Running head: PROJECT MANAGEMENT. 1
PROJECT MANAGEMENT. 2
Project management process is a crucial tool in the development
of any organization. This is because the projects that the
organization deploys determine the business clientele. Critical
analysis of the project management process is paramount to the
successful execution of these elements within an organization.
In the case of introducing the California Coast Credit Union
into the San Diego State University, there are five crucial
processes that should be adhered to in order to ensure the
project’s success.
Initiation
During the initiation process, the eligibility of any relevant
projects available is checked so as to validate the feasibility of
the project plan. Once the project plans have been presented and
the feasibility checked, the selection process is then initiated
based on the requirements that each individual project would
require. The project manager and the project management team
then sign off on the requirements of the specific project
selected.
In this case, the DBSI team was selected for the implementation
of data signage procedures that are to be introduced within the
student’s hub of the San Diego State University. It is during this
stage that the appropriate team members of the project are
identified as well as the project leaders. Selection of the project
leaders is crucial to the next stage of the project management
process which is the planning process. Furthermore, the ideal
environment for the execution of the project is also identified so
as to propagate an approximate orientation as to the next stage
of the project plan (Making Waves with Digital Signage, 2014).
Planning
The next stage of the project management process is the
planning process. The planning process is crucial in the
intricate addressing of the project requirements so as to
effectively kick start the project. Once all the project
requirements are identified, the project planning can then be
able to cultivate procedural steps in the implementation of the
project. The project requirements are aligned with the project
objectives or the elements that the project hopes to achieve. The
specific objectives of the California Coast Credit Union by
introducing data signage in the San Diego State University is to
create an interactive forum where the students would be able to
relate to the credit union, create a specific brand that would
advocate for reliability and accessibility, and finally create and
more engaging foot traffic among the thirty thousand students
operating the campus (5 Basic Phases of Project Management,
2016).
The planning process also involves the scope of the project in
terms of its relativity to the actual services that the project
hopes to provide. The scope would entail prospects such as open
air digital designs, using the ideal equipment so as to utilize the
available technology and presentation of the right content in an
entertaining forum. Moreover, the planning process also has to
take into consideration the implementation timelines of the
project. Most managers offer short viable projects so as to
assess the productivity of the project within the appropriate
period. The implementation of the project was estimated to be
two months as per California Coast Credit Union’s timelines. In
addition, the project’s approximate budget should also be
discussed during the planning process so as to facilitate the
proper schedules and resource allocation factors.
Execution
The execution process is the most essential part of the project
management process as it entails the actual implementation of
the project’s goals and objectives. During the execution
process, individual assignments are handed out to the relevant
stakeholders and participants of the project so as to ensure that
all the essential prospects of the project are actually taken care
of. As the introduction of digital signage in the San Diego State
University is mostly focused on video brochures, videos and
interactive tutorials, specific tasks would be assigned to
different stakeholders. This is to ensure that the specified
elements related to the implementation of the project objectives
are covered. These elements incorporate things such as the
designs, the construction of the relevant structures, the relevant
equipment used in the operation as well as the digital
technology strategies that can be applied. Besides, as the digital
signage incorporates awareness to the students, the content and
content sharing strategies are also assigned to specific
individuals not to mention the copyrighting and the graphic
designs applied to the digital signage.
The execution also entails keeping track of the detailed project
progress through regular updates on the project. Regular
updates ensure that there is constant progress in the project
implementation thus a preferable update process would be a
daily or weekly update plan in all the relevant prospects as per
the drafted project plans and schedule.
Control and monitoring
The fourth process in the project management process is the
control, monitoring and validation of the projects successful
implementation. Control and monitoring should involve the
adhering to the selected project plans so as to make sure that
successful implementation and running of the project is done.
Monitoring the updates can ensure adherence to the project
plans by the respective stakeholder in the project (5 Basic
Phases of Project Management, 2016).
The control and monitoring process also entails the quality
assessments through assurance test plans. These assurance test
plans validate the quality of the project work and delivery as
applied during the implementation of the project.
Communication plans are also relevant in the control and
monitoring process as they ensure that the right information is
passed along to the relevant recipients such that there would be
coordination in the implementation of the project.
Closing
The closing process is final phase of the project management
process and a project management professional or a team of
professionals, should conduct an evaluation of the entire project
so as to validate the project. Evaluation of viable projects
usually indicate little or no error during their assessment.
Nonetheless, the identification of mistakes by project teams
typically indicate that there is a problem with the project and
that specific elements of the error need to checked in order to
fix the project into a viable project. Assessment of the timelines
involved in the execution of specific project plans is also
crucial to identifying any possible errors in the project (Making
Waves with Digital Signage, 2014).
Effects of PMP on team members.
Team members benefit a lot from the execution of project plans
that they have been assigned to. The team members get a chance
to put their relevant skills towards the successful execution of
the project. The team members also get a chance to learn
effective communication skills as from the formulated
communication plans relevant to the project. Furthermore, the
involved team members invoke their creative and capacitive
skills in their normal work designations by creating more
innovative ideas that would help in the overall development of
the organization.
References.
5 Basic Phases of Project Management. (2016). Retrieved on
August 19th 2016, from
www.projectinsight.net/project-management-basics/basic-
project-management-phases
Making Waves with Digital Signage. (2014). Retrieved on
August 19th 2016, from
dbsi-inc.com/true-stories/digital-signage/true-story-california-
coast-credit-union/
Chapter 1
Risk and Its Treatment
Copyright © 2017 Pearson Education, Inc. All rights reserved.
Copyright © 2017 Pearson Education, Inc. All rights reserved.
1-‹#›
1
Agenda
Definitions of Risk
Chance of Loss
Peril and Hazard
Classification of Risk
Major Personal Risks and Commercial Risks
Burden of Risk on Society
Techniques for Managing Risk
Copyright © 2017 Pearson Education, Inc. All rights reserved.
1-‹#›
2
Definitions of Risk
Traditional Definition of Risk: Uncertainty concerning the
occurrence of a loss
In the insurance industry, risk is also used to identify the
property or life that is being considered for insurance
In economics and finance:
The term risk is used in situations where the probabilities of
possible outcomes are known
Uncertainty is used in situations where such probabilities
cannot be estimated
Copyright © 2017 Pearson Education, Inc. All rights reserved.
1-‹#›
3
Transparency Master 1.2
Loss Exposure: Any situation or circumstance in which a loss is
possible, regardless of whether a loss occurs
Objective risk is defined as the relative variation of actual loss
from expected loss
It can be statistically calculated by some measure of dispersion,
such as the standard deviation
Subjective (perceived) risk is defined as uncertainty based on a
person’s mental condition or state of mind
Definitions of Risk (Continued)
Copyright © 2017 Pearson Education, Inc. All rights reserved.
1-‹#›
Chance of Loss
Chance of loss: The probability that an event will occur
Objective probability refers to the long-run relative frequency
of an event based on the assumptions of an infinite number of
observations and of no change in the underlying conditions
Subjective probability is the individual’s personal estimate of
the chance of loss
Copyright © 2017 Pearson Education, Inc. All rights reserved.
1-‹#›
5
Transparency Master 1.2
Chance of Loss vs. Objective Risk
Chance of loss is the probability that an event that causes a loss
will occur.
Objective risk is the relative variation of actual loss from
expected loss
The chance of loss may be identical for two different groups,
but objective risk may be quite different!
City# homesAverage # firesRangeChance of FireObjective
RiskPhiladelphia10,00010075 – 1251%25%Los
Angeles10,00010090 - 1101%10%
Copyright © 2017 Pearson Education, Inc. All rights reserved.
1-‹#›
6
Transparency Master 1.2
Peril and Hazard
A peril is defined as the cause of the loss.
Examples include property damage because of fire, windstorm,
or lightening, or damage to your car because of a collision with
another vehicle.
A hazard is a condition that increases the chance of loss
A physical hazard is a physical condition that increases the
frequency or severity of loss
Moral hazard is dishonesty or character defects in an individual
that increase the frequency or severity of loss
Copyright © 2017 Pearson Education, Inc. All rights reserved.
1-‹#›
7
Transparency Master 1.2
Peril and Hazard (Continued)
Attitudinal Hazard (Morale Hazard) is carelessness or
indifference to a loss, which increases the frequency or severity
of a loss
Legal Hazard refers to characteristics of the legal system or
regulatory environment that increase the frequency or severity
of losses
Copyright © 2017 Pearson Education, Inc. All rights reserved.
1-‹#›
Classification of Risk
Pure Risk and Speculative Risk
A pure risk is a situation in which there are only the
possibilities of loss or no loss (earthquake)
A speculative risk is a situation in which either profit or loss is
possible (gambling)
Copyright © 2017 Pearson Education, Inc. All rights reserved.
1-‹#›
9
Transparency Master 1.2
Classification of Risk (Continued)
Diversifiable Risk and Nondiversifiable Risk
A diversifiable risk affects only individuals or small groups (car
theft). It can be reduced or eliminated by diversification.
A nondiversifiable risk affects the entire economy or large
numbers of persons or groups within the economy (hurricane). It
is also called fundamental risk.
Government assistance may be necessary to insure
nondiversifiable risks.
Copyright © 2017 Pearson Education, Inc. All rights reserved.
1-‹#›
Classification of Risk (Continued)
Enterprise risk encompasses all major risks faced by a business
firm, which include: pure risk, speculative risk, strategic risk,
operational risk, and financial risk
Strategic Risk refers to uncertainty regarding the firm’s
financial goals and objectives.
Operational risk results from the firm’s business operations.
Financial Risk refers to the uncertainty of loss because of
adverse changes in commodity prices, interest rates, foreign
exchange rates, and the value of money.
Copyright © 2017 Pearson Education, Inc. All rights reserved.
1-‹#›
Classification of Risk (Continued)
Enterprise Risk Management combines into a single unified
treatment program all major risks faced by the firm:
Pure risk
Speculative risk
Strategic risk
Operational risk
Financial risk
Copyright © 2017 Pearson Education, Inc. All rights reserved.
1-‹#›
Classification of Risk (Continued)
As long as all risks are not perfectly correlated, the firm can
offset one risk against another, thus reducing the firm’s overall
risk.
Treatment of financial risks requires the use of complex
hedging techniques, financial derivatives, futures contracts and
other financial instruments.
Copyright © 2017 Pearson Education, Inc. All rights reserved.
1-‹#›
Classification of Risk (Continued)
Systemic risk is the risk of collapse of an entire system or entire
market due to the failure of a single entity or group of entities
that can result in the breakdown of the entire financial system
Systemic risk is especially important with respect to large
financial institutions that are considered too large to fail
without doing major financial harm to the US economy
Copyright © 2017 Pearson Education, Inc. All rights reserved.
1-‹#›
Major Personal Risks
Personal risks are risks that directly affect an individual or
family. They involve the possibility of a loss or reduction in
income, extra expenses or depletion of financial assets, due to:
Premature death
Inadequate retirement income
Poor health
Unemployment
Copyright © 2017 Pearson Education, Inc. All rights reserved.
1-‹#›
15
Transparency Master 1.2
Exhibit 1.1 Total Savings and Investments Reported by
Retirees, Among Those Responding
(not including value of primary residence or defined benefit
plans)
Copyright © 2017 Pearson Education, Inc. All rights reserved.
1-‹#›
16
Major Personal Risks (Continued)
Property risks involve the possibility of losses associated with
the destruction or theft of property
Direct loss vs. indirect loss
A direct loss is a financial loss that results from the physical
damage, destruction, or theft of the property, such as fire
damage to a home
An indirect or consequential loss is a financial loss that results
indirectly from the occurrence of a direct physical damage or
theft loss (e.g., the additional living expenses after a fire).
Copyright © 2017 Pearson Education, Inc. All rights reserved.
1-‹#›
17
Major Personal Risks (Continued)
Liability risks involve the possibility of being held legally
liable for bodily injury or property damage to someone else
There is no maximum upper limit with respect to the amount of
the loss
A lien can be placed on your income and financial assets
Legal defense costs can be enormous
Copyright © 2017 Pearson Education, Inc. All rights reserved.
1-‹#›
18
Major Commercial Risks
Firms face a variety of pure risks that can have serious financial
consequences if a loss occurs:
Property risks, such as damage to buildings, furniture and office
equipment
Liability risks, such as suits for defective products, pollution,
and sexual harassment
Loss of business income, when the firm must shut down for
some time after a physical damage loss
Cybersecurity and identity theft by thieves breaking into a
firm’s computer system
Copyright © 2017 Pearson Education, Inc. All rights reserved.
1-‹#›
Major Commercial Risks (Continued)
Other risks faced by business firms include:
Human resources exposures, such as job-related injuries
Foreign loss exposures, such as acts of terrorism
Intangible property exposures, such as damage to the market
reputation and public image of the company
Government exposures, such as violation of safety standards
Copyright © 2017 Pearson Education, Inc. All rights reserved.
1-‹#›
Burden of Risk on Society
The presence of risk results in three major burdens on society:
In the absence of insurance, individuals and business firms
would have to maintain large emergency funds to pay for
unexpected losses
The risk of a liability lawsuit may discourage innovation,
depriving society of certain goods and services
Risk causes worry and fear
Copyright © 2017 Pearson Education, Inc. All rights reserved.
1-‹#›
21
Techniques for Managing Risk
Risk Control refers to techniques that reduce the frequency or
severity of losses:
Avoidance
Loss prevention refers to activities to reduce the frequency of
losses
Loss reduction refers to activities to reduce the severity of
losses:
Duplication
Separation
Diversification
Copyright © 2017 Pearson Education, Inc. All rights reserved.
1-‹#›
22
Transparency Master 1.2
Techniques for Managing Risk (Continued)
Risk Financing refers to techniques that provide for payment of
losses after they occur:
Retention means that an individual or business firm retains part
or all of the losses that can result from a given risk.
Active retention means that an individual is aware of the risk
and deliberately plans to retain all or part of it
Passive retention means risks may be unknowingly retained
because of ignorance, indifference, or laziness
Copyright © 2017 Pearson Education, Inc. All rights reserved.
1-‹#›
Techniques for Managing Risk (Continued)
Self Insurance is a special form of planned retention by which
part or all of a given loss exposure is retained by the firm
A Noninsurance transfer transfers a risk to another party.
A transfer of risk by contract, such as through a hold-harmless
clause in a contract
Hedging is a technique for transferring the risk of unfavorable
price fluctuations to a speculator Incorporation of a business
firm transfers to the creditors the risk of having insufficient
assets
Copyright © 2017 Pearson Education, Inc. All rights reserved.
1-‹#›
Techniques for Managing Risk (Continued)
For most people, insurance is the most practical method for
handling major risks:
Risk transfer is used because a pure risk is transferred to the
insurer.
The pooling technique is used to spread the losses of the few
over the entire group
The risk may be reduced by application of the law of large
numbers
Copyright © 2017 Pearson Education, Inc. All rights reserved.
1-‹#›

Running head PROJECT MANAGEMENT.1PROJECT MANAGEMENT.2.docx

  • 1.
    Running head: PROJECTMANAGEMENT. 1 PROJECT MANAGEMENT. 2 Project management process is a crucial tool in the development of any organization. This is because the projects that the organization deploys determine the business clientele. Critical analysis of the project management process is paramount to the successful execution of these elements within an organization. In the case of introducing the California Coast Credit Union into the San Diego State University, there are five crucial processes that should be adhered to in order to ensure the project’s success. Initiation During the initiation process, the eligibility of any relevant projects available is checked so as to validate the feasibility of the project plan. Once the project plans have been presented and the feasibility checked, the selection process is then initiated based on the requirements that each individual project would require. The project manager and the project management team then sign off on the requirements of the specific project selected. In this case, the DBSI team was selected for the implementation of data signage procedures that are to be introduced within the student’s hub of the San Diego State University. It is during this stage that the appropriate team members of the project are identified as well as the project leaders. Selection of the project leaders is crucial to the next stage of the project management process which is the planning process. Furthermore, the ideal environment for the execution of the project is also identified so as to propagate an approximate orientation as to the next stage of the project plan (Making Waves with Digital Signage, 2014). Planning
  • 2.
    The next stageof the project management process is the planning process. The planning process is crucial in the intricate addressing of the project requirements so as to effectively kick start the project. Once all the project requirements are identified, the project planning can then be able to cultivate procedural steps in the implementation of the project. The project requirements are aligned with the project objectives or the elements that the project hopes to achieve. The specific objectives of the California Coast Credit Union by introducing data signage in the San Diego State University is to create an interactive forum where the students would be able to relate to the credit union, create a specific brand that would advocate for reliability and accessibility, and finally create and more engaging foot traffic among the thirty thousand students operating the campus (5 Basic Phases of Project Management, 2016). The planning process also involves the scope of the project in terms of its relativity to the actual services that the project hopes to provide. The scope would entail prospects such as open air digital designs, using the ideal equipment so as to utilize the available technology and presentation of the right content in an entertaining forum. Moreover, the planning process also has to take into consideration the implementation timelines of the project. Most managers offer short viable projects so as to assess the productivity of the project within the appropriate period. The implementation of the project was estimated to be two months as per California Coast Credit Union’s timelines. In addition, the project’s approximate budget should also be discussed during the planning process so as to facilitate the proper schedules and resource allocation factors. Execution The execution process is the most essential part of the project management process as it entails the actual implementation of the project’s goals and objectives. During the execution process, individual assignments are handed out to the relevant
  • 3.
    stakeholders and participantsof the project so as to ensure that all the essential prospects of the project are actually taken care of. As the introduction of digital signage in the San Diego State University is mostly focused on video brochures, videos and interactive tutorials, specific tasks would be assigned to different stakeholders. This is to ensure that the specified elements related to the implementation of the project objectives are covered. These elements incorporate things such as the designs, the construction of the relevant structures, the relevant equipment used in the operation as well as the digital technology strategies that can be applied. Besides, as the digital signage incorporates awareness to the students, the content and content sharing strategies are also assigned to specific individuals not to mention the copyrighting and the graphic designs applied to the digital signage. The execution also entails keeping track of the detailed project progress through regular updates on the project. Regular updates ensure that there is constant progress in the project implementation thus a preferable update process would be a daily or weekly update plan in all the relevant prospects as per the drafted project plans and schedule. Control and monitoring The fourth process in the project management process is the control, monitoring and validation of the projects successful implementation. Control and monitoring should involve the adhering to the selected project plans so as to make sure that successful implementation and running of the project is done. Monitoring the updates can ensure adherence to the project plans by the respective stakeholder in the project (5 Basic Phases of Project Management, 2016). The control and monitoring process also entails the quality assessments through assurance test plans. These assurance test plans validate the quality of the project work and delivery as applied during the implementation of the project. Communication plans are also relevant in the control and monitoring process as they ensure that the right information is
  • 4.
    passed along tothe relevant recipients such that there would be coordination in the implementation of the project. Closing The closing process is final phase of the project management process and a project management professional or a team of professionals, should conduct an evaluation of the entire project so as to validate the project. Evaluation of viable projects usually indicate little or no error during their assessment. Nonetheless, the identification of mistakes by project teams typically indicate that there is a problem with the project and that specific elements of the error need to checked in order to fix the project into a viable project. Assessment of the timelines involved in the execution of specific project plans is also crucial to identifying any possible errors in the project (Making Waves with Digital Signage, 2014). Effects of PMP on team members. Team members benefit a lot from the execution of project plans that they have been assigned to. The team members get a chance to put their relevant skills towards the successful execution of the project. The team members also get a chance to learn effective communication skills as from the formulated communication plans relevant to the project. Furthermore, the involved team members invoke their creative and capacitive skills in their normal work designations by creating more innovative ideas that would help in the overall development of the organization. References. 5 Basic Phases of Project Management. (2016). Retrieved on August 19th 2016, from www.projectinsight.net/project-management-basics/basic- project-management-phases Making Waves with Digital Signage. (2014). Retrieved on August 19th 2016, from dbsi-inc.com/true-stories/digital-signage/true-story-california- coast-credit-union/
  • 5.
    Chapter 1 Risk andIts Treatment Copyright © 2017 Pearson Education, Inc. All rights reserved. Copyright © 2017 Pearson Education, Inc. All rights reserved. 1-‹#› 1 Agenda Definitions of Risk Chance of Loss Peril and Hazard Classification of Risk Major Personal Risks and Commercial Risks Burden of Risk on Society Techniques for Managing Risk Copyright © 2017 Pearson Education, Inc. All rights reserved. 1-‹#› 2
  • 6.
    Definitions of Risk TraditionalDefinition of Risk: Uncertainty concerning the occurrence of a loss In the insurance industry, risk is also used to identify the property or life that is being considered for insurance In economics and finance: The term risk is used in situations where the probabilities of possible outcomes are known Uncertainty is used in situations where such probabilities cannot be estimated Copyright © 2017 Pearson Education, Inc. All rights reserved. 1-‹#› 3 Transparency Master 1.2 Loss Exposure: Any situation or circumstance in which a loss is possible, regardless of whether a loss occurs Objective risk is defined as the relative variation of actual loss from expected loss It can be statistically calculated by some measure of dispersion, such as the standard deviation Subjective (perceived) risk is defined as uncertainty based on a person’s mental condition or state of mind Definitions of Risk (Continued)
  • 7.
    Copyright © 2017Pearson Education, Inc. All rights reserved. 1-‹#› Chance of Loss Chance of loss: The probability that an event will occur Objective probability refers to the long-run relative frequency of an event based on the assumptions of an infinite number of observations and of no change in the underlying conditions Subjective probability is the individual’s personal estimate of the chance of loss Copyright © 2017 Pearson Education, Inc. All rights reserved. 1-‹#› 5 Transparency Master 1.2 Chance of Loss vs. Objective Risk Chance of loss is the probability that an event that causes a loss will occur. Objective risk is the relative variation of actual loss from expected loss The chance of loss may be identical for two different groups, but objective risk may be quite different!
  • 8.
    City# homesAverage #firesRangeChance of FireObjective RiskPhiladelphia10,00010075 – 1251%25%Los Angeles10,00010090 - 1101%10% Copyright © 2017 Pearson Education, Inc. All rights reserved. 1-‹#› 6 Transparency Master 1.2 Peril and Hazard A peril is defined as the cause of the loss. Examples include property damage because of fire, windstorm, or lightening, or damage to your car because of a collision with another vehicle. A hazard is a condition that increases the chance of loss A physical hazard is a physical condition that increases the frequency or severity of loss Moral hazard is dishonesty or character defects in an individual that increase the frequency or severity of loss Copyright © 2017 Pearson Education, Inc. All rights reserved. 1-‹#› 7 Transparency Master 1.2
  • 9.
    Peril and Hazard(Continued) Attitudinal Hazard (Morale Hazard) is carelessness or indifference to a loss, which increases the frequency or severity of a loss Legal Hazard refers to characteristics of the legal system or regulatory environment that increase the frequency or severity of losses Copyright © 2017 Pearson Education, Inc. All rights reserved. 1-‹#› Classification of Risk Pure Risk and Speculative Risk A pure risk is a situation in which there are only the possibilities of loss or no loss (earthquake) A speculative risk is a situation in which either profit or loss is possible (gambling) Copyright © 2017 Pearson Education, Inc. All rights reserved. 1-‹#› 9 Transparency Master 1.2 Classification of Risk (Continued) Diversifiable Risk and Nondiversifiable Risk
  • 10.
    A diversifiable riskaffects only individuals or small groups (car theft). It can be reduced or eliminated by diversification. A nondiversifiable risk affects the entire economy or large numbers of persons or groups within the economy (hurricane). It is also called fundamental risk. Government assistance may be necessary to insure nondiversifiable risks. Copyright © 2017 Pearson Education, Inc. All rights reserved. 1-‹#› Classification of Risk (Continued) Enterprise risk encompasses all major risks faced by a business firm, which include: pure risk, speculative risk, strategic risk, operational risk, and financial risk Strategic Risk refers to uncertainty regarding the firm’s financial goals and objectives. Operational risk results from the firm’s business operations. Financial Risk refers to the uncertainty of loss because of adverse changes in commodity prices, interest rates, foreign exchange rates, and the value of money. Copyright © 2017 Pearson Education, Inc. All rights reserved. 1-‹#› Classification of Risk (Continued) Enterprise Risk Management combines into a single unified treatment program all major risks faced by the firm:
  • 11.
    Pure risk Speculative risk Strategicrisk Operational risk Financial risk Copyright © 2017 Pearson Education, Inc. All rights reserved. 1-‹#› Classification of Risk (Continued) As long as all risks are not perfectly correlated, the firm can offset one risk against another, thus reducing the firm’s overall risk. Treatment of financial risks requires the use of complex hedging techniques, financial derivatives, futures contracts and other financial instruments. Copyright © 2017 Pearson Education, Inc. All rights reserved. 1-‹#› Classification of Risk (Continued) Systemic risk is the risk of collapse of an entire system or entire market due to the failure of a single entity or group of entities that can result in the breakdown of the entire financial system Systemic risk is especially important with respect to large financial institutions that are considered too large to fail without doing major financial harm to the US economy
  • 12.
    Copyright © 2017Pearson Education, Inc. All rights reserved. 1-‹#› Major Personal Risks Personal risks are risks that directly affect an individual or family. They involve the possibility of a loss or reduction in income, extra expenses or depletion of financial assets, due to: Premature death Inadequate retirement income Poor health Unemployment Copyright © 2017 Pearson Education, Inc. All rights reserved. 1-‹#› 15 Transparency Master 1.2 Exhibit 1.1 Total Savings and Investments Reported by Retirees, Among Those Responding (not including value of primary residence or defined benefit plans) Copyright © 2017 Pearson Education, Inc. All rights reserved.
  • 13.
    1-‹#› 16 Major Personal Risks(Continued) Property risks involve the possibility of losses associated with the destruction or theft of property Direct loss vs. indirect loss A direct loss is a financial loss that results from the physical damage, destruction, or theft of the property, such as fire damage to a home An indirect or consequential loss is a financial loss that results indirectly from the occurrence of a direct physical damage or theft loss (e.g., the additional living expenses after a fire). Copyright © 2017 Pearson Education, Inc. All rights reserved. 1-‹#› 17 Major Personal Risks (Continued) Liability risks involve the possibility of being held legally liable for bodily injury or property damage to someone else There is no maximum upper limit with respect to the amount of the loss A lien can be placed on your income and financial assets Legal defense costs can be enormous
  • 14.
    Copyright © 2017Pearson Education, Inc. All rights reserved. 1-‹#› 18 Major Commercial Risks Firms face a variety of pure risks that can have serious financial consequences if a loss occurs: Property risks, such as damage to buildings, furniture and office equipment Liability risks, such as suits for defective products, pollution, and sexual harassment Loss of business income, when the firm must shut down for some time after a physical damage loss Cybersecurity and identity theft by thieves breaking into a firm’s computer system Copyright © 2017 Pearson Education, Inc. All rights reserved. 1-‹#› Major Commercial Risks (Continued) Other risks faced by business firms include: Human resources exposures, such as job-related injuries Foreign loss exposures, such as acts of terrorism Intangible property exposures, such as damage to the market reputation and public image of the company Government exposures, such as violation of safety standards
  • 15.
    Copyright © 2017Pearson Education, Inc. All rights reserved. 1-‹#› Burden of Risk on Society The presence of risk results in three major burdens on society: In the absence of insurance, individuals and business firms would have to maintain large emergency funds to pay for unexpected losses The risk of a liability lawsuit may discourage innovation, depriving society of certain goods and services Risk causes worry and fear Copyright © 2017 Pearson Education, Inc. All rights reserved. 1-‹#› 21 Techniques for Managing Risk Risk Control refers to techniques that reduce the frequency or severity of losses: Avoidance Loss prevention refers to activities to reduce the frequency of losses Loss reduction refers to activities to reduce the severity of losses: Duplication Separation Diversification
  • 16.
    Copyright © 2017Pearson Education, Inc. All rights reserved. 1-‹#› 22 Transparency Master 1.2 Techniques for Managing Risk (Continued) Risk Financing refers to techniques that provide for payment of losses after they occur: Retention means that an individual or business firm retains part or all of the losses that can result from a given risk. Active retention means that an individual is aware of the risk and deliberately plans to retain all or part of it Passive retention means risks may be unknowingly retained because of ignorance, indifference, or laziness Copyright © 2017 Pearson Education, Inc. All rights reserved. 1-‹#› Techniques for Managing Risk (Continued) Self Insurance is a special form of planned retention by which part or all of a given loss exposure is retained by the firm A Noninsurance transfer transfers a risk to another party. A transfer of risk by contract, such as through a hold-harmless clause in a contract Hedging is a technique for transferring the risk of unfavorable price fluctuations to a speculator Incorporation of a business firm transfers to the creditors the risk of having insufficient assets
  • 17.
    Copyright © 2017Pearson Education, Inc. All rights reserved. 1-‹#› Techniques for Managing Risk (Continued) For most people, insurance is the most practical method for handling major risks: Risk transfer is used because a pure risk is transferred to the insurer. The pooling technique is used to spread the losses of the few over the entire group The risk may be reduced by application of the law of large numbers Copyright © 2017 Pearson Education, Inc. All rights reserved. 1-‹#›