Romeo S. Encarnacion is a Filipino national born on September 09, 1983 who has worked as a QC Technician specializing in PWHT/HT/MT/PT since 2008 in Saudi Arabia. He has over 10 years of experience ensuring quality control and compliance for pipeline projects. His responsibilities include inspecting and monitoring heat treatment work, performing hardness tests, and maintaining accurate documentation. He is skilled in techniques like PWHT, BHN testing, and machine calibration.
1. RESUME OF KEY PERSONNEL
Name : Romeo S. Encarnacion
Nationality : FILIPINO
Date of Birth : September 09, 1983
JOB TITLE : QC PWHT/HT/MT/PT/TECHNIAN
EDUCATIONAL ATTAINMENT:
AUTOMOTIVE
RESPOSIBILITY:
To inspect and monitor daily works of PWHT/HT in accordance with the quality
Plan and associated procedures and specifications approved by the client/project
And ensures daily the PWHT/HT work in progressand reports.
EMPLOYMENT HISTORY:
PERIOD COMPANY/PROJECT / POSITION /WORK DESCRIPTION
October 14 2014 SIEVERT VERITAS COMPANY
June 2012/ MOHAMMAD AL-MOJIL GROUP
january 2014 MMGSTEEL FACTORY Dammam /// WASIT PROJECT
Kingdom of Saudi Arabia
QC Technician (PWHT/HT)
- To comply local regulations and company requirements.
- To support QA/QC Superintendent to coordinates issues with client regarding QC aspect.
- Coordinate QC issues in respective responsible area.
- To join periodically or non-periodically QC inspections, meetings such as backlog list for
PWHT required line class and follow up NCR correction.
- To perform heat treatment in activities in accordance with quality control plan and
associated procedures and specifications.
- To perform PWHT to weld joints of caustic pipelines.
- To monitor the graph to ensure heating, holding, cooling rate output by the machine to work
correctly.
- To calibrate machine recorder in every 3 months by the third party contractor to ensure the
machine recorder is working accurately.
- To perform BHN hardness test using TELLEBRINELL OR EQOUTIP machine.
- To make daily progress report and productions.
- Maintain close relationship with the responsible QC Superintendent,
Cont.
PERIOD COMPANY/PROJECT / POSITION /WORK DESC
2. November 2011/ - MOHAMMAD AL-MOJIL GROUP
April 2012 Manifa siepem PROJECTKingdom of Saudi Arabia
QC Technician (PWHT/HT)
- To comply local regulations and company requirements.
- To support QA/QC Superintendent to coordinates issues with client regarding QC aspect.
- Coordinate QC issues in respective responsible area.
- To join periodically or non-periodically QC inspections, meetings such as backlog list for
PWHT required line class and follow up NCR correction.
- To perform heat treatment in activities in accordance with quality control plan and
associated procedures and specifications.
- To perform PWHT to weld joints of caustic pipelines.
- To monitor the graph to ensure heating, holding, cooling rate output by the machine to work
correctly.
- To calibrate machine recorder in every 3 months by the third party contractor to ensure the
machine recorder is working accurately.
- To perform BHN hardness test using TELLEBRINELL OR EQOUTIP machine.
- To make daily progress report and productions.
- Maintain close relationship with the responsible QC Supervisor.
June 2010 / - MOHAMMAD AL-MOJIL GROUP
September 2011 SAUDI ARAMCO/
Kingdom of Saudi Arabia
QC Technician (PWHT/HT)
- To comply local regulations and company requirements.
- To support QA/QC Superintendent to coordinates issues with client regarding QC aspect.
- Coordinate QC issues in respective responsible area.
- To join periodically or non-periodically QC inspections, meetings such as backlog list for
PWHT required line class and follow up NCR correction.
- To line check pipelines to be PWHT.
- To perform heat treatment in activities in accordance with quality control plan and
associated procedures and specifications.
- To perform PWHT to weld joints of caustic pipelines.
- To monitor the graph to ensure heating, holding, cooling rate output by the machine to work
correctly.
- To calibrate machine recorder in every 3 months by the third party contractor to ensure the
machine recorder is working accurately.
- To perform BHN hardness test using TELLEBRINELL OR EQOUTIP machine.
- To make daily progress report and productions.
- Maintain close relationship with the responsible QC Supervisor.
January 2008 / - MOHAMMAD AL-MOJIL GROUP
April 2010 JUBAIL UNITED PETROCHEMICAL COMPANY Sasref PROJECT
Kingdom of Saudi Arabia
QC Technician (PWHT/HT)
- To line check the pipeline to be PWHT.
- To perform heat treatment in activities in accordance with quality control plan and
associated procedures and specifications.
- To perform PWHT to weld joints of caustic pipelines.
- To monitor the graph to ensure heating, holding, cooling rate output by the machine to work
correctly.
- To perform BHN hardness test using TELLEBRINELL OR EQOUTIP machine.
- To make daily progress report and productions.
- Maintain close relationship with the responsible QC Supervisor.
Nov 2007 / - MOHAMMAD AL-MOJIL GROUP
Dec 2008 JUAYMAH EXPANSION PROJECT/TRG-ARAMCO
Kingdom of Saudi Arabia
QC Technician Assistant (PWHT/HT)
3. - Assist to perform heat treatment activities in accordance with quality
control plan and associated procedures and specifications.
- Assist to performing PWHT to weld joints of caustic pipelines.
-Assist to monitor the graph to ensure heating, holding, cooling rate
output by the machine to work accurately.
- Maintain close working relationship with the responsible technicians
and supervisor and the assigned QC Inspector
The information mentioned above is true and correct.
Romeo S EncarnacionQC Technician (PWHT/NDT/CAL)
Cp no. 0951236415or +639072944283roaming no.