SlideShare a Scribd company logo
Major Accomplishments: Rockne Center at Muessel Grove
1. One hundred percent of the work performed to date has been from private
investment by a Catholic family that cares about ending poverty (despite promises
made by the City to support after the building was “abated and down on the ground”
and despite constant, costly interference, harassment and threats).
2. All illegal activity having a negative impact on the community (former gang
headquarters, tagging, vandalism, building break-ins, prostitution, illicit drugs) has been
shut down and the site has been clear of those offenses for over 2 years.
3. Friable asbestos containing materials have been professionally abated (removed and
disposed of in accordance to federal law) in all buildings.
4. The vacant portions of the various buildings have been secured and the ownership has
worked in partnership with the South Bend Police Department to eliminate future
vandalism, dumping, graffiti another negative activity from returning.
5. Two minority owned companies who have been on property since the 1990’s have
grown their businesses under our ownership. The strategy to keep the current
businesses rather than displace them has also ensured that the occupied property has
been continuously improved and has prevented it falling into disrepair and being
vandalized like the buildings that have been taken down (the City has been trying to
get us to evict these companies from day one without justification).
6. Tenant spaces have been updated with new bathroom fixtures, air conditioning in the
front offices (that were getting hot in the summer) and new light fixtures. Additionally,
long term problems in roof leaks and mold have been fixed.
7. 150,000+ square feet of dangerous and vacant structures (that had been left to
deteriorate) have been razed to ground level without incident.
8. No damage to city streets was caused from the demolition despite much of the
frontage abutting the ROW.
9. 300+ graffiti markings left unchecked for 15+ years, have been removed.
10.98% of the 2,000,000 lbs+ of waste generated from the razing of the buildings has been
recycled locally in Indiana.
11.Over 300 invasive trees that were putting roofs and other infrastructure of the property
at risk have been removed.
12.Tens of thousands of bricks from the original mid to late 1800’s construction were
recycled and allowed Notre Dame to match the original Notre Dame Buildings for their
new Chapel project (which were made with from the sands of Notre Dame Campus).
13.Compliance letters with No Violations received from IDEM for the removal of asbestos
that had deteriorated and littered the razed portion of the facility for over 4 decades.
14.The original Drewry’s limestone sign that was prominent above the executive offices
and tasting area was saved from demolition (to be reinforced, refurbished and to be
reinstalled later on the historic building fronting Portage at a later date).
15.Temporary and permanent fencing and gates have been installed to continue to
prevent access to the property during redevelopment.
16.Current Tenant Spaces have been upgraded since 2016 to meet provisions from a fire
inspection to bring them up to City requirements for the first time ever.
17.Remaining Buildings have gone into architectural planning and have been evaluated
for reuse and a tenant improvement plan has been formulated.
18. Renown Historic Architect, Lauren Allsopp, has been retained to test mortar, segment
brick, and build a plan for restoration of both the existing buildings and the
reconstruction of the most historic building on its 1860's foundation (which was
preserved from the demolition).
19.Renown Visionary, and former Economic Development Director of Austin Texas, Kevin
Johns has been engaged to assist in the project.
20.A Urban Food Campus site plan has been created for the redevelopment by a renown
Dallas Firm known for a myriad of successes on urban re-development that integrates
into the fabric of communities.
21.A tenant was attracted that meets the provisions of the 2018 charrette lead by Opticos
Design for “ideal characteristics” for companies who could be tenants in the buildings
they left in their plan for “adaptive reuse.”
22.In roads have been made (because of that tenants long standing relationship with a
technology program at Notre Dame) to start the process of aligning various
departments in the project to bring Notre Dame further into the community.
Small Sampling of Pictures of Asbestos Abated and Hazards Removed – 2015 Photos
Rockne center major accomplishments so far
Rockne center major accomplishments so far
Rockne center major accomplishments so far
Rockne center major accomplishments so far
Rockne center major accomplishments so far
Rockne center major accomplishments so far
Rockne center major accomplishments so far
Rockne center major accomplishments so far
Rockne center major accomplishments so far
Rockne center major accomplishments so far

More Related Content

What's hot

Killara project executive summary
Killara project executive summaryKillara project executive summary
Killara project executive summarydolzz
 
Liz Gray, Atkins
Liz Gray, Atkins   Liz Gray, Atkins
Liz Gray, Atkins IES / IAQM
 
Articles & Features
Articles & FeaturesArticles & Features
Articles & FeaturesDaniel Allen
 
HISTORY OF THE LAND TITLES BUILDING
HISTORY OF THE LAND TITLES BUILDINGHISTORY OF THE LAND TITLES BUILDING
HISTORY OF THE LAND TITLES BUILDINGYvette Moore S.O.M.
 
Beach towers case study
Beach towers case studyBeach towers case study
Beach towers case studyDicot
 
Competition flyer
Competition flyerCompetition flyer
Competition flyerKeith Holt
 
"Sourcing Products / Technologies for Eco-Retrofit" - Gary Wilburn, HPW Archi...
"Sourcing Products / Technologies for Eco-Retrofit" - Gary Wilburn, HPW Archi..."Sourcing Products / Technologies for Eco-Retrofit" - Gary Wilburn, HPW Archi...
"Sourcing Products / Technologies for Eco-Retrofit" - Gary Wilburn, HPW Archi...Sustainable Business Partnership
 

What's hot (10)

CV
CVCV
CV
 
Killara project executive summary
Killara project executive summaryKillara project executive summary
Killara project executive summary
 
Liz Gray, Atkins
Liz Gray, Atkins   Liz Gray, Atkins
Liz Gray, Atkins
 
Articles & Features
Articles & FeaturesArticles & Features
Articles & Features
 
HISTORY OF THE LAND TITLES BUILDING
HISTORY OF THE LAND TITLES BUILDINGHISTORY OF THE LAND TITLES BUILDING
HISTORY OF THE LAND TITLES BUILDING
 
Beach towers case study
Beach towers case studyBeach towers case study
Beach towers case study
 
Competition flyer
Competition flyerCompetition flyer
Competition flyer
 
"Sourcing Products / Technologies for Eco-Retrofit" - Gary Wilburn, HPW Archi...
"Sourcing Products / Technologies for Eco-Retrofit" - Gary Wilburn, HPW Archi..."Sourcing Products / Technologies for Eco-Retrofit" - Gary Wilburn, HPW Archi...
"Sourcing Products / Technologies for Eco-Retrofit" - Gary Wilburn, HPW Archi...
 
Residential Conversions & Adaptive Reuse
Residential Conversions & Adaptive ReuseResidential Conversions & Adaptive Reuse
Residential Conversions & Adaptive Reuse
 
Affordable Housing Lecture Cnu 17
Affordable Housing Lecture Cnu 17Affordable Housing Lecture Cnu 17
Affordable Housing Lecture Cnu 17
 

Similar to Rockne center major accomplishments so far

Rockne center timeline progress_todate
Rockne center timeline progress_todateRockne center timeline progress_todate
Rockne center timeline progress_todateSteve Durkee
 
ICE Case Study 2016
ICE Case Study 2016ICE Case Study 2016
ICE Case Study 2016Steve Edgson
 
74 77 global project focus EPC Age magazine 2008
74 77 global project focus EPC Age magazine 200874 77 global project focus EPC Age magazine 2008
74 77 global project focus EPC Age magazine 2008Remona Divekar
 
Lane Miles Standish Redevelopment Top Project 2008
Lane Miles Standish Redevelopment Top Project 2008Lane Miles Standish Redevelopment Top Project 2008
Lane Miles Standish Redevelopment Top Project 2008Chris Humphries
 
Milpitas redevelopment case study,
Milpitas redevelopment case study, Milpitas redevelopment case study,
Milpitas redevelopment case study, Ar Pankaj Kumar
 
Kaminska 10409475 Exchange Square
Kaminska 10409475 Exchange SquareKaminska 10409475 Exchange Square
Kaminska 10409475 Exchange SquareNatalia Kaminska
 
1215 Bidwell, Alan To Vancouver City Council, 10 Dec 2009
1215 Bidwell, Alan To Vancouver City Council, 10 Dec 20091215 Bidwell, Alan To Vancouver City Council, 10 Dec 2009
1215 Bidwell, Alan To Vancouver City Council, 10 Dec 2009WestEnd Prepare
 
Leonia Town hall Presentation on New Municipal Building - 20181128 v5
Leonia Town hall Presentation on New Municipal Building - 20181128 v5Leonia Town hall Presentation on New Municipal Building - 20181128 v5
Leonia Town hall Presentation on New Municipal Building - 20181128 v5Borough of Leonia
 
Cleaning Up & Reconstructing in Haiti after the 2010 Earthquake
Cleaning Up & Reconstructing in Haiti after the 2010 EarthquakeCleaning Up & Reconstructing in Haiti after the 2010 Earthquake
Cleaning Up & Reconstructing in Haiti after the 2010 Earthquakeisabelle arnold
 
Recent Project List 4-2015
Recent Project List 4-2015Recent Project List 4-2015
Recent Project List 4-2015Chip Lowe
 
Post Harvey Flood Data and the Future of Resilient Infrastructure
Post Harvey Flood Data and the Future of Resilient InfrastructurePost Harvey Flood Data and the Future of Resilient Infrastructure
Post Harvey Flood Data and the Future of Resilient Infrastructurejuliekannai
 
Hanford Waste Treatment Plant completes fifth concrete wall elevation for lar...
Hanford Waste Treatment Plant completes fifth concrete wall elevation for lar...Hanford Waste Treatment Plant completes fifth concrete wall elevation for lar...
Hanford Waste Treatment Plant completes fifth concrete wall elevation for lar...DOE Office of River Protection
 
Hanford Waste Treatment Plant completes fifth concrete wall elevation for lar...
Hanford Waste Treatment Plant completes fifth concrete wall elevation for lar...Hanford Waste Treatment Plant completes fifth concrete wall elevation for lar...
Hanford Waste Treatment Plant completes fifth concrete wall elevation for lar...DOE Office of River Protection
 
2443-rags-to-riches-how-chicagos-111-west-wacker-finally-got-built
2443-rags-to-riches-how-chicagos-111-west-wacker-finally-got-built2443-rags-to-riches-how-chicagos-111-west-wacker-finally-got-built
2443-rags-to-riches-how-chicagos-111-west-wacker-finally-got-builtStephen Matkovits
 

Similar to Rockne center major accomplishments so far (20)

Facade Study Webinar
Facade Study WebinarFacade Study Webinar
Facade Study Webinar
 
Rockne center timeline progress_todate
Rockne center timeline progress_todateRockne center timeline progress_todate
Rockne center timeline progress_todate
 
ICE Case Study 2016
ICE Case Study 2016ICE Case Study 2016
ICE Case Study 2016
 
74 77 global project focus EPC Age magazine 2008
74 77 global project focus EPC Age magazine 200874 77 global project focus EPC Age magazine 2008
74 77 global project focus EPC Age magazine 2008
 
Madison Park Project Plans (Most Recent, All Documents, 1/12/17)
Madison Park Project Plans (Most Recent, All Documents, 1/12/17)Madison Park Project Plans (Most Recent, All Documents, 1/12/17)
Madison Park Project Plans (Most Recent, All Documents, 1/12/17)
 
Ulx1008
Ulx1008Ulx1008
Ulx1008
 
The Inner City ucgs
The Inner City ucgsThe Inner City ucgs
The Inner City ucgs
 
Lane Miles Standish Redevelopment Top Project 2008
Lane Miles Standish Redevelopment Top Project 2008Lane Miles Standish Redevelopment Top Project 2008
Lane Miles Standish Redevelopment Top Project 2008
 
COMPANY PROFILE
COMPANY PROFILECOMPANY PROFILE
COMPANY PROFILE
 
Milpitas redevelopment case study,
Milpitas redevelopment case study, Milpitas redevelopment case study,
Milpitas redevelopment case study,
 
Kaminska 10409475 Exchange Square
Kaminska 10409475 Exchange SquareKaminska 10409475 Exchange Square
Kaminska 10409475 Exchange Square
 
1215 Bidwell, Alan To Vancouver City Council, 10 Dec 2009
1215 Bidwell, Alan To Vancouver City Council, 10 Dec 20091215 Bidwell, Alan To Vancouver City Council, 10 Dec 2009
1215 Bidwell, Alan To Vancouver City Council, 10 Dec 2009
 
Leonia Town hall Presentation on New Municipal Building - 20181128 v5
Leonia Town hall Presentation on New Municipal Building - 20181128 v5Leonia Town hall Presentation on New Municipal Building - 20181128 v5
Leonia Town hall Presentation on New Municipal Building - 20181128 v5
 
Cleaning Up & Reconstructing in Haiti after the 2010 Earthquake
Cleaning Up & Reconstructing in Haiti after the 2010 EarthquakeCleaning Up & Reconstructing in Haiti after the 2010 Earthquake
Cleaning Up & Reconstructing in Haiti after the 2010 Earthquake
 
Long Resume
Long ResumeLong Resume
Long Resume
 
Recent Project List 4-2015
Recent Project List 4-2015Recent Project List 4-2015
Recent Project List 4-2015
 
Post Harvey Flood Data and the Future of Resilient Infrastructure
Post Harvey Flood Data and the Future of Resilient InfrastructurePost Harvey Flood Data and the Future of Resilient Infrastructure
Post Harvey Flood Data and the Future of Resilient Infrastructure
 
Hanford Waste Treatment Plant completes fifth concrete wall elevation for lar...
Hanford Waste Treatment Plant completes fifth concrete wall elevation for lar...Hanford Waste Treatment Plant completes fifth concrete wall elevation for lar...
Hanford Waste Treatment Plant completes fifth concrete wall elevation for lar...
 
Hanford Waste Treatment Plant completes fifth concrete wall elevation for lar...
Hanford Waste Treatment Plant completes fifth concrete wall elevation for lar...Hanford Waste Treatment Plant completes fifth concrete wall elevation for lar...
Hanford Waste Treatment Plant completes fifth concrete wall elevation for lar...
 
2443-rags-to-riches-how-chicagos-111-west-wacker-finally-got-built
2443-rags-to-riches-how-chicagos-111-west-wacker-finally-got-built2443-rags-to-riches-how-chicagos-111-west-wacker-finally-got-built
2443-rags-to-riches-how-chicagos-111-west-wacker-finally-got-built
 

Recently uploaded

PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stopahcitycouncil
 
Elderly Persons Midday Meal Program kurnool
Elderly Persons Midday Meal Program kurnoolElderly Persons Midday Meal Program kurnool
Elderly Persons Midday Meal Program kurnoolSERUDS INDIA
 
Item # 6 - 7001 Broadway Significance Review
Item # 6 - 7001 Broadway Significance ReviewItem # 6 - 7001 Broadway Significance Review
Item # 6 - 7001 Broadway Significance Reviewahcitycouncil
 
一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单
一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单
一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单enbam
 
Hub Design Inspiration Graphics May 24 2024.pdf
Hub Design Inspiration Graphics May 24 2024.pdfHub Design Inspiration Graphics May 24 2024.pdf
Hub Design Inspiration Graphics May 24 2024.pdfStephen Abram
 
一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单
一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单
一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单aveka1
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37JSchaus & Associates
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单ehbuaw
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfClaudioTebaldi2
 
Item # 4 -- 525 Argo Avenue ARB Case 926F
Item # 4 -- 525 Argo Avenue ARB Case 926FItem # 4 -- 525 Argo Avenue ARB Case 926F
Item # 4 -- 525 Argo Avenue ARB Case 926Fahcitycouncil
 
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxMHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxILC- UK
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单enbam
 
What is the point of small housing associations.pptx
What is the point of small housing associations.pptxWhat is the point of small housing associations.pptx
What is the point of small housing associations.pptxPaul Smith
 
The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estateoklahomajudicialproc1
 
Item # 7 - BB Inspection Services Agreement
Item # 7 - BB Inspection Services AgreementItem # 7 - BB Inspection Services Agreement
Item # 7 - BB Inspection Services Agreementahcitycouncil
 
一比一原版(UWA毕业证)西澳大学毕业证成绩单
一比一原版(UWA毕业证)西澳大学毕业证成绩单一比一原版(UWA毕业证)西澳大学毕业证成绩单
一比一原版(UWA毕业证)西澳大学毕业证成绩单enbam
 
Setting a new path to greater, shared prosperity
Setting a new path to greater, shared prosperitySetting a new path to greater, shared prosperity
Setting a new path to greater, shared prosperityResolutionFoundation
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单enbam
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Congressional Budget Office
 
一比一原版(IC毕业证)帝国理工大学毕业证成绩单
一比一原版(IC毕业证)帝国理工大学毕业证成绩单一比一原版(IC毕业证)帝国理工大学毕业证成绩单
一比一原版(IC毕业证)帝国理工大学毕业证成绩单exuyk
 

Recently uploaded (20)

PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
 
Elderly Persons Midday Meal Program kurnool
Elderly Persons Midday Meal Program kurnoolElderly Persons Midday Meal Program kurnool
Elderly Persons Midday Meal Program kurnool
 
Item # 6 - 7001 Broadway Significance Review
Item # 6 - 7001 Broadway Significance ReviewItem # 6 - 7001 Broadway Significance Review
Item # 6 - 7001 Broadway Significance Review
 
一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单
一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单
一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单
 
Hub Design Inspiration Graphics May 24 2024.pdf
Hub Design Inspiration Graphics May 24 2024.pdfHub Design Inspiration Graphics May 24 2024.pdf
Hub Design Inspiration Graphics May 24 2024.pdf
 
一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单
一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单
一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
 
Item # 4 -- 525 Argo Avenue ARB Case 926F
Item # 4 -- 525 Argo Avenue ARB Case 926FItem # 4 -- 525 Argo Avenue ARB Case 926F
Item # 4 -- 525 Argo Avenue ARB Case 926F
 
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxMHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
 
What is the point of small housing associations.pptx
What is the point of small housing associations.pptxWhat is the point of small housing associations.pptx
What is the point of small housing associations.pptx
 
The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estate
 
Item # 7 - BB Inspection Services Agreement
Item # 7 - BB Inspection Services AgreementItem # 7 - BB Inspection Services Agreement
Item # 7 - BB Inspection Services Agreement
 
一比一原版(UWA毕业证)西澳大学毕业证成绩单
一比一原版(UWA毕业证)西澳大学毕业证成绩单一比一原版(UWA毕业证)西澳大学毕业证成绩单
一比一原版(UWA毕业证)西澳大学毕业证成绩单
 
Setting a new path to greater, shared prosperity
Setting a new path to greater, shared prosperitySetting a new path to greater, shared prosperity
Setting a new path to greater, shared prosperity
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
 
一比一原版(IC毕业证)帝国理工大学毕业证成绩单
一比一原版(IC毕业证)帝国理工大学毕业证成绩单一比一原版(IC毕业证)帝国理工大学毕业证成绩单
一比一原版(IC毕业证)帝国理工大学毕业证成绩单
 

Rockne center major accomplishments so far

  • 1. Major Accomplishments: Rockne Center at Muessel Grove 1. One hundred percent of the work performed to date has been from private investment by a Catholic family that cares about ending poverty (despite promises made by the City to support after the building was “abated and down on the ground” and despite constant, costly interference, harassment and threats). 2. All illegal activity having a negative impact on the community (former gang headquarters, tagging, vandalism, building break-ins, prostitution, illicit drugs) has been shut down and the site has been clear of those offenses for over 2 years. 3. Friable asbestos containing materials have been professionally abated (removed and disposed of in accordance to federal law) in all buildings. 4. The vacant portions of the various buildings have been secured and the ownership has worked in partnership with the South Bend Police Department to eliminate future vandalism, dumping, graffiti another negative activity from returning. 5. Two minority owned companies who have been on property since the 1990’s have grown their businesses under our ownership. The strategy to keep the current businesses rather than displace them has also ensured that the occupied property has been continuously improved and has prevented it falling into disrepair and being vandalized like the buildings that have been taken down (the City has been trying to get us to evict these companies from day one without justification). 6. Tenant spaces have been updated with new bathroom fixtures, air conditioning in the front offices (that were getting hot in the summer) and new light fixtures. Additionally, long term problems in roof leaks and mold have been fixed. 7. 150,000+ square feet of dangerous and vacant structures (that had been left to deteriorate) have been razed to ground level without incident. 8. No damage to city streets was caused from the demolition despite much of the frontage abutting the ROW. 9. 300+ graffiti markings left unchecked for 15+ years, have been removed. 10.98% of the 2,000,000 lbs+ of waste generated from the razing of the buildings has been recycled locally in Indiana. 11.Over 300 invasive trees that were putting roofs and other infrastructure of the property at risk have been removed.
  • 2. 12.Tens of thousands of bricks from the original mid to late 1800’s construction were recycled and allowed Notre Dame to match the original Notre Dame Buildings for their new Chapel project (which were made with from the sands of Notre Dame Campus). 13.Compliance letters with No Violations received from IDEM for the removal of asbestos that had deteriorated and littered the razed portion of the facility for over 4 decades. 14.The original Drewry’s limestone sign that was prominent above the executive offices and tasting area was saved from demolition (to be reinforced, refurbished and to be reinstalled later on the historic building fronting Portage at a later date). 15.Temporary and permanent fencing and gates have been installed to continue to prevent access to the property during redevelopment. 16.Current Tenant Spaces have been upgraded since 2016 to meet provisions from a fire inspection to bring them up to City requirements for the first time ever. 17.Remaining Buildings have gone into architectural planning and have been evaluated for reuse and a tenant improvement plan has been formulated. 18. Renown Historic Architect, Lauren Allsopp, has been retained to test mortar, segment brick, and build a plan for restoration of both the existing buildings and the reconstruction of the most historic building on its 1860's foundation (which was preserved from the demolition). 19.Renown Visionary, and former Economic Development Director of Austin Texas, Kevin Johns has been engaged to assist in the project. 20.A Urban Food Campus site plan has been created for the redevelopment by a renown Dallas Firm known for a myriad of successes on urban re-development that integrates into the fabric of communities. 21.A tenant was attracted that meets the provisions of the 2018 charrette lead by Opticos Design for “ideal characteristics” for companies who could be tenants in the buildings they left in their plan for “adaptive reuse.” 22.In roads have been made (because of that tenants long standing relationship with a technology program at Notre Dame) to start the process of aligning various departments in the project to bring Notre Dame further into the community.
  • 3. Small Sampling of Pictures of Asbestos Abated and Hazards Removed – 2015 Photos