Energy Scenario of Nepal
The current scenario of Energy in Nepal is pathetic as
the demand-supply gap is extremely wide due to
multiple reasons which hindered the development &
execution of power projects (both Hydro and
Thermal). The major hurdles came due to paralyzed
policies, government’s poor vision of Energy
Economics and the decade long Maoist insurgency
(1996-2006).
Energy Scenario of Nepal
The current demand stands at 1178.30 MW peak hour
demand but the installed capacity is only 1100 MW as
of FY 2012-13. The Energy deficit is the main cause of
power cuts (termed popularly “LOADSHEDDING”
among the mass). Power cuts in Wet season are t an
average of 3-4 hours daily and during Dry season, it
shoots to 12-16 hours daily.
Energy Scenario of NepalConsumers are industries are severely affected. Even
service oriented industries have to cut their office
hours to maintain uniformity with the market.
Manufacturing units are compelled to go for
Diesel/Fossil fuel plants to operate industries pushing
the operational costs of finished products by a
whopping 25% to 40%. Majority of industries have
been shut down and instead started trading of basic &
FMCG products. It has made the entire National
economy import oriented.
Peak Hour Demand and Available
EnergyYear Peak Demand
(MW)
Change in
Peak
Demand
Available
Energy
(GWh)
Change in
Available Energy
2005 557.53 2642.75
2006 603.28 ↑8.21% 2780.92 ↑5.23%
2007 648.39 ↑7.48% 3051.82 ↑9.74%
2008 721.73 ↑11.31% 3185.95 ↑4.40%
2009 812.50 ↑12.58% 3130.79 ↓1.73%
2010 885.28 ↑8.96% 3711.77 ↑18.56%
*If 10% CAGR pre-assumption consumption of energy is
considered, the peak demand for the FY2012-13 is 1178.30 MW.
Where does the Energy come
from?
NEA (Nepal Electricity Authority) is a Govt. of Nepal
undertaking responsible for the distribution of
electricity and controlling all other derivatives of
electricity to the consumers (both commercial &
industrial). NEA and Nepal Govt. operate both Hydro
& Thermal power projects. NEA trades and distributes
the electricity in Nepal through its grids.
Hydro and Thermal Energy
available for past 6 years
Year NEA Hydro (GWh) Change in
NEA Hydro
NEA Thermal
(GWh)
Change in
NEA
Thermal
2005 1522.90 13.669
2006 1568.55 ↑3.00% 16.10 ↑17.78%
2007 1747.42 ↑11.40% 13.31 ↓17.33%
2008 1793.14 ↑2.62% 9.17 ↓31.10%
2009 1839.53 ↑2.59% 9.06 ↓1.20%
2010 2108.65 ↑14.63% 13.01 ↑43.60%
NEA Energy Chart
0
500
1000
1500
2000
2500
2005 2006 2007 2008 2009 2010
NEA Hydro (GWh)
NEA Thermal (GWh)
Where does the rest of the Energy come from?
There are many private sector players in the Hydro power.
These are called Independent Power Producers (IPP). IPP
are private sector operating energy projects (both Hydro
and Thermal). Private projects go through the same stages
clearances as Govt. projects. Private projects ink PPA
(Power Purchase Agreement) with the NEA to sell their
energy. If a private project wants to sell their energy to a
third country then it can sign agreement with the
respective country. All the private projects must sell their
energy to the NEA only as NEA is the only organization in
Nepal to trade and distribute electricity. But if a private
company wants to develop a project for their own industrial
purpose then thy can develop and have to pay royalty and
hand over the energy project after 25 years of operation to
the Govt. of Nepal.
Where does the rest of the Energy
come from?
Water is a national resource so it is necessary to pay
royalty to the Govt. A private project can be hold up to
25 years by the company and then hand over to the
Nepal Govt. The current PPA rate for Wet Energy is
NRs. 6 ($0.06) per KWh & for Dry Energy d NRs. 4.80
($0.048) per KWh. Due to supply gap, a big share of
electricity is imported from India esp. during the dry
season.
Energy purchased by NEA from IPP
and India:
Year IPP (GWh) Change in IPP Indian Import
(GWh)
Change in
Indian
Import
2005 864.795 241.389
2006 930.04 ↑7.54% 266.23 ↑10.29%
2007 962.26 ↑3.46% 328.83 ↑23.51%
2008 958.42 ↓0.40% 425.22 ↑29.31%
2009 925.74 ↓3.53% 356.46 ↓16.17%
2010 951.43 ↑2.78% 638.68 ↑79.17%
Energy Purchased by NEA from IPP and India
0
200
400
600
800
1000
1200
2005 2006 2007 2008 2009 2010
IPP (GWh)
Indian Import (GWh)
The growth in IPP from 2005 to 2010 is only 2% CAGR. There are several hundreds
of private projects in pipeline but due to lack of investment & proper
planning, promoters have not been able to deliver projects & hence there is huge
deficit of power in Nepal. Where as, imports from India have increased significantly
to 21.50% CAGR & huge forex is invested just to pay the electricity tariff.
*Considering tariff at IRs. 4 ($0.067) per KWh then just IRs. 2555.72 million ($42.58
million) have been emptied from the forex in 2010 to pay the electricity bills to
India. Nepal’s forex reserves is Indian Currency as 72% of trade is with India.
LOASHEDDING
The most popular term and the most common excuse in
recent years. NEA and IPPs have their own hydro projects
but still 3-4 hours daily power outage in Wet season and up
to 12-16 hours daily in the Dry season. Almost all the
projects are run-of-river projects. During the wet
season, the energy produced is almost equivalent to the
installed capacity but in the dry season, the energy
production is only about 25% to 30% of the installed
capacity which is why the power situation in the winter
becomes critical. Since, the projects are run-of-river, the
water flow and level decreases significantly during the
winter so does electricity production.
Solution to Power Crisis
Nepal was declared a Energy crisis state in early 2008 by
the then Govt. There are many smaller run-of-river
projects coming up. Majority of them have received
clearances and even concluded PPA with the Govt. but
due to lack of funds, the projects have not been carried
out smoothly. The investment size of a hydro power is
behemoth and up to $2 million per MW generation
from detailed survey study to project completion and
electricity genertaion.
Solution to Power Crisis
The Govt. has identified few storage projects ranging
from 400 MW to 900 MW. Few have been awarded as
well. West Seti 786 MW to Three Gorges (China) and
Upper Karnali 900 MW to GMR (India). These
projects have already signed PPA with the Indian Govt.
These projects were awarded to the respective
companies under BOOT model. There are other few in
pipeline with negotiations on relevant issues. Upper
Tamakoshi 415 MW is a project to look after where the
South Koreans have invested majority and is to be in
operation by mid 2016 after several delays.
Hindrances in Smaller Projects
 Many projects are not viable due to accessibility and
connectivity.
 Project cost gets hyped due to building of
infrastructures.
 Locals create problems demanding free energy and
free share.
 Once the deadline misses, the project cost gets hyped.
 Investment is a major issue. The commercial banks
can hardly lend the 70% of a 2 MW project ($4
million). Banks are not lenient to lend on long term
projects.
Major Power Projects
There are several measures taken by the recent Govt. to
lure investment into big projects. GMR’s 900 MW
Upper Karnali and Three Gorges’s 786 MW West Seti
are some projects where Govt. has taken bold steps in
benefit of both the promoters and the country. For
storage projects over 500 MW, the country’s
Investment Board (www.investmentboard.gov.np)
looks after the project where the entire Environment
clearances are permitted by this board upon the
approval from their panel and huge incentives on tax
are approved on the benefit of the promoters.
What the Govt. can do?
With all the past mistakes, the Govt. should learn to be
lenient to adopt policies which will allow the investors
to develop projects hassle free & reap maximum
benefit in the shortest time-frame possible. Nepal
could become energy surplus in the next 15 years with
proper execution of some 15 major projects. The Govt.
is calculating the Energy economics & should come up
with some few measures:
What the Govt. can do?
 The Govt. should approve the feasible projects to
investors with a flexible timeframe.
 The approved projects must come under Govt.’s pre-
assumption energy demand at a certain timeframe.
Say, like 6000 MW by 2031.
 India is a country which could consume as we supply.
India’s current production stands at 185,000 MW and
thermal power has 68% share. Hydro power is cleaner
and cheaper in the long run.
Resolution of Current Energy
Scenario:
 First, we require huge investments (esp. foreign investment) in
the small run-of-river projects so that we cold generate extra
1000-1200 MW by 2018-19. There will be deficit in winter only
which can be solved by power wheeling with India and exchange
for dry-wet and vice-versa.
 Secondly, the Govt. must repair & build new transmission lines
as soon as possible to prevent dissipation of energy from grid &
transmission lines.
 Setting up and allowing foreign players to set up Captive Power
Plant (CPP) at strategic locations. This will solve industrial
demand by almost 90%.
Biratnagar, Kalaiya, Birganj, Bhairahwaha & Nepalganj are ideal
places. A 50 MW CPP coal-based will decrease power cuts by
nearly 50-60% in the coming 5 years.
Alternative Energy
Alternative Energy implementation & projects are needed to
be promoted by the Govt. These projects require REM
(Renewable Energy Mechanism) procedure to sell their
energy. The Govt. must be lenient to introduce an
investment friendly REM as Nepal has a great potential in
Wind Energy. Mustang & Manang have cut rate speed to
run turbines ranging from 250 KW to 1500 KW. Around
30,000 MW could be harnessed in these districts alone.
Infrastructure & accessibility to these districts have to be
built first. Clearances like Avian Clearance & EIA schemes
for wind project need to be defined so that investors would
be confident before committing to such projects.
GEETA INVESTMENT SERVICES
AVDESH MANDAL
avdlink@gmail.com
+9779803384110
+919999861160

More Related Content

What's hot

Indian and global energy sources
Indian and global energy sourcesIndian and global energy sources
Indian and global energy sources
Adarsh sharma
 
Indian Power Sector
Indian Power SectorIndian Power Sector
Indian Power Sector
Mustafa Sonasath
 
What does merit order mean
What does merit order meanWhat does merit order mean
What does merit order mean
Power System Operation
 
Captive power Policy
Captive power PolicyCaptive power Policy
Captive power Policy
PRIYANK JAIN
 
Energy sector of pakistan
Energy sector of pakistanEnergy sector of pakistan
Energy sector of pakistan
Owais Hassan
 
From centralised long-term planning to market-based access: Proposed change i...
From centralised long-term planning to market-based access: Proposed change i...From centralised long-term planning to market-based access: Proposed change i...
From centralised long-term planning to market-based access: Proposed change i...
Amitava Nag
 
Hydrogen Mission 2021& Green Hydrogen Policy 2022.pptx
Hydrogen Mission 2021& Green Hydrogen  Policy 2022.pptxHydrogen Mission 2021& Green Hydrogen  Policy 2022.pptx
Hydrogen Mission 2021& Green Hydrogen Policy 2022.pptx
YuvrajSaigal
 
Power Purchase Agreement PPA
Power Purchase Agreement PPA Power Purchase Agreement PPA
Power Purchase Agreement PPA
Power System Operation
 
Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India sanjeev jain
 
Growth of Electricity Sector in India since 1947 to 2015
Growth of Electricity Sector in India since 1947 to 2015Growth of Electricity Sector in India since 1947 to 2015
Growth of Electricity Sector in India since 1947 to 2015
Ashish Verma
 
Renewable energy in india
Renewable energy in indiaRenewable energy in india
Renewable energy in indiaSHAMSHAD AHAMAD
 
Electricity and power consumption in india (1)
Electricity and power consumption in india (1)Electricity and power consumption in india (1)
Electricity and power consumption in india (1)Anirudh Sharma
 
Power scenario in india ppt
Power scenario in india pptPower scenario in india ppt
Power scenario in india ppt
navreet singh
 
POWER PURCHASE AGREEMENTS(PPA)
POWER PURCHASE AGREEMENTS(PPA)POWER PURCHASE AGREEMENTS(PPA)
POWER PURCHASE AGREEMENTS(PPA)Munira Abubakari
 
Project Report on Industrial Summer Training at NTPC Simhadri
 Project Report on Industrial Summer Training at NTPC Simhadri Project Report on Industrial Summer Training at NTPC Simhadri
Project Report on Industrial Summer Training at NTPC Simhadri
Ashish Uppu
 
gas power plant ntpc dadri
gas power plant ntpc dadrigas power plant ntpc dadri
gas power plant ntpc dadri
Virat Shishodia
 
Deviation Settlement Mechanism (DSM)
Deviation Settlement Mechanism (DSM)Deviation Settlement Mechanism (DSM)
Deviation Settlement Mechanism (DSM)
Shishir Kumar Pradhan
 
CONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANTCONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANTSubarna Poddar
 
Power sector of pakistan
Power sector of pakistanPower sector of pakistan
Power sector of pakistan
USMAN TARIQ
 

What's hot (20)

Indian and global energy sources
Indian and global energy sourcesIndian and global energy sources
Indian and global energy sources
 
Indian Power Sector
Indian Power SectorIndian Power Sector
Indian Power Sector
 
What does merit order mean
What does merit order meanWhat does merit order mean
What does merit order mean
 
Captive power Policy
Captive power PolicyCaptive power Policy
Captive power Policy
 
Energy sector of pakistan
Energy sector of pakistanEnergy sector of pakistan
Energy sector of pakistan
 
From centralised long-term planning to market-based access: Proposed change i...
From centralised long-term planning to market-based access: Proposed change i...From centralised long-term planning to market-based access: Proposed change i...
From centralised long-term planning to market-based access: Proposed change i...
 
Hydrogen Mission 2021& Green Hydrogen Policy 2022.pptx
Hydrogen Mission 2021& Green Hydrogen  Policy 2022.pptxHydrogen Mission 2021& Green Hydrogen  Policy 2022.pptx
Hydrogen Mission 2021& Green Hydrogen Policy 2022.pptx
 
Ntpc simhadri
Ntpc simhadriNtpc simhadri
Ntpc simhadri
 
Power Purchase Agreement PPA
Power Purchase Agreement PPA Power Purchase Agreement PPA
Power Purchase Agreement PPA
 
Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India
 
Growth of Electricity Sector in India since 1947 to 2015
Growth of Electricity Sector in India since 1947 to 2015Growth of Electricity Sector in India since 1947 to 2015
Growth of Electricity Sector in India since 1947 to 2015
 
Renewable energy in india
Renewable energy in indiaRenewable energy in india
Renewable energy in india
 
Electricity and power consumption in india (1)
Electricity and power consumption in india (1)Electricity and power consumption in india (1)
Electricity and power consumption in india (1)
 
Power scenario in india ppt
Power scenario in india pptPower scenario in india ppt
Power scenario in india ppt
 
POWER PURCHASE AGREEMENTS(PPA)
POWER PURCHASE AGREEMENTS(PPA)POWER PURCHASE AGREEMENTS(PPA)
POWER PURCHASE AGREEMENTS(PPA)
 
Project Report on Industrial Summer Training at NTPC Simhadri
 Project Report on Industrial Summer Training at NTPC Simhadri Project Report on Industrial Summer Training at NTPC Simhadri
Project Report on Industrial Summer Training at NTPC Simhadri
 
gas power plant ntpc dadri
gas power plant ntpc dadrigas power plant ntpc dadri
gas power plant ntpc dadri
 
Deviation Settlement Mechanism (DSM)
Deviation Settlement Mechanism (DSM)Deviation Settlement Mechanism (DSM)
Deviation Settlement Mechanism (DSM)
 
CONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANTCONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANT
 
Power sector of pakistan
Power sector of pakistanPower sector of pakistan
Power sector of pakistan
 

Similar to Nepal Energy Scenario

Energy crises in pakistan butt presentation
Energy crises in pakistan butt presentationEnergy crises in pakistan butt presentation
Energy crises in pakistan butt presentationgoodamazing
 
STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...
STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...
STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...
libin paul
 
Energycrisesinpakistanbuttpresentation 120602154635-phpapp02
Energycrisesinpakistanbuttpresentation 120602154635-phpapp02Energycrisesinpakistanbuttpresentation 120602154635-phpapp02
Energycrisesinpakistanbuttpresentation 120602154635-phpapp02
Ahmer Khan
 
Sustainable Energy development bangladesh
Sustainable Energy development bangladeshSustainable Energy development bangladesh
Sustainable Energy development bangladeshA.S.M. Abdul Hye
 
Energy crises in pakistan
Energy crises in pakistanEnergy crises in pakistan
Energy crises in pakistanShehzad Imran
 
indian energy sector overview
indian energy sector overviewindian energy sector overview
indian energy sector overview
shivraj negi
 
India : Power Sector Report_August 2013
India : Power Sector Report_August 2013India : Power Sector Report_August 2013
India : Power Sector Report_August 2013
India Brand Equity Foundation
 
Clean Energy Australia Report
Clean Energy Australia ReportClean Energy Australia Report
Clean Energy Australia Report
Turlough Guerin GAICD FGIA
 
Vietnam, a hidden gem in power development & investing
Vietnam, a hidden gem in power development & investingVietnam, a hidden gem in power development & investing
Vietnam, a hidden gem in power development & investing
Phat Nguyen
 
Modern Energy Transport - Country Analysis India
Modern Energy Transport - Country Analysis IndiaModern Energy Transport - Country Analysis India
Modern Energy Transport - Country Analysis India
AdityaDesai77
 
POTENTIAL STUDY ADDRESSING SHORTAGE OF POWER AND ECONOMIC GROWTH THROUGH FORE...
POTENTIAL STUDY ADDRESSING SHORTAGE OF POWER AND ECONOMIC GROWTH THROUGH FORE...POTENTIAL STUDY ADDRESSING SHORTAGE OF POWER AND ECONOMIC GROWTH THROUGH FORE...
POTENTIAL STUDY ADDRESSING SHORTAGE OF POWER AND ECONOMIC GROWTH THROUGH FORE...
IAEME Publication
 
Small hydropower development in nepal iit roorkee
Small hydropower development in  nepal iit roorkeeSmall hydropower development in  nepal iit roorkee
Small hydropower development in nepal iit roorkeeSanjeev Pokhrel
 
Review and Analysis of National Pride Project UPPER TAMAKOSHI HYDROPOWER PRO...
Review and Analysis of National Pride Project UPPER TAMAKOSHIHYDROPOWER PRO...Review and Analysis of National Pride Project UPPER TAMAKOSHIHYDROPOWER PRO...
Review and Analysis of National Pride Project UPPER TAMAKOSHI HYDROPOWER PRO...
AlizaRLShrestha1
 
Integrating Renewable Energy in Smart Grid: Opportunity, Challenges and Progr...
Integrating Renewable Energy in Smart Grid: Opportunity, Challenges and Progr...Integrating Renewable Energy in Smart Grid: Opportunity, Challenges and Progr...
Integrating Renewable Energy in Smart Grid: Opportunity, Challenges and Progr...
IRJET Journal
 
India power transmission & distribution sector opportunity outlook 2025
India power transmission & distribution sector opportunity outlook 2025India power transmission & distribution sector opportunity outlook 2025
India power transmission & distribution sector opportunity outlook 2025
Rajesh Sarma
 
India power transmission & distribution sector opportunity outlook 2025
India power transmission & distribution sector opportunity outlook 2025India power transmission & distribution sector opportunity outlook 2025
India power transmission & distribution sector opportunity outlook 2025
Rajesh Sarma
 

Similar to Nepal Energy Scenario (20)

Energy crises in pakistan butt presentation
Energy crises in pakistan butt presentationEnergy crises in pakistan butt presentation
Energy crises in pakistan butt presentation
 
9-Energy
9-Energy9-Energy
9-Energy
 
STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...
STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...
STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...
 
Energycrisesinpakistanbuttpresentation 120602154635-phpapp02
Energycrisesinpakistanbuttpresentation 120602154635-phpapp02Energycrisesinpakistanbuttpresentation 120602154635-phpapp02
Energycrisesinpakistanbuttpresentation 120602154635-phpapp02
 
Solar power - A developer prespective
Solar power - A developer prespectiveSolar power - A developer prespective
Solar power - A developer prespective
 
Sustainable Energy development bangladesh
Sustainable Energy development bangladeshSustainable Energy development bangladesh
Sustainable Energy development bangladesh
 
Energy crises in pakistan
Energy crises in pakistanEnergy crises in pakistan
Energy crises in pakistan
 
indian energy sector overview
indian energy sector overviewindian energy sector overview
indian energy sector overview
 
India : Power Sector Report_August 2013
India : Power Sector Report_August 2013India : Power Sector Report_August 2013
India : Power Sector Report_August 2013
 
Clean Energy Australia Report
Clean Energy Australia ReportClean Energy Australia Report
Clean Energy Australia Report
 
Vietnam, a hidden gem in power development & investing
Vietnam, a hidden gem in power development & investingVietnam, a hidden gem in power development & investing
Vietnam, a hidden gem in power development & investing
 
Modern Energy Transport - Country Analysis India
Modern Energy Transport - Country Analysis IndiaModern Energy Transport - Country Analysis India
Modern Energy Transport - Country Analysis India
 
POTENTIAL STUDY ADDRESSING SHORTAGE OF POWER AND ECONOMIC GROWTH THROUGH FORE...
POTENTIAL STUDY ADDRESSING SHORTAGE OF POWER AND ECONOMIC GROWTH THROUGH FORE...POTENTIAL STUDY ADDRESSING SHORTAGE OF POWER AND ECONOMIC GROWTH THROUGH FORE...
POTENTIAL STUDY ADDRESSING SHORTAGE OF POWER AND ECONOMIC GROWTH THROUGH FORE...
 
Small hydropower development in nepal iit roorkee
Small hydropower development in  nepal iit roorkeeSmall hydropower development in  nepal iit roorkee
Small hydropower development in nepal iit roorkee
 
Power Ppt
Power PptPower Ppt
Power Ppt
 
Review and Analysis of National Pride Project UPPER TAMAKOSHI HYDROPOWER PRO...
Review and Analysis of National Pride Project UPPER TAMAKOSHIHYDROPOWER PRO...Review and Analysis of National Pride Project UPPER TAMAKOSHIHYDROPOWER PRO...
Review and Analysis of National Pride Project UPPER TAMAKOSHI HYDROPOWER PRO...
 
Integrating Renewable Energy in Smart Grid: Opportunity, Challenges and Progr...
Integrating Renewable Energy in Smart Grid: Opportunity, Challenges and Progr...Integrating Renewable Energy in Smart Grid: Opportunity, Challenges and Progr...
Integrating Renewable Energy in Smart Grid: Opportunity, Challenges and Progr...
 
India power transmission & distribution sector opportunity outlook 2025
India power transmission & distribution sector opportunity outlook 2025India power transmission & distribution sector opportunity outlook 2025
India power transmission & distribution sector opportunity outlook 2025
 
India power transmission & distribution sector opportunity outlook 2025
India power transmission & distribution sector opportunity outlook 2025India power transmission & distribution sector opportunity outlook 2025
India power transmission & distribution sector opportunity outlook 2025
 
SOLAR potential EDIT 2
SOLAR potential EDIT 2SOLAR potential EDIT 2
SOLAR potential EDIT 2
 

Recently uploaded

How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
Jisc
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Dr. Vinod Kumar Kanvaria
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
EduSkills OECD
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
SACHIN R KONDAGURI
 
Pride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School DistrictPride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School District
David Douglas School District
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
Multithreading_in_C++ - std::thread, race condition
Multithreading_in_C++ - std::thread, race conditionMultithreading_in_C++ - std::thread, race condition
Multithreading_in_C++ - std::thread, race condition
Mohammed Sikander
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
JosvitaDsouza2
 
A Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptxA Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptx
thanhdowork
 
Normal Labour/ Stages of Labour/ Mechanism of Labour
Normal Labour/ Stages of Labour/ Mechanism of LabourNormal Labour/ Stages of Labour/ Mechanism of Labour
Normal Labour/ Stages of Labour/ Mechanism of Labour
Wasim Ak
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
camakaiclarkmusic
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
EverAndrsGuerraGuerr
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
vaibhavrinwa19
 

Recently uploaded (20)

How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
 
Pride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School DistrictPride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School District
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
Multithreading_in_C++ - std::thread, race condition
Multithreading_in_C++ - std::thread, race conditionMultithreading_in_C++ - std::thread, race condition
Multithreading_in_C++ - std::thread, race condition
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
A Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptxA Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptx
 
Normal Labour/ Stages of Labour/ Mechanism of Labour
Normal Labour/ Stages of Labour/ Mechanism of LabourNormal Labour/ Stages of Labour/ Mechanism of Labour
Normal Labour/ Stages of Labour/ Mechanism of Labour
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
 

Nepal Energy Scenario

  • 1. We take a look at the current electricity production, demand and supply in Nepal with suggestive measures.
  • 2. Energy Scenario of Nepal The current scenario of Energy in Nepal is pathetic as the demand-supply gap is extremely wide due to multiple reasons which hindered the development & execution of power projects (both Hydro and Thermal). The major hurdles came due to paralyzed policies, government’s poor vision of Energy Economics and the decade long Maoist insurgency (1996-2006).
  • 3. Energy Scenario of Nepal The current demand stands at 1178.30 MW peak hour demand but the installed capacity is only 1100 MW as of FY 2012-13. The Energy deficit is the main cause of power cuts (termed popularly “LOADSHEDDING” among the mass). Power cuts in Wet season are t an average of 3-4 hours daily and during Dry season, it shoots to 12-16 hours daily.
  • 4. Energy Scenario of NepalConsumers are industries are severely affected. Even service oriented industries have to cut their office hours to maintain uniformity with the market. Manufacturing units are compelled to go for Diesel/Fossil fuel plants to operate industries pushing the operational costs of finished products by a whopping 25% to 40%. Majority of industries have been shut down and instead started trading of basic & FMCG products. It has made the entire National economy import oriented.
  • 5. Peak Hour Demand and Available EnergyYear Peak Demand (MW) Change in Peak Demand Available Energy (GWh) Change in Available Energy 2005 557.53 2642.75 2006 603.28 ↑8.21% 2780.92 ↑5.23% 2007 648.39 ↑7.48% 3051.82 ↑9.74% 2008 721.73 ↑11.31% 3185.95 ↑4.40% 2009 812.50 ↑12.58% 3130.79 ↓1.73% 2010 885.28 ↑8.96% 3711.77 ↑18.56% *If 10% CAGR pre-assumption consumption of energy is considered, the peak demand for the FY2012-13 is 1178.30 MW.
  • 6. Where does the Energy come from? NEA (Nepal Electricity Authority) is a Govt. of Nepal undertaking responsible for the distribution of electricity and controlling all other derivatives of electricity to the consumers (both commercial & industrial). NEA and Nepal Govt. operate both Hydro & Thermal power projects. NEA trades and distributes the electricity in Nepal through its grids.
  • 7. Hydro and Thermal Energy available for past 6 years Year NEA Hydro (GWh) Change in NEA Hydro NEA Thermal (GWh) Change in NEA Thermal 2005 1522.90 13.669 2006 1568.55 ↑3.00% 16.10 ↑17.78% 2007 1747.42 ↑11.40% 13.31 ↓17.33% 2008 1793.14 ↑2.62% 9.17 ↓31.10% 2009 1839.53 ↑2.59% 9.06 ↓1.20% 2010 2108.65 ↑14.63% 13.01 ↑43.60%
  • 8. NEA Energy Chart 0 500 1000 1500 2000 2500 2005 2006 2007 2008 2009 2010 NEA Hydro (GWh) NEA Thermal (GWh)
  • 9. Where does the rest of the Energy come from? There are many private sector players in the Hydro power. These are called Independent Power Producers (IPP). IPP are private sector operating energy projects (both Hydro and Thermal). Private projects go through the same stages clearances as Govt. projects. Private projects ink PPA (Power Purchase Agreement) with the NEA to sell their energy. If a private project wants to sell their energy to a third country then it can sign agreement with the respective country. All the private projects must sell their energy to the NEA only as NEA is the only organization in Nepal to trade and distribute electricity. But if a private company wants to develop a project for their own industrial purpose then thy can develop and have to pay royalty and hand over the energy project after 25 years of operation to the Govt. of Nepal.
  • 10. Where does the rest of the Energy come from? Water is a national resource so it is necessary to pay royalty to the Govt. A private project can be hold up to 25 years by the company and then hand over to the Nepal Govt. The current PPA rate for Wet Energy is NRs. 6 ($0.06) per KWh & for Dry Energy d NRs. 4.80 ($0.048) per KWh. Due to supply gap, a big share of electricity is imported from India esp. during the dry season.
  • 11. Energy purchased by NEA from IPP and India: Year IPP (GWh) Change in IPP Indian Import (GWh) Change in Indian Import 2005 864.795 241.389 2006 930.04 ↑7.54% 266.23 ↑10.29% 2007 962.26 ↑3.46% 328.83 ↑23.51% 2008 958.42 ↓0.40% 425.22 ↑29.31% 2009 925.74 ↓3.53% 356.46 ↓16.17% 2010 951.43 ↑2.78% 638.68 ↑79.17%
  • 12. Energy Purchased by NEA from IPP and India 0 200 400 600 800 1000 1200 2005 2006 2007 2008 2009 2010 IPP (GWh) Indian Import (GWh) The growth in IPP from 2005 to 2010 is only 2% CAGR. There are several hundreds of private projects in pipeline but due to lack of investment & proper planning, promoters have not been able to deliver projects & hence there is huge deficit of power in Nepal. Where as, imports from India have increased significantly to 21.50% CAGR & huge forex is invested just to pay the electricity tariff. *Considering tariff at IRs. 4 ($0.067) per KWh then just IRs. 2555.72 million ($42.58 million) have been emptied from the forex in 2010 to pay the electricity bills to India. Nepal’s forex reserves is Indian Currency as 72% of trade is with India.
  • 13. LOASHEDDING The most popular term and the most common excuse in recent years. NEA and IPPs have their own hydro projects but still 3-4 hours daily power outage in Wet season and up to 12-16 hours daily in the Dry season. Almost all the projects are run-of-river projects. During the wet season, the energy produced is almost equivalent to the installed capacity but in the dry season, the energy production is only about 25% to 30% of the installed capacity which is why the power situation in the winter becomes critical. Since, the projects are run-of-river, the water flow and level decreases significantly during the winter so does electricity production.
  • 14. Solution to Power Crisis Nepal was declared a Energy crisis state in early 2008 by the then Govt. There are many smaller run-of-river projects coming up. Majority of them have received clearances and even concluded PPA with the Govt. but due to lack of funds, the projects have not been carried out smoothly. The investment size of a hydro power is behemoth and up to $2 million per MW generation from detailed survey study to project completion and electricity genertaion.
  • 15. Solution to Power Crisis The Govt. has identified few storage projects ranging from 400 MW to 900 MW. Few have been awarded as well. West Seti 786 MW to Three Gorges (China) and Upper Karnali 900 MW to GMR (India). These projects have already signed PPA with the Indian Govt. These projects were awarded to the respective companies under BOOT model. There are other few in pipeline with negotiations on relevant issues. Upper Tamakoshi 415 MW is a project to look after where the South Koreans have invested majority and is to be in operation by mid 2016 after several delays.
  • 16. Hindrances in Smaller Projects  Many projects are not viable due to accessibility and connectivity.  Project cost gets hyped due to building of infrastructures.  Locals create problems demanding free energy and free share.  Once the deadline misses, the project cost gets hyped.  Investment is a major issue. The commercial banks can hardly lend the 70% of a 2 MW project ($4 million). Banks are not lenient to lend on long term projects.
  • 17. Major Power Projects There are several measures taken by the recent Govt. to lure investment into big projects. GMR’s 900 MW Upper Karnali and Three Gorges’s 786 MW West Seti are some projects where Govt. has taken bold steps in benefit of both the promoters and the country. For storage projects over 500 MW, the country’s Investment Board (www.investmentboard.gov.np) looks after the project where the entire Environment clearances are permitted by this board upon the approval from their panel and huge incentives on tax are approved on the benefit of the promoters.
  • 18. What the Govt. can do? With all the past mistakes, the Govt. should learn to be lenient to adopt policies which will allow the investors to develop projects hassle free & reap maximum benefit in the shortest time-frame possible. Nepal could become energy surplus in the next 15 years with proper execution of some 15 major projects. The Govt. is calculating the Energy economics & should come up with some few measures:
  • 19. What the Govt. can do?  The Govt. should approve the feasible projects to investors with a flexible timeframe.  The approved projects must come under Govt.’s pre- assumption energy demand at a certain timeframe. Say, like 6000 MW by 2031.  India is a country which could consume as we supply. India’s current production stands at 185,000 MW and thermal power has 68% share. Hydro power is cleaner and cheaper in the long run.
  • 20. Resolution of Current Energy Scenario:  First, we require huge investments (esp. foreign investment) in the small run-of-river projects so that we cold generate extra 1000-1200 MW by 2018-19. There will be deficit in winter only which can be solved by power wheeling with India and exchange for dry-wet and vice-versa.  Secondly, the Govt. must repair & build new transmission lines as soon as possible to prevent dissipation of energy from grid & transmission lines.  Setting up and allowing foreign players to set up Captive Power Plant (CPP) at strategic locations. This will solve industrial demand by almost 90%. Biratnagar, Kalaiya, Birganj, Bhairahwaha & Nepalganj are ideal places. A 50 MW CPP coal-based will decrease power cuts by nearly 50-60% in the coming 5 years.
  • 21. Alternative Energy Alternative Energy implementation & projects are needed to be promoted by the Govt. These projects require REM (Renewable Energy Mechanism) procedure to sell their energy. The Govt. must be lenient to introduce an investment friendly REM as Nepal has a great potential in Wind Energy. Mustang & Manang have cut rate speed to run turbines ranging from 250 KW to 1500 KW. Around 30,000 MW could be harnessed in these districts alone. Infrastructure & accessibility to these districts have to be built first. Clearances like Avian Clearance & EIA schemes for wind project need to be defined so that investors would be confident before committing to such projects.
  • 22. GEETA INVESTMENT SERVICES AVDESH MANDAL avdlink@gmail.com +9779803384110 +919999861160

Editor's Notes

  1. Contd.
  2. Contd.
  3. Contd.
  4. Contd.
  5. Contd.
  6. Contd.
  7. Contd.
  8. Contd.
  9. Contd.
  10. Contd.
  11. Contd.
  12. Contd.
  13. Contd.
  14. Contd.
  15. Contd.
  16. Contd.