REPORT ON ONE MONTH VOCATIONAL TRAINING – 1st July to 31st July 2019
AMBUJA CEMENTS UNIT--BHATAPARA
The company's
quintessential
spirit has
ensured a
product that
embodies Giant
Strength.
ACKNOLEDGEMENT
 It is my pleasure to be indebted to various people, who
directly or indirectly contributed in the development of
this work and who influenced my thinking, behavior, and
acts during the course of training. I express my sincere
gratitude to Rungta College Of Engg & Tech for
providing me an opportunity to undergo summer training
at Ambuja Cement Bhatapara. I am thankful to Mr.
S.K.Mishra (GM,E&I) and my trainer Mr.Sandeep
Shrivastav(Manager,E&I) for his support, cooperation,
and motivation provided to me during the training for
constant inspiration, presence and blessings. I also
extend my sincere appreciation to Human Resource
Department for their valuable suggestions and precious
time in accomplishing my project . Lastly, I would like to
thank the almighty and my parents for their moral
support and my friends with whom I shared my day-to-
day experience and received lots of suggestions that
improved my quality of work.
ABOUT AMBUJA CEMENTS
 Ambuja Cements Ltd, a part of the global
conglomerate LafargeHolcim, is among the leading
cement companies in India. Currently, Ambuja
Cement has a cement capacity of 29.65 million
tonnes with five integrated cement manufacturing
plants and eight cement grinding units across the
country.
 The company has many firsts to its credit – a
captive port with four terminals that has facilitated
timely, cost-effective, cleaner shipments of bulk
cement to its customers.
ZERO HARM
For Ambuja Cement, its people are its most
important resource. The company is committed
to ensure the safety of all its employees,
contractors and others connected with its
operations, through its Zero Harm policy.
We Care – an umbrella initiative which covers all
stakeholders – has played a seminal role in
transforming Ambuja Cement's operations as well
as attitudes towards safety.
CEMENT PRODUCTION AT
AMBUJA BHATAPARA PLANT..
 FOR CEMENT PRODUCTION AMBUJA
CEMENTS AT BHATAPARA HAS TWO PLANT:
 1 . LINE I – 3800 TPD CLINKER PRODUCTION
CAPACITY.
 2 . LINE II - 9400 TPD CLINKER PRODUCTION
CAPACITY.
 TOTAL POWER AVAILABILITY :86 MW
POWER
SOURCES
CSEB DIESEL
GENERATOR
THERMAL
POWER
PLANT
18 MW STG 1
15MW
STG 2
15MW
STG3
33W 5 MW
POWER DISTRIBUTION MSS
POWER DISTRIBUTION OF
LINE II
CONNECTED LOADS
LINE 1 LINE II
LS CRUSHER 1.2MW
RAW MILL 5.5 MW
COAL MILL 1 MW
KILN COLER &
COAL FIRING
3.8MW
FACTORY
AUXILARY
0.8MW
COLONY 0.3MW
PACKING PLANT &
CLINKER LOADING
1.5MW
CEMENT MILL 1 5 MW
CEMENT MILL II 6.5MW
CEMENT MILL III 5.5MW
TOTAL LOAD 31.1 MW
LS CRUSHER 2.0MW
RAW MILL 12MW
COAL MILL 3.2MW
KILN COOLER
&COAL FIRING
9.5MW
TOTAL LOAD 26.7MW
TOTAL CONNECTED LOAD :57.8 MW
CRITICAL MOTORS OF LINE I PLANT:
Bag House Fan Motor[1300MW, Voltage 6.6KV ]
Raw Mill Main Drive[2800KW, Voltage 11KV]
Raw Mill Fan [2800KW,Voltage11KV]
Coal Mill Main Drive [950KW,VOLTAGE11KV]
Kiln Main Drive [700KW,VOLTAGE 690KV]
Cement mill -1(Twin drive)- 2200KW X 2,Voltage 11KV
Cement mill -2(Twin drive)- 2200KW X 2,Voltage 11KV
Cement mill -3(Twin drive) - 2500 KW X 2 ,Voltage 6.6KV
• General Diagram
Maintenance of VFD includes:
1. Cooling fan checking
2. Electrolytic capacitor checking
3. Parameters checkup
4. Diode and IGBT testing
5. Capacitor reforming
LV-VFD
• ACS800, Standalone module, DSU
, INU modules
MV-VFD
• ACS5000 (COAL MILL AND RAW
MILL), YASKAWA (PH & BH FAN),
ACS2000
Purpose of using VFD:
1. SPEED CONTROL POSSIBLE
ACCORDING TO PROCESS.
2. POWER SAVING (As
compared to DOL + Damper
combination)
3. Provides Soft start
VFD’s (VARIABLE FREQUENCY DRIVE)
HT
MOTOR
Cleaning carbon filter,
checking carbon brush
length, checking of slip ring
assembly.
Checking of all motor
termination and insulation
checking.
Checking of IR value and
winding resistance.
LT
MOTOR
Running hours based motor
O/H.
1500 RPM or below – 3 Yrs.
2900 RPM range– 6-12
Months
Checking of terminal and
junction box.
Checking of IR value and
winding resistance. Trial of
motor is done and current in
each phase is measured.
Check for abnormal
noise/vibrations/Excessi
ve heat/Burning
smell/Chemical smell.
Check for proper
earthing connection
and any loose bolts.
Check for cooling of
motor effectiveness
Check for the dirt,
dust and oil on the
motor which could
results into failure
WBI
MOTOR MAINTENANCE
Total cement packers – 7 Nos. installed in ACL Bhatapara
Packers 1 to 4, capacity – 120 TPH – 8 Spout
Packers 5 to 6, capacity – 180 TPH – 12 Spout
Packers 7 - capacity – 240 TPH – 16 Spout
Total – 16 Nos. close type wagon loaders.
Total – 8 Nos. open type wagon loaders.
Total – 5 nos. Truck loaders.
 Arc flash is a dangerous condition associated with the release of energy caused by
an electric arc. An electric arc is the passage of substantial electrical current
through ionized air. It produces extremely high temperature and is explosive in
nature
 ARC FLASH INJURIES:
1. Electric shock
2. Severe Burns
3. Blindness
4. Hearing damage
 Causes of arc flash:
ARC FLASH AND RELATED HAZARDS
Spark discharge from: Accidental touching and Dropping tools
Failure of insulating materials
Dust, impurities, corrosion, condensation.
 ARC FLASH BOUNDARY:
•Limited Approach Boundary.
•Restricted Approach Boundary
•Prohibited Approach Boundary
LT 25.4 mm 304.8 mm 1070
mm
HT 177.8 mm 660.4 mm 1530
mm
 Wear arc rated PPE,arc flash suite
within arc flash danger zone
 Perform regular preventive
maintenance.
 Job safety analysis and job related
sops
De-energize equipment before working
Proper labelling on all the equipments
ACL, BHATAPARA
16
KEY FACTORS TO MAINTAIN ARC FLASH SAFETY
Electrostatic precipitators
 Electrostatic precipitators (ESP) are
used for gas cleaning in almost every
section of cement manufacture. The
characterisation of dust emissions
has been done for different units,
such as rotary kiln and raw mill, alkali
by-pass, clinker cooler, cement and
coal mill, in terms of exit gas quantity,
temperature, dew point, dust content
and particle size. It is seen that all
these characteristics have a wide
range of variance. The ESP system
must effectively deal with these
variations.
The basic principle of electrostatic precipitator is that gas borne
particles( mainly ash) are ionised by the high voltage discharge
electrode by the CORONA EFFECT.The ash particles ionise to
negative charge and are attracted to the positively charged collector
plates.
ALTERNATIVE FUEL RESOURSE
AFR is an alternative
way of reducing the
consumption of coal
which is a serious matter
of concern .
Keeping this in mind
Ambuja Cement unit
Bhatapara has set up
AFR ptant as substitute of
coal.
It is successful in saving
22 crore rupees in a
single year.
“In learning you will teach, and
in teaching you will learn.”
THANK YOU

More Related Content

Similar to TRAINNING PPT (1).pptx

COMPANY PRESENTATION
COMPANY PRESENTATIONCOMPANY PRESENTATION
COMPANY PRESENTATION
Silvia Iovu
 
New Star Plasma Brochure
New Star Plasma BrochureNew Star Plasma Brochure
New Star Plasma Brochure
Paul Mutch
 
Sunil gaur bhel ppt
Sunil gaur bhel pptSunil gaur bhel ppt
Sunil gaur bhel ppt
sunil gaur
 
CLW ANKAN PRESENTATION - Copy.pptx
CLW ANKAN PRESENTATION - Copy.pptxCLW ANKAN PRESENTATION - Copy.pptx
CLW ANKAN PRESENTATION - Copy.pptx
Ankan Dey
 
AXTEL SCREW FEEDER REPORT
AXTEL SCREW FEEDER REPORTAXTEL SCREW FEEDER REPORT
AXTEL SCREW FEEDER REPORT
sudhir gohil
 

Similar to TRAINNING PPT (1).pptx (20)

Ultrasonic Product Catalogue
Ultrasonic Product CatalogueUltrasonic Product Catalogue
Ultrasonic Product Catalogue
 
COMPANY PRESENTATION
COMPANY PRESENTATIONCOMPANY PRESENTATION
COMPANY PRESENTATION
 
New Star Plasma Brochure
New Star Plasma BrochureNew Star Plasma Brochure
New Star Plasma Brochure
 
Gates advantage Hydraulic Hose and Couplings
Gates advantage Hydraulic Hose and CouplingsGates advantage Hydraulic Hose and Couplings
Gates advantage Hydraulic Hose and Couplings
 
MAS Lift Mechanical Catalogue
MAS Lift Mechanical CatalogueMAS Lift Mechanical Catalogue
MAS Lift Mechanical Catalogue
 
RABIGH II Resume ksa
RABIGH II Resume ksaRABIGH II Resume ksa
RABIGH II Resume ksa
 
PROJECT REPORT ON BHEL BHOPAL FOR MECHANICAL
PROJECT REPORT ON BHEL BHOPAL FOR MECHANICALPROJECT REPORT ON BHEL BHOPAL FOR MECHANICAL
PROJECT REPORT ON BHEL BHOPAL FOR MECHANICAL
 
INDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaM
INDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaMINDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaM
INDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaM
 
A Review on Modification in Honing Machine Stone Feeding Installation
A Review on Modification in Honing Machine Stone Feeding InstallationA Review on Modification in Honing Machine Stone Feeding Installation
A Review on Modification in Honing Machine Stone Feeding Installation
 
Summer Trg
Summer TrgSummer Trg
Summer Trg
 
Sunil gaur bhel ppt
Sunil gaur bhel pptSunil gaur bhel ppt
Sunil gaur bhel ppt
 
IRJET- Simulation of Structural Vibration Controlled System using Semi Active...
IRJET- Simulation of Structural Vibration Controlled System using Semi Active...IRJET- Simulation of Structural Vibration Controlled System using Semi Active...
IRJET- Simulation of Structural Vibration Controlled System using Semi Active...
 
Development of Machine for Opening and Cleaning of Cotton Fibre in Laboratories
Development of Machine for Opening and Cleaning of Cotton Fibre in LaboratoriesDevelopment of Machine for Opening and Cleaning of Cotton Fibre in Laboratories
Development of Machine for Opening and Cleaning of Cotton Fibre in Laboratories
 
CLW ANKAN PRESENTATION - Copy.pptx
CLW ANKAN PRESENTATION - Copy.pptxCLW ANKAN PRESENTATION - Copy.pptx
CLW ANKAN PRESENTATION - Copy.pptx
 
IRJET- Experimental Investigation of Aluminum 7075 using Dry, Wet and MQL...
IRJET-  	  Experimental Investigation of Aluminum 7075 using Dry, Wet and MQL...IRJET-  	  Experimental Investigation of Aluminum 7075 using Dry, Wet and MQL...
IRJET- Experimental Investigation of Aluminum 7075 using Dry, Wet and MQL...
 
Shibu Thomas-CV
Shibu Thomas-CVShibu Thomas-CV
Shibu Thomas-CV
 
Summer internship report
Summer internship reportSummer internship report
Summer internship report
 
IndoAsian Corp. Presentation 2022-.pptx
IndoAsian Corp. Presentation 2022-.pptxIndoAsian Corp. Presentation 2022-.pptx
IndoAsian Corp. Presentation 2022-.pptx
 
Machine - HK.pptx
Machine - HK.pptxMachine - HK.pptx
Machine - HK.pptx
 
AXTEL SCREW FEEDER REPORT
AXTEL SCREW FEEDER REPORTAXTEL SCREW FEEDER REPORT
AXTEL SCREW FEEDER REPORT
 

Recently uploaded

Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 

Recently uploaded (20)

Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 

TRAINNING PPT (1).pptx

  • 1. PREPARED BY : APOORVA DHURANDHAR BRANCH : ELECTRICAL ENGINEERING COLLEGE : RUNGTA COLLEGE OF ENGG & TECH,BHILAI (C.G.) REPORT ON ONE MONTH VOCATIONAL TRAINING – 1st July to 31st July 2019 AMBUJA CEMENTS UNIT--BHATAPARA
  • 2. The company's quintessential spirit has ensured a product that embodies Giant Strength.
  • 3. ACKNOLEDGEMENT  It is my pleasure to be indebted to various people, who directly or indirectly contributed in the development of this work and who influenced my thinking, behavior, and acts during the course of training. I express my sincere gratitude to Rungta College Of Engg & Tech for providing me an opportunity to undergo summer training at Ambuja Cement Bhatapara. I am thankful to Mr. S.K.Mishra (GM,E&I) and my trainer Mr.Sandeep Shrivastav(Manager,E&I) for his support, cooperation, and motivation provided to me during the training for constant inspiration, presence and blessings. I also extend my sincere appreciation to Human Resource Department for their valuable suggestions and precious time in accomplishing my project . Lastly, I would like to thank the almighty and my parents for their moral support and my friends with whom I shared my day-to- day experience and received lots of suggestions that improved my quality of work.
  • 4. ABOUT AMBUJA CEMENTS  Ambuja Cements Ltd, a part of the global conglomerate LafargeHolcim, is among the leading cement companies in India. Currently, Ambuja Cement has a cement capacity of 29.65 million tonnes with five integrated cement manufacturing plants and eight cement grinding units across the country.  The company has many firsts to its credit – a captive port with four terminals that has facilitated timely, cost-effective, cleaner shipments of bulk cement to its customers.
  • 5. ZERO HARM For Ambuja Cement, its people are its most important resource. The company is committed to ensure the safety of all its employees, contractors and others connected with its operations, through its Zero Harm policy. We Care – an umbrella initiative which covers all stakeholders – has played a seminal role in transforming Ambuja Cement's operations as well as attitudes towards safety.
  • 6.
  • 7. CEMENT PRODUCTION AT AMBUJA BHATAPARA PLANT..  FOR CEMENT PRODUCTION AMBUJA CEMENTS AT BHATAPARA HAS TWO PLANT:  1 . LINE I – 3800 TPD CLINKER PRODUCTION CAPACITY.  2 . LINE II - 9400 TPD CLINKER PRODUCTION CAPACITY.
  • 8.  TOTAL POWER AVAILABILITY :86 MW POWER SOURCES CSEB DIESEL GENERATOR THERMAL POWER PLANT 18 MW STG 1 15MW STG 2 15MW STG3 33W 5 MW
  • 9. POWER DISTRIBUTION MSS POWER DISTRIBUTION OF LINE II
  • 10. CONNECTED LOADS LINE 1 LINE II LS CRUSHER 1.2MW RAW MILL 5.5 MW COAL MILL 1 MW KILN COLER & COAL FIRING 3.8MW FACTORY AUXILARY 0.8MW COLONY 0.3MW PACKING PLANT & CLINKER LOADING 1.5MW CEMENT MILL 1 5 MW CEMENT MILL II 6.5MW CEMENT MILL III 5.5MW TOTAL LOAD 31.1 MW LS CRUSHER 2.0MW RAW MILL 12MW COAL MILL 3.2MW KILN COOLER &COAL FIRING 9.5MW TOTAL LOAD 26.7MW TOTAL CONNECTED LOAD :57.8 MW
  • 11. CRITICAL MOTORS OF LINE I PLANT: Bag House Fan Motor[1300MW, Voltage 6.6KV ] Raw Mill Main Drive[2800KW, Voltage 11KV] Raw Mill Fan [2800KW,Voltage11KV] Coal Mill Main Drive [950KW,VOLTAGE11KV] Kiln Main Drive [700KW,VOLTAGE 690KV] Cement mill -1(Twin drive)- 2200KW X 2,Voltage 11KV Cement mill -2(Twin drive)- 2200KW X 2,Voltage 11KV Cement mill -3(Twin drive) - 2500 KW X 2 ,Voltage 6.6KV
  • 12. • General Diagram Maintenance of VFD includes: 1. Cooling fan checking 2. Electrolytic capacitor checking 3. Parameters checkup 4. Diode and IGBT testing 5. Capacitor reforming LV-VFD • ACS800, Standalone module, DSU , INU modules MV-VFD • ACS5000 (COAL MILL AND RAW MILL), YASKAWA (PH & BH FAN), ACS2000 Purpose of using VFD: 1. SPEED CONTROL POSSIBLE ACCORDING TO PROCESS. 2. POWER SAVING (As compared to DOL + Damper combination) 3. Provides Soft start VFD’s (VARIABLE FREQUENCY DRIVE)
  • 13. HT MOTOR Cleaning carbon filter, checking carbon brush length, checking of slip ring assembly. Checking of all motor termination and insulation checking. Checking of IR value and winding resistance. LT MOTOR Running hours based motor O/H. 1500 RPM or below – 3 Yrs. 2900 RPM range– 6-12 Months Checking of terminal and junction box. Checking of IR value and winding resistance. Trial of motor is done and current in each phase is measured. Check for abnormal noise/vibrations/Excessi ve heat/Burning smell/Chemical smell. Check for proper earthing connection and any loose bolts. Check for cooling of motor effectiveness Check for the dirt, dust and oil on the motor which could results into failure WBI MOTOR MAINTENANCE
  • 14. Total cement packers – 7 Nos. installed in ACL Bhatapara Packers 1 to 4, capacity – 120 TPH – 8 Spout Packers 5 to 6, capacity – 180 TPH – 12 Spout Packers 7 - capacity – 240 TPH – 16 Spout Total – 16 Nos. close type wagon loaders. Total – 8 Nos. open type wagon loaders. Total – 5 nos. Truck loaders.
  • 15.  Arc flash is a dangerous condition associated with the release of energy caused by an electric arc. An electric arc is the passage of substantial electrical current through ionized air. It produces extremely high temperature and is explosive in nature  ARC FLASH INJURIES: 1. Electric shock 2. Severe Burns 3. Blindness 4. Hearing damage  Causes of arc flash: ARC FLASH AND RELATED HAZARDS Spark discharge from: Accidental touching and Dropping tools Failure of insulating materials Dust, impurities, corrosion, condensation.
  • 16.  ARC FLASH BOUNDARY: •Limited Approach Boundary. •Restricted Approach Boundary •Prohibited Approach Boundary LT 25.4 mm 304.8 mm 1070 mm HT 177.8 mm 660.4 mm 1530 mm  Wear arc rated PPE,arc flash suite within arc flash danger zone  Perform regular preventive maintenance.  Job safety analysis and job related sops De-energize equipment before working Proper labelling on all the equipments ACL, BHATAPARA 16 KEY FACTORS TO MAINTAIN ARC FLASH SAFETY
  • 17. Electrostatic precipitators  Electrostatic precipitators (ESP) are used for gas cleaning in almost every section of cement manufacture. The characterisation of dust emissions has been done for different units, such as rotary kiln and raw mill, alkali by-pass, clinker cooler, cement and coal mill, in terms of exit gas quantity, temperature, dew point, dust content and particle size. It is seen that all these characteristics have a wide range of variance. The ESP system must effectively deal with these variations. The basic principle of electrostatic precipitator is that gas borne particles( mainly ash) are ionised by the high voltage discharge electrode by the CORONA EFFECT.The ash particles ionise to negative charge and are attracted to the positively charged collector plates.
  • 18. ALTERNATIVE FUEL RESOURSE AFR is an alternative way of reducing the consumption of coal which is a serious matter of concern . Keeping this in mind Ambuja Cement unit Bhatapara has set up AFR ptant as substitute of coal. It is successful in saving 22 crore rupees in a single year.
  • 19. “In learning you will teach, and in teaching you will learn.” THANK YOU