SlideShare a Scribd company logo
Joseph Robinson
Post Box No: 17750
Doha – Qatar.
Telephone: +974 55350726. Mobile: +974 55862365.
Email: robinsasco@gmail.com; robin@sasconet.com.
Page1of6
___________________________________________________________________________________________________________________
PROJ ECT MANAGER
w Business Development – Commercially Astute – Engineer w
Highly successful Project Manager and a diplomatic negotiator
with multi-faceted responsibilities. Possessing a track record of
securing multi-million Riyals contracts covering the complete
bidding cycle, whilst providing the full range of design, engineering,
project / programme management services and client solutions.
Continually meeting increased regulatory targets for out turn costs,
on-time deliveries within a Continuous Improvement environment.
Establishing new contracts, as well as overseeing many new sites,
including setting up site offices, gathering the right resources for
the contract in terms of staff and operatives, monitoring
programme, production, health and safety issues and everything
else involved in the successful delivery of a project.
AREAS OF EXPERTISE
· Project Management · Site management
· Continuous Improvement · Demand fulfillment
· Procurement · Risk / viability assessments · Health and Safety
· Major schemes of work · Budgeting
· Identifying client needs · On-time delivery · Cost control
___________________________________________________________________________________________________
PROFESSIONAL DEVELOPMENT
Master Deg. Project Management (current studies - distance learning) 2014.
Bachelor Deg. Alagappa University, Tamil Nadu, India - English (distance learning) 2008-2011.
Diploma in (NCVT) Eng. 1986-1988.
Industrial Training in Eng. – 1989-1990.
Secondary School – 1986.
Auto Cad - 2000
Internal Auditor Course -2009
Project Management Student Activity
· Participated a 3 days seminar about Project Management Professional organized by MMT including a
practical group, case study, work presentations and developing industry awareness.
PROFESSIONAL EXPERIENCE AND SIGNIFICANT ACHIEVEMENTS
Specialized Aluminum and Steel Co, Doha-Qatar. April 1994 – Present (21 -Years)
PROJECT MANAGER April 2006 – Present
Joseph Robinson
Post Box No: 17750
Doha – Qatar.
Telephone: +974 55350726. Mobile: +974 55862365.
Email: robinsasco@gmail.com; robin@sasconet.com.
Page2of6
· The largest construction project in Qatar completed in 2013, (SHEMOUKH TWIN TOWER - Below
mentioned) was one of my best achievements in my carrier.
· Responsible for Project Design and Management, client liaison, site surveys, agreeing deliverables,
procurement, CAD, systems engineering and project documentation.
· Planned the right labor, plant, materials, information, quality, place, at the right time, every time.
· Eliminated budget and programme overruns, resolved conflicting relationships between stakeholders, and
increased the reliability and quality of information flow and material supply.
· Developed close working relationships with my colleagues, management and consultants.
· Working to very tight timescales built a sound construction teams that worked for each other and
ultimately delivered a successful jobs for both the client and the business.
· The overall in charge of all aspects of the project from the time of issuing the work order to handing over
the project to client’s expectation for timely and qualitative works.
· Prepare a master plan, control and monitor various activities of the projects at all stages.
· Coordinate with head of the design dept. for submission and approval of the drawings.
· Coordinate with Technical Manager / Engineer for submission and approval of the samples and other
technical items.
· Prepare Budgeting report in the format required by the Accounts department in coordination with
Contracts department, for monitoring of works by the top level management.
· Coordinate with the Contracts / Marketing departments for any kind of contractual matters to safe guard
the company’s interest.
· Follow up with the Purchase department and Production departments for timely delivery of materials.
· Organize site survey and measurements with the surveyor and site engineer.
· Issue production orders with concerned engineers and follow up materials in the production.
· Co-ordinate, guide and supervise subcontractors (like composite cladding, stainless steel Handrails etc.)
for timely and quality works.
· Provide the required information for Contracts department on monthly / fortnightly about the progress of
works for billing.
· Coordinate with Contracts department for bill approvals as and when required.
· Arrange the project completion certificates and get it acknowledged by the concerned person from Main
Contractor or Client.
Procurement Achievements:
· Recognized the benefits that supply chain partnership arrangements bring to our organization and our
clients. Supporting business operations through more efficient procurement.
· Secured reliable and consistent suppliers.
· Reduced costs through innovation and product development.
· Continually improved processes and procedures for forecasting demand, managing logistics and controlling
materials.
· Developed strategic alliances with suppliers and manufacturers.
· From early success on the introduction of traditional procurement specifications, moved on to a
challenging level of cost management, design approvals, document control, Health and Safety, budgeting
and administering work on all projects, all within strict timescales.
Joseph Robinson
Post Box No: 17750
Doha – Qatar.
Telephone: +974 55350726. Mobile: +974 55862365.
Email: robinsasco@gmail.com; robin@sasconet.com.
Page3of6
Project Achievements & On Going Projects
Designation : Project Manager
Project Name : STATE AUDIT BUREAU (4B+G+1+ME+31.Floors)
Client : Hamad Ali Hamad Abdullah Al-Attiyah
Main Contractor : Societed’Entreprise (SEG)
Project Management: IBE Partnership
Design Consultant : Keo International Consultants
Contract Value : 39.72. Millions. (Qrs)
Duration : Sep 2013 – Present.
___________________________________________________________________________________________________
Designation : Project Manager
Project Name : SHEMOUKH TWIN TOWERS (3B+G+M+S+23.Floors)
Client : Real Estate Serveries Group
Main Contractor : Societed’Entreprise (SEG)
Project Management: Hill International
Design Consultant : EHAF Qatar Consulting Engineers
Contract Value : 53.5. Millions. (Qrs)
Duration : Aug 2011 – June 2013.
___________________________________________________________________________________________________
Designation : Project Manager
Project Name : Arwa Residential Tower (2B+G+41.Floors)
Client : Sh. Aisha Abdulla Thani al Thani
Main Contractor : Al Habtoor Lighton Group
Consultant : Diwan Al Emara
Contract Value : 19.8. Millions. (Qrs)
Duration : Sep 2010 – Present. (Hold)
Designation : Project Manager
Project Name : Al Waab City – Villa B&C
Client : Shk.Nasser Bin Khalid
Main Contractor : ARABTEC
Consultant : Engineering Consulting Group
Contract Value : 40.88 Millions. (Qrs)
Duration : Feb 2008 – Present.
Joseph Robinson
Post Box No: 17750
Doha – Qatar.
Telephone: +974 55350726. Mobile: +974 55862365.
Email: robinsasco@gmail.com; robin@sasconet.com.
Page4of6
Designation : Project Manager
Project Name : School of Business Building
Client : Qatar University
Main Contractor : AMANA
Consultant : the arab architect
Contract Value : 12.6 Millions. (Qrs)
Duration : Jun 2008 – July 2010.
___________________________________________________________________________________________________
Designation : Project Manager
Project Name : Golden Bay Tower (2B+G+16.Floors)
Client : Shk. Khalifa Bin Jassim
Main Contractor : Societed’Entreprise (SEG)
Consultant : Gulf Engineering Consulting Group
Contract Value : 10.63 Millions. (Qrs)
Duration : Feb2007 – Dec 2009.
___________________________________________________________________________________________________
Designation : Project Manager
Project Name : (3+4+7) 14.New Schools
Client : Public Works (Asghal)
Main Contractor : ITCC
Consultant : Consulting Eng. Group
Contract Value : 18.16. Millions. (Qrs)
Duration : Jun 2009 – May 2011.
___________________________________________________________________________________________________
PROJECT ENGINEER June 2002 – March 2006
Specialized Aluminum and Steel Co.
· Assisting in the in development and expansion of the infrastructure and improving engineering
facilities. Liaising between both the internal and external stakeholders.
· Contributing to strategy formulation and forward planning as a member of the management team.
· Initiating the project, defining project scope and preparing the project plan.
· Writing technical specifications and overseeing production of conceptual drawings, preliminary
design criteria for project including Scope of Work, Work Breakdown Structure and general
specification, milestone identification and planning.
· Identifying service needs, solving engineering problems relating to the continuous expansion of the
project.
Joseph Robinson
Post Box No: 17750
Doha – Qatar.
Telephone: +974 55350726. Mobile: +974 55862365.
Email: robinsasco@gmail.com; robin@sasconet.com.
Page5of6
· Establishing “Planned and Preventive Maintenance” PPM programs and procedures after project
closure.
· Identifying and matching needs to approved budget with project stakeholders.
· Identifying ongoing project risks and assigning and mitigating risks.
· Reporting project status at progress meetings.
· Ensuring all resources (manpower and materials), are provided as per the contractor’s scheduled
plan, meet all on time and within budget.
Technical Engineer March 2000 – May 2002.
Specialized Aluminum and Steel Co.
· Preparing Submittals; Request for Information (RFI) and Request for Approval (RFA), Transmitted
Responded RFA’s and RFI’s to Operation, Survey, QA/QC and Other concern department and Sub-
contractors.
· Updating RFA’s and RFI’s for Coordinators Monitoring.
· Preparation of Look-ahead Schedule for Architectural.
· Preparation of Architectural Schedule.
· Reporting to the Site Manager and Superintendents about the status of our schedule (delay or advance).
· Preparation of Quantitative Target Accomplishment for the Month.
· Assisting my superiors in technical details.
· Release data sheets, update formulation records.
· Propose projects for qualifications.
· Authorize design progression.
· Take responsibility for design of equipment.
· Designate design for new products.
· Make decisions regarding process design, technical databases, qualification test and technical procedures.
Production Engineer April 1994 – Feb 2000.
Specialized Aluminum and Steel Co.
Joseph Robinson
Post Box No: 17750
Doha – Qatar.
Telephone: +974 55350726. Mobile: +974 55862365.
Email: robinsasco@gmail.com; robin@sasconet.com.
Page6of6
· To plan work execution at shop floor on a daily basis.
· To enter the measurement to be taken record in the diary after receipt of Work Order.
· To follow up regarding all the materials (Aluminum) which are requisitioned to Stores / Purchase and to
ensure that it reaches the factory for fabrication at appropriate time.
· To fill up the description part in work register from the order received from HO. with follow-up.
· Technical coordination / clarification to all concerned at shop floor.
· Daily Outside work Planning with Factory Manager.
· Requisition for glass and follow up for delivery in time.
· Outside work status to be collected on a daily basis and records to be kept in work Order register.
Production Supervisor April 1990 – Feb 1994.
Southern Conveyers Pvt. Ltd. Chennai-96. INDIA.
· Ensure that the works are completed in time.
· Collect status of work at floor level and site level.
· Maintain overall coordination.
· Maintain work register.
· Ensure that Materials are sent to site as per Work Charts, on a daily basis.
_____________________________________________________________________________________________________________________
COMPUTER SKILLS
· Familiar with statistical packages.
· Used of Microsoft office Project, Word, Excel Spreadsheets, and PowerPoint.
· Studied of AutoCAD 2000.
PERSONAL
Interests and Pastimes: Travelling, swimming, volleyball, badminton, reading, music.
Languages: Fluent in English, Tamil and Malayalam.
Speaking in Hindi and Arabic.
PERSONAL PROFILE
Name: Joseph Robinson.
Passport No: J 6411932.
Validity: 14th
April 2022.
Qatar I.D No: 27135602179.
Nationality: Indian.
Born: 22nd
May 1971.
Status: Married with 2 Children.
_____________________________________________________________________________________________________________________

More Related Content

What's hot

CV_Civil_Engineer
CV_Civil_EngineerCV_Civil_Engineer
CV_Civil_Engineer
Anas Zannerni
 
Hannes strydom CV
Hannes strydom CVHannes strydom CV
Hannes strydom CV
Hannes Strydom
 
Sterling Project Management profile for project management, contruction manag...
Sterling Project Management profile for project management, contruction manag...Sterling Project Management profile for project management, contruction manag...
Sterling Project Management profile for project management, contruction manag...
thomassterling
 
Project Manager CV -Rev
Project Manager CV -RevProject Manager CV -Rev
Project Manager CV -Rev
Thanki M.L
 
mohiyuddin CV1
mohiyuddin CV1mohiyuddin CV1
mohiyuddin CV1
Mohin Moosa
 
Pp1 group assignment presentation slides
Pp1 group assignment presentation slidesPp1 group assignment presentation slides
Pp1 group assignment presentation slides
Pui Chun Shian
 
Resume New 2016- Mustapha A. Jubeily
Resume New 2016- Mustapha A. JubeilyResume New 2016- Mustapha A. Jubeily
Resume New 2016- Mustapha A. Jubeily
Mustapha Jubeily
 
Project Management Case Study .EC Harris International Ltd. (Al Wahda Mast...
Project Management Case Study .EC Harris International Ltd.   (Al Wahda Mast...Project Management Case Study .EC Harris International Ltd.   (Al Wahda Mast...
Project Management Case Study .EC Harris International Ltd. (Al Wahda Mast...
Malik Liaqat Ali
 
Moath ahmad cv (1)
Moath ahmad cv (1)Moath ahmad cv (1)
Moath ahmad cv (1)
Moath Alhorainy
 
Project charter presentation
Project charter presentationProject charter presentation
Project charter presentation
Kunal Gudwani
 
Construction Phase Mgmt Srvcs (2)
Construction Phase Mgmt Srvcs (2)Construction Phase Mgmt Srvcs (2)
Construction Phase Mgmt Srvcs (2)
Lee Maserian R.D.I.
 
Sunil Rana Resume
Sunil Rana ResumeSunil Rana Resume
Sunil Rana Resume
Sunil Rana Sunil
 
Daoud Bou Ajram
Daoud  Bou AjramDaoud  Bou Ajram
Daoud Bou Ajram
Daoud Bou Ajram
 
Nizar Mukahal CV 2015
Nizar Mukahal CV 2015Nizar Mukahal CV 2015
Nizar Mukahal CV 2015
nizar m mukahal
 
Senior Quantity Surveyor Engineer ....
Senior Quantity Surveyor Engineer ....Senior Quantity Surveyor Engineer ....
Senior Quantity Surveyor Engineer ....
Ali Mohamed
 
MD HAROON RASHID
MD  HAROON  RASHIDMD  HAROON  RASHID
MD HAROON RASHID
Haroon Rashid
 
Romany resume 2016
Romany resume 2016Romany resume 2016
Romany resume 2016
Romany Fayez
 
Rabih_Rabah_Resume
Rabih_Rabah_ResumeRabih_Rabah_Resume
Rabih_Rabah_Resume
Rabih Rabah
 
CV SHIRISH 1-1-2015
CV SHIRISH 1-1-2015CV SHIRISH 1-1-2015
CV SHIRISH 1-1-2015
Shirish Rahurkar
 
Lina Mohamed CV
Lina Mohamed CVLina Mohamed CV
Lina Mohamed CV
Lina Ortashi
 

What's hot (20)

CV_Civil_Engineer
CV_Civil_EngineerCV_Civil_Engineer
CV_Civil_Engineer
 
Hannes strydom CV
Hannes strydom CVHannes strydom CV
Hannes strydom CV
 
Sterling Project Management profile for project management, contruction manag...
Sterling Project Management profile for project management, contruction manag...Sterling Project Management profile for project management, contruction manag...
Sterling Project Management profile for project management, contruction manag...
 
Project Manager CV -Rev
Project Manager CV -RevProject Manager CV -Rev
Project Manager CV -Rev
 
mohiyuddin CV1
mohiyuddin CV1mohiyuddin CV1
mohiyuddin CV1
 
Pp1 group assignment presentation slides
Pp1 group assignment presentation slidesPp1 group assignment presentation slides
Pp1 group assignment presentation slides
 
Resume New 2016- Mustapha A. Jubeily
Resume New 2016- Mustapha A. JubeilyResume New 2016- Mustapha A. Jubeily
Resume New 2016- Mustapha A. Jubeily
 
Project Management Case Study .EC Harris International Ltd. (Al Wahda Mast...
Project Management Case Study .EC Harris International Ltd.   (Al Wahda Mast...Project Management Case Study .EC Harris International Ltd.   (Al Wahda Mast...
Project Management Case Study .EC Harris International Ltd. (Al Wahda Mast...
 
Moath ahmad cv (1)
Moath ahmad cv (1)Moath ahmad cv (1)
Moath ahmad cv (1)
 
Project charter presentation
Project charter presentationProject charter presentation
Project charter presentation
 
Construction Phase Mgmt Srvcs (2)
Construction Phase Mgmt Srvcs (2)Construction Phase Mgmt Srvcs (2)
Construction Phase Mgmt Srvcs (2)
 
Sunil Rana Resume
Sunil Rana ResumeSunil Rana Resume
Sunil Rana Resume
 
Daoud Bou Ajram
Daoud  Bou AjramDaoud  Bou Ajram
Daoud Bou Ajram
 
Nizar Mukahal CV 2015
Nizar Mukahal CV 2015Nizar Mukahal CV 2015
Nizar Mukahal CV 2015
 
Senior Quantity Surveyor Engineer ....
Senior Quantity Surveyor Engineer ....Senior Quantity Surveyor Engineer ....
Senior Quantity Surveyor Engineer ....
 
MD HAROON RASHID
MD  HAROON  RASHIDMD  HAROON  RASHID
MD HAROON RASHID
 
Romany resume 2016
Romany resume 2016Romany resume 2016
Romany resume 2016
 
Rabih_Rabah_Resume
Rabih_Rabah_ResumeRabih_Rabah_Resume
Rabih_Rabah_Resume
 
CV SHIRISH 1-1-2015
CV SHIRISH 1-1-2015CV SHIRISH 1-1-2015
CV SHIRISH 1-1-2015
 
Lina Mohamed CV
Lina Mohamed CVLina Mohamed CV
Lina Mohamed CV
 

Viewers also liked

Arun das latest resume
Arun das latest resumeArun das latest resume
Arun das latest resume
Arun Das
 
Abdelaziz Al-safadi CV 2016. word
Abdelaziz Al-safadi CV 2016. wordAbdelaziz Al-safadi CV 2016. word
Abdelaziz Al-safadi CV 2016. word
Abdelaziz Alsafadi
 
GEORGE CV
GEORGE CVGEORGE CV
GEORGE CV
George Alexander
 
Fadel Mansour's CV
Fadel Mansour's CVFadel Mansour's CV
Fadel Mansour's CV
Fadel Mansour
 
Saravanan - Profile (2015-16)
Saravanan - Profile (2015-16)Saravanan - Profile (2015-16)
Saravanan - Profile (2015-16)
Saravanan Arumugam Btech (Civil), ICIOB
 
Sadiq-CV- Document Controller
Sadiq-CV- Document ControllerSadiq-CV- Document Controller
Sadiq-CV- Document Controller
Sadiq Ali
 
Offer letter The Royal Riviera Hotel Doha
Offer letter The Royal Riviera Hotel DohaOffer letter The Royal Riviera Hotel Doha
Offer letter The Royal Riviera Hotel Doha
Mohammed Yousuf
 
CV
CVCV
CV Bonnell - March 2015
CV Bonnell - March 2015CV Bonnell - March 2015
CV Bonnell - March 2015
Vaughan Bonnell
 
4th Civil Defence Exhibition and Conference - Qatar
4th Civil Defence Exhibition and Conference - Qatar4th Civil Defence Exhibition and Conference - Qatar
4th Civil Defence Exhibition and Conference - Qatar
civildefenceqatar
 
AISHA JASSIM MOHAMMED ALTHAWADI CV
AISHA JASSIM MOHAMMED ALTHAWADI CVAISHA JASSIM MOHAMMED ALTHAWADI CV
AISHA JASSIM MOHAMMED ALTHAWADI CV
Ayoosha Althawadi
 
CV
CVCV
CV Inesh
CV IneshCV Inesh
CV Inesh
inesh singh
 
SELVAPRIYAN-RESUME
SELVAPRIYAN-RESUMESELVAPRIYAN-RESUME
SELVAPRIYAN-RESUME
Selvapriyan Natarajan
 
Peter Holt CV 12-05-2015
Peter Holt CV 12-05-2015Peter Holt CV 12-05-2015
Peter Holt CV 12-05-2015
Peter Holt
 
CV - Mubarak Ali .rtf
CV - Mubarak Ali .rtfCV - Mubarak Ali .rtf
CV - Mubarak Ali .rtf
Mubarak Ali
 
Resume-Sanjay Bhattacharya updated
Resume-Sanjay Bhattacharya updatedResume-Sanjay Bhattacharya updated
Resume-Sanjay Bhattacharya updated
Sanjay Bhattacharya
 
Allan Dick - rigging foreman
Allan Dick - rigging foremanAllan Dick - rigging foreman
Allan Dick - rigging foreman
ALLAN DICK ESTERA
 

Viewers also liked (18)

Arun das latest resume
Arun das latest resumeArun das latest resume
Arun das latest resume
 
Abdelaziz Al-safadi CV 2016. word
Abdelaziz Al-safadi CV 2016. wordAbdelaziz Al-safadi CV 2016. word
Abdelaziz Al-safadi CV 2016. word
 
GEORGE CV
GEORGE CVGEORGE CV
GEORGE CV
 
Fadel Mansour's CV
Fadel Mansour's CVFadel Mansour's CV
Fadel Mansour's CV
 
Saravanan - Profile (2015-16)
Saravanan - Profile (2015-16)Saravanan - Profile (2015-16)
Saravanan - Profile (2015-16)
 
Sadiq-CV- Document Controller
Sadiq-CV- Document ControllerSadiq-CV- Document Controller
Sadiq-CV- Document Controller
 
Offer letter The Royal Riviera Hotel Doha
Offer letter The Royal Riviera Hotel DohaOffer letter The Royal Riviera Hotel Doha
Offer letter The Royal Riviera Hotel Doha
 
CV
CVCV
CV
 
CV Bonnell - March 2015
CV Bonnell - March 2015CV Bonnell - March 2015
CV Bonnell - March 2015
 
4th Civil Defence Exhibition and Conference - Qatar
4th Civil Defence Exhibition and Conference - Qatar4th Civil Defence Exhibition and Conference - Qatar
4th Civil Defence Exhibition and Conference - Qatar
 
AISHA JASSIM MOHAMMED ALTHAWADI CV
AISHA JASSIM MOHAMMED ALTHAWADI CVAISHA JASSIM MOHAMMED ALTHAWADI CV
AISHA JASSIM MOHAMMED ALTHAWADI CV
 
CV
CVCV
CV
 
CV Inesh
CV IneshCV Inesh
CV Inesh
 
SELVAPRIYAN-RESUME
SELVAPRIYAN-RESUMESELVAPRIYAN-RESUME
SELVAPRIYAN-RESUME
 
Peter Holt CV 12-05-2015
Peter Holt CV 12-05-2015Peter Holt CV 12-05-2015
Peter Holt CV 12-05-2015
 
CV - Mubarak Ali .rtf
CV - Mubarak Ali .rtfCV - Mubarak Ali .rtf
CV - Mubarak Ali .rtf
 
Resume-Sanjay Bhattacharya updated
Resume-Sanjay Bhattacharya updatedResume-Sanjay Bhattacharya updated
Resume-Sanjay Bhattacharya updated
 
Allan Dick - rigging foreman
Allan Dick - rigging foremanAllan Dick - rigging foreman
Allan Dick - rigging foreman
 

Similar to Robin CV 2015

Aziz updated cv
Aziz updated  cvAziz updated  cv
Aziz updated cv
Arshad Aziz
 
Aziz updated cv
Aziz updated  cvAziz updated  cv
Aziz updated cv
Arshad Aziz
 
Mohamed abdelaziz c.v.
Mohamed abdelaziz c.v.Mohamed abdelaziz c.v.
Mohamed abdelaziz c.v.
Mohamed Abdelaziz
 
QS - CV
QS - CVQS - CV
Abdul Ghafoor (SQS) ( )
Abdul Ghafoor (SQS) ( )Abdul Ghafoor (SQS) ( )
Abdul Ghafoor (SQS) ( )
Ghafoor Butt
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
mahmood mansor
 
Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CV
vimal nc
 
John CV
John CVJohn CV
John CV
John W.
 
Natasha_Harding_Baxter_MCIOB_CV_060116
Natasha_Harding_Baxter_MCIOB_CV_060116Natasha_Harding_Baxter_MCIOB_CV_060116
Natasha_Harding_Baxter_MCIOB_CV_060116
Natasha Harding-Baxter MCIOB MACostE ACIarB
 
Shakeel Sarwar CV Civil+QS.July-2015
Shakeel Sarwar CV Civil+QS.July-2015Shakeel Sarwar CV Civil+QS.July-2015
Shakeel Sarwar CV Civil+QS.July-2015
Shakeel Sarwar
 
CV Shehzad SQS
CV Shehzad SQSCV Shehzad SQS
CV Shehzad SQS
Muhammad Shehzad Ali
 
M.elsayed CV
M.elsayed CVM.elsayed CV
M.elsayed CV
Mohamed Ali
 
avinash chandrashekar-CV
avinash chandrashekar-CVavinash chandrashekar-CV
avinash chandrashekar-CV
avinash chandrashekar
 
PP1 - Presentation Slides
PP1 - Presentation Slides PP1 - Presentation Slides
PP1 - Presentation Slides
Pang Khai Shuen
 
Khaled Last updated CV 15-9-2014 Final
Khaled Last updated CV 15-9-2014 FinalKhaled Last updated CV 15-9-2014 Final
Khaled Last updated CV 15-9-2014 Final
Khaled El-Hefnawy, PMP®
 
CV- Abdullah Reddy Baddam
CV- Abdullah Reddy BaddamCV- Abdullah Reddy Baddam
CV- Abdullah Reddy Baddam
Abdullah Reddy Baddam
 
Project Manager.pdf
Project Manager.pdfProject Manager.pdf
Project Manager.pdf
mahmoud904990
 
Resume for Senior Manager - projects
Resume for  Senior Manager -  projectsResume for  Senior Manager -  projects
Resume for Senior Manager - projects
pramod patel
 
Planner's Resume
Planner's ResumePlanner's Resume
Planner's Resume
Tanveer Ahmed Niazi
 
Resume - Bisho Wagdy Aziz (1)
Resume - Bisho Wagdy Aziz (1)Resume - Bisho Wagdy Aziz (1)
Resume - Bisho Wagdy Aziz (1)
Bishoy Wagdy Aziz
 

Similar to Robin CV 2015 (20)

Aziz updated cv
Aziz updated  cvAziz updated  cv
Aziz updated cv
 
Aziz updated cv
Aziz updated  cvAziz updated  cv
Aziz updated cv
 
Mohamed abdelaziz c.v.
Mohamed abdelaziz c.v.Mohamed abdelaziz c.v.
Mohamed abdelaziz c.v.
 
QS - CV
QS - CVQS - CV
QS - CV
 
Abdul Ghafoor (SQS) ( )
Abdul Ghafoor (SQS) ( )Abdul Ghafoor (SQS) ( )
Abdul Ghafoor (SQS) ( )
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
 
Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CV
 
John CV
John CVJohn CV
John CV
 
Natasha_Harding_Baxter_MCIOB_CV_060116
Natasha_Harding_Baxter_MCIOB_CV_060116Natasha_Harding_Baxter_MCIOB_CV_060116
Natasha_Harding_Baxter_MCIOB_CV_060116
 
Shakeel Sarwar CV Civil+QS.July-2015
Shakeel Sarwar CV Civil+QS.July-2015Shakeel Sarwar CV Civil+QS.July-2015
Shakeel Sarwar CV Civil+QS.July-2015
 
CV Shehzad SQS
CV Shehzad SQSCV Shehzad SQS
CV Shehzad SQS
 
M.elsayed CV
M.elsayed CVM.elsayed CV
M.elsayed CV
 
avinash chandrashekar-CV
avinash chandrashekar-CVavinash chandrashekar-CV
avinash chandrashekar-CV
 
PP1 - Presentation Slides
PP1 - Presentation Slides PP1 - Presentation Slides
PP1 - Presentation Slides
 
Khaled Last updated CV 15-9-2014 Final
Khaled Last updated CV 15-9-2014 FinalKhaled Last updated CV 15-9-2014 Final
Khaled Last updated CV 15-9-2014 Final
 
CV- Abdullah Reddy Baddam
CV- Abdullah Reddy BaddamCV- Abdullah Reddy Baddam
CV- Abdullah Reddy Baddam
 
Project Manager.pdf
Project Manager.pdfProject Manager.pdf
Project Manager.pdf
 
Resume for Senior Manager - projects
Resume for  Senior Manager -  projectsResume for  Senior Manager -  projects
Resume for Senior Manager - projects
 
Planner's Resume
Planner's ResumePlanner's Resume
Planner's Resume
 
Resume - Bisho Wagdy Aziz (1)
Resume - Bisho Wagdy Aziz (1)Resume - Bisho Wagdy Aziz (1)
Resume - Bisho Wagdy Aziz (1)
 

Robin CV 2015

  • 1. Joseph Robinson Post Box No: 17750 Doha – Qatar. Telephone: +974 55350726. Mobile: +974 55862365. Email: robinsasco@gmail.com; robin@sasconet.com. Page1of6 ___________________________________________________________________________________________________________________ PROJ ECT MANAGER w Business Development – Commercially Astute – Engineer w Highly successful Project Manager and a diplomatic negotiator with multi-faceted responsibilities. Possessing a track record of securing multi-million Riyals contracts covering the complete bidding cycle, whilst providing the full range of design, engineering, project / programme management services and client solutions. Continually meeting increased regulatory targets for out turn costs, on-time deliveries within a Continuous Improvement environment. Establishing new contracts, as well as overseeing many new sites, including setting up site offices, gathering the right resources for the contract in terms of staff and operatives, monitoring programme, production, health and safety issues and everything else involved in the successful delivery of a project. AREAS OF EXPERTISE · Project Management · Site management · Continuous Improvement · Demand fulfillment · Procurement · Risk / viability assessments · Health and Safety · Major schemes of work · Budgeting · Identifying client needs · On-time delivery · Cost control ___________________________________________________________________________________________________ PROFESSIONAL DEVELOPMENT Master Deg. Project Management (current studies - distance learning) 2014. Bachelor Deg. Alagappa University, Tamil Nadu, India - English (distance learning) 2008-2011. Diploma in (NCVT) Eng. 1986-1988. Industrial Training in Eng. – 1989-1990. Secondary School – 1986. Auto Cad - 2000 Internal Auditor Course -2009 Project Management Student Activity · Participated a 3 days seminar about Project Management Professional organized by MMT including a practical group, case study, work presentations and developing industry awareness. PROFESSIONAL EXPERIENCE AND SIGNIFICANT ACHIEVEMENTS Specialized Aluminum and Steel Co, Doha-Qatar. April 1994 – Present (21 -Years) PROJECT MANAGER April 2006 – Present
  • 2. Joseph Robinson Post Box No: 17750 Doha – Qatar. Telephone: +974 55350726. Mobile: +974 55862365. Email: robinsasco@gmail.com; robin@sasconet.com. Page2of6 · The largest construction project in Qatar completed in 2013, (SHEMOUKH TWIN TOWER - Below mentioned) was one of my best achievements in my carrier. · Responsible for Project Design and Management, client liaison, site surveys, agreeing deliverables, procurement, CAD, systems engineering and project documentation. · Planned the right labor, plant, materials, information, quality, place, at the right time, every time. · Eliminated budget and programme overruns, resolved conflicting relationships between stakeholders, and increased the reliability and quality of information flow and material supply. · Developed close working relationships with my colleagues, management and consultants. · Working to very tight timescales built a sound construction teams that worked for each other and ultimately delivered a successful jobs for both the client and the business. · The overall in charge of all aspects of the project from the time of issuing the work order to handing over the project to client’s expectation for timely and qualitative works. · Prepare a master plan, control and monitor various activities of the projects at all stages. · Coordinate with head of the design dept. for submission and approval of the drawings. · Coordinate with Technical Manager / Engineer for submission and approval of the samples and other technical items. · Prepare Budgeting report in the format required by the Accounts department in coordination with Contracts department, for monitoring of works by the top level management. · Coordinate with the Contracts / Marketing departments for any kind of contractual matters to safe guard the company’s interest. · Follow up with the Purchase department and Production departments for timely delivery of materials. · Organize site survey and measurements with the surveyor and site engineer. · Issue production orders with concerned engineers and follow up materials in the production. · Co-ordinate, guide and supervise subcontractors (like composite cladding, stainless steel Handrails etc.) for timely and quality works. · Provide the required information for Contracts department on monthly / fortnightly about the progress of works for billing. · Coordinate with Contracts department for bill approvals as and when required. · Arrange the project completion certificates and get it acknowledged by the concerned person from Main Contractor or Client. Procurement Achievements: · Recognized the benefits that supply chain partnership arrangements bring to our organization and our clients. Supporting business operations through more efficient procurement. · Secured reliable and consistent suppliers. · Reduced costs through innovation and product development. · Continually improved processes and procedures for forecasting demand, managing logistics and controlling materials. · Developed strategic alliances with suppliers and manufacturers. · From early success on the introduction of traditional procurement specifications, moved on to a challenging level of cost management, design approvals, document control, Health and Safety, budgeting and administering work on all projects, all within strict timescales.
  • 3. Joseph Robinson Post Box No: 17750 Doha – Qatar. Telephone: +974 55350726. Mobile: +974 55862365. Email: robinsasco@gmail.com; robin@sasconet.com. Page3of6 Project Achievements & On Going Projects Designation : Project Manager Project Name : STATE AUDIT BUREAU (4B+G+1+ME+31.Floors) Client : Hamad Ali Hamad Abdullah Al-Attiyah Main Contractor : Societed’Entreprise (SEG) Project Management: IBE Partnership Design Consultant : Keo International Consultants Contract Value : 39.72. Millions. (Qrs) Duration : Sep 2013 – Present. ___________________________________________________________________________________________________ Designation : Project Manager Project Name : SHEMOUKH TWIN TOWERS (3B+G+M+S+23.Floors) Client : Real Estate Serveries Group Main Contractor : Societed’Entreprise (SEG) Project Management: Hill International Design Consultant : EHAF Qatar Consulting Engineers Contract Value : 53.5. Millions. (Qrs) Duration : Aug 2011 – June 2013. ___________________________________________________________________________________________________ Designation : Project Manager Project Name : Arwa Residential Tower (2B+G+41.Floors) Client : Sh. Aisha Abdulla Thani al Thani Main Contractor : Al Habtoor Lighton Group Consultant : Diwan Al Emara Contract Value : 19.8. Millions. (Qrs) Duration : Sep 2010 – Present. (Hold) Designation : Project Manager Project Name : Al Waab City – Villa B&C Client : Shk.Nasser Bin Khalid Main Contractor : ARABTEC Consultant : Engineering Consulting Group Contract Value : 40.88 Millions. (Qrs) Duration : Feb 2008 – Present.
  • 4. Joseph Robinson Post Box No: 17750 Doha – Qatar. Telephone: +974 55350726. Mobile: +974 55862365. Email: robinsasco@gmail.com; robin@sasconet.com. Page4of6 Designation : Project Manager Project Name : School of Business Building Client : Qatar University Main Contractor : AMANA Consultant : the arab architect Contract Value : 12.6 Millions. (Qrs) Duration : Jun 2008 – July 2010. ___________________________________________________________________________________________________ Designation : Project Manager Project Name : Golden Bay Tower (2B+G+16.Floors) Client : Shk. Khalifa Bin Jassim Main Contractor : Societed’Entreprise (SEG) Consultant : Gulf Engineering Consulting Group Contract Value : 10.63 Millions. (Qrs) Duration : Feb2007 – Dec 2009. ___________________________________________________________________________________________________ Designation : Project Manager Project Name : (3+4+7) 14.New Schools Client : Public Works (Asghal) Main Contractor : ITCC Consultant : Consulting Eng. Group Contract Value : 18.16. Millions. (Qrs) Duration : Jun 2009 – May 2011. ___________________________________________________________________________________________________ PROJECT ENGINEER June 2002 – March 2006 Specialized Aluminum and Steel Co. · Assisting in the in development and expansion of the infrastructure and improving engineering facilities. Liaising between both the internal and external stakeholders. · Contributing to strategy formulation and forward planning as a member of the management team. · Initiating the project, defining project scope and preparing the project plan. · Writing technical specifications and overseeing production of conceptual drawings, preliminary design criteria for project including Scope of Work, Work Breakdown Structure and general specification, milestone identification and planning. · Identifying service needs, solving engineering problems relating to the continuous expansion of the project.
  • 5. Joseph Robinson Post Box No: 17750 Doha – Qatar. Telephone: +974 55350726. Mobile: +974 55862365. Email: robinsasco@gmail.com; robin@sasconet.com. Page5of6 · Establishing “Planned and Preventive Maintenance” PPM programs and procedures after project closure. · Identifying and matching needs to approved budget with project stakeholders. · Identifying ongoing project risks and assigning and mitigating risks. · Reporting project status at progress meetings. · Ensuring all resources (manpower and materials), are provided as per the contractor’s scheduled plan, meet all on time and within budget. Technical Engineer March 2000 – May 2002. Specialized Aluminum and Steel Co. · Preparing Submittals; Request for Information (RFI) and Request for Approval (RFA), Transmitted Responded RFA’s and RFI’s to Operation, Survey, QA/QC and Other concern department and Sub- contractors. · Updating RFA’s and RFI’s for Coordinators Monitoring. · Preparation of Look-ahead Schedule for Architectural. · Preparation of Architectural Schedule. · Reporting to the Site Manager and Superintendents about the status of our schedule (delay or advance). · Preparation of Quantitative Target Accomplishment for the Month. · Assisting my superiors in technical details. · Release data sheets, update formulation records. · Propose projects for qualifications. · Authorize design progression. · Take responsibility for design of equipment. · Designate design for new products. · Make decisions regarding process design, technical databases, qualification test and technical procedures. Production Engineer April 1994 – Feb 2000. Specialized Aluminum and Steel Co.
  • 6. Joseph Robinson Post Box No: 17750 Doha – Qatar. Telephone: +974 55350726. Mobile: +974 55862365. Email: robinsasco@gmail.com; robin@sasconet.com. Page6of6 · To plan work execution at shop floor on a daily basis. · To enter the measurement to be taken record in the diary after receipt of Work Order. · To follow up regarding all the materials (Aluminum) which are requisitioned to Stores / Purchase and to ensure that it reaches the factory for fabrication at appropriate time. · To fill up the description part in work register from the order received from HO. with follow-up. · Technical coordination / clarification to all concerned at shop floor. · Daily Outside work Planning with Factory Manager. · Requisition for glass and follow up for delivery in time. · Outside work status to be collected on a daily basis and records to be kept in work Order register. Production Supervisor April 1990 – Feb 1994. Southern Conveyers Pvt. Ltd. Chennai-96. INDIA. · Ensure that the works are completed in time. · Collect status of work at floor level and site level. · Maintain overall coordination. · Maintain work register. · Ensure that Materials are sent to site as per Work Charts, on a daily basis. _____________________________________________________________________________________________________________________ COMPUTER SKILLS · Familiar with statistical packages. · Used of Microsoft office Project, Word, Excel Spreadsheets, and PowerPoint. · Studied of AutoCAD 2000. PERSONAL Interests and Pastimes: Travelling, swimming, volleyball, badminton, reading, music. Languages: Fluent in English, Tamil and Malayalam. Speaking in Hindi and Arabic. PERSONAL PROFILE Name: Joseph Robinson. Passport No: J 6411932. Validity: 14th April 2022. Qatar I.D No: 27135602179. Nationality: Indian. Born: 22nd May 1971. Status: Married with 2 Children. _____________________________________________________________________________________________________________________