SlideShare a Scribd company logo
How Renewable Energy Can Power Java-Bali and Sumatra
Summary for
Policy Makers
in cooperation with:
A Roadmap for
Indonesia’s Power Sector:
iesr.or.id1
IMPRINT
A Roadmap for Indonesia’s Power Sector:
How Renewable Energy Can Power Java-Bali and Sumatra
Study by:
Monash Grid Innovation Hub/Australia Indonesia Centre
Monash Energy Materials and Systems Institute
Monash University
Wellington Rd, Clayton VIC 3800 | Australia
T: +61 9905 1049
www.monash.edu | memsi@monash.edu
Institute for Essential Services Reform
Jalan Tebet Barat Dalam VIII No. 20 B
Jakarta Selatan 12810 | Indonesia
T: +62 21 2232 3069 | F: +62 21 8317 073
www.iesr.or.id | iesr@iesr.or.id
Agora Energiewende
Anna-Louisa-Karsch-Straße 2
10178 Berlin | Germany
T: +49 30 700 14 35-000 | F: +49 30 700 14 35-129
www.agora-energiewende.org | info@agora-energiewende.de
Study team:
Dr. Ariel Liebman - Monash Grid Innovation Hub
Warwick Forster - Apogee Energy
Mentari Pujantoro and Philipp Godron - Agora Energiewende
Fabby Tumiwa, Jannata Giwangkara, and
Agus Tampubolon - Institute for Essential Services Reform
The summary for policy makers was written by:
Fabby Tumiwa, Institute for Essential Services Reform
Mentari Pujantoro and Philipp Godron, Agora Energiewende
A Roadmap for Indonesia’s Power Sector:
How Renewable Energy Can Power Java-Bali and Sumatra
This report should be cited:
IESR (2019), A Roadmap for Indonesia’s Power Sector: How Renewable Energy Can Power Java-Bali and Sumatra,
Institute for Essential Services Reform (IESR), Jakarta
Publication:
February 2019
iesr.or.id 2
Dear reader,	
	 Indonesia is the world’s 4th most populous
country on a continuous growth trajectory. To supply
the increasing electricity demand, the government is
emphasizing the role of fossil, and, in particular coal-
fired generation, which is supposed to grow to 65% of
total generation. At the same time, it stipulates that by
2025, Renewable energy shall make up 23% of primary
energy mix, up from 8% today. Policy focus is on hydro
and geothermal resources, while solar and wind power
play only a negligible role.
	 Globally, the trend is very different: power
systems around the world are increasingly being
shaped by renewables. Solar and wind – driven by
significant technology cost reduction - have been at
the forefront of power sector investment for years and
will continue to play the decisive role in modernizing
and decarbonizing power systems globally.
	 Against this background, we conducted a
model-based powers system analysis, performed with
the PLEXOS model which is widely used for power
sector analysis. The study focuses on the Java-Bali and
Sumatra systems, which is where the majority of the
population lives and about 90% of the electricity is
produced and consumed. The model assesses both the
demand and supply dimensions of the power system.
	 Looking ten years ahead, we have assessed
different pathways for the Indonesia’s power system:
what are the impacts of a moderate electricity demand
growth on investment and power plant utilisation?
What is the impact of adding considerable shares of
wind and solar capacity to system cost, and how will
the system ensure security of supply?
Fabby Tumiwa
Executive Director
Foreword
iesr.or.id3
IESR | A Roadmap for Indonesia’s Power Sector:
How Renewable Energy Can Power Java-Bali and Sumatra
iesr.or.id 4
Executive Summary
	 A Roadmap for Indonesia’s power sector: how
renewable energy can power Java-Bali and Sumatra
summary for policy makers was produced by Monash
University’s Grid Innovation Hub partnering with
the Australia Indonesia Centre, supported by Agora
Energiewende and the Institute for Essential Services
Reform (IESR). The study modelled different pathways
for Indonesia’s power system to reliably meet energy
and climate targets for the period 2018 to 2027. The
study focuses on Java-Bali and Sumatra where the
majority of the population lives and about 90% of the
electricity is consumed. The model assesses both the
demand and supply dimensions of the power system.
	 Analysis was performed with the PLEXOS
power system simulation and planning software
system, which is widely used internationally for power
sector analysis. The study identifies the impact of
reduced demand on generation investment, utilisation
and power system cost and assesses the impact of
adding considerable shares of wind and solar capacity
to the system.
Key Findings
•	 The Ministry of Energy and Mineral
Resources and utility PLN have continuously
overestimated energy demand in Java-Bali
and Sumatra. If PLN continues with its current
plans, there is likely to be an overbuild of
12.5GW of coal, gas and diesel, resulting
in approximately US$12.7 billion in wasted
investment. This would burden PLN’s finances
and eventually have to be covered by the
Indonesian public.
•	 The risk of lower than planned utilisation
of thermal power plants may increase as
demand projections are overestimated
and as renewables become cheaper. Once
renewables are built, they produce electricity
at almost zero marginal cost. This could result
in additional losses for PLN, which is locked
into long-term power purchase agreements
with Independent Power Producers.
•	 Java-Bali and Sumatra could reliably meet
growing electricity demand in the next 10
years through a doubling of the share of
renewable energy. The cost of doubling the
share of renewables through investment in
wind and solar is comparable to the current
high fossil-fuel pathway. Greenhouse gas
emissions would be reduced by 36%. The
development of renewables would bring
important additional co-benefits, reduce
negative health and environmental impacts
and provide job opportunities throughout the
country.
•	 A high renewables scenario coupled with
realistic energy savings would result in a
cost saving of US$10 billion over ten years
as compared with the current RUPTL plan
if the cost of capital and cost of technology
is brought down in line with international
prices. This would require an ambitious long-
term strategic plan, clear intermediate targets
and implementing regulations in place.
•	 Even with 43% renewables, the security of
supply of the power system is maintained.
Recommendations
	 To develop a reliable, cost-effective energy
system which avoids wasted capital and serious
environmental impacts, MEMR and PLN should:
•	 Review best practice approaches and
techniques in demand forecasting around the
world and implement such an approach in
iesr.or.id5
Indonesia;
•	 Integrate the potential of energy efficiency for
forecasting future electricity demand;
•	 Review current proposals for new coal-fired
power stations in the Java-Bali and Sumatra
systems and apply current prevailing costs for
renewable technology in developing future
plans to asses alternative cost-effective and
low carbon pathways;
•	 Develop and assess alternative scenarios
and low carbon electricity pathways in
the National Electricity Plan (RUKN) which
integrate medium and higher renewable
energy penetration in various electricity
systems; and
•	 Adopt an ambitious long-term strategic plan
with clear intermediate targets for renewable
energy expansion, supporting policies and
streamlined implementation at national,
provincial and local levels.
photo: PLTB Sidrap / Biro Pers Istana
iesr.or.id 6
Introduction
	 Indonesia has seen strong growth in GDP
as well as in electricity demand in the past decade.
The government is expecting continuous growth,
with electricity demand projected to double by 2030
(RUKN, 2016). To supply the increasing demand, the
government is emphasizing the role of coal-fired
power, which is supposed to grow to 65% of total
generation. At the same time, it stipulates by 2025,
renewable energy shall make up 23% of generation,
up from 8% today (RUEN, 2017 and RUKN, 2016).
	 Each year, Perusahaan Listrik Negara (PLN),
the state-owned electricity utility, publishes an
Electricity General Plan (Rencana Umum Penyediaan
Tenaga Listrik or RUPTL), which maps in detail the
development of electricity demand and supply for the
next 10 years. According to the latest RUPTL (2018 –
2027), the 23% renewables target would be reached
by 2025. Due to lack of a longer-term target, however,
renewable share would then decrease afterwards.
PLN still puts a clear focus on conventional and fossil-
fueled generation in the power mix, with only very
negligible shares of solar and wind.
	 Globally, the trend is very different: power
systems around the world are increasingly being
shaped by renewables. In an effort to modernise
power systems, taking advantage of the dramatic
drop in prices of solar PV and wind, and looking
for a more sustainable power mix, countries and
energy companies are strongly investing in these
technologies. Since 2015, more investment has gone
intorenewableenergyaroundtheworldeachyearthan
in conventional fossil fuel generation. India, in 2017,
for the first time, invested more in renewables than
fossil fuel generation (IEA, World Energy Investment
2018) – simply because electricity from wind and solar
has become cheaper than from new gas and coal fired
power plants. In addition, renewable energy has the
co-benefits of reductions in carbon emissions and air
pollution.
	
	 Against this background, we conducted
a model-based analysis of different pathways for
Indonesia’s power system. We have focused on the
Java-Bali and Sumatra systems, which is where the
majority of the population lives and about 90% of the
electricity is consumed. By mid-2020, Sumatra and
Java will be connected via a submarine cable, thereby
integrating the systems of these three large islands.
	 The model assessed both the demand and
supply dimensions of the power system. It took
into account the opportunities of the impressive
renewable energy technology cost drop in the past
decade, particularly on solar and wind energy,
assessing alternative pathways to current power mix
planning and meeting Indonesia’s energy and climate
targets while still ensuring the reliability of the power
system.
	 The study used the 2018 RUPTL as a baseline
with regard to existing and future generation builds, as
well as peak demand and energy growth. Analysis was
performed with the Australian PLEXOS model, which
is widely used globally for power sector analysis. Input
data combined international sources on technology
cost with Indonesia-specific knowhow provided by a
range of national experts in workshops and bilateral
discussions. The power system was modeled for a
10 year time-span, for the period 2018 to 2027, with
hourly time steps. It takes into account supply and
demand on a provincial level as well as inter-provincial
transmission capacity restrictions.
	 The two main objectives of the study relate to
demand development and wind and solar investment
in Java, Bali and Sumatra. We:
a.	 identify the impact of reduced demand on
investment, utilisation and power system cost
and;
b.	 assess the impact of adding considerable shares
of wind and solar capacity to the system.
	 The setup and key differentiating parameters
of the scenarios assessed are presented in Figure 1.
iesr.or.id7
The study’s main findings are presented below.
Figure 1 Scenarios and key drivers
Overestimating Demand Growth and
Underestimating The Potential of Energy
Efficiency Increase The Risk of Stranded
Assets
	 Estimating the energy demand trajectory over
longer periods of time is very challenging, in particular
in emerging economies that have become used to high
growth figures. Governmental projections are often
driven by political targets more than by sound evidence,
and the potential of more efficient appliances in the
industrial sector and building stock (AC, light bulbs, etc.)
is often underestimated.
	 Indonesia is no exception: in its annual Ten-Year
Plans, PLN has consistently overestimated electricity
demand growth. Typically, demand has been expected
to more than double in a 10-year horizon. According to
the RUPTL 2008, Java-Bali electricity demand today was
expected to have reached 250 TWh by 2017. In reality, it
stood at 170 TWh, i.e. about two thirds of the projection.
Even though growth rates have been reduced recently,
notablyinthe2018RUPTL(ascomparedtoRUPTL2017),
the growth path for Java-Bali and Sumatra system for
the next decade still projects demand values that are 20-
50% higher than those to be expected when following
the growth trajectory of the past decade. Therefore,
in the analysis, we have modeled an alternative
growth path more reflective of the pathway of the last
decade. This is particularly true for Java-Bali, where
demand is already at a higher level, while for Sumatra,
a level of growth somewhere between historical trends
and RUPTL 2018 projections is assumed (Figure 2).
iesr.or.id 8
Figure 2 Historical demand and demand projection in Java Bali and Sumatra: a tendency to overestimate the future
demand growth
	 Comparing demand of the RUPTL baseline
case with the moderate demand growth scenario
reveals the magnitude of difference and impact on
the existing and planned power generation fleet. In a
scenario where the growth in Java-Bali and Sumatra
reflects the growth of the past decade, electricity
demand in 2027 would be 16% lower than what is
assumed in the 2018 RUPTL. This means from 197
TWh in 2017, demand would increase to 322 TWh in
the moderate scenario, rather than to 382 TWh.
	 The moderate demand growth will imply:
a.	 There will be considerably fewer power plants
needed to meet the demand and;
b.	 b)	 if, nevertheless, all the power plants in
the RUPTL 2018-2027 were built, power plants
would run at lower utilisation rates, putting
their business case in question and, effectively,
increasing overall system and levelised generation
cost.
Reduced demand results in a reduction of additional
generation capacity requirements by approximately
12.5 GW, mainly of coal, CCGT and OCGT (about 3 GW
each), and diesel (-1.6 GW). In essence, there would
be 12.5 GW of capacity built that is not required to
meet demand. In the capacity assessment, outages
for maintenance as well as forced outages have been
taken into account, according to current standards in
Indonesia.
	 Building these extra 12.5 GW of plants would
require unnecessary investment of about 12.7 billion
USD; total investment cost would increase from 39.7
billion USD to 52.4 USD. This would, by the year 2027,
increase annual capital cost of the power plant fleet
by 28%.
Demand would be lower by 49 TWh in Java Bali and 11 TWh in Sumatra, translating to 64.4 TWh less generation
needed, if power system losses of about 8% are taken into account
Combined Cycle Gas Turbine
Open Cycle Gas Turbine
1
2
3
iesr.or.id9
Figure 3 Installed capacity in 2027 between RUPTL and the optimised system
Figure 4 Difference in investment cost due to overbuilt of 12.5 GW capacity
	 If all power plants are built according to RUPTL
2018 plan, but demand growth turns out to be more
moderate, utilisation of thermal power plants will drop,
since a higher number of power plants will generate the
same amount of energy. As renewables power plants
– e.g. geothermal, hydro, solar and wind - generate at
zero marginal cost, this will mainly affect thermal power
plants, meaning coal utilisation will, within the next 10
years, decrease by an average rate of 8%. The impact
becomes even more pronounced when looking at the
change in utilisation on a more disaggregate basis.
	 Figure 5 depicts the change in utilisation rates
of coal power plants for the different demand scenarios.
Each circle represents one province: it is evident that
there are several provinces where utilisation of both
existing and new coal power generation drops by more
than 10 percentage points, and some where utilisation
will reduce by about 20 percentage points. For gas,
given the CCGTs and OCGTs higher short run marginal
cost, utilisation would even drop further. It is still
probable that the new built plants would be utilised to
a much lesser extent than planned, thus increasing the
risk of stranded assets. Given that thermal power plants
are increasingly being built by Independent Power
Producers with long-term power purchase agreements
with PLN, this means that PLN will likely be paying for
electricity it does not need, thereby burdening the
Indonesian taxpayer with additional debt.
iesr.or.id 10
	 As mentioned before, forecasting demand is
not an easy business, and the risk of over-investment
needs to be weighed against the political goal of
supplying citizens and the economy with sufficient
energy. However, recent developments of strongly
increasing reserve margins and delays in projects due
to lack of demand demonstrate that overinvestment is
a real issue for Indonesia already today.
	 The risk of lower utilisation of power plants
than originally planned may increase with renewables
becoming cheaper, as these technologies, once they
have been built, produce electricity at almost zero
marginal cost. At the same time, wind and solar plants
can be developed in a much more flexible way. In well-
developed renewables markets, time from planning, to
start of operation, ranges between two years (for wind
parks) and six months (for solar PV) and these projects
can be developed economically in a very modular way,
adapting project size to the needs. Efficient thermal
power plants, in contrast, have sizes between 400 MW
(for gas) and more than 1 GW (for coal), and require
much longer lead times. The risk of unnecessary
investment is therefore much lower with renewables
power plants.
Figure 5 Changes in utilisation rate between high demand (RUPTL) and lower demand scenario (RUPTL Low gen). Each
point represents 1 coal power plant in 1 province. The power plants are grouped into 3 status: existing, under con-
struction, and planned
iesr.or.id11
Indonesia Has a Vast Potential of Diverse
Renewable Energy Sources,
Which Easily Allows for Doubling
The Currently Planned Share of
Renewables within The Next Decade
	 Indonesia has abundant renewable energy
potential from a variety of resources - well beyond
what is available in most other countries around the
globe. Being located on the so-called “ring of fire” on
the Pacific tectonic plate, Indonesia is one of the most
attractive countries for geothermal development. Since
2018, Indonesia has the second highest geothermal
capacity (almost 2 GW) in the world, only trailing
the United States; resource potential is estimated to
be at 11 GW, reserves at another 17 GW. Technical
hydropower potential, according to the International
Hydropower Association, is about 75 GW, with 8 GW
economically feasible already today – on top of the
existing 4 GW. While many large dam projects raise
environmental and social questions, there is also
remarkable potential for (individually) much smaller
projects.
	 In terms of solar and wind power, Indonesia
is only at the very beginning of tapping its huge
potential. Solar irradiation is at attractive levels all
across Indonesia, due to the high number of daylight
hours and rather low cloud cover throughout the year.
Limitations, in particular in densely populated Java,
are rather driven by land availability. Nevertheless, out
of estimated ~200GW of potential across the country,
~30 GW are estimated for Java Bali, and more than 90
GW for Sumatra. Due to relatively low wind speeds
in many regions, as well as land restrictions, wind
potential has for a long time been underestimated.
Recent meso-scale modelling as well as technological
progress which allows wind turbines to harvest lower
wind speeds reveals there is actually more potential
and suitable locations than previously thought.
According to these assessments, wind potential is
estimated at ~6 GW for Sumatra and 24 GW for Java-
Bali.
	 Based on the potential above, we have
calculated three different power mix scenarios, which
mainly differ in their share of wind and solar power.
As a baseline scenario, we use the RUPTL_Low cap. It
reflects the technological preferences expressed in the
RUPTL, i.e. some investment in geothermal and hydro,
but major focus on coal (+ 11 GW in 10 years), as well
as gas (+ 7 GW), assuming, however, moderate demand
growth. We compare this baseline with two scenarios
that are based on the same demand assumptions, but
different generation mix:
•	 RE_Medium assumes a mix of investment in
fossils and renewables, while;
•	 RE_High looks at an investment pathway
mainly focusing on renewables, with no new
investment in coal and CCGT beyond that
already under construction.
	 Figure 6 depicts the installed capacity and
generation mix of each scenario. While in the baseline
scenario, renewables – mainly hydro and geothermal
– make up nearly 19% of annual generation, in the
alternative scenarios, renewables shares increase to
31% (RE_Medium) and 43% (RE_High). By 2027, the
installed capacities of solar and wind in the RE Medium
scenario are 19 GW and 8 GW respectively. In the high
renewables scenario, there will be in total 35 GW of
solar and 19 GW of wind installed across Java Bali and
Sumatra. This would mean less than 30% of currently
estimated solar and wind potential is exploited.
	 In the high renewables scenario, annual
capacity additions would be 3.5 GW of solar and 1.9
GW of onshore wind. As comparison, in India, the
country has installed 55 GW of solar and wind in the
last 10 years.
iesr.or.id 12
To reach India’s renewable energy target of 160 GW
of wind and solar in 2022, annual capacity additions
are 20-30 GW per year for solar PV and 6 – 10 GW per
year for wind. In Germany, annual capacity additions
are 2.9 GW per year for onshore wind and 2.5 GW
per year for solar PV, but this is after the country
has developed 105 GW of solar and wind in the past
decade. Therefore, the high renewables scenario is
feasible to achieve, provided the right policies are in
place.
	 Due to higher non-thermal output in the
renewables scenario as compared to the RUPTL
planning, emissions go down from 0.76 to 0.64 ton/
MWh in RE Medium and to 0.49 ton/MWh in RE High
scenario, dropping by 16% and 36% respectively.
	 While Indonesia’s NDC still allows for an
overall significant increase in the power sector’s
emission to 2030, the RE High scenario would result
in a decrease in the power sector’s emission, thereby
contributing to greater greenhouse gas reductions.
Mitigation from the power sector is a low hanging fruit
that should be explored in reducing CO2 emission.
Figure 6 Installed capacity and generation per technology in each scenario. Renewables percentage in bracket.
Figure 7 Emission intensity of power sector in each scenario
iesr.or.id13
A High Renewables Scenario
Coupled with Realistic Energy Savings Could
Result in a Cost Saving of US$10
Billion Over Ten Years
	 Fulfillingthegrowingelectricitydemandmeans
deploying significant amount of investment. Therefore,
it is paramount for the country to consider the future
trend on the cost, thus reaching the political target (be
it electrification ratio, RE shares, CO2 emission, or even
welfare) in the most economical way. The financial
impacts of the transition to a larger penetration of
renewables in the Java-Bali-Sumatra system are
investigated by reporting the total operating and
annualised investment costs for the period 2018-
2027. Figure 8 shows the total system cost for the
five scenarios – RUPTL, RUPTL_Low cap as baseline,
Medium and High Renewables and Energy
Transition scenarios.
	 We see that using a consistent set of
assumptions the simulations show that the RUPTL_Low
cap baseline scenario comes at lowest overall cost of
135.4 billion USD over the ten-year period. The system
with 31% renewables (RE Medium) has 4% higher
system cost compared to the RUPTL_Low cap; while
the High Renewables scenario, with ~43% renewable,
increases the system cost by 7%. However, the overall
system cost of the High Renewables scenario is $7.7
billion less than the current RUPTL plan, taking into
account efficiency savings and lower demand.
	 Wind and solar technology cost drops have
repeatedly been faster than anticipated. The impact of
lower technology cost and a lower risk perception of
investors is shown in the Energy Transition scenario.
Assuming that cost of capital could be reduced from
10% to 8%, in line with global trends, and a steeper
learning curve for solar and wind, the total CAPEX for
the Energy Transition scenario would be reduced by
20% and the system cost could be down by 10 billion
USD, at the same level of the RUPTL baseline scenario.
And keep in mind: none of the scenarios takes into
account externalities such as cost for environmental
impact, CO2 emissions, health, or social effects.
Figure 8 Total operating and investment cost for Java-Bali-Sumatra 2018-2027
iesr.or.id 14
Conducive Investment Environment is Key
to Enabling Higher Renewable
Penetration and Reducing Overall Costs
	 Systems with higher shares of renewables
have very different cost structures from those with
high shares of fossil generation. Producing power
from renewables requires high upfront investment,
but subsequently allows power production for 25
years and more at operating cost of close to zero.
While technology cost tends to standardise across
competitive global markets, interest paid on both debt
and equity is very different from country to country,
and has a strong impact on total cost, as mentioned
above.
	 In a sensitivity analysis, we singled out the
impact of different levels of cost of capital for funding
solar and wind projects in Java-Bali and Sumatra
system. The result shows that at a weighted average
cost of capital (WACC) of 7.5% for wind and solar, the
High Renewables system is at the same cost, even
slightly lower, compared to the baseline scenario.	
Figure 9 Sensitivity Analysis on Different WACC for Wind and Solar PV (Column in green:
assumption used in the model)
iesr.or.id15
	 While this may seem very ambitious in the
Indonesian context today, countries where wind
and solar markets are well developed, such as Chile,
Mexico, Dubai, India, or Germany show that WACC
can be as low as 5% or even less. The regulatory
environment in Indonesia will thus be key to enabling
higher renewables penetration, as the cost of capital
is largely driven by the risk perceived by the investors.
	 In addition to assessing impact of improved
investment condition for renewables in Indonesia, the
model also calculated the impact of coal prices, as the
power system is quite dominated by coal-fired power
plants.
	 Figure 10 depicts the change in total system
cost under different coal price assumptions. The result
of our analysis indicates that all scenarios are sensitive
to changing coal prices but not as strongly as one may
expect. This is due to the fact the in all scenarios, due
to the large existing coal fleet, there is considerable
coal capacity. By 2027, even in the High RE scenarios,
there are 22 GW of coal fired power plants in the
Java Bali and Sumatra system, producing 40% of
all generation. Based only on coal price increase,
the coal price would need to reach record levels for
the High Renewable scenario to be on par with the
baseline scenario. While this may be realistic under
the current development in world market coal price,
the Domestic Market Obligation policy caps the coal
price at 70 USD/ton. However, should the country, in
line with the announced “clean coal” policy, increase
environmental standards, by using coal with higher
calorific value for its power plants or by imposing
other pollution-reduction measures, generation cost
by coal plants, which today is very low in international
comparison, would increase, shifting the balance to
renewables-based systems.
In this model, the assumption for coal calorific value is 4200 kcal/kg.4
Figure 10 Fuel Cost Sensitivity of each Scenario.
iesr.or.id 16
Even with High Shares of Wind and Solar,
Security of Supply of
The Indonesian Power System
Can be Guaranteed
	 Increasing the share of wind and solar PV
leads to a fundamental transformation of the power
system. Increasing variable RES output is often associ-
ated with the need for enhanced power system flexi-
bility and affects the role played and the contribution
made by the remainder of power generation portfolio.
	 In the High RE scenario, almost one quarter
of the average annual generation comes from wind
and solar. Still, at such shares of variable renewables,
the system can provide sufficient energy at every hour
of the year. To illustrate this, hourly generation pro-
files during two sample weeks with changing wind and
solar contributions are shown in Figure 11. One can
observe that during the day time, the peak load pat-
tern aligns with the Solar PV feed-in. In some hours,
especially around midday, solar and wind generation
can make up 60% of total demand; in this case around
30 GW. In the days with low wind and solar generation,
the hydro power generation increases and provides
the bulk of balancing, but also coal, CCGT and in par-
ticular very flexible OCGT plants contribute to power
system flexibility.
	 Residual power plants, e.g. hydro, gas, and
coal power plants have to respond rapidly to an in-
crease or decrease of solar and wind generation, in es-
sence: operate more flexibly. The flexibility challenge
is manageable from a technical perspective, yet it is
important to note that flexible operation will impact
power plant economics and may change cost efficien-
cies between gas and coal technologies.
We use a conservative assumption that coal can ramp up and down 2 MW/min, CCGT 10 MW/min, and OCGT 20 MW/min5
iesr.or.id17
Figure 11 Hourly generation in a week with high solar and wind (October 2027) and low solar and wind
(January 2027)
photo: PLTS Kupang / jabartoday.com
iesr.or.id 18
Conclusion and Outlook
	 By the end of 2017, there was roughly 6 GW
of renewable energy capacity installed in Java Bali and
Sumatra, (mainly hydro and geothermal), providing 8%
of overall generation in Java-Bali and Sumatra (RUPTL,
2018). According to the National Energy Plan (2017),
the share of renewable generation should increase to
23% by 2025 and the renewable capacity should be
33% of the total installed capacity in 2025.
	 Following this course, it means in
6 years the country needs to install over
30 GW of renewables out of 106 GW of total installed
capacity. However, the 2018-2027 RUPTL, being the
major reference in power sector development, only
plans 14.3 GW of renewables plants, mainly hydro and
geothermal. Reaching the target and following the
growth trajectory will require stronger efforts, more
than what is currently planned in RUPTL 2018-2027.
Solar and wind, so far almost ignored, provide an
attractive potential to reach the target.
	 The simulations demonstrated that a
renewable pathway, taking into account a higher share
of solar and wind power, is economically feasible
and does not put security of supply at stake. While
adding 19 GW of wind and 35 GW of solar capacity
in one decade will require a considerable amount of
investment, a 40% renewable system can be developed
at similar cost levels as a system planned under the
RUPTL, today focusing very much on coal. In the end it
is hard to predict whether a renewables pathway or a
fossil pathway will come with slightly higher costs, as
many uncertainties prevail in a 10 year horizon – be
they world market prices for coal, further cost drops
for wind and solar, or the cost of borrowing money in
dynamic global financial markets.
	 There are, however, a number of certainties
that should be taken into account by Indonesian
policymakers when framing their future energy
system: reducing reliance on fossil will not only reduce
the risk of being impacted by global fuel prices on
coal and gas, but also come with great environmental,
social and health benefits and allow Indonesia to meet
its climate change mitigation commitments under the
Paris Agreement. Incentivizing investment in wind
and solar across the archipelago, on top of that, has
the potential for directing money flows and economic
benefits to regions that are currently less developed.
	 Policy and regulation will be key for enabling
higher renewables penetration in Indonesia. In order to
attract investors, ensure competition and bring down
cost of capital, it is paramount to have an ambitious
long-term strategic plan with clear intermediate
targets, e.g. an annual renewable investment pathway,
supporting policies and streamlined implementation
at national, provincial and local level.
Institute for Essential Services Reform
Jalan Tebet Barat Dalam VIII No. 20 B
Jakarta Selatan 12810 | Indonesia
T: +62 21 2232 3069 | F: +62 21 8317 073
www.iesr.or.id | iesr@iesr.or.id
@iesr.id@IESR

More Related Content

What's hot

2011 National Energy Policy Recommendations IEEE-USA
2011 National Energy Policy Recommendations   IEEE-USA2011 National Energy Policy Recommendations   IEEE-USA
2011 National Energy Policy Recommendations IEEE-USAJohn Ragan
 
India : Power Sector Report_August 2013
India : Power Sector Report_August 2013India : Power Sector Report_August 2013
India : Power Sector Report_August 2013
India Brand Equity Foundation
 
Power Sector Report July 2017
Power Sector Report July 2017Power Sector Report July 2017
Power Sector Report July 2017
India Brand Equity Foundation
 
Power Sector Report - March 2017
Power Sector Report - March 2017Power Sector Report - March 2017
Power Sector Report - March 2017
India Brand Equity Foundation
 
Electricity and power consumption in india (1)
Electricity and power consumption in india (1)Electricity and power consumption in india (1)
Electricity and power consumption in india (1)Anirudh Sharma
 
Haripur npp project
Haripur npp projectHaripur npp project
Haripur npp project
Amit Raj
 
Energy Scenario in India by Prayaas
Energy Scenario in India by PrayaasEnergy Scenario in India by Prayaas
Energy Scenario in India by Prayaas
sambhaavnaa
 
Power Sector - India - Sample
Power Sector - India - SamplePower Sector - India - Sample
Power Sector - India - Sample
Netscribes, Inc.
 
Power Transmission and Distribution Sector in India
Power Transmission and Distribution Sector in IndiaPower Transmission and Distribution Sector in India
Power Transmission and Distribution Sector in India
Aditya Goyal
 
Energy Consumption and Distribution
Energy Consumption and DistributionEnergy Consumption and Distribution
Energy Consumption and Distribution
IJMER
 
Economic viability of street lighting system
Economic viability of street lighting systemEconomic viability of street lighting system
Economic viability of street lighting system
Md Rabiul Hasan
 
Power sector in India
Power sector in IndiaPower sector in India
Power sector in India
Daya Kherwar
 
Indian future of Renewable energy
Indian future of Renewable energyIndian future of Renewable energy
Indian future of Renewable energy
H Janardan Prabhu
 
Carbon finance potential of renewable energy technologies in india
Carbon finance potential of renewable energy technologies in indiaCarbon finance potential of renewable energy technologies in india
Carbon finance potential of renewable energy technologies in indiaPallav Purohit
 
Industrial Analysis on power Industry
Industrial Analysis on power IndustryIndustrial Analysis on power Industry
Industrial Analysis on power Industry
Siva Konduri
 
POWER SCENARIO IN INDIA(pdf)
POWER SCENARIO IN INDIA(pdf)POWER SCENARIO IN INDIA(pdf)
POWER SCENARIO IN INDIA(pdf)
navreet singh
 
Renewable energy sources – policies of india
Renewable energy sources – policies of indiaRenewable energy sources – policies of india
Renewable energy sources – policies of india
Angu Ramesh
 
Gloomy Power Scene By Arjumand Ansar
Gloomy Power Scene By Arjumand AnsarGloomy Power Scene By Arjumand Ansar
Gloomy Power Scene By Arjumand Ansar
IEEEP Karachi
 
Nepal Energy Scenario
Nepal Energy ScenarioNepal Energy Scenario
Nepal Energy Scenario
Avdesh Mandal
 

What's hot (20)

2011 National Energy Policy Recommendations IEEE-USA
2011 National Energy Policy Recommendations   IEEE-USA2011 National Energy Policy Recommendations   IEEE-USA
2011 National Energy Policy Recommendations IEEE-USA
 
India : Power Sector Report_August 2013
India : Power Sector Report_August 2013India : Power Sector Report_August 2013
India : Power Sector Report_August 2013
 
Power Sector Report July 2017
Power Sector Report July 2017Power Sector Report July 2017
Power Sector Report July 2017
 
Power Sector Report - March 2017
Power Sector Report - March 2017Power Sector Report - March 2017
Power Sector Report - March 2017
 
Electricity and power consumption in india (1)
Electricity and power consumption in india (1)Electricity and power consumption in india (1)
Electricity and power consumption in india (1)
 
Haripur npp project
Haripur npp projectHaripur npp project
Haripur npp project
 
Energy industry overview
Energy  industry overviewEnergy  industry overview
Energy industry overview
 
Energy Scenario in India by Prayaas
Energy Scenario in India by PrayaasEnergy Scenario in India by Prayaas
Energy Scenario in India by Prayaas
 
Power Sector - India - Sample
Power Sector - India - SamplePower Sector - India - Sample
Power Sector - India - Sample
 
Power Transmission and Distribution Sector in India
Power Transmission and Distribution Sector in IndiaPower Transmission and Distribution Sector in India
Power Transmission and Distribution Sector in India
 
Energy Consumption and Distribution
Energy Consumption and DistributionEnergy Consumption and Distribution
Energy Consumption and Distribution
 
Economic viability of street lighting system
Economic viability of street lighting systemEconomic viability of street lighting system
Economic viability of street lighting system
 
Power sector in India
Power sector in IndiaPower sector in India
Power sector in India
 
Indian future of Renewable energy
Indian future of Renewable energyIndian future of Renewable energy
Indian future of Renewable energy
 
Carbon finance potential of renewable energy technologies in india
Carbon finance potential of renewable energy technologies in indiaCarbon finance potential of renewable energy technologies in india
Carbon finance potential of renewable energy technologies in india
 
Industrial Analysis on power Industry
Industrial Analysis on power IndustryIndustrial Analysis on power Industry
Industrial Analysis on power Industry
 
POWER SCENARIO IN INDIA(pdf)
POWER SCENARIO IN INDIA(pdf)POWER SCENARIO IN INDIA(pdf)
POWER SCENARIO IN INDIA(pdf)
 
Renewable energy sources – policies of india
Renewable energy sources – policies of indiaRenewable energy sources – policies of india
Renewable energy sources – policies of india
 
Gloomy Power Scene By Arjumand Ansar
Gloomy Power Scene By Arjumand AnsarGloomy Power Scene By Arjumand Ansar
Gloomy Power Scene By Arjumand Ansar
 
Nepal Energy Scenario
Nepal Energy ScenarioNepal Energy Scenario
Nepal Energy Scenario
 

Similar to Roadmap for Indonesia's Power Sector - Summary for Policy Makers

How renewables can help electrify indonesia's sprawling island nation renew...
How renewables can help electrify indonesia's sprawling island nation   renew...How renewables can help electrify indonesia's sprawling island nation   renew...
How renewables can help electrify indonesia's sprawling island nation renew...
Gandabhaskara Saputra
 
Modeling and simulation of distributed generation system
Modeling and simulation of distributed generation systemModeling and simulation of distributed generation system
Modeling and simulation of distributed generation system
IRJET Journal
 
IChemE Energy Centre report - Transitions in electricity systems towards 2030...
IChemE Energy Centre report - Transitions in electricity systems towards 2030...IChemE Energy Centre report - Transitions in electricity systems towards 2030...
IChemE Energy Centre report - Transitions in electricity systems towards 2030...Alexandra Howe
 
A review of available hybrid renewable energy systems in Malaysia
A review of available hybrid renewable energy systems in MalaysiaA review of available hybrid renewable energy systems in Malaysia
A review of available hybrid renewable energy systems in Malaysia
International Journal of Power Electronics and Drive Systems
 
A Case Study Of An Educational Building Transformation To Renewable Energy
A Case Study Of An Educational Building Transformation To Renewable EnergyA Case Study Of An Educational Building Transformation To Renewable Energy
A Case Study Of An Educational Building Transformation To Renewable Energy
Joe Osborn
 
Forecasting and Scheduling of Wind and Solar Power generation in India
Forecasting and Scheduling of Wind and Solar Power generation in IndiaForecasting and Scheduling of Wind and Solar Power generation in India
Forecasting and Scheduling of Wind and Solar Power generation in IndiaDas A. K.
 
Forecasting and scheduling of wind and solar power generation in india
Forecasting and scheduling of wind and solar power generation in indiaForecasting and scheduling of wind and solar power generation in india
Forecasting and scheduling of wind and solar power generation in india
Das A. K.
 
Forecasting and Scheduling of Wind and Solar Power generation in India
Forecasting and Scheduling of Wind and Solar Power generation in IndiaForecasting and Scheduling of Wind and Solar Power generation in India
Forecasting and Scheduling of Wind and Solar Power generation in Indiadel2infinity Energy
 
Gridlocked a long term look at south africas electricity sector
Gridlocked   a long term look at south africas electricity sectorGridlocked   a long term look at south africas electricity sector
Gridlocked a long term look at south africas electricity sector
Marketing Durban Chamber
 
Development of Smart Grid Interoperability for Energy Efficiency Systems
Development of Smart Grid Interoperability for Energy Efficiency SystemsDevelopment of Smart Grid Interoperability for Energy Efficiency Systems
Development of Smart Grid Interoperability for Energy Efficiency Systems
ijtsrd
 
AUROVILLE RENEWABLE ENERGY SOURCING PLAN
AUROVILLE RENEWABLE ENERGY SOURCING PLANAUROVILLE RENEWABLE ENERGY SOURCING PLAN
AUROVILLE RENEWABLE ENERGY SOURCING PLAN
AurovilleConsulting
 
Framework for the analysis of the potential of the
Framework for the analysis of the potential of theFramework for the analysis of the potential of the
Framework for the analysis of the potential of the
Izaiah Mulenga
 
National energy policy nep presentation r1
National energy policy  nep presentation r1National energy policy  nep presentation r1
National energy policy nep presentation r1
Prashantkarhade72
 
A Systematic Review of Renewable Energy Trend.pdf
A Systematic Review of Renewable Energy Trend.pdfA Systematic Review of Renewable Energy Trend.pdf
A Systematic Review of Renewable Energy Trend.pdf
ssuser793b4e
 
Klibel5 law 8
Klibel5 law 8Klibel5 law 8
Klibel5 law 8
KLIBEL
 
AMA - Final Project Report1 dtd 20-06-2015
AMA - Final Project Report1 dtd 20-06-2015AMA - Final Project Report1 dtd 20-06-2015
AMA - Final Project Report1 dtd 20-06-2015Dhiren Patel
 
I010326469
I010326469I010326469
I010326469
IOSR Journals
 
Global Power Grid Interconnection for Sustainable Growth: Concept, Project an...
Global Power Grid Interconnection for Sustainable Growth: Concept, Project an...Global Power Grid Interconnection for Sustainable Growth: Concept, Project an...
Global Power Grid Interconnection for Sustainable Growth: Concept, Project an...
Power System Operation
 
Alternate power generation by hybridization model of SPV/Wind/Biomass
Alternate power generation by hybridization model of SPV/Wind/BiomassAlternate power generation by hybridization model of SPV/Wind/Biomass
Alternate power generation by hybridization model of SPV/Wind/Biomass
IRJET Journal
 

Similar to Roadmap for Indonesia's Power Sector - Summary for Policy Makers (20)

How renewables can help electrify indonesia's sprawling island nation renew...
How renewables can help electrify indonesia's sprawling island nation   renew...How renewables can help electrify indonesia's sprawling island nation   renew...
How renewables can help electrify indonesia's sprawling island nation renew...
 
Modeling and simulation of distributed generation system
Modeling and simulation of distributed generation systemModeling and simulation of distributed generation system
Modeling and simulation of distributed generation system
 
IChemE Energy Centre report - Transitions in electricity systems towards 2030...
IChemE Energy Centre report - Transitions in electricity systems towards 2030...IChemE Energy Centre report - Transitions in electricity systems towards 2030...
IChemE Energy Centre report - Transitions in electricity systems towards 2030...
 
A review of available hybrid renewable energy systems in Malaysia
A review of available hybrid renewable energy systems in MalaysiaA review of available hybrid renewable energy systems in Malaysia
A review of available hybrid renewable energy systems in Malaysia
 
A Case Study Of An Educational Building Transformation To Renewable Energy
A Case Study Of An Educational Building Transformation To Renewable EnergyA Case Study Of An Educational Building Transformation To Renewable Energy
A Case Study Of An Educational Building Transformation To Renewable Energy
 
Forecasting and Scheduling of Wind and Solar Power generation in India
Forecasting and Scheduling of Wind and Solar Power generation in IndiaForecasting and Scheduling of Wind and Solar Power generation in India
Forecasting and Scheduling of Wind and Solar Power generation in India
 
Forecasting and scheduling of wind and solar power generation in india
Forecasting and scheduling of wind and solar power generation in indiaForecasting and scheduling of wind and solar power generation in india
Forecasting and scheduling of wind and solar power generation in india
 
Forecasting and Scheduling of Wind and Solar Power generation in India
Forecasting and Scheduling of Wind and Solar Power generation in IndiaForecasting and Scheduling of Wind and Solar Power generation in India
Forecasting and Scheduling of Wind and Solar Power generation in India
 
Gridlocked a long term look at south africas electricity sector
Gridlocked   a long term look at south africas electricity sectorGridlocked   a long term look at south africas electricity sector
Gridlocked a long term look at south africas electricity sector
 
BOOK
BOOKBOOK
BOOK
 
Development of Smart Grid Interoperability for Energy Efficiency Systems
Development of Smart Grid Interoperability for Energy Efficiency SystemsDevelopment of Smart Grid Interoperability for Energy Efficiency Systems
Development of Smart Grid Interoperability for Energy Efficiency Systems
 
AUROVILLE RENEWABLE ENERGY SOURCING PLAN
AUROVILLE RENEWABLE ENERGY SOURCING PLANAUROVILLE RENEWABLE ENERGY SOURCING PLAN
AUROVILLE RENEWABLE ENERGY SOURCING PLAN
 
Framework for the analysis of the potential of the
Framework for the analysis of the potential of theFramework for the analysis of the potential of the
Framework for the analysis of the potential of the
 
National energy policy nep presentation r1
National energy policy  nep presentation r1National energy policy  nep presentation r1
National energy policy nep presentation r1
 
A Systematic Review of Renewable Energy Trend.pdf
A Systematic Review of Renewable Energy Trend.pdfA Systematic Review of Renewable Energy Trend.pdf
A Systematic Review of Renewable Energy Trend.pdf
 
Klibel5 law 8
Klibel5 law 8Klibel5 law 8
Klibel5 law 8
 
AMA - Final Project Report1 dtd 20-06-2015
AMA - Final Project Report1 dtd 20-06-2015AMA - Final Project Report1 dtd 20-06-2015
AMA - Final Project Report1 dtd 20-06-2015
 
I010326469
I010326469I010326469
I010326469
 
Global Power Grid Interconnection for Sustainable Growth: Concept, Project an...
Global Power Grid Interconnection for Sustainable Growth: Concept, Project an...Global Power Grid Interconnection for Sustainable Growth: Concept, Project an...
Global Power Grid Interconnection for Sustainable Growth: Concept, Project an...
 
Alternate power generation by hybridization model of SPV/Wind/Biomass
Alternate power generation by hybridization model of SPV/Wind/BiomassAlternate power generation by hybridization model of SPV/Wind/Biomass
Alternate power generation by hybridization model of SPV/Wind/Biomass
 

More from Gandabhaskara Saputra

Prioritas Kebijakan Sektor Energi Indonesia dan Kandidat Menteri ESDM
Prioritas Kebijakan Sektor Energi Indonesia dan Kandidat Menteri ESDMPrioritas Kebijakan Sektor Energi Indonesia dan Kandidat Menteri ESDM
Prioritas Kebijakan Sektor Energi Indonesia dan Kandidat Menteri ESDM
Gandabhaskara Saputra
 
Mengurangi tantangan pembangkit hijau di indonesia
Mengurangi tantangan pembangkit hijau di indonesia Mengurangi tantangan pembangkit hijau di indonesia
Mengurangi tantangan pembangkit hijau di indonesia
Gandabhaskara Saputra
 
Pojok energi presentation alternative rural electricity development
Pojok energi presentation alternative rural electricity developmentPojok energi presentation alternative rural electricity development
Pojok energi presentation alternative rural electricity development
Gandabhaskara Saputra
 
Business models for off grid systems
Business models for off grid systemsBusiness models for off grid systems
Business models for off grid systems
Gandabhaskara Saputra
 
Bahan diskusi iesr dirpro kamis 21 mar 19 rev 2
Bahan diskusi iesr dirpro kamis 21 mar 19 rev 2Bahan diskusi iesr dirpro kamis 21 mar 19 rev 2
Bahan diskusi iesr dirpro kamis 21 mar 19 rev 2
Gandabhaskara Saputra
 
2019 03-19 paparan diskusi pojok energi iesr-rev_kdap
2019 03-19 paparan diskusi pojok energi iesr-rev_kdap2019 03-19 paparan diskusi pojok energi iesr-rev_kdap
2019 03-19 paparan diskusi pojok energi iesr-rev_kdap
Gandabhaskara Saputra
 
Technical Report: A Roadmap for Indonesia's Power Sector
Technical Report: A Roadmap for Indonesia's Power SectorTechnical Report: A Roadmap for Indonesia's Power Sector
Technical Report: A Roadmap for Indonesia's Power Sector
Gandabhaskara Saputra
 
Rangkuman Peta Jalan Ketenagalistrikan Indonesia
Rangkuman Peta Jalan Ketenagalistrikan Indonesia Rangkuman Peta Jalan Ketenagalistrikan Indonesia
Rangkuman Peta Jalan Ketenagalistrikan Indonesia
Gandabhaskara Saputra
 

More from Gandabhaskara Saputra (8)

Prioritas Kebijakan Sektor Energi Indonesia dan Kandidat Menteri ESDM
Prioritas Kebijakan Sektor Energi Indonesia dan Kandidat Menteri ESDMPrioritas Kebijakan Sektor Energi Indonesia dan Kandidat Menteri ESDM
Prioritas Kebijakan Sektor Energi Indonesia dan Kandidat Menteri ESDM
 
Mengurangi tantangan pembangkit hijau di indonesia
Mengurangi tantangan pembangkit hijau di indonesia Mengurangi tantangan pembangkit hijau di indonesia
Mengurangi tantangan pembangkit hijau di indonesia
 
Pojok energi presentation alternative rural electricity development
Pojok energi presentation alternative rural electricity developmentPojok energi presentation alternative rural electricity development
Pojok energi presentation alternative rural electricity development
 
Business models for off grid systems
Business models for off grid systemsBusiness models for off grid systems
Business models for off grid systems
 
Bahan diskusi iesr dirpro kamis 21 mar 19 rev 2
Bahan diskusi iesr dirpro kamis 21 mar 19 rev 2Bahan diskusi iesr dirpro kamis 21 mar 19 rev 2
Bahan diskusi iesr dirpro kamis 21 mar 19 rev 2
 
2019 03-19 paparan diskusi pojok energi iesr-rev_kdap
2019 03-19 paparan diskusi pojok energi iesr-rev_kdap2019 03-19 paparan diskusi pojok energi iesr-rev_kdap
2019 03-19 paparan diskusi pojok energi iesr-rev_kdap
 
Technical Report: A Roadmap for Indonesia's Power Sector
Technical Report: A Roadmap for Indonesia's Power SectorTechnical Report: A Roadmap for Indonesia's Power Sector
Technical Report: A Roadmap for Indonesia's Power Sector
 
Rangkuman Peta Jalan Ketenagalistrikan Indonesia
Rangkuman Peta Jalan Ketenagalistrikan Indonesia Rangkuman Peta Jalan Ketenagalistrikan Indonesia
Rangkuman Peta Jalan Ketenagalistrikan Indonesia
 

Recently uploaded

一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
zm9ajxup
 
Sustainable farming practices in India .pptx
Sustainable farming  practices in India .pptxSustainable farming  practices in India .pptx
Sustainable farming practices in India .pptx
chaitaliambole
 
ppt on beauty of the nature by Palak.pptx
ppt on  beauty of the nature by Palak.pptxppt on  beauty of the nature by Palak.pptx
ppt on beauty of the nature by Palak.pptx
RaniJaiswal16
 
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business VenturesWillie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
greendigital
 
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptxAGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
BanitaDsouza
 
How about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shopHow about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shop
laozhuseo02
 
Daan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like itDaan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like it
a0966109726
 
Natural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptxNatural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptx
sidjena70
 
Q&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service PlaybookQ&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service Playbook
World Resources Institute (WRI)
 
Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...
Open Access Research Paper
 
Sustainable Rain water harvesting in india.ppt
Sustainable Rain water harvesting in india.pptSustainable Rain water harvesting in india.ppt
Sustainable Rain water harvesting in india.ppt
chaitaliambole
 
Artificial Reefs by Kuddle Life Foundation - May 2024
Artificial Reefs by Kuddle Life Foundation - May 2024Artificial Reefs by Kuddle Life Foundation - May 2024
Artificial Reefs by Kuddle Life Foundation - May 2024
punit537210
 
Navigating the complex landscape of AI governance
Navigating the complex landscape of AI governanceNavigating the complex landscape of AI governance
Navigating the complex landscape of AI governance
Piermenotti Mauro
 
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for..."Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
MMariSelvam4
 
NRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation StrategyNRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation Strategy
Robin Grant
 
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdfUNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
JulietMogola
 
DRAFT NRW Recreation Strategy - People and Nature thriving together
DRAFT NRW Recreation Strategy - People and Nature thriving togetherDRAFT NRW Recreation Strategy - People and Nature thriving together
DRAFT NRW Recreation Strategy - People and Nature thriving together
Robin Grant
 
growbilliontrees.com-Trees for Granddaughter (1).pdf
growbilliontrees.com-Trees for Granddaughter (1).pdfgrowbilliontrees.com-Trees for Granddaughter (1).pdf
growbilliontrees.com-Trees for Granddaughter (1).pdf
yadavakashagra
 
Environmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. SinghEnvironmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. Singh
AhmadKhan917612
 
Celebrating World-environment-day-2024.pdf
Celebrating  World-environment-day-2024.pdfCelebrating  World-environment-day-2024.pdf
Celebrating World-environment-day-2024.pdf
rohankumarsinghrore1
 

Recently uploaded (20)

一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
 
Sustainable farming practices in India .pptx
Sustainable farming  practices in India .pptxSustainable farming  practices in India .pptx
Sustainable farming practices in India .pptx
 
ppt on beauty of the nature by Palak.pptx
ppt on  beauty of the nature by Palak.pptxppt on  beauty of the nature by Palak.pptx
ppt on beauty of the nature by Palak.pptx
 
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business VenturesWillie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
 
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptxAGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
 
How about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shopHow about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shop
 
Daan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like itDaan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like it
 
Natural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptxNatural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptx
 
Q&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service PlaybookQ&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service Playbook
 
Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...
 
Sustainable Rain water harvesting in india.ppt
Sustainable Rain water harvesting in india.pptSustainable Rain water harvesting in india.ppt
Sustainable Rain water harvesting in india.ppt
 
Artificial Reefs by Kuddle Life Foundation - May 2024
Artificial Reefs by Kuddle Life Foundation - May 2024Artificial Reefs by Kuddle Life Foundation - May 2024
Artificial Reefs by Kuddle Life Foundation - May 2024
 
Navigating the complex landscape of AI governance
Navigating the complex landscape of AI governanceNavigating the complex landscape of AI governance
Navigating the complex landscape of AI governance
 
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for..."Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
 
NRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation StrategyNRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation Strategy
 
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdfUNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
 
DRAFT NRW Recreation Strategy - People and Nature thriving together
DRAFT NRW Recreation Strategy - People and Nature thriving togetherDRAFT NRW Recreation Strategy - People and Nature thriving together
DRAFT NRW Recreation Strategy - People and Nature thriving together
 
growbilliontrees.com-Trees for Granddaughter (1).pdf
growbilliontrees.com-Trees for Granddaughter (1).pdfgrowbilliontrees.com-Trees for Granddaughter (1).pdf
growbilliontrees.com-Trees for Granddaughter (1).pdf
 
Environmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. SinghEnvironmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. Singh
 
Celebrating World-environment-day-2024.pdf
Celebrating  World-environment-day-2024.pdfCelebrating  World-environment-day-2024.pdf
Celebrating World-environment-day-2024.pdf
 

Roadmap for Indonesia's Power Sector - Summary for Policy Makers

  • 1. How Renewable Energy Can Power Java-Bali and Sumatra Summary for Policy Makers in cooperation with: A Roadmap for Indonesia’s Power Sector:
  • 2. iesr.or.id1 IMPRINT A Roadmap for Indonesia’s Power Sector: How Renewable Energy Can Power Java-Bali and Sumatra Study by: Monash Grid Innovation Hub/Australia Indonesia Centre Monash Energy Materials and Systems Institute Monash University Wellington Rd, Clayton VIC 3800 | Australia T: +61 9905 1049 www.monash.edu | memsi@monash.edu Institute for Essential Services Reform Jalan Tebet Barat Dalam VIII No. 20 B Jakarta Selatan 12810 | Indonesia T: +62 21 2232 3069 | F: +62 21 8317 073 www.iesr.or.id | iesr@iesr.or.id Agora Energiewende Anna-Louisa-Karsch-Straße 2 10178 Berlin | Germany T: +49 30 700 14 35-000 | F: +49 30 700 14 35-129 www.agora-energiewende.org | info@agora-energiewende.de Study team: Dr. Ariel Liebman - Monash Grid Innovation Hub Warwick Forster - Apogee Energy Mentari Pujantoro and Philipp Godron - Agora Energiewende Fabby Tumiwa, Jannata Giwangkara, and Agus Tampubolon - Institute for Essential Services Reform The summary for policy makers was written by: Fabby Tumiwa, Institute for Essential Services Reform Mentari Pujantoro and Philipp Godron, Agora Energiewende A Roadmap for Indonesia’s Power Sector: How Renewable Energy Can Power Java-Bali and Sumatra This report should be cited: IESR (2019), A Roadmap for Indonesia’s Power Sector: How Renewable Energy Can Power Java-Bali and Sumatra, Institute for Essential Services Reform (IESR), Jakarta Publication: February 2019
  • 3. iesr.or.id 2 Dear reader, Indonesia is the world’s 4th most populous country on a continuous growth trajectory. To supply the increasing electricity demand, the government is emphasizing the role of fossil, and, in particular coal- fired generation, which is supposed to grow to 65% of total generation. At the same time, it stipulates that by 2025, Renewable energy shall make up 23% of primary energy mix, up from 8% today. Policy focus is on hydro and geothermal resources, while solar and wind power play only a negligible role. Globally, the trend is very different: power systems around the world are increasingly being shaped by renewables. Solar and wind – driven by significant technology cost reduction - have been at the forefront of power sector investment for years and will continue to play the decisive role in modernizing and decarbonizing power systems globally. Against this background, we conducted a model-based powers system analysis, performed with the PLEXOS model which is widely used for power sector analysis. The study focuses on the Java-Bali and Sumatra systems, which is where the majority of the population lives and about 90% of the electricity is produced and consumed. The model assesses both the demand and supply dimensions of the power system. Looking ten years ahead, we have assessed different pathways for the Indonesia’s power system: what are the impacts of a moderate electricity demand growth on investment and power plant utilisation? What is the impact of adding considerable shares of wind and solar capacity to system cost, and how will the system ensure security of supply? Fabby Tumiwa Executive Director Foreword
  • 4. iesr.or.id3 IESR | A Roadmap for Indonesia’s Power Sector: How Renewable Energy Can Power Java-Bali and Sumatra
  • 5. iesr.or.id 4 Executive Summary A Roadmap for Indonesia’s power sector: how renewable energy can power Java-Bali and Sumatra summary for policy makers was produced by Monash University’s Grid Innovation Hub partnering with the Australia Indonesia Centre, supported by Agora Energiewende and the Institute for Essential Services Reform (IESR). The study modelled different pathways for Indonesia’s power system to reliably meet energy and climate targets for the period 2018 to 2027. The study focuses on Java-Bali and Sumatra where the majority of the population lives and about 90% of the electricity is consumed. The model assesses both the demand and supply dimensions of the power system. Analysis was performed with the PLEXOS power system simulation and planning software system, which is widely used internationally for power sector analysis. The study identifies the impact of reduced demand on generation investment, utilisation and power system cost and assesses the impact of adding considerable shares of wind and solar capacity to the system. Key Findings • The Ministry of Energy and Mineral Resources and utility PLN have continuously overestimated energy demand in Java-Bali and Sumatra. If PLN continues with its current plans, there is likely to be an overbuild of 12.5GW of coal, gas and diesel, resulting in approximately US$12.7 billion in wasted investment. This would burden PLN’s finances and eventually have to be covered by the Indonesian public. • The risk of lower than planned utilisation of thermal power plants may increase as demand projections are overestimated and as renewables become cheaper. Once renewables are built, they produce electricity at almost zero marginal cost. This could result in additional losses for PLN, which is locked into long-term power purchase agreements with Independent Power Producers. • Java-Bali and Sumatra could reliably meet growing electricity demand in the next 10 years through a doubling of the share of renewable energy. The cost of doubling the share of renewables through investment in wind and solar is comparable to the current high fossil-fuel pathway. Greenhouse gas emissions would be reduced by 36%. The development of renewables would bring important additional co-benefits, reduce negative health and environmental impacts and provide job opportunities throughout the country. • A high renewables scenario coupled with realistic energy savings would result in a cost saving of US$10 billion over ten years as compared with the current RUPTL plan if the cost of capital and cost of technology is brought down in line with international prices. This would require an ambitious long- term strategic plan, clear intermediate targets and implementing regulations in place. • Even with 43% renewables, the security of supply of the power system is maintained. Recommendations To develop a reliable, cost-effective energy system which avoids wasted capital and serious environmental impacts, MEMR and PLN should: • Review best practice approaches and techniques in demand forecasting around the world and implement such an approach in
  • 6. iesr.or.id5 Indonesia; • Integrate the potential of energy efficiency for forecasting future electricity demand; • Review current proposals for new coal-fired power stations in the Java-Bali and Sumatra systems and apply current prevailing costs for renewable technology in developing future plans to asses alternative cost-effective and low carbon pathways; • Develop and assess alternative scenarios and low carbon electricity pathways in the National Electricity Plan (RUKN) which integrate medium and higher renewable energy penetration in various electricity systems; and • Adopt an ambitious long-term strategic plan with clear intermediate targets for renewable energy expansion, supporting policies and streamlined implementation at national, provincial and local levels. photo: PLTB Sidrap / Biro Pers Istana
  • 7. iesr.or.id 6 Introduction Indonesia has seen strong growth in GDP as well as in electricity demand in the past decade. The government is expecting continuous growth, with electricity demand projected to double by 2030 (RUKN, 2016). To supply the increasing demand, the government is emphasizing the role of coal-fired power, which is supposed to grow to 65% of total generation. At the same time, it stipulates by 2025, renewable energy shall make up 23% of generation, up from 8% today (RUEN, 2017 and RUKN, 2016). Each year, Perusahaan Listrik Negara (PLN), the state-owned electricity utility, publishes an Electricity General Plan (Rencana Umum Penyediaan Tenaga Listrik or RUPTL), which maps in detail the development of electricity demand and supply for the next 10 years. According to the latest RUPTL (2018 – 2027), the 23% renewables target would be reached by 2025. Due to lack of a longer-term target, however, renewable share would then decrease afterwards. PLN still puts a clear focus on conventional and fossil- fueled generation in the power mix, with only very negligible shares of solar and wind. Globally, the trend is very different: power systems around the world are increasingly being shaped by renewables. In an effort to modernise power systems, taking advantage of the dramatic drop in prices of solar PV and wind, and looking for a more sustainable power mix, countries and energy companies are strongly investing in these technologies. Since 2015, more investment has gone intorenewableenergyaroundtheworldeachyearthan in conventional fossil fuel generation. India, in 2017, for the first time, invested more in renewables than fossil fuel generation (IEA, World Energy Investment 2018) – simply because electricity from wind and solar has become cheaper than from new gas and coal fired power plants. In addition, renewable energy has the co-benefits of reductions in carbon emissions and air pollution. Against this background, we conducted a model-based analysis of different pathways for Indonesia’s power system. We have focused on the Java-Bali and Sumatra systems, which is where the majority of the population lives and about 90% of the electricity is consumed. By mid-2020, Sumatra and Java will be connected via a submarine cable, thereby integrating the systems of these three large islands. The model assessed both the demand and supply dimensions of the power system. It took into account the opportunities of the impressive renewable energy technology cost drop in the past decade, particularly on solar and wind energy, assessing alternative pathways to current power mix planning and meeting Indonesia’s energy and climate targets while still ensuring the reliability of the power system. The study used the 2018 RUPTL as a baseline with regard to existing and future generation builds, as well as peak demand and energy growth. Analysis was performed with the Australian PLEXOS model, which is widely used globally for power sector analysis. Input data combined international sources on technology cost with Indonesia-specific knowhow provided by a range of national experts in workshops and bilateral discussions. The power system was modeled for a 10 year time-span, for the period 2018 to 2027, with hourly time steps. It takes into account supply and demand on a provincial level as well as inter-provincial transmission capacity restrictions. The two main objectives of the study relate to demand development and wind and solar investment in Java, Bali and Sumatra. We: a. identify the impact of reduced demand on investment, utilisation and power system cost and; b. assess the impact of adding considerable shares of wind and solar capacity to the system. The setup and key differentiating parameters of the scenarios assessed are presented in Figure 1.
  • 8. iesr.or.id7 The study’s main findings are presented below. Figure 1 Scenarios and key drivers Overestimating Demand Growth and Underestimating The Potential of Energy Efficiency Increase The Risk of Stranded Assets Estimating the energy demand trajectory over longer periods of time is very challenging, in particular in emerging economies that have become used to high growth figures. Governmental projections are often driven by political targets more than by sound evidence, and the potential of more efficient appliances in the industrial sector and building stock (AC, light bulbs, etc.) is often underestimated. Indonesia is no exception: in its annual Ten-Year Plans, PLN has consistently overestimated electricity demand growth. Typically, demand has been expected to more than double in a 10-year horizon. According to the RUPTL 2008, Java-Bali electricity demand today was expected to have reached 250 TWh by 2017. In reality, it stood at 170 TWh, i.e. about two thirds of the projection. Even though growth rates have been reduced recently, notablyinthe2018RUPTL(ascomparedtoRUPTL2017), the growth path for Java-Bali and Sumatra system for the next decade still projects demand values that are 20- 50% higher than those to be expected when following the growth trajectory of the past decade. Therefore, in the analysis, we have modeled an alternative growth path more reflective of the pathway of the last decade. This is particularly true for Java-Bali, where demand is already at a higher level, while for Sumatra, a level of growth somewhere between historical trends and RUPTL 2018 projections is assumed (Figure 2).
  • 9. iesr.or.id 8 Figure 2 Historical demand and demand projection in Java Bali and Sumatra: a tendency to overestimate the future demand growth Comparing demand of the RUPTL baseline case with the moderate demand growth scenario reveals the magnitude of difference and impact on the existing and planned power generation fleet. In a scenario where the growth in Java-Bali and Sumatra reflects the growth of the past decade, electricity demand in 2027 would be 16% lower than what is assumed in the 2018 RUPTL. This means from 197 TWh in 2017, demand would increase to 322 TWh in the moderate scenario, rather than to 382 TWh. The moderate demand growth will imply: a. There will be considerably fewer power plants needed to meet the demand and; b. b) if, nevertheless, all the power plants in the RUPTL 2018-2027 were built, power plants would run at lower utilisation rates, putting their business case in question and, effectively, increasing overall system and levelised generation cost. Reduced demand results in a reduction of additional generation capacity requirements by approximately 12.5 GW, mainly of coal, CCGT and OCGT (about 3 GW each), and diesel (-1.6 GW). In essence, there would be 12.5 GW of capacity built that is not required to meet demand. In the capacity assessment, outages for maintenance as well as forced outages have been taken into account, according to current standards in Indonesia. Building these extra 12.5 GW of plants would require unnecessary investment of about 12.7 billion USD; total investment cost would increase from 39.7 billion USD to 52.4 USD. This would, by the year 2027, increase annual capital cost of the power plant fleet by 28%. Demand would be lower by 49 TWh in Java Bali and 11 TWh in Sumatra, translating to 64.4 TWh less generation needed, if power system losses of about 8% are taken into account Combined Cycle Gas Turbine Open Cycle Gas Turbine 1 2 3
  • 10. iesr.or.id9 Figure 3 Installed capacity in 2027 between RUPTL and the optimised system Figure 4 Difference in investment cost due to overbuilt of 12.5 GW capacity If all power plants are built according to RUPTL 2018 plan, but demand growth turns out to be more moderate, utilisation of thermal power plants will drop, since a higher number of power plants will generate the same amount of energy. As renewables power plants – e.g. geothermal, hydro, solar and wind - generate at zero marginal cost, this will mainly affect thermal power plants, meaning coal utilisation will, within the next 10 years, decrease by an average rate of 8%. The impact becomes even more pronounced when looking at the change in utilisation on a more disaggregate basis. Figure 5 depicts the change in utilisation rates of coal power plants for the different demand scenarios. Each circle represents one province: it is evident that there are several provinces where utilisation of both existing and new coal power generation drops by more than 10 percentage points, and some where utilisation will reduce by about 20 percentage points. For gas, given the CCGTs and OCGTs higher short run marginal cost, utilisation would even drop further. It is still probable that the new built plants would be utilised to a much lesser extent than planned, thus increasing the risk of stranded assets. Given that thermal power plants are increasingly being built by Independent Power Producers with long-term power purchase agreements with PLN, this means that PLN will likely be paying for electricity it does not need, thereby burdening the Indonesian taxpayer with additional debt.
  • 11. iesr.or.id 10 As mentioned before, forecasting demand is not an easy business, and the risk of over-investment needs to be weighed against the political goal of supplying citizens and the economy with sufficient energy. However, recent developments of strongly increasing reserve margins and delays in projects due to lack of demand demonstrate that overinvestment is a real issue for Indonesia already today. The risk of lower utilisation of power plants than originally planned may increase with renewables becoming cheaper, as these technologies, once they have been built, produce electricity at almost zero marginal cost. At the same time, wind and solar plants can be developed in a much more flexible way. In well- developed renewables markets, time from planning, to start of operation, ranges between two years (for wind parks) and six months (for solar PV) and these projects can be developed economically in a very modular way, adapting project size to the needs. Efficient thermal power plants, in contrast, have sizes between 400 MW (for gas) and more than 1 GW (for coal), and require much longer lead times. The risk of unnecessary investment is therefore much lower with renewables power plants. Figure 5 Changes in utilisation rate between high demand (RUPTL) and lower demand scenario (RUPTL Low gen). Each point represents 1 coal power plant in 1 province. The power plants are grouped into 3 status: existing, under con- struction, and planned
  • 12. iesr.or.id11 Indonesia Has a Vast Potential of Diverse Renewable Energy Sources, Which Easily Allows for Doubling The Currently Planned Share of Renewables within The Next Decade Indonesia has abundant renewable energy potential from a variety of resources - well beyond what is available in most other countries around the globe. Being located on the so-called “ring of fire” on the Pacific tectonic plate, Indonesia is one of the most attractive countries for geothermal development. Since 2018, Indonesia has the second highest geothermal capacity (almost 2 GW) in the world, only trailing the United States; resource potential is estimated to be at 11 GW, reserves at another 17 GW. Technical hydropower potential, according to the International Hydropower Association, is about 75 GW, with 8 GW economically feasible already today – on top of the existing 4 GW. While many large dam projects raise environmental and social questions, there is also remarkable potential for (individually) much smaller projects. In terms of solar and wind power, Indonesia is only at the very beginning of tapping its huge potential. Solar irradiation is at attractive levels all across Indonesia, due to the high number of daylight hours and rather low cloud cover throughout the year. Limitations, in particular in densely populated Java, are rather driven by land availability. Nevertheless, out of estimated ~200GW of potential across the country, ~30 GW are estimated for Java Bali, and more than 90 GW for Sumatra. Due to relatively low wind speeds in many regions, as well as land restrictions, wind potential has for a long time been underestimated. Recent meso-scale modelling as well as technological progress which allows wind turbines to harvest lower wind speeds reveals there is actually more potential and suitable locations than previously thought. According to these assessments, wind potential is estimated at ~6 GW for Sumatra and 24 GW for Java- Bali. Based on the potential above, we have calculated three different power mix scenarios, which mainly differ in their share of wind and solar power. As a baseline scenario, we use the RUPTL_Low cap. It reflects the technological preferences expressed in the RUPTL, i.e. some investment in geothermal and hydro, but major focus on coal (+ 11 GW in 10 years), as well as gas (+ 7 GW), assuming, however, moderate demand growth. We compare this baseline with two scenarios that are based on the same demand assumptions, but different generation mix: • RE_Medium assumes a mix of investment in fossils and renewables, while; • RE_High looks at an investment pathway mainly focusing on renewables, with no new investment in coal and CCGT beyond that already under construction. Figure 6 depicts the installed capacity and generation mix of each scenario. While in the baseline scenario, renewables – mainly hydro and geothermal – make up nearly 19% of annual generation, in the alternative scenarios, renewables shares increase to 31% (RE_Medium) and 43% (RE_High). By 2027, the installed capacities of solar and wind in the RE Medium scenario are 19 GW and 8 GW respectively. In the high renewables scenario, there will be in total 35 GW of solar and 19 GW of wind installed across Java Bali and Sumatra. This would mean less than 30% of currently estimated solar and wind potential is exploited. In the high renewables scenario, annual capacity additions would be 3.5 GW of solar and 1.9 GW of onshore wind. As comparison, in India, the country has installed 55 GW of solar and wind in the last 10 years.
  • 13. iesr.or.id 12 To reach India’s renewable energy target of 160 GW of wind and solar in 2022, annual capacity additions are 20-30 GW per year for solar PV and 6 – 10 GW per year for wind. In Germany, annual capacity additions are 2.9 GW per year for onshore wind and 2.5 GW per year for solar PV, but this is after the country has developed 105 GW of solar and wind in the past decade. Therefore, the high renewables scenario is feasible to achieve, provided the right policies are in place. Due to higher non-thermal output in the renewables scenario as compared to the RUPTL planning, emissions go down from 0.76 to 0.64 ton/ MWh in RE Medium and to 0.49 ton/MWh in RE High scenario, dropping by 16% and 36% respectively. While Indonesia’s NDC still allows for an overall significant increase in the power sector’s emission to 2030, the RE High scenario would result in a decrease in the power sector’s emission, thereby contributing to greater greenhouse gas reductions. Mitigation from the power sector is a low hanging fruit that should be explored in reducing CO2 emission. Figure 6 Installed capacity and generation per technology in each scenario. Renewables percentage in bracket. Figure 7 Emission intensity of power sector in each scenario
  • 14. iesr.or.id13 A High Renewables Scenario Coupled with Realistic Energy Savings Could Result in a Cost Saving of US$10 Billion Over Ten Years Fulfillingthegrowingelectricitydemandmeans deploying significant amount of investment. Therefore, it is paramount for the country to consider the future trend on the cost, thus reaching the political target (be it electrification ratio, RE shares, CO2 emission, or even welfare) in the most economical way. The financial impacts of the transition to a larger penetration of renewables in the Java-Bali-Sumatra system are investigated by reporting the total operating and annualised investment costs for the period 2018- 2027. Figure 8 shows the total system cost for the five scenarios – RUPTL, RUPTL_Low cap as baseline, Medium and High Renewables and Energy Transition scenarios. We see that using a consistent set of assumptions the simulations show that the RUPTL_Low cap baseline scenario comes at lowest overall cost of 135.4 billion USD over the ten-year period. The system with 31% renewables (RE Medium) has 4% higher system cost compared to the RUPTL_Low cap; while the High Renewables scenario, with ~43% renewable, increases the system cost by 7%. However, the overall system cost of the High Renewables scenario is $7.7 billion less than the current RUPTL plan, taking into account efficiency savings and lower demand. Wind and solar technology cost drops have repeatedly been faster than anticipated. The impact of lower technology cost and a lower risk perception of investors is shown in the Energy Transition scenario. Assuming that cost of capital could be reduced from 10% to 8%, in line with global trends, and a steeper learning curve for solar and wind, the total CAPEX for the Energy Transition scenario would be reduced by 20% and the system cost could be down by 10 billion USD, at the same level of the RUPTL baseline scenario. And keep in mind: none of the scenarios takes into account externalities such as cost for environmental impact, CO2 emissions, health, or social effects. Figure 8 Total operating and investment cost for Java-Bali-Sumatra 2018-2027
  • 15. iesr.or.id 14 Conducive Investment Environment is Key to Enabling Higher Renewable Penetration and Reducing Overall Costs Systems with higher shares of renewables have very different cost structures from those with high shares of fossil generation. Producing power from renewables requires high upfront investment, but subsequently allows power production for 25 years and more at operating cost of close to zero. While technology cost tends to standardise across competitive global markets, interest paid on both debt and equity is very different from country to country, and has a strong impact on total cost, as mentioned above. In a sensitivity analysis, we singled out the impact of different levels of cost of capital for funding solar and wind projects in Java-Bali and Sumatra system. The result shows that at a weighted average cost of capital (WACC) of 7.5% for wind and solar, the High Renewables system is at the same cost, even slightly lower, compared to the baseline scenario. Figure 9 Sensitivity Analysis on Different WACC for Wind and Solar PV (Column in green: assumption used in the model)
  • 16. iesr.or.id15 While this may seem very ambitious in the Indonesian context today, countries where wind and solar markets are well developed, such as Chile, Mexico, Dubai, India, or Germany show that WACC can be as low as 5% or even less. The regulatory environment in Indonesia will thus be key to enabling higher renewables penetration, as the cost of capital is largely driven by the risk perceived by the investors. In addition to assessing impact of improved investment condition for renewables in Indonesia, the model also calculated the impact of coal prices, as the power system is quite dominated by coal-fired power plants. Figure 10 depicts the change in total system cost under different coal price assumptions. The result of our analysis indicates that all scenarios are sensitive to changing coal prices but not as strongly as one may expect. This is due to the fact the in all scenarios, due to the large existing coal fleet, there is considerable coal capacity. By 2027, even in the High RE scenarios, there are 22 GW of coal fired power plants in the Java Bali and Sumatra system, producing 40% of all generation. Based only on coal price increase, the coal price would need to reach record levels for the High Renewable scenario to be on par with the baseline scenario. While this may be realistic under the current development in world market coal price, the Domestic Market Obligation policy caps the coal price at 70 USD/ton. However, should the country, in line with the announced “clean coal” policy, increase environmental standards, by using coal with higher calorific value for its power plants or by imposing other pollution-reduction measures, generation cost by coal plants, which today is very low in international comparison, would increase, shifting the balance to renewables-based systems. In this model, the assumption for coal calorific value is 4200 kcal/kg.4 Figure 10 Fuel Cost Sensitivity of each Scenario.
  • 17. iesr.or.id 16 Even with High Shares of Wind and Solar, Security of Supply of The Indonesian Power System Can be Guaranteed Increasing the share of wind and solar PV leads to a fundamental transformation of the power system. Increasing variable RES output is often associ- ated with the need for enhanced power system flexi- bility and affects the role played and the contribution made by the remainder of power generation portfolio. In the High RE scenario, almost one quarter of the average annual generation comes from wind and solar. Still, at such shares of variable renewables, the system can provide sufficient energy at every hour of the year. To illustrate this, hourly generation pro- files during two sample weeks with changing wind and solar contributions are shown in Figure 11. One can observe that during the day time, the peak load pat- tern aligns with the Solar PV feed-in. In some hours, especially around midday, solar and wind generation can make up 60% of total demand; in this case around 30 GW. In the days with low wind and solar generation, the hydro power generation increases and provides the bulk of balancing, but also coal, CCGT and in par- ticular very flexible OCGT plants contribute to power system flexibility. Residual power plants, e.g. hydro, gas, and coal power plants have to respond rapidly to an in- crease or decrease of solar and wind generation, in es- sence: operate more flexibly. The flexibility challenge is manageable from a technical perspective, yet it is important to note that flexible operation will impact power plant economics and may change cost efficien- cies between gas and coal technologies. We use a conservative assumption that coal can ramp up and down 2 MW/min, CCGT 10 MW/min, and OCGT 20 MW/min5
  • 18. iesr.or.id17 Figure 11 Hourly generation in a week with high solar and wind (October 2027) and low solar and wind (January 2027) photo: PLTS Kupang / jabartoday.com
  • 19. iesr.or.id 18 Conclusion and Outlook By the end of 2017, there was roughly 6 GW of renewable energy capacity installed in Java Bali and Sumatra, (mainly hydro and geothermal), providing 8% of overall generation in Java-Bali and Sumatra (RUPTL, 2018). According to the National Energy Plan (2017), the share of renewable generation should increase to 23% by 2025 and the renewable capacity should be 33% of the total installed capacity in 2025. Following this course, it means in 6 years the country needs to install over 30 GW of renewables out of 106 GW of total installed capacity. However, the 2018-2027 RUPTL, being the major reference in power sector development, only plans 14.3 GW of renewables plants, mainly hydro and geothermal. Reaching the target and following the growth trajectory will require stronger efforts, more than what is currently planned in RUPTL 2018-2027. Solar and wind, so far almost ignored, provide an attractive potential to reach the target. The simulations demonstrated that a renewable pathway, taking into account a higher share of solar and wind power, is economically feasible and does not put security of supply at stake. While adding 19 GW of wind and 35 GW of solar capacity in one decade will require a considerable amount of investment, a 40% renewable system can be developed at similar cost levels as a system planned under the RUPTL, today focusing very much on coal. In the end it is hard to predict whether a renewables pathway or a fossil pathway will come with slightly higher costs, as many uncertainties prevail in a 10 year horizon – be they world market prices for coal, further cost drops for wind and solar, or the cost of borrowing money in dynamic global financial markets. There are, however, a number of certainties that should be taken into account by Indonesian policymakers when framing their future energy system: reducing reliance on fossil will not only reduce the risk of being impacted by global fuel prices on coal and gas, but also come with great environmental, social and health benefits and allow Indonesia to meet its climate change mitigation commitments under the Paris Agreement. Incentivizing investment in wind and solar across the archipelago, on top of that, has the potential for directing money flows and economic benefits to regions that are currently less developed. Policy and regulation will be key for enabling higher renewables penetration in Indonesia. In order to attract investors, ensure competition and bring down cost of capital, it is paramount to have an ambitious long-term strategic plan with clear intermediate targets, e.g. an annual renewable investment pathway, supporting policies and streamlined implementation at national, provincial and local level.
  • 20.
  • 21. Institute for Essential Services Reform Jalan Tebet Barat Dalam VIII No. 20 B Jakarta Selatan 12810 | Indonesia T: +62 21 2232 3069 | F: +62 21 8317 073 www.iesr.or.id | iesr@iesr.or.id @iesr.id@IESR