to create awareness
on safety at work as well as home.
51. SAFETY COMMITTEE MEETINGS
FIRE & SAFETY TRAININGS
ONSITE AND OFFSITE MOCK DRILLS
SAFETY WEEK CELEBRATIONS
ENVIRONMENT DAY CELEBRATIONS
PROGRAMMES CONDUCTED BY
SAFETY COMMITTEE
52. SAFETY COMMITTEE MEETINGS
Safety meetings are done once in a month to review
and discuss issues related to safety and implement the
suggested improvements.
Safety committee is headed by the Sr. Terminal
Manager as chairman and a nominated Engineering
Executive as safety officer and one Operator as worker
representative and all technical staff as its members.
53. ∗ Fire & Safety workshops are conducted in house as well as
by external agencies like IFAST, BPCL-Kochi Refinery
Fire & Safety department.
∗ Separate training sessions are provided to employees as well
as contract staff, LPM’s and Security guards.
FIRE & SAFETY TRAININGSFIRE & SAFETY TRAININGS
58. MOCK DRILLS
On-site mock drills are carried out periodically.
Off-Site emergency mock drills are conducted once in a year involving
external agencies and other statutory authorities like factory
inspectorate, police, fire force, local panchayats etc…
59. OFFSITE MOCK DRILLS SCENARIOSOFFSITE MOCK DRILLS SCENARIOS
Water logged area scenario.
Open field scenario.
Valve station scenario.
86. Following CSR schemes implemented in Kerala during the year 2015-16 & 2016-17:
• Renovation of one number of anganwadi center and distribution of indoor play
equipments for 31 numbers of aganwadis in Parakkadavu, Ernakulam.
• Renovation of three numbers of anganwadi centers and distribution of indoor play
equipments for 31 numbers of aganwadis in Annamanada, Thrissur.
• Rehab on wheels with RIPMR at Thrissur.
• Electrification of six class rooms and completion of parapet wall in Govt. Girls High
School, Alathur in Palakkad District.
• Potable water (water purifier) to six Government Lower Primary Schools in
Pudussery Panchayat.
• Sanitation & Potable water (water purifier) to Government primary health centre,
Kanjikode in Pudussery Panchayat.
• Computers to six Government Lower Primary Schools in Pudussery Panchayat.
• Quality improvement project of assembly/play area at Govt. lower primary school,
Kanjikode.
90. SAFETY ACHIEVEMENTS
eceived Outstanding Safety Performance AwardOutstanding Safety Performance Award from ….National
Safety Council - Kerala Chapter for the last ….five
years (2012, 2013, 2014, 2015 & 2016)
eceived Outstanding Safety Performance AwardOutstanding Safety Performance Award
….from Factories and Boilers Department - Kerala for the
….year 2012 , 2014 & 2016
91. RECEIVING SAFETY AWARD - 2016 FROM NATIONAL SAFETY COUNCIL
FOR OUTSTANDING SAFETY PERFORMANCE
RECEIVING SAFETY AWARD -
2014 FROM DEPARTMENT OF
FACTORIES AND BOILERS,
FOR OUTSTANDING SAFETY
PERFORMANCE
92. The industry’s safety record is a demonstration of our
members’ steadfast commitment to operating the
pipeline systems in a way that safeguards workers,
the public and the environment.
Safety is our industry’s highest priority, and will always
lie at the core of everything we do.