One Day Seminar on
Safety Examination, Operation & Maintenance of Gates
For Dams, Canals, Drains, and Other structures.
July 3rd
. 2015
Subject: Safety Inspection of Gates and its documentation.
By M.V.S.Murthy C.E. (Retired) WRD GOG
Need for Safety Inspection of Gates:
Safety Inspection of Gates is a part of Dam Safety Activity
While routine maintenance of Gate components is the responsibility of the Field Staff,
Safety Inspection of Gates on a project and its documentation by an Independent group of
senior personnel and specialists, is useful in assessing overall performance capability and
reliability of these Equipment, and identify areas of deficiency. This activity can be called
‘Safety Audit of gates’. It also assesses the adequacy of Gate maintenance procedures and
records, and Field Officers‘ preparedness to handle problems which may arise, before they
develop into distress.
Further, as Dam Spillway and canal outlets are built to meet the maximum anticipated
demand, there could be some redundancy during off-season or normal working. If some
equipment becomes inoperative, its absence may remain unnoticed or overlooked by the field
staff. Such lapses are not uncommon, and may prove disastrous during emergency. Safety
Inspection avoids such a situation.
A review of Safety Inspection of Gates on different projects in a state may bring out
existence of outdated and defective gates and construction practices and initiate review and
modification. This would improve the overall reliability and safety of Dams.
Safety Inspection and its Documentation:
The safety inspection activity can be broken down into three steps:
1. Preparation for the task.
2. Inspection technique
3. Documentation of report
Preparation for the task
1. Pre- planning of Inspection.
This may be necessary as Reservoir water level should be acceptable for testing of equipment and
inspection of components. Minimum wastage of storage and interruption to water demand, should be
attempted. Necessary precautions are to be taken for this un-timely operating of gates, such as, prior
notification, and warnings to downstream areas of likely increase in flow .etc
2. Reviewing Documents
Following records may be collected and studied.
(a) Final Construction and Installation Drawings for Gates and related equipment including
Supplier’s Operation Manual
(b) Details of any major alterations, modification, carried out and when why and by
whom.
(c) Review of Pre-monsoon and Post-monsoon inspection and servicing Records for their
adequacy.
(d) Standard Operating Procedures for gates, displayed in control room.
(e) Security arrangements to prevent unauthorized person, operating gates.
(f) Check sources of Power supply for Gates operation, its dependability during heavy
floods, Stand-by power supply, its exclusiveness, adequacy for number of gates to be
operated simultaneously at a time to handle maximum flood, effective communication
between standby power source and gates control area.
(g) Contingency plan to restore power if one of the Power cables to gates, fails.
(h) Fire Hazard prevention: As the environment is windy humid and wet, and power
cables are abundant, possibility of short-circuit and fire hazard are high. A valid Inspection
and Testing certificate for Electrical Installation for Gates operation, from a competent
authority is desirable. Also, availability of Fire-fighting Equipment and their working may
be checked and noted.
3. Preparation on the field.
Tools Tackle and manpower to be mobilized (Many of these are not likely to be available
at site)
A list is indicated: Steel Tape. Steel Rule with graduation. Machinist’s Spirit Level. Heavy
Plumb. Steel Right Angle. Inside-Outside Calipers. Micrometers, Filler Gauges, Heavy Duty
Tool Kit with Wrenches Spanners, Stud removers Impact wrenches, Torque Wrenches
Chisels Hammers hand drills etc.
Mirror, Magnifying Glass. Depth-gauge Steel shim plates of assorted thickness.
Wire brush Blow torch, Camera with flash. Torchlight, Electrical Testing meters, tester for
testing insulation and earthing. Ammeters Volt meters Tong testers for measuring current
in a cable. Degreasing fluid, cotton waste, Dye for Dye-penetration test etc
The list is indicative only.
Personal Safety arrangement: As Inspection involves movement on wet and slippery
surface, approach by boat, climbing on temporary ladders ,working in heights and above
flowing water, the officer who is to inspect should be healthy agile and alert.
Safety precautions should be taken, hard hats, Gum boots etc. used. Boats with lifejackets,
rescue and First aid facilities to be at hand where necessary. As worksites are likely to be
windy, loose clothing should be avoided by persons involved.
Inspection technique.
Physical inspection of Equipment, and Components, and recording findings, is the main purpose of this
exercise. This should give an overall assessment of their reliability for safety of Dam. The Inspector has
to decide what gates are to be tested, and which critical components to be checked, based on his
experience, and literature available.
The booklet “Guidelines for Operation and Maintenance of Spillway Gates on Dams” by M.V.S.Murthy, is
one such literature available for free download from link given below:
http://pothi.com/pothi/book/ebook-m-v-s-murthy-guidelines-operation-and-maintenance-spillway-
gates-dams
1. Preparation for inspection at site:
Study and make notes of Drawings and sketches of parts to be inspected, Decide gate/s to be
selected for detailed inspection and trial, sketches of components to be drawn, to identify
them in the report. Sequence of components to be checked to be decided. Problem areas,
and limitation in checking to be noted down. Restoring the equipment to normal operation
after inspection to be planned.
2. Inspection of Gates:
Though there are different types and sizes, such as spillway gates, radial type and vertical lift
type, dam outlet gates fixed wheel type and slide gates, Canal gates etc., some inspection
aspects are common while others are specific to the type. We may discuss the common
aspects first.
Common Aspects:
Corrosion, pitting, Cavitation and Electro-chemical reaction on metals, crack in weld, are some
of the defects common to all types of gates. Causes and remedies are discussed in the booklet
“Guidelines on O&M of Spillway Gates on Dams” by M.V.S.Murthy)
(a) During visual inspection of gates, we may look for signs of Rusting, Corrosion and pitting
of components and record their location possible cause and suggest remedy. Cavitation
occurs where flow is not streamlined and turbulent flow occurs. The area will have to be
dewatered to check the extent and seriousness of problem of cavitation.
(b) Where Stainless steel plates are used as seal seat and are fixed to MS base plate in
Embedment by intermittent welding, cracking of weld and peeling off of seal seat, may
cause leakage, damage to seal, and rough movement of gate. Above points need be
verified and recorded. These defects are difficult to rectify and may need detailed
planning.
(c) Some of the old design and fabrication practices adopted, particularly in the case of
Vertical Lift Type Gates for Spillways and Dam outlets, are prone to cause major problems
over years of use. A few are indicated below which may be checked during Safety
Inspection.
(d) Fixing of Seal travel seat with Base plate in the embedment.:- Brass plates were used
as Seal Seats and fixed to embedded steel Base plate by brass countersunk screws
.Frequent travel of seal during gate operation, unevenness of surface, leakage at seals,
pressure buildup behind the seal seat, and vibration, could cause loosening of screws,
falling off of seal plate, seal damage, vibration and even gate failure, particularly in case
of dam outlet gates.
(e) Seal Quality: Quality check of seals used or stored as spare, may be verified as molded
type seals of correct specification are much costly compared to look-alike seals available
in the market.
(f) Fixing of MS Track Plate (for wheel travel) to base plate with countersunk bolts. Over a
period of use Track Plate wear, waviness, loosening of bolts, heavy vibration, etc. may
pose a source of potential danger.
(g) In the case of fabricated steel outlet gates and canal gates, the shape of Gate lip could be
source of turbulence and vibration of gate. This may be observed during trial operation
and commented
(h) During Safety Inspection of gates on a project, it may not be feasible to operate and test
all gates. There are a number of dams where there are 30 to 35 spillway gates. In such
cases, while superficial visual inspection of all such gates may be carried out and recorded,
detailed, component-wise trial and inspection and operating the gate for full travel, may
have to be judiciously restricted. For example, one gate in the middle of the spillway
which is frequently used may be chosen for detailed inspection, to observe smooth
operation and wear and tear of components, another on additional spillway or a gate
towards the end of spillway, may be chosen to test its reliability during emergency. Same
principal could be adopted in the case of outlet gates.
The Author suggests that, where the number of gates is large, the field officers may plan
such that operating all gates to full travel get covered during a five year cycle, even by
lowering stop log or emergency gates where needed.
In the case of Stop logs during safety inspection, it may be prudent to try-out lowering one
or two stop log elements into each of the vents of spillway to ensure that lowering of stop
logs in any vent during emergency would not be a problem.
Inspection of Radial Gates:
In Up-stream suspension type gates, gate lifting parts and wire-ropes and pulleys are
submerged for most part of the year and accessible for inspection, only if water level in
the dam falls below sill. In case this condition is not achievable, Stop logs are to be
lowered and area between stop log and the gates dewatered. Condition of Clevis, Turn-
buckles, pulleys, wire ropes equalizer bar etc. should be examined and recorded. Wear
on wear-plate on skin plate to be checked. Full opening of gate may be checked for
smooth travel. Rough and jerky movement of gate, leakage in closed position and
excessive leakage during seal travel, Vibration, Drag or excessive rubbing of seal
,abnormal noise, gate sway, increase in hoist load, Trunnion binding, and such
abnormalities are to be observed and the gate position at which these occur are to be
noted. These indicate the defects in gate groove, gate and trunnion alignment, loose
fitting of parts etc.
The condition of sill, any cavitation and erosion of sill groove could be examined in the
raised position of gate
In case of gates with D/S suspension, similar inspection of gate suspension parts could be
carried out if access from downstream is available. Testing under Full gate opening is
desirable as it brings out potential weaknesses and help taking timely corrective action.
Access to trunnion, walk-way and railing Trunion pin lock, bushing wear, lubrication of
trunnion Thrust-pads Trunion anchorage , Hub weld, Horizontal girders, Splice joints,
Field joints in skin plates are some important points to be checked and condition
recorded.
Winch type or hydraulic hoists provided for operating gates, may be inspected and
observations recorded. Gate position Indicators Limit Switches, and their settings may
be checked, Functioning of Limit Switches may be checked
While servicing of Gate components are generally attended to by the field staff, Stoplogs
and Hoist gantry crane and Rail track are likely to be neglected as they are needed during
Emergency only. So, during Safety inspection, special attention may be given to these
Emergency Equipment
Inspection of Vertical lift Gates
Vertical lift type gates are used as spillway gates, in a few old dams and in barrages. Stop
logs on spillways are also of this type. Hoist winches or Gantry Cranes are used for lifting
and handling these gates.
Dam outlet Gates and Canal gates are generally of Vertical lift type. These are of two
types: (a) upstream skin plate type and Downstream skin plate type. The service gate used
for frequent operation for discharge-regulation is a D/S skin plate type. The Emergency
Gate is Upstream skin plate Type.
As service gates are operated frequently, they are generally attended to, by the Field staff.
But Emergency gates which are rarely used tend to be neglected. During Safety
Inspection, condition of Emergency Gates, Storage facility, condition of gate groove,
Lifting and hoist mechanism, need special attention.
Functioning of the gate over full travel may be checked to see if it is smooth and without
binding, vibration or excessive leakage. Cavitation due to inadequate air vent or clogged
air passage needs to be checked.
Use of Hydraulic Hoists is becoming popular due to its being compact with fewer moving
parts, ease of operation, both opening and closing being positive and accurate,. The
system demands clean dust-free environment, moisture-free oil of specified grade,
avoiding leakage in hoses piping, and seals. Meticulous calibrating and servicing of
Hydraulic components such as Hydraulic pumps, pressure regulating valves, Filters,
cylinders etc. is called for. Performance of Hydraulic Hoists may be checked for smooth
movement of piston rod, absence of valve flutter, leakage at seals and connectors,
unsteady pressure gauge, gate creep, etc.
Before closing the Inspection job and leaving the site,, it is necessary to take a review of
data collected and make sure that no data is incomplete and no item is overlooked.
Documentation
Large amount of data collected during Inspection, in the form of sketches, notes, pictures, and
measurements, will have to be analyzed categorized, and inference drawn, and presented. The time-
limit for submission of report would be in the letter of authority. This could generally be within 3
months of inspection.
The Report may be in 3 parts:
1. Summary of findings and recommendations (condensed in 3-4 pages.)
2. Detailed Report
3. Annexures containing copies of records, Tables of measurements, Sketches, Photographs
etc.to support the Report.
It is desirable that the report comments on the system and not on an individual.
Detailed Report:
Format for Detailed Report is suggested below:
Introduction:
1. Give reference of Authority letter initiating Safety Inspection. Copy of this letter will be in the
Annexure
2. Mention whether the Inspection is the first of this type for the project. If it is a periodic
Inspection, when previous one was done. Keep copy of Report of previous Inspection in
Annexure.
3. Scope of Inspection: whether overall assessment related to Dam Safety or restricted to a specific
area or group of equipment like Gates of outdated design practice.
4. Personnel in the team, their qualification, Expertise, whether within the organization or hired
for examining specific aspect.
5. Date of commencement of Inspection and reasons for delay if any.
Main Report:
Review the records made available and give comment.
1. Review records of Field Maintenance, Pre-monsoon and post-monsoon inspection by field
staff. Give your view about, format used, whether equipment-vise, component-vise
inspection is maintained, adequacy of details given, defects noticed, quantified, and their
location noted, how and when rectified, whether scrutinized by higher officer and
commented. Suggestion for improving quality of inspecting and reporting may be given. This
may again be brought out in ‘Recommendations’
2. Comment on new equipment and techniques introduced on the project, (e,g. Hydraulic
Hoists, Pre-stressed anchorage remote control operation) and Field staff’s adaptability. Need
for training
3. Comment on security and safety aspects
4. State details of Visual Inspection and findings.
5. Testing of gates in operating condition, and observation
6. Observation and comments on gates of old design and fabrication practices,
7. Suggestion to field officers regarding program for covering all gates for testing for full travel.
8. Overall assessment of Safety aspect of Gates on the dam/project, based on findings in this
exercise
Conclusion:
Based on observations made in the Report above, .specific conclusions are drawn about safety
aspect of gates on the project and their contribution to overall safety of dam. Mention areas of
lacuna noticed and improvements suggested, any lessons learnt which could be adopted on other
projects,
Each conclusion should be specific and linked to the main Report. Adequacy of data and depth of
study should be verified, before drawing conclusions.
Conclusions could be supported by other case studies, Reports and literature available.
Unwarranted alarm or unsupported inferences should be avoided
Vague and unconfirmed conclusions should be avoided.
Recommendations:
Recommendations should be for specific line of action, and based on observations in the Report
and Conclusions drawn
Urgency of implementation of any specific recommendation may be indicated, giving reason;,
financial viability, and such implications .
Do not conclude the Report, without thanking the project authorities, for the courtesy and
facilities extended.
The Report should be signed by all the members of the Team, sealed and submitted to the
’Authority’.
Annexures- Attachments:
Copies of important and relevant communications. Pictures, Sketches, referred in the report
should be numbered, and tagged. Supporting technical literature with source should be
separately attached.
Executive Summary:
A brief Summary of Report of 3-4 pages may be drawn up and signed and sealed and submitted to
the concerned ‘Authority’ and discussed in person by the members of the team.
The Summary report should be brief, precise, and unambiguous. Conclusions should be with Links
to main Report. Recommendations should be numbered and their order of listing to reflect their
importance or urgency.
A well written inspection report is an asset which may be a guide to subsequent inspections.
References
1 Guidelines for Operation and Maintenance of Spillway Gates on Dams.
(Revised-2012) By M.V.S.Murthy B.E.(Mech) C.E. (Retd) GOG
(Free Download link http://pothi.com/pothi/book/ebook-m-v-s-murthy-guidelines-operation-
and-maintenance-spillway-gates-dams}
2 TADS Module- Inspection and testing of Gates Valves, and other Mechanical Systems
3 Indian Standards Spec. IS 10096 part 3 (2002)

More Related Content

What's hot

H & d ppt 05 wet docks
H & d ppt 05 wet docksH & d ppt 05 wet docks
H & d ppt 05 wet docksHasna Hassan
 
Spillway and gates
Spillway and gatesSpillway and gates
Spillway and gatesholegajendra
 
Railway Construction and Maintenance RHTA Module 2
Railway Construction and Maintenance RHTA Module 2Railway Construction and Maintenance RHTA Module 2
Railway Construction and Maintenance RHTA Module 2AJEETH B
 
Various types of gates, their important components
Various types of gates, their important componentsVarious types of gates, their important components
Various types of gates, their important componentsIEI GSC
 
PIPES , PIPE FITTINGS,PIPE JOINTS & LAYING OF PIPELINES
PIPES , PIPE FITTINGS,PIPE JOINTS & LAYING OF PIPELINESPIPES , PIPE FITTINGS,PIPE JOINTS & LAYING OF PIPELINES
PIPES , PIPE FITTINGS,PIPE JOINTS & LAYING OF PIPELINESMehul Gohil
 
Canal outlets
Canal outletsCanal outlets
Canal outletssaibabu48
 
fabrication,erection and repairing oF Dam's Gate
fabrication,erection and repairing oF Dam's Gatefabrication,erection and repairing oF Dam's Gate
fabrication,erection and repairing oF Dam's GateTushar Dholakia
 
Canal regulation works. m4pptx
Canal regulation works. m4pptxCanal regulation works. m4pptx
Canal regulation works. m4pptxBibhabasu Mohanty
 
hot mix plant
hot mix plant hot mix plant
hot mix plant pradip dangar
 
Canal headworks
Canal headworksCanal headworks
Canal headworksAtul Hajong
 
Fittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdfFittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdfTVijayaGowri
 
Erection of steel Structure
Erection of steel StructureErection of steel Structure
Erection of steel StructureGaurang Kakadiya
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineeringPooja Lonare
 
Diversion head works
Diversion head worksDiversion head works
Diversion head worksGayatri Sherkar
 
Spillways and Flood Control Works
Spillways and Flood Control WorksSpillways and Flood Control Works
Spillways and Flood Control WorksGAURAV. H .TANDON
 
Rail fastenings and joints
Rail fastenings and jointsRail fastenings and joints
Rail fastenings and jointsDeven Diran
 

What's hot (20)

Harbour
HarbourHarbour
Harbour
 
H & d ppt 05 wet docks
H & d ppt 05 wet docksH & d ppt 05 wet docks
H & d ppt 05 wet docks
 
Spillway and gates
Spillway and gatesSpillway and gates
Spillway and gates
 
Railway Construction and Maintenance RHTA Module 2
Railway Construction and Maintenance RHTA Module 2Railway Construction and Maintenance RHTA Module 2
Railway Construction and Maintenance RHTA Module 2
 
Various types of gates, their important components
Various types of gates, their important componentsVarious types of gates, their important components
Various types of gates, their important components
 
Classification of dams
Classification of damsClassification of dams
Classification of dams
 
PIPES , PIPE FITTINGS,PIPE JOINTS & LAYING OF PIPELINES
PIPES , PIPE FITTINGS,PIPE JOINTS & LAYING OF PIPELINESPIPES , PIPE FITTINGS,PIPE JOINTS & LAYING OF PIPELINES
PIPES , PIPE FITTINGS,PIPE JOINTS & LAYING OF PIPELINES
 
Canal outlets
Canal outletsCanal outlets
Canal outlets
 
fabrication,erection and repairing oF Dam's Gate
fabrication,erection and repairing oF Dam's Gatefabrication,erection and repairing oF Dam's Gate
fabrication,erection and repairing oF Dam's Gate
 
Canal regulation works. m4pptx
Canal regulation works. m4pptxCanal regulation works. m4pptx
Canal regulation works. m4pptx
 
hot mix plant
hot mix plant hot mix plant
hot mix plant
 
Harbours Engineering
 Harbours Engineering  Harbours Engineering
Harbours Engineering
 
Canal headworks
Canal headworksCanal headworks
Canal headworks
 
Fittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdfFittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdf
 
Erection of steel Structure
Erection of steel StructureErection of steel Structure
Erection of steel Structure
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineering
 
Diversion head works
Diversion head worksDiversion head works
Diversion head works
 
Bridge pier
Bridge pierBridge pier
Bridge pier
 
Spillways and Flood Control Works
Spillways and Flood Control WorksSpillways and Flood Control Works
Spillways and Flood Control Works
 
Rail fastenings and joints
Rail fastenings and jointsRail fastenings and joints
Rail fastenings and joints
 

Viewers also liked

Orbinox.mu penstock
Orbinox.mu penstockOrbinox.mu penstock
Orbinox.mu penstockchoiski
 
Presentation1
Presentation1Presentation1
Presentation1Gaurav Bhati
 
How the Gates Operate at Morris Sheppard Dam
How the Gates Operate at Morris Sheppard DamHow the Gates Operate at Morris Sheppard Dam
How the Gates Operate at Morris Sheppard DamJackie Fewell
 
Awwa c501 1980 cast iron sluice gates
Awwa c501 1980 cast iron sluice gatesAwwa c501 1980 cast iron sluice gates
Awwa c501 1980 cast iron sluice gatesEagle3232
 
Dam gate hoist, head gate hoist, electric gate gear, sluice gate lifting gear...
Dam gate hoist, head gate hoist, electric gate gear, sluice gate lifting gear...Dam gate hoist, head gate hoist, electric gate gear, sluice gate lifting gear...
Dam gate hoist, head gate hoist, electric gate gear, sluice gate lifting gear...Jacton Electromechanical Co.,Ltd
 
Ce154 lecture 3 reservoirs, spillways, & energy dissipators
Ce154   lecture 3 reservoirs, spillways, & energy dissipatorsCe154   lecture 3 reservoirs, spillways, & energy dissipators
Ce154 lecture 3 reservoirs, spillways, & energy dissipatorsSudhir Jagtap
 
Rope handbook
Rope handbookRope handbook
Rope handbookvadimirkaz
 
Sardar Sarovar Dam
Sardar Sarovar DamSardar Sarovar Dam
Sardar Sarovar DamKp Ahm
 
Structural Reliability Assessment of a Winch Drum for an Offshore Crane
Structural Reliability Assessment of a Winch Drum for an Offshore CraneStructural Reliability Assessment of a Winch Drum for an Offshore Crane
Structural Reliability Assessment of a Winch Drum for an Offshore CraneLes Moyo
 
Spillways2000 101110063804-phpapp02 - copy
Spillways2000 101110063804-phpapp02 - copySpillways2000 101110063804-phpapp02 - copy
Spillways2000 101110063804-phpapp02 - copybakht zamin
 
FINAL REPORT - Copy
FINAL REPORT - CopyFINAL REPORT - Copy
FINAL REPORT - CopyDivay Chadha
 

Viewers also liked (13)

Orbinox.mu penstock
Orbinox.mu penstockOrbinox.mu penstock
Orbinox.mu penstock
 
Presentation1
Presentation1Presentation1
Presentation1
 
How the Gates Operate at Morris Sheppard Dam
How the Gates Operate at Morris Sheppard DamHow the Gates Operate at Morris Sheppard Dam
How the Gates Operate at Morris Sheppard Dam
 
Awwa c501 1980 cast iron sluice gates
Awwa c501 1980 cast iron sluice gatesAwwa c501 1980 cast iron sluice gates
Awwa c501 1980 cast iron sluice gates
 
Dam gate hoist, head gate hoist, electric gate gear, sluice gate lifting gear...
Dam gate hoist, head gate hoist, electric gate gear, sluice gate lifting gear...Dam gate hoist, head gate hoist, electric gate gear, sluice gate lifting gear...
Dam gate hoist, head gate hoist, electric gate gear, sluice gate lifting gear...
 
4th yer ppt
4th yer  ppt4th yer  ppt
4th yer ppt
 
Ce154 lecture 3 reservoirs, spillways, & energy dissipators
Ce154   lecture 3 reservoirs, spillways, & energy dissipatorsCe154   lecture 3 reservoirs, spillways, & energy dissipators
Ce154 lecture 3 reservoirs, spillways, & energy dissipators
 
airport drainage
airport drainageairport drainage
airport drainage
 
Rope handbook
Rope handbookRope handbook
Rope handbook
 
Sardar Sarovar Dam
Sardar Sarovar DamSardar Sarovar Dam
Sardar Sarovar Dam
 
Structural Reliability Assessment of a Winch Drum for an Offshore Crane
Structural Reliability Assessment of a Winch Drum for an Offshore CraneStructural Reliability Assessment of a Winch Drum for an Offshore Crane
Structural Reliability Assessment of a Winch Drum for an Offshore Crane
 
Spillways2000 101110063804-phpapp02 - copy
Spillways2000 101110063804-phpapp02 - copySpillways2000 101110063804-phpapp02 - copy
Spillways2000 101110063804-phpapp02 - copy
 
FINAL REPORT - Copy
FINAL REPORT - CopyFINAL REPORT - Copy
FINAL REPORT - Copy
 

Similar to Safety inspection of gates

Dam safety & Safety Devices
Dam safety & Safety DevicesDam safety & Safety Devices
Dam safety & Safety DevicesTushar Dholakia
 
A life cycle approach to corrosion management and asset integrity
A life cycle approach to corrosion management and asset integrityA life cycle approach to corrosion management and asset integrity
A life cycle approach to corrosion management and asset integrityOkeme Esegine PMP
 
343312365 mt-ppt
343312365 mt-ppt343312365 mt-ppt
343312365 mt-pptMohamedAwad197
 
OSEA 2006 - Precom Impact final
OSEA 2006 - Precom Impact finalOSEA 2006 - Precom Impact final
OSEA 2006 - Precom Impact finalJohn Grover
 
"Inspection and rehabilitation | Moffatt & Nichol"
"Inspection and rehabilitation | Moffatt & Nichol""Inspection and rehabilitation | Moffatt & Nichol"
"Inspection and rehabilitation | Moffatt & Nichol"KatthyLucas2100
 
Cswip 11-01 - plant inspection- Week 2 cours
Cswip 11-01 - plant inspection- Week 2 coursCswip 11-01 - plant inspection- Week 2 cours
Cswip 11-01 - plant inspection- Week 2 coursRafik Guerbous
 
HT & LT Bus Ducts Manufacturer in Telangana and Andhra Pradesh
HT & LT Bus Ducts Manufacturer in Telangana and Andhra PradeshHT & LT Bus Ducts Manufacturer in Telangana and Andhra Pradesh
HT & LT Bus Ducts Manufacturer in Telangana and Andhra PradeshMohit Bathineni
 
Risk Assessment and Method Statement for Installation of Boardwalk in Dublin ...
Risk Assessment and Method Statement for Installation of Boardwalk in Dublin ...Risk Assessment and Method Statement for Installation of Boardwalk in Dublin ...
Risk Assessment and Method Statement for Installation of Boardwalk in Dublin ...pierdole
 
mh_saad_resume (2) - Copy
mh_saad_resume (2) - Copymh_saad_resume (2) - Copy
mh_saad_resume (2) - Copymohamed saad
 
Valves in Pipelines-December 20150Final
Valves in Pipelines-December 20150FinalValves in Pipelines-December 20150Final
Valves in Pipelines-December 20150Finalgobindkhiani
 
FW Tank Cleaning (1).pptx
FW Tank Cleaning (1).pptxFW Tank Cleaning (1).pptx
FW Tank Cleaning (1).pptxAnubhav Soni
 
61131730 transmission-line-case-study
61131730 transmission-line-case-study61131730 transmission-line-case-study
61131730 transmission-line-case-studyhomeworkping4
 
Mithun Banjan CV
Mithun Banjan CVMithun Banjan CV
Mithun Banjan CVmithun banjan
 
Jim Reed - The Gas Co. - Pipeline Safety In A Post San Bruno Era
Jim Reed - The Gas Co. - Pipeline Safety In A Post San Bruno EraJim Reed - The Gas Co. - Pipeline Safety In A Post San Bruno Era
Jim Reed - The Gas Co. - Pipeline Safety In A Post San Bruno EraContract Cities
 
Piping inspector questions 1
Piping inspector questions  1 Piping inspector questions  1
Piping inspector questions 1 MOHAMMAD ATIF ALI
 
Piping sample report
Piping sample reportPiping sample report
Piping sample reportram111eg
 
Sealweld commissioning enhancement
Sealweld commissioning enhancementSealweld commissioning enhancement
Sealweld commissioning enhancementkokan007
 

Similar to Safety inspection of gates (20)

Download
DownloadDownload
Download
 
Dam safety & Safety Devices
Dam safety & Safety DevicesDam safety & Safety Devices
Dam safety & Safety Devices
 
A life cycle approach to corrosion management and asset integrity
A life cycle approach to corrosion management and asset integrityA life cycle approach to corrosion management and asset integrity
A life cycle approach to corrosion management and asset integrity
 
Navtec rigging service guidelines
Navtec rigging service guidelinesNavtec rigging service guidelines
Navtec rigging service guidelines
 
343312365 mt-ppt
343312365 mt-ppt343312365 mt-ppt
343312365 mt-ppt
 
OSEA 2006 - Precom Impact final
OSEA 2006 - Precom Impact finalOSEA 2006 - Precom Impact final
OSEA 2006 - Precom Impact final
 
"Inspection and rehabilitation | Moffatt & Nichol"
"Inspection and rehabilitation | Moffatt & Nichol""Inspection and rehabilitation | Moffatt & Nichol"
"Inspection and rehabilitation | Moffatt & Nichol"
 
Cswip 11-01 - plant inspection- Week 2 cours
Cswip 11-01 - plant inspection- Week 2 coursCswip 11-01 - plant inspection- Week 2 cours
Cswip 11-01 - plant inspection- Week 2 cours
 
HT & LT Bus Ducts Manufacturer in Telangana and Andhra Pradesh
HT & LT Bus Ducts Manufacturer in Telangana and Andhra PradeshHT & LT Bus Ducts Manufacturer in Telangana and Andhra Pradesh
HT & LT Bus Ducts Manufacturer in Telangana and Andhra Pradesh
 
Risk Assessment and Method Statement for Installation of Boardwalk in Dublin ...
Risk Assessment and Method Statement for Installation of Boardwalk in Dublin ...Risk Assessment and Method Statement for Installation of Boardwalk in Dublin ...
Risk Assessment and Method Statement for Installation of Boardwalk in Dublin ...
 
mh_saad_resume (2) - Copy
mh_saad_resume (2) - Copymh_saad_resume (2) - Copy
mh_saad_resume (2) - Copy
 
KNPC Volume 3B.pdf
KNPC Volume 3B.pdfKNPC Volume 3B.pdf
KNPC Volume 3B.pdf
 
Valves in Pipelines-December 20150Final
Valves in Pipelines-December 20150FinalValves in Pipelines-December 20150Final
Valves in Pipelines-December 20150Final
 
FW Tank Cleaning (1).pptx
FW Tank Cleaning (1).pptxFW Tank Cleaning (1).pptx
FW Tank Cleaning (1).pptx
 
61131730 transmission-line-case-study
61131730 transmission-line-case-study61131730 transmission-line-case-study
61131730 transmission-line-case-study
 
Mithun Banjan CV
Mithun Banjan CVMithun Banjan CV
Mithun Banjan CV
 
Jim Reed - The Gas Co. - Pipeline Safety In A Post San Bruno Era
Jim Reed - The Gas Co. - Pipeline Safety In A Post San Bruno EraJim Reed - The Gas Co. - Pipeline Safety In A Post San Bruno Era
Jim Reed - The Gas Co. - Pipeline Safety In A Post San Bruno Era
 
Piping inspector questions 1
Piping inspector questions  1 Piping inspector questions  1
Piping inspector questions 1
 
Piping sample report
Piping sample reportPiping sample report
Piping sample report
 
Sealweld commissioning enhancement
Sealweld commissioning enhancementSealweld commissioning enhancement
Sealweld commissioning enhancement
 

More from IEI GSC

DIAGNOSTIC ANALYSIS OF DISTRESSED HYDRAULIC STRUCTURES: CASE STUDIES OF GUJAR...
DIAGNOSTIC ANALYSIS OF DISTRESSED HYDRAULIC STRUCTURES: CASE STUDIES OF GUJAR...DIAGNOSTIC ANALYSIS OF DISTRESSED HYDRAULIC STRUCTURES: CASE STUDIES OF GUJAR...
DIAGNOSTIC ANALYSIS OF DISTRESSED HYDRAULIC STRUCTURES: CASE STUDIES OF GUJAR...IEI GSC
 
Flexure Behaviour of Ferrocement Strengthened RC beams
Flexure Behaviour of Ferrocement Strengthened RC beamsFlexure Behaviour of Ferrocement Strengthened RC beams
Flexure Behaviour of Ferrocement Strengthened RC beamsIEI GSC
 
MIXTURE DESIGN OF FLY ASH & SLAG BASED ALKALI ACTIVATED CONCRETE FOR PRECAST ...
MIXTURE DESIGN OF FLY ASH & SLAG BASED ALKALI ACTIVATED CONCRETE FOR PRECAST ...MIXTURE DESIGN OF FLY ASH & SLAG BASED ALKALI ACTIVATED CONCRETE FOR PRECAST ...
MIXTURE DESIGN OF FLY ASH & SLAG BASED ALKALI ACTIVATED CONCRETE FOR PRECAST ...IEI GSC
 
COMPARATIVE STUDY OF OUTRIGGER STRUCTURE WITH DIFFERENT CONFIGURATIONS
COMPARATIVE STUDY OF OUTRIGGER STRUCTURE WITH DIFFERENT CONFIGURATIONSCOMPARATIVE STUDY OF OUTRIGGER STRUCTURE WITH DIFFERENT CONFIGURATIONS
COMPARATIVE STUDY OF OUTRIGGER STRUCTURE WITH DIFFERENT CONFIGURATIONSIEI GSC
 
Laboratory Investigation on the Mechanical Behavior of Concrete Containing St...
Laboratory Investigation on the Mechanical Behavior of Concrete Containing St...Laboratory Investigation on the Mechanical Behavior of Concrete Containing St...
Laboratory Investigation on the Mechanical Behavior of Concrete Containing St...IEI GSC
 
ENHANCEMENT OF SEISMIC PERFORMANCE OF STRUCTURES USING HyFRC
ENHANCEMENT OF SEISMIC PERFORMANCE OF STRUCTURES USING HyFRCENHANCEMENT OF SEISMIC PERFORMANCE OF STRUCTURES USING HyFRC
ENHANCEMENT OF SEISMIC PERFORMANCE OF STRUCTURES USING HyFRCIEI GSC
 
Prefabricated construction systems in India- Precast Status and needed Impetus
Prefabricated construction systems in India- Precast Status and needed ImpetusPrefabricated construction systems in India- Precast Status and needed Impetus
Prefabricated construction systems in India- Precast Status and needed ImpetusIEI GSC
 
Evaluation of durability properties of recycled aggregate concrete incorporat...
Evaluation of durability properties of recycled aggregate concrete incorporat...Evaluation of durability properties of recycled aggregate concrete incorporat...
Evaluation of durability properties of recycled aggregate concrete incorporat...IEI GSC
 
Precast infastructure
Precast infastructurePrecast infastructure
Precast infastructureIEI GSC
 
Advances in Hydraulic Structures, Rubber Dam-A way forward
Advances in Hydraulic Structures, Rubber Dam-A way forwardAdvances in Hydraulic Structures, Rubber Dam-A way forward
Advances in Hydraulic Structures, Rubber Dam-A way forwardIEI GSC
 
Effect of Waste Foundry Sand on Durability Properties of Concrete
Effect of Waste Foundry Sand on Durability Properties of ConcreteEffect of Waste Foundry Sand on Durability Properties of Concrete
Effect of Waste Foundry Sand on Durability Properties of ConcreteIEI GSC
 
Flexure Behaviour of Ferrocement Strengthened RC beams
Flexure Behaviour of Ferrocement Strengthened RC beamsFlexure Behaviour of Ferrocement Strengthened RC beams
Flexure Behaviour of Ferrocement Strengthened RC beamsIEI GSC
 
Future of civil engineering
Future of civil engineering Future of civil engineering
Future of civil engineering IEI GSC
 
Dr. Jaikrishna Memorial Lecture on Evolution of Bridges
Dr. Jaikrishna Memorial Lecture on Evolution of BridgesDr. Jaikrishna Memorial Lecture on Evolution of Bridges
Dr. Jaikrishna Memorial Lecture on Evolution of BridgesIEI GSC
 
Structural Safety in India
Structural Safety in India Structural Safety in India
Structural Safety in India IEI GSC
 
GEO TEXTILES FOR DEVELOPMENT OF NORTH EASTERN REGION
GEO TEXTILES FOR DEVELOPMENT OF NORTH EASTERN REGIONGEO TEXTILES FOR DEVELOPMENT OF NORTH EASTERN REGION
GEO TEXTILES FOR DEVELOPMENT OF NORTH EASTERN REGIONIEI GSC
 
Use of GeoTextiles in Civil Engineering : Work on NH 150, Manipur
Use of GeoTextiles in Civil Engineering : Work on NH 150, ManipurUse of GeoTextiles in Civil Engineering : Work on NH 150, Manipur
Use of GeoTextiles in Civil Engineering : Work on NH 150, ManipurIEI GSC
 
Textiles & GeoTextile Composites
Textiles & GeoTextile CompositesTextiles & GeoTextile Composites
Textiles & GeoTextile CompositesIEI GSC
 
Presentation application-of-geosynthetics-in-canal
Presentation application-of-geosynthetics-in-canalPresentation application-of-geosynthetics-in-canal
Presentation application-of-geosynthetics-in-canalIEI GSC
 
Presentation: Comparative Evaluation Of Epoxy Treated Reinforcement And Ename...
Presentation: Comparative Evaluation Of Epoxy Treated Reinforcement And Ename...Presentation: Comparative Evaluation Of Epoxy Treated Reinforcement And Ename...
Presentation: Comparative Evaluation Of Epoxy Treated Reinforcement And Ename...IEI GSC
 

More from IEI GSC (20)

DIAGNOSTIC ANALYSIS OF DISTRESSED HYDRAULIC STRUCTURES: CASE STUDIES OF GUJAR...
DIAGNOSTIC ANALYSIS OF DISTRESSED HYDRAULIC STRUCTURES: CASE STUDIES OF GUJAR...DIAGNOSTIC ANALYSIS OF DISTRESSED HYDRAULIC STRUCTURES: CASE STUDIES OF GUJAR...
DIAGNOSTIC ANALYSIS OF DISTRESSED HYDRAULIC STRUCTURES: CASE STUDIES OF GUJAR...
 
Flexure Behaviour of Ferrocement Strengthened RC beams
Flexure Behaviour of Ferrocement Strengthened RC beamsFlexure Behaviour of Ferrocement Strengthened RC beams
Flexure Behaviour of Ferrocement Strengthened RC beams
 
MIXTURE DESIGN OF FLY ASH & SLAG BASED ALKALI ACTIVATED CONCRETE FOR PRECAST ...
MIXTURE DESIGN OF FLY ASH & SLAG BASED ALKALI ACTIVATED CONCRETE FOR PRECAST ...MIXTURE DESIGN OF FLY ASH & SLAG BASED ALKALI ACTIVATED CONCRETE FOR PRECAST ...
MIXTURE DESIGN OF FLY ASH & SLAG BASED ALKALI ACTIVATED CONCRETE FOR PRECAST ...
 
COMPARATIVE STUDY OF OUTRIGGER STRUCTURE WITH DIFFERENT CONFIGURATIONS
COMPARATIVE STUDY OF OUTRIGGER STRUCTURE WITH DIFFERENT CONFIGURATIONSCOMPARATIVE STUDY OF OUTRIGGER STRUCTURE WITH DIFFERENT CONFIGURATIONS
COMPARATIVE STUDY OF OUTRIGGER STRUCTURE WITH DIFFERENT CONFIGURATIONS
 
Laboratory Investigation on the Mechanical Behavior of Concrete Containing St...
Laboratory Investigation on the Mechanical Behavior of Concrete Containing St...Laboratory Investigation on the Mechanical Behavior of Concrete Containing St...
Laboratory Investigation on the Mechanical Behavior of Concrete Containing St...
 
ENHANCEMENT OF SEISMIC PERFORMANCE OF STRUCTURES USING HyFRC
ENHANCEMENT OF SEISMIC PERFORMANCE OF STRUCTURES USING HyFRCENHANCEMENT OF SEISMIC PERFORMANCE OF STRUCTURES USING HyFRC
ENHANCEMENT OF SEISMIC PERFORMANCE OF STRUCTURES USING HyFRC
 
Prefabricated construction systems in India- Precast Status and needed Impetus
Prefabricated construction systems in India- Precast Status and needed ImpetusPrefabricated construction systems in India- Precast Status and needed Impetus
Prefabricated construction systems in India- Precast Status and needed Impetus
 
Evaluation of durability properties of recycled aggregate concrete incorporat...
Evaluation of durability properties of recycled aggregate concrete incorporat...Evaluation of durability properties of recycled aggregate concrete incorporat...
Evaluation of durability properties of recycled aggregate concrete incorporat...
 
Precast infastructure
Precast infastructurePrecast infastructure
Precast infastructure
 
Advances in Hydraulic Structures, Rubber Dam-A way forward
Advances in Hydraulic Structures, Rubber Dam-A way forwardAdvances in Hydraulic Structures, Rubber Dam-A way forward
Advances in Hydraulic Structures, Rubber Dam-A way forward
 
Effect of Waste Foundry Sand on Durability Properties of Concrete
Effect of Waste Foundry Sand on Durability Properties of ConcreteEffect of Waste Foundry Sand on Durability Properties of Concrete
Effect of Waste Foundry Sand on Durability Properties of Concrete
 
Flexure Behaviour of Ferrocement Strengthened RC beams
Flexure Behaviour of Ferrocement Strengthened RC beamsFlexure Behaviour of Ferrocement Strengthened RC beams
Flexure Behaviour of Ferrocement Strengthened RC beams
 
Future of civil engineering
Future of civil engineering Future of civil engineering
Future of civil engineering
 
Dr. Jaikrishna Memorial Lecture on Evolution of Bridges
Dr. Jaikrishna Memorial Lecture on Evolution of BridgesDr. Jaikrishna Memorial Lecture on Evolution of Bridges
Dr. Jaikrishna Memorial Lecture on Evolution of Bridges
 
Structural Safety in India
Structural Safety in India Structural Safety in India
Structural Safety in India
 
GEO TEXTILES FOR DEVELOPMENT OF NORTH EASTERN REGION
GEO TEXTILES FOR DEVELOPMENT OF NORTH EASTERN REGIONGEO TEXTILES FOR DEVELOPMENT OF NORTH EASTERN REGION
GEO TEXTILES FOR DEVELOPMENT OF NORTH EASTERN REGION
 
Use of GeoTextiles in Civil Engineering : Work on NH 150, Manipur
Use of GeoTextiles in Civil Engineering : Work on NH 150, ManipurUse of GeoTextiles in Civil Engineering : Work on NH 150, Manipur
Use of GeoTextiles in Civil Engineering : Work on NH 150, Manipur
 
Textiles & GeoTextile Composites
Textiles & GeoTextile CompositesTextiles & GeoTextile Composites
Textiles & GeoTextile Composites
 
Presentation application-of-geosynthetics-in-canal
Presentation application-of-geosynthetics-in-canalPresentation application-of-geosynthetics-in-canal
Presentation application-of-geosynthetics-in-canal
 
Presentation: Comparative Evaluation Of Epoxy Treated Reinforcement And Ename...
Presentation: Comparative Evaluation Of Epoxy Treated Reinforcement And Ename...Presentation: Comparative Evaluation Of Epoxy Treated Reinforcement And Ename...
Presentation: Comparative Evaluation Of Epoxy Treated Reinforcement And Ename...
 

Recently uploaded

Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 

Safety inspection of gates

  • 1. One Day Seminar on Safety Examination, Operation & Maintenance of Gates For Dams, Canals, Drains, and Other structures. July 3rd . 2015 Subject: Safety Inspection of Gates and its documentation. By M.V.S.Murthy C.E. (Retired) WRD GOG Need for Safety Inspection of Gates: Safety Inspection of Gates is a part of Dam Safety Activity While routine maintenance of Gate components is the responsibility of the Field Staff, Safety Inspection of Gates on a project and its documentation by an Independent group of senior personnel and specialists, is useful in assessing overall performance capability and reliability of these Equipment, and identify areas of deficiency. This activity can be called ‘Safety Audit of gates’. It also assesses the adequacy of Gate maintenance procedures and records, and Field Officers‘ preparedness to handle problems which may arise, before they develop into distress. Further, as Dam Spillway and canal outlets are built to meet the maximum anticipated demand, there could be some redundancy during off-season or normal working. If some equipment becomes inoperative, its absence may remain unnoticed or overlooked by the field staff. Such lapses are not uncommon, and may prove disastrous during emergency. Safety Inspection avoids such a situation. A review of Safety Inspection of Gates on different projects in a state may bring out existence of outdated and defective gates and construction practices and initiate review and modification. This would improve the overall reliability and safety of Dams. Safety Inspection and its Documentation: The safety inspection activity can be broken down into three steps: 1. Preparation for the task. 2. Inspection technique 3. Documentation of report
  • 2. Preparation for the task 1. Pre- planning of Inspection. This may be necessary as Reservoir water level should be acceptable for testing of equipment and inspection of components. Minimum wastage of storage and interruption to water demand, should be attempted. Necessary precautions are to be taken for this un-timely operating of gates, such as, prior notification, and warnings to downstream areas of likely increase in flow .etc 2. Reviewing Documents Following records may be collected and studied. (a) Final Construction and Installation Drawings for Gates and related equipment including Supplier’s Operation Manual (b) Details of any major alterations, modification, carried out and when why and by whom. (c) Review of Pre-monsoon and Post-monsoon inspection and servicing Records for their adequacy. (d) Standard Operating Procedures for gates, displayed in control room. (e) Security arrangements to prevent unauthorized person, operating gates. (f) Check sources of Power supply for Gates operation, its dependability during heavy floods, Stand-by power supply, its exclusiveness, adequacy for number of gates to be operated simultaneously at a time to handle maximum flood, effective communication between standby power source and gates control area. (g) Contingency plan to restore power if one of the Power cables to gates, fails. (h) Fire Hazard prevention: As the environment is windy humid and wet, and power cables are abundant, possibility of short-circuit and fire hazard are high. A valid Inspection and Testing certificate for Electrical Installation for Gates operation, from a competent authority is desirable. Also, availability of Fire-fighting Equipment and their working may be checked and noted. 3. Preparation on the field. Tools Tackle and manpower to be mobilized (Many of these are not likely to be available at site) A list is indicated: Steel Tape. Steel Rule with graduation. Machinist’s Spirit Level. Heavy Plumb. Steel Right Angle. Inside-Outside Calipers. Micrometers, Filler Gauges, Heavy Duty Tool Kit with Wrenches Spanners, Stud removers Impact wrenches, Torque Wrenches Chisels Hammers hand drills etc. Mirror, Magnifying Glass. Depth-gauge Steel shim plates of assorted thickness.
  • 3. Wire brush Blow torch, Camera with flash. Torchlight, Electrical Testing meters, tester for testing insulation and earthing. Ammeters Volt meters Tong testers for measuring current in a cable. Degreasing fluid, cotton waste, Dye for Dye-penetration test etc The list is indicative only. Personal Safety arrangement: As Inspection involves movement on wet and slippery surface, approach by boat, climbing on temporary ladders ,working in heights and above flowing water, the officer who is to inspect should be healthy agile and alert. Safety precautions should be taken, hard hats, Gum boots etc. used. Boats with lifejackets, rescue and First aid facilities to be at hand where necessary. As worksites are likely to be windy, loose clothing should be avoided by persons involved. Inspection technique. Physical inspection of Equipment, and Components, and recording findings, is the main purpose of this exercise. This should give an overall assessment of their reliability for safety of Dam. The Inspector has to decide what gates are to be tested, and which critical components to be checked, based on his experience, and literature available. The booklet “Guidelines for Operation and Maintenance of Spillway Gates on Dams” by M.V.S.Murthy, is one such literature available for free download from link given below: http://pothi.com/pothi/book/ebook-m-v-s-murthy-guidelines-operation-and-maintenance-spillway- gates-dams 1. Preparation for inspection at site: Study and make notes of Drawings and sketches of parts to be inspected, Decide gate/s to be selected for detailed inspection and trial, sketches of components to be drawn, to identify them in the report. Sequence of components to be checked to be decided. Problem areas, and limitation in checking to be noted down. Restoring the equipment to normal operation after inspection to be planned. 2. Inspection of Gates: Though there are different types and sizes, such as spillway gates, radial type and vertical lift type, dam outlet gates fixed wheel type and slide gates, Canal gates etc., some inspection aspects are common while others are specific to the type. We may discuss the common aspects first. Common Aspects: Corrosion, pitting, Cavitation and Electro-chemical reaction on metals, crack in weld, are some of the defects common to all types of gates. Causes and remedies are discussed in the booklet “Guidelines on O&M of Spillway Gates on Dams” by M.V.S.Murthy)
  • 4. (a) During visual inspection of gates, we may look for signs of Rusting, Corrosion and pitting of components and record their location possible cause and suggest remedy. Cavitation occurs where flow is not streamlined and turbulent flow occurs. The area will have to be dewatered to check the extent and seriousness of problem of cavitation. (b) Where Stainless steel plates are used as seal seat and are fixed to MS base plate in Embedment by intermittent welding, cracking of weld and peeling off of seal seat, may cause leakage, damage to seal, and rough movement of gate. Above points need be verified and recorded. These defects are difficult to rectify and may need detailed planning. (c) Some of the old design and fabrication practices adopted, particularly in the case of Vertical Lift Type Gates for Spillways and Dam outlets, are prone to cause major problems over years of use. A few are indicated below which may be checked during Safety Inspection. (d) Fixing of Seal travel seat with Base plate in the embedment.:- Brass plates were used as Seal Seats and fixed to embedded steel Base plate by brass countersunk screws .Frequent travel of seal during gate operation, unevenness of surface, leakage at seals, pressure buildup behind the seal seat, and vibration, could cause loosening of screws, falling off of seal plate, seal damage, vibration and even gate failure, particularly in case of dam outlet gates. (e) Seal Quality: Quality check of seals used or stored as spare, may be verified as molded type seals of correct specification are much costly compared to look-alike seals available in the market. (f) Fixing of MS Track Plate (for wheel travel) to base plate with countersunk bolts. Over a period of use Track Plate wear, waviness, loosening of bolts, heavy vibration, etc. may pose a source of potential danger. (g) In the case of fabricated steel outlet gates and canal gates, the shape of Gate lip could be source of turbulence and vibration of gate. This may be observed during trial operation and commented (h) During Safety Inspection of gates on a project, it may not be feasible to operate and test all gates. There are a number of dams where there are 30 to 35 spillway gates. In such cases, while superficial visual inspection of all such gates may be carried out and recorded, detailed, component-wise trial and inspection and operating the gate for full travel, may have to be judiciously restricted. For example, one gate in the middle of the spillway which is frequently used may be chosen for detailed inspection, to observe smooth operation and wear and tear of components, another on additional spillway or a gate towards the end of spillway, may be chosen to test its reliability during emergency. Same principal could be adopted in the case of outlet gates. The Author suggests that, where the number of gates is large, the field officers may plan such that operating all gates to full travel get covered during a five year cycle, even by lowering stop log or emergency gates where needed. In the case of Stop logs during safety inspection, it may be prudent to try-out lowering one or two stop log elements into each of the vents of spillway to ensure that lowering of stop logs in any vent during emergency would not be a problem.
  • 5. Inspection of Radial Gates: In Up-stream suspension type gates, gate lifting parts and wire-ropes and pulleys are submerged for most part of the year and accessible for inspection, only if water level in the dam falls below sill. In case this condition is not achievable, Stop logs are to be lowered and area between stop log and the gates dewatered. Condition of Clevis, Turn- buckles, pulleys, wire ropes equalizer bar etc. should be examined and recorded. Wear on wear-plate on skin plate to be checked. Full opening of gate may be checked for smooth travel. Rough and jerky movement of gate, leakage in closed position and excessive leakage during seal travel, Vibration, Drag or excessive rubbing of seal ,abnormal noise, gate sway, increase in hoist load, Trunnion binding, and such abnormalities are to be observed and the gate position at which these occur are to be noted. These indicate the defects in gate groove, gate and trunnion alignment, loose fitting of parts etc. The condition of sill, any cavitation and erosion of sill groove could be examined in the raised position of gate In case of gates with D/S suspension, similar inspection of gate suspension parts could be carried out if access from downstream is available. Testing under Full gate opening is desirable as it brings out potential weaknesses and help taking timely corrective action. Access to trunnion, walk-way and railing Trunion pin lock, bushing wear, lubrication of trunnion Thrust-pads Trunion anchorage , Hub weld, Horizontal girders, Splice joints, Field joints in skin plates are some important points to be checked and condition recorded. Winch type or hydraulic hoists provided for operating gates, may be inspected and observations recorded. Gate position Indicators Limit Switches, and their settings may be checked, Functioning of Limit Switches may be checked While servicing of Gate components are generally attended to by the field staff, Stoplogs and Hoist gantry crane and Rail track are likely to be neglected as they are needed during Emergency only. So, during Safety inspection, special attention may be given to these Emergency Equipment Inspection of Vertical lift Gates Vertical lift type gates are used as spillway gates, in a few old dams and in barrages. Stop logs on spillways are also of this type. Hoist winches or Gantry Cranes are used for lifting and handling these gates. Dam outlet Gates and Canal gates are generally of Vertical lift type. These are of two types: (a) upstream skin plate type and Downstream skin plate type. The service gate used
  • 6. for frequent operation for discharge-regulation is a D/S skin plate type. The Emergency Gate is Upstream skin plate Type. As service gates are operated frequently, they are generally attended to, by the Field staff. But Emergency gates which are rarely used tend to be neglected. During Safety Inspection, condition of Emergency Gates, Storage facility, condition of gate groove, Lifting and hoist mechanism, need special attention. Functioning of the gate over full travel may be checked to see if it is smooth and without binding, vibration or excessive leakage. Cavitation due to inadequate air vent or clogged air passage needs to be checked. Use of Hydraulic Hoists is becoming popular due to its being compact with fewer moving parts, ease of operation, both opening and closing being positive and accurate,. The system demands clean dust-free environment, moisture-free oil of specified grade, avoiding leakage in hoses piping, and seals. Meticulous calibrating and servicing of Hydraulic components such as Hydraulic pumps, pressure regulating valves, Filters, cylinders etc. is called for. Performance of Hydraulic Hoists may be checked for smooth movement of piston rod, absence of valve flutter, leakage at seals and connectors, unsteady pressure gauge, gate creep, etc. Before closing the Inspection job and leaving the site,, it is necessary to take a review of data collected and make sure that no data is incomplete and no item is overlooked. Documentation Large amount of data collected during Inspection, in the form of sketches, notes, pictures, and measurements, will have to be analyzed categorized, and inference drawn, and presented. The time- limit for submission of report would be in the letter of authority. This could generally be within 3 months of inspection. The Report may be in 3 parts: 1. Summary of findings and recommendations (condensed in 3-4 pages.) 2. Detailed Report 3. Annexures containing copies of records, Tables of measurements, Sketches, Photographs etc.to support the Report. It is desirable that the report comments on the system and not on an individual. Detailed Report: Format for Detailed Report is suggested below: Introduction: 1. Give reference of Authority letter initiating Safety Inspection. Copy of this letter will be in the Annexure
  • 7. 2. Mention whether the Inspection is the first of this type for the project. If it is a periodic Inspection, when previous one was done. Keep copy of Report of previous Inspection in Annexure. 3. Scope of Inspection: whether overall assessment related to Dam Safety or restricted to a specific area or group of equipment like Gates of outdated design practice. 4. Personnel in the team, their qualification, Expertise, whether within the organization or hired for examining specific aspect. 5. Date of commencement of Inspection and reasons for delay if any. Main Report: Review the records made available and give comment. 1. Review records of Field Maintenance, Pre-monsoon and post-monsoon inspection by field staff. Give your view about, format used, whether equipment-vise, component-vise inspection is maintained, adequacy of details given, defects noticed, quantified, and their location noted, how and when rectified, whether scrutinized by higher officer and commented. Suggestion for improving quality of inspecting and reporting may be given. This may again be brought out in ‘Recommendations’ 2. Comment on new equipment and techniques introduced on the project, (e,g. Hydraulic Hoists, Pre-stressed anchorage remote control operation) and Field staff’s adaptability. Need for training 3. Comment on security and safety aspects 4. State details of Visual Inspection and findings. 5. Testing of gates in operating condition, and observation 6. Observation and comments on gates of old design and fabrication practices, 7. Suggestion to field officers regarding program for covering all gates for testing for full travel. 8. Overall assessment of Safety aspect of Gates on the dam/project, based on findings in this exercise Conclusion: Based on observations made in the Report above, .specific conclusions are drawn about safety aspect of gates on the project and their contribution to overall safety of dam. Mention areas of lacuna noticed and improvements suggested, any lessons learnt which could be adopted on other projects, Each conclusion should be specific and linked to the main Report. Adequacy of data and depth of study should be verified, before drawing conclusions. Conclusions could be supported by other case studies, Reports and literature available. Unwarranted alarm or unsupported inferences should be avoided Vague and unconfirmed conclusions should be avoided.
  • 8. Recommendations: Recommendations should be for specific line of action, and based on observations in the Report and Conclusions drawn Urgency of implementation of any specific recommendation may be indicated, giving reason;, financial viability, and such implications . Do not conclude the Report, without thanking the project authorities, for the courtesy and facilities extended. The Report should be signed by all the members of the Team, sealed and submitted to the ’Authority’. Annexures- Attachments: Copies of important and relevant communications. Pictures, Sketches, referred in the report should be numbered, and tagged. Supporting technical literature with source should be separately attached. Executive Summary: A brief Summary of Report of 3-4 pages may be drawn up and signed and sealed and submitted to the concerned ‘Authority’ and discussed in person by the members of the team. The Summary report should be brief, precise, and unambiguous. Conclusions should be with Links to main Report. Recommendations should be numbered and their order of listing to reflect their importance or urgency. A well written inspection report is an asset which may be a guide to subsequent inspections. References 1 Guidelines for Operation and Maintenance of Spillway Gates on Dams. (Revised-2012) By M.V.S.Murthy B.E.(Mech) C.E. (Retd) GOG (Free Download link http://pothi.com/pothi/book/ebook-m-v-s-murthy-guidelines-operation- and-maintenance-spillway-gates-dams} 2 TADS Module- Inspection and testing of Gates Valves, and other Mechanical Systems 3 Indian Standards Spec. IS 10096 part 3 (2002)