SlideShare a Scribd company logo
Welcome to Innovation of Rock
Enginering(Tunnel and Automation
Welcome Smart Tunnel Project EPC Team
External/Internal Surge Source
Sources for Extra Current /Voltages from different areas……
 Signal Surges Generation due
direct lightning
 Switching operations of
heavy duty machines like
motors, lifts, AC units,
refrigerator, welding machine
etc.
 Ground Potential Rise
Short Circuit due Wire/ Cables
An Arcing Fault is the flow of current through
the air between phase conductors or phase
conductors and neutral or ground. Concentrated
radiant energy is released at the point of arcing
an a small amount of time resulting
in Extremely High Temperature.
Fire Accident
Reason Lose Contact Earthing Disorder and Lightning
Follow Safety in Electrical Instalation Shocks
Surge in Systems and Result
Surge in DC Application
Tunnel Engineering
Tunnel and Require Equipments
Tunnel in Snow Area and Automation and
Sign
Tunnel Require Equipments
Tunnel
Tunnel
Tunnel Machinery
Tunnel
Network Connectivity
Network Connectivity
Traffic Support Equipments
Train and Services
Train Control Systems
Rolling Stock Communication
Traffic Important
Tunnel Monitoring and Risk Management
Safe Journey
The 100% of lightning energy breaks down as
follows:
a) 50% of the lightning current will flow through
the ground
b) 50% of the lightning current will flow over the
connected metal parts out of the building:
• about 10% to the water pipe (metal)
• about 10% to the gas pipe (metal)
• about 10% to the oil pipe (metal tank)
• about 10% to the sewage pipe
• a out % to the po er supplier’s i o i g feed
• max. 5% or 5 kA shared across all data lines
50 %
50 %
Equipotential bonding for lightning protection according IEC 61024-
1 and IEC 61312-1; IEC62305
In India & Sri Lanka Only Chance is Power Line
Approximately 50 % of Total Lightning Current has
to be diverted to Power lines
v
JMV LPS Products
Copper Cladded Conductor For Electrical
Installation
The Copper Clad Steel Grounding Conductor is made up of steel with the coating of 99.99% pure copper. These
conductors/ wires
or strands are equipped with the strength of steel with the conductivity and copper with the better corrosion
resistance property. The concentric copper cladding is metallurgic ally bonded to a steel core through a continuous,
solid cladding process using pressure rolling for primary bonding. The copper cladding
thickness remains constant surrounding steel. We use different steel grades for the steel core result in Dead Soft
Annealed, High strength and Extra High Strength Characteristics.
The Copper Clad Steel Wire yields a composite conductivity of 21%, 30% and 40% IACS, and available in Annealed
and Hard drawn. We are delivering products with varied conductivity and tensile strength as per the customer need.
Further, the wire can be processed to be silver plated or tinned copper clad steel wire.
Most Efficient JointProcess
It is efficient and superior to all existing surface –to-surface
mechanical retention connectors.
What is Exothermic Welding System?
Copper to Bi-Metal and Alumenium
Types of Exothermic Joints:
Possible to join any bi metal except aluminum
Exothermic welding is a process of making maintain free highly molecular bonding process is superior in
performance connection to any known mechanical or compression-type surface-to-surface contact connector.
Exothermic weld connections provide current carrying (fusing) capacity equal to that of the conductor and will
not deteriorate with age.
 It offers Electrical connections between two or more copper to copper and copper to steel conductors.
 Highly portable method as it does not require any external power source or heat source, so it can be done
almost anywhere.
 It provides strong permanent molecular bond among metallic conductors that cannot loosen and further will
not deteriorate with age.
 Connection does not corrode with time and it offers permanent conductivity.
Copper Clad Steel Solid ROD and Conductor
LIGHTNING FORMATION
Facts about Lightning
• A strike can average 100 million volts of electricity
• Current of up to 200,000 amperes
• Can generate 54,000 oF
• 10/350MicroSec/50KA Fault Current/Discharge in
Nano Sec
Protection
Earthing Design100KA Fault Current/Joints Exothermic
/Flexible Down Conductor with Shortest Route &
Less Corner
• Lightning Protection Standard use in India
(IS2309 Now IEC 62305-5)NBC2016
Working Principle Angullar No Compromise with Design
Max Protection 30Mtrs from One
No Product warrenty from Manufacturer
High Maintenance Require
NFC17-102(2011) Now Europeon Standard(ESE LA)
Working Principle Radius Compromise with Design
Possible with Increasing Qty of ESE
Max Protection 109 Mtrs Radius from One
Manufacturing Warrenty and Test Certificate for Products
Available
Maintenance on Call Basis
Lightning Risk assessment Study is actually the measure of risk of a lightning strike and
probability of damages. As Per IEC62305-2.
All these calculations are based on:
lightning strike density in that particular area (provided by OMV i.e. Ng = 8),
Danger for people,
Occupation coefficient of structure,
Relative location of site,
Fire Risk,
Associated services,
Electrical Lines,
Lightning Protection Level,
Surge Arrestor and
Dimensions of installation.
Lighting Strike Density (Ng)
It is the measure of lightning strikes per kilometre square per year in the particular area.
Higher the lighting strike density, higher the probability of lightning strike which needs higher level of lightning protection level.
Danger for People (h)
It is the factor of presence of people and panic in the building in case of a lightning strike
No particular danger 1
Low panic level(<=2 floors, < 100 persons 2
Medium risk of panic (< 1000 persons) 5
Difficult to evacuate (disabled people, hospitals) 5
High risk of panic (> 1000 persons) 10
Hazard for surroundings or environment 20
Contamination of surroundings or environment 50
Occupancy Coefficient (Lf1)
It is the risk reduction factor with respect to theoccupancy of the building / installation. For example, loss due to lighting strike is higher in hospital as compared to a store / warehouse.
Structure unoccupied 0.1
Structure normally occupied 0.01
Relative Location of Site (Cd)
It is the risk reduction factor with respect to the location and surrounding of the building / installation. For example, chance of lighting strike is minimized if the building is near to a high tower.
Structure surrounded by higher objects or trees 0.25
Structure surrounded by similar or lower objects 0.5
Isolated structure-No other objects nearby 1
Isolated structure on top of a hill or a hillock 2
Fire Risk (rf)
It is the risk reduction factor with respect to the flammability of the material present in the building / installation. For example, in case of lighting strike, loss will be very high at a gas station as compare to the cement store.
Explosion 1
High 0.1
Ordinary 0.01
Low 0.001
Lightning Risk Calcuator as per IEC6305
LIGHTNING RISK ASSESSMENT CALCULATIONS
Building / Installation : KTC Tower
Building ID No. KTC, Mall Road
LIGHTNING DENSITY Ng= 8
STRUCTURE
Length L(m) L= 12
Width W(m) W= 15
Height H(m) Hi= 10
Chimney/Tower height (m) T= 2
DANGER FOR PEOPLE h= No particular danger
OCCUPATION OF THE STRUCTURE Lf1= Structure normally occupied
LIGHTNING CONDUCTOR Pd= Protection Level IV
Electrical Line Ai= Underground
RELATIVE LOCATION OF THE STRUCTURE Cd= Structure surrounded by higher objects or trees
FIRE RISK rf= Low
SERVICE Lf2= Gas, water
SURGE ARRESTOR Pi= None
RESULTS OF THE RISK ASSESSMENT
Risk of human loss R1= ACCEPTABLE
Risk of loss of service R2= ACCEPTABLE
Risk of loss of cultural heritage R3= ACCEPTABLE
PASSIVE PROTECTION SYSTEM
The Simple Rod air terminal is composed from a metallic rod with 2 to 8 m height dominating
the structure to protect, and linked to 2 down conductors minimum, and 2 earthing systems.
The protection radius ensured by this air terminal which is limited to 30 m more or less
(Protection level IV, height = 60 m), especially dedicated to the protection of small structures or
areas like to ers, hi eys, ta ks, ater to er, a te a asts… The EN -3 standard
describes the installation procedure for these air terminals.
13 Simple Rods, 13 down conductors, and 13 earthing systems are necessary to ensure the
protection below :
The meshed cage protection is composed from a meshing in roof surface and in the front face around the
uildi g. Surrou di g the roof surfa e, a d o high poi ts, apture poi ts are positio ed. A o du tors’
network is placed at the outer perimeter of the roof. This network is completed by transverse conductors.
The size of the meshing is 5 to meters, and depends on the efficiency needed for the protection. On the
front face of the building, the down conductors are linked at the top to the meshing of the roof. And, down,
to specific earthing systems. The distance between two conductors is 10 to 25 meters, and depend on the
efficiency needed for the protection. The EN 62305-3 describes the installation procedure for this method.
Generally, this method is heavy and expensive, due to the complexity of the structures to protect.
26 capture points, 26 down conductors and a grounded loop earthing system are necessaries to ensure the
protection of the structure here below :
The catenary wires protection is a method closed to the meshed cage principle, because it is
constituted with meshing of the conductors far from the structure to protect, to avoid any
contact with lightning current.
Catenary wires are located over the structure to protect, connected to down conductors and
specific earthing systems. The width of the meshing and distance between the down conductors
must respect the same rules as for the meshed cage. The EN 62305-3 describes the installation
procedure for this method.
Generally, this method is heavy and expensive, due to the complexity of the structures to
protect.
The ESE air terminal is a terminal which enables to generate artificially an upward leader earlier than a
simple rod, with an ionization system, in order to establish a special impact on its point. The capture of the
lightning strike being faster than a simple rod, this technology enables to benefit from larger protection
areas, ensuring protection for large dimensions structures.
The ge erated prote tio radius depe ds o the early strea er e issio alue of the air ter i al Δt i µs ,
its height, and the efficiency of the protection. The protection radius ensured by this type of air terminal is
120 m (Protection level IV, height = 60 m , early streamer emission time 60µs) The NFC 17-102 standard
describes the installation procedure for this type of air terminal.
The installation of this type of air terminal is easy and cheaper than other technologies. It can protect whole
buildings with one E.S.E. air terminal. It enables the protection of a structure and its environment, the
protection of opened areas and well integrate in the architecture of a structure without aesthetic alteration.
1 ESE, 2 down conductors and 2 earthing systems are necessary to ensure the protection below :
Installation
ESE AT with radius protection form 32 mtr to 107 mtr.
DMC Insulator .
GI/FRP Mast .
Down Conductor Copper / Copper Cadmium
Cable 70 sq. mm
Copper Bonded Ground Earthing
Step – 1
Step – 2
Step – 3
Joint all phase wire/ cable with the help of
crimping tools and lugs
Fixed the separation sheet between all wires/
cables
Close the filled Silicon enclosure from top and
bottom , complete installation is done.
Thimble
Separation Sheet
Gel / Silicon
Features :
Provides cable with cable connections and jointing wires in switchboard / electric boxes Being a jelly it can be
easily fit into molds of any shape and size.
Helps in safeguarding electrical connections and also protects electrical connection joints from catching fire, sparking
and leakage current.
Eradicates all the possibilities of fire, electric shocks and sparks, etc. causes due to improper electrical connection
joints and safeguards structure, equipment and person.
Offers safety to your electrical joints from ageing, corrosion, moisture and also observes leakage current.
Advantages :
Nontoxic
Insulating
Highly reliable operation
Maintenance Free
Repairable
Cost Effective
High repeat value
Elasticity
Shape retention
JMV’s Clients
Neeraj Saini – 9910398538
Rahul Verma – 9910398535
Manav Chandra - 9910398999
manav@jmv.co.in

More Related Content

What's hot

Presentation fire and safety protection by jmv lps
Presentation  fire and safety protection by jmv lpsPresentation  fire and safety protection by jmv lps
Presentation fire and safety protection by jmv lps
Mahesh Chandra Manav
 
Presentation eil project by jmv lps
Presentation eil project by jmv lpsPresentation eil project by jmv lps
Presentation eil project by jmv lps
Mahesh Chandra Manav
 
Metro Rail ,DFCC and Indian Railway Presentation by JMV LPS Ltd
Metro Rail ,DFCC and Indian Railway Presentation by JMV LPS Ltd Metro Rail ,DFCC and Indian Railway Presentation by JMV LPS Ltd
Metro Rail ,DFCC and Indian Railway Presentation by JMV LPS Ltd
Mahesh Chandra Manav
 
Project sagarmala presentation jmv lps
Project sagarmala presentation jmv lpsProject sagarmala presentation jmv lps
Project sagarmala presentation jmv lps
Mahesh Chandra Manav
 
Presentation indian railway electrical and s&amp;t 1
Presentation indian railway electrical and s&amp;t 1Presentation indian railway electrical and s&amp;t 1
Presentation indian railway electrical and s&amp;t 1
Mahesh Chandra Manav
 
Jmv Presentation Airport and JMV LPS LTD
Jmv Presentation Airport and JMV LPS LTDJmv Presentation Airport and JMV LPS LTD
Jmv Presentation Airport and JMV LPS LTD
Mahesh Chandra Manav
 
Global solar power presentation by jmv lps july2017
Global solar power presentation by jmv lps july2017Global solar power presentation by jmv lps july2017
Global solar power presentation by jmv lps july2017
Mahesh Chandra Manav
 
presentation national desaster management and JMV LPS Ltd
 presentation  national desaster management  and JMV LPS Ltd presentation  national desaster management  and JMV LPS Ltd
presentation national desaster management and JMV LPS Ltd
Mahesh Chandra Manav
 
Jmv presentation smart power transmission projects cea
Jmv  presentation  smart power transmission projects  ceaJmv  presentation  smart power transmission projects  cea
Jmv presentation smart power transmission projects cea
Mahesh Chandra Manav
 
Jmv presentation smart process plant -hurl 2017
Jmv  presentation  smart process plant -hurl 2017Jmv  presentation  smart process plant -hurl 2017
Jmv presentation smart process plant -hurl 2017
Mahesh Chandra Manav
 
presentation defence and police and JMV LPS LTD
 presentation  defence and police  and JMV LPS LTD presentation  defence and police  and JMV LPS LTD
presentation defence and police and JMV LPS LTD
Mahesh Chandra Manav
 
Project amrut presentation jmv lps
Project  amrut presentation jmv lpsProject  amrut presentation jmv lps
Project amrut presentation jmv lps
Mahesh Chandra Manav
 
Hybrid battery +solar pv grid tie power project presentation by jmv lps
Hybrid battery +solar pv grid tie power project presentation by jmv lpsHybrid battery +solar pv grid tie power project presentation by jmv lps
Hybrid battery +solar pv grid tie power project presentation by jmv lps
Mahesh Chandra Manav
 
Solar power pv presentation by jmv lps ltd (2)
Solar power pv presentation by jmv lps ltd (2)Solar power pv presentation by jmv lps ltd (2)
Solar power pv presentation by jmv lps ltd (2)
Mahesh Chandra Manav
 

What's hot (14)

Presentation fire and safety protection by jmv lps
Presentation  fire and safety protection by jmv lpsPresentation  fire and safety protection by jmv lps
Presentation fire and safety protection by jmv lps
 
Presentation eil project by jmv lps
Presentation eil project by jmv lpsPresentation eil project by jmv lps
Presentation eil project by jmv lps
 
Metro Rail ,DFCC and Indian Railway Presentation by JMV LPS Ltd
Metro Rail ,DFCC and Indian Railway Presentation by JMV LPS Ltd Metro Rail ,DFCC and Indian Railway Presentation by JMV LPS Ltd
Metro Rail ,DFCC and Indian Railway Presentation by JMV LPS Ltd
 
Project sagarmala presentation jmv lps
Project sagarmala presentation jmv lpsProject sagarmala presentation jmv lps
Project sagarmala presentation jmv lps
 
Presentation indian railway electrical and s&amp;t 1
Presentation indian railway electrical and s&amp;t 1Presentation indian railway electrical and s&amp;t 1
Presentation indian railway electrical and s&amp;t 1
 
Jmv Presentation Airport and JMV LPS LTD
Jmv Presentation Airport and JMV LPS LTDJmv Presentation Airport and JMV LPS LTD
Jmv Presentation Airport and JMV LPS LTD
 
Global solar power presentation by jmv lps july2017
Global solar power presentation by jmv lps july2017Global solar power presentation by jmv lps july2017
Global solar power presentation by jmv lps july2017
 
presentation national desaster management and JMV LPS Ltd
 presentation  national desaster management  and JMV LPS Ltd presentation  national desaster management  and JMV LPS Ltd
presentation national desaster management and JMV LPS Ltd
 
Jmv presentation smart power transmission projects cea
Jmv  presentation  smart power transmission projects  ceaJmv  presentation  smart power transmission projects  cea
Jmv presentation smart power transmission projects cea
 
Jmv presentation smart process plant -hurl 2017
Jmv  presentation  smart process plant -hurl 2017Jmv  presentation  smart process plant -hurl 2017
Jmv presentation smart process plant -hurl 2017
 
presentation defence and police and JMV LPS LTD
 presentation  defence and police  and JMV LPS LTD presentation  defence and police  and JMV LPS LTD
presentation defence and police and JMV LPS LTD
 
Project amrut presentation jmv lps
Project  amrut presentation jmv lpsProject  amrut presentation jmv lps
Project amrut presentation jmv lps
 
Hybrid battery +solar pv grid tie power project presentation by jmv lps
Hybrid battery +solar pv grid tie power project presentation by jmv lpsHybrid battery +solar pv grid tie power project presentation by jmv lps
Hybrid battery +solar pv grid tie power project presentation by jmv lps
 
Solar power pv presentation by jmv lps ltd (2)
Solar power pv presentation by jmv lps ltd (2)Solar power pv presentation by jmv lps ltd (2)
Solar power pv presentation by jmv lps ltd (2)
 

Similar to Road train-tunnel project presentation by jmv lps (1)

Presentation fire and safety protection by jmv lps
Presentation  fire and safety protection by jmv lpsPresentation  fire and safety protection by jmv lps
Presentation fire and safety protection by jmv lps
Mahesh Chandra Manav
 
Presentation fire and safety protection by jmv lps
Presentation  fire and safety protection by jmv lpsPresentation  fire and safety protection by jmv lps
Presentation fire and safety protection by jmv lps
Mahesh Chandra Manav
 
Presentation fire and safety protection by jmv lps
Presentation  fire and safety protection by jmv lpsPresentation  fire and safety protection by jmv lps
Presentation fire and safety protection by jmv lps
Mahesh Chandra Manav
 
Presentation indian railway electrical and s&amp;t 1
Presentation indian railway electrical and s&amp;t 1Presentation indian railway electrical and s&amp;t 1
Presentation indian railway electrical and s&amp;t 1
Mahesh Chandra Manav
 
Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...
Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...
Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...
Mahesh Chandra Manav
 
Power transmission and distribution along with power qualty presentation by j...
Power transmission and distribution along with power qualty presentation by j...Power transmission and distribution along with power qualty presentation by j...
Power transmission and distribution along with power qualty presentation by j...
Mahesh Chandra Manav
 
Presentation water way journey by jmv lps
Presentation water way journey by jmv lpsPresentation water way journey by jmv lps
Presentation water way journey by jmv lps
Mahesh Chandra Manav
 
Jmv presentation goods (dfcc) rail project
Jmv  presentation goods (dfcc) rail projectJmv  presentation goods (dfcc) rail project
Jmv presentation goods (dfcc) rail project
Mahesh Chandra Manav
 
Jmv presentation national desaster management authority
Jmv  presentation  national desaster management authorityJmv  presentation  national desaster management authority
Jmv presentation national desaster management authority
Mahesh Chandra Manav
 
Jmv presentation national desaster management authority
Jmv  presentation  national desaster management authorityJmv  presentation  national desaster management authority
Jmv presentation national desaster management authority
Mahesh Chandra Manav
 
One nation pride defence presentation jmv lps
One nation pride defence presentation jmv lpsOne nation pride defence presentation jmv lps
One nation pride defence presentation jmv lps
Mahesh Chandra Manav
 
Power quality presentation by jmv lps
Power quality presentation by jmv lpsPower quality presentation by jmv lps
Power quality presentation by jmv lps
Mahesh Chandra Manav
 
Corporate presentation for l&amp;t solar div by jmv lps
Corporate presentation  for l&amp;t solar div by jmv lpsCorporate presentation  for l&amp;t solar div by jmv lps
Corporate presentation for l&amp;t solar div by jmv lps
Mahesh Chandra Manav
 
Presentation indian railway electrical and s&amp;t by jmv
Presentation indian railway electrical and s&amp;t by jmvPresentation indian railway electrical and s&amp;t by jmv
Presentation indian railway electrical and s&amp;t by jmv
Mahesh Chandra Manav
 
Presentation Smart Hospital Projects and JMV LPS Ltd
 Presentation  Smart Hospital Projects  and JMV LPS Ltd Presentation  Smart Hospital Projects  and JMV LPS Ltd
Presentation Smart Hospital Projects and JMV LPS Ltd
Mahesh Chandra Manav
 
Jmv presentation smart hospital projects india-1
Jmv  presentation  smart hospital projects india-1Jmv  presentation  smart hospital projects india-1
Jmv presentation smart hospital projects india-1
Mahesh Chandra Manav
 
Lightning protection as per iec62035
Lightning protection as per iec62035Lightning protection as per iec62035
Lightning protection as per iec62035
Mahesh Chandra Manav
 

Similar to Road train-tunnel project presentation by jmv lps (1) (17)

Presentation fire and safety protection by jmv lps
Presentation  fire and safety protection by jmv lpsPresentation  fire and safety protection by jmv lps
Presentation fire and safety protection by jmv lps
 
Presentation fire and safety protection by jmv lps
Presentation  fire and safety protection by jmv lpsPresentation  fire and safety protection by jmv lps
Presentation fire and safety protection by jmv lps
 
Presentation fire and safety protection by jmv lps
Presentation  fire and safety protection by jmv lpsPresentation  fire and safety protection by jmv lps
Presentation fire and safety protection by jmv lps
 
Presentation indian railway electrical and s&amp;t 1
Presentation indian railway electrical and s&amp;t 1Presentation indian railway electrical and s&amp;t 1
Presentation indian railway electrical and s&amp;t 1
 
Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...
Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...
Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...
 
Power transmission and distribution along with power qualty presentation by j...
Power transmission and distribution along with power qualty presentation by j...Power transmission and distribution along with power qualty presentation by j...
Power transmission and distribution along with power qualty presentation by j...
 
Presentation water way journey by jmv lps
Presentation water way journey by jmv lpsPresentation water way journey by jmv lps
Presentation water way journey by jmv lps
 
Jmv presentation goods (dfcc) rail project
Jmv  presentation goods (dfcc) rail projectJmv  presentation goods (dfcc) rail project
Jmv presentation goods (dfcc) rail project
 
Jmv presentation national desaster management authority
Jmv  presentation  national desaster management authorityJmv  presentation  national desaster management authority
Jmv presentation national desaster management authority
 
Jmv presentation national desaster management authority
Jmv  presentation  national desaster management authorityJmv  presentation  national desaster management authority
Jmv presentation national desaster management authority
 
One nation pride defence presentation jmv lps
One nation pride defence presentation jmv lpsOne nation pride defence presentation jmv lps
One nation pride defence presentation jmv lps
 
Power quality presentation by jmv lps
Power quality presentation by jmv lpsPower quality presentation by jmv lps
Power quality presentation by jmv lps
 
Corporate presentation for l&amp;t solar div by jmv lps
Corporate presentation  for l&amp;t solar div by jmv lpsCorporate presentation  for l&amp;t solar div by jmv lps
Corporate presentation for l&amp;t solar div by jmv lps
 
Presentation indian railway electrical and s&amp;t by jmv
Presentation indian railway electrical and s&amp;t by jmvPresentation indian railway electrical and s&amp;t by jmv
Presentation indian railway electrical and s&amp;t by jmv
 
Presentation Smart Hospital Projects and JMV LPS Ltd
 Presentation  Smart Hospital Projects  and JMV LPS Ltd Presentation  Smart Hospital Projects  and JMV LPS Ltd
Presentation Smart Hospital Projects and JMV LPS Ltd
 
Jmv presentation smart hospital projects india-1
Jmv  presentation  smart hospital projects india-1Jmv  presentation  smart hospital projects india-1
Jmv presentation smart hospital projects india-1
 
Lightning protection as per iec62035
Lightning protection as per iec62035Lightning protection as per iec62035
Lightning protection as per iec62035
 

More from Mahesh Chandra Manav

The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
The Ministry of Road Transport and Highways with Electric Vehicle Charging an...The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
Mahesh Chandra Manav
 
Building Automation,Networking & Communication Presentation by LVS 2022.pdf
Building Automation,Networking & Communication Presentation by LVS 2022.pdfBuilding Automation,Networking & Communication Presentation by LVS 2022.pdf
Building Automation,Networking & Communication Presentation by LVS 2022.pdf
Mahesh Chandra Manav
 
Indian railway&amp;metro rail,others electrical safety first periorty
Indian railway&amp;metro rail,others electrical safety first periortyIndian railway&amp;metro rail,others electrical safety first periorty
Indian railway&amp;metro rail,others electrical safety first periorty
Mahesh Chandra Manav
 
National green building code 2021 india kaya kool hey hum by link vue system
National green building code 2021 india  kaya kool hey hum by link vue systemNational green building code 2021 india  kaya kool hey hum by link vue system
National green building code 2021 india kaya kool hey hum by link vue system
Mahesh Chandra Manav
 
Lightning it's not joke kills or destry only safety first
Lightning it's not joke kills or destry only safety firstLightning it's not joke kills or destry only safety first
Lightning it's not joke kills or destry only safety first
Mahesh Chandra Manav
 
Electric vehicle charging information. by linkvue system
Electric vehicle charging   information. by linkvue systemElectric vehicle charging   information. by linkvue system
Electric vehicle charging information. by linkvue system
Mahesh Chandra Manav
 
Solar power and our application (2)
Solar power and our application (2)Solar power and our application (2)
Solar power and our application (2)
Mahesh Chandra Manav
 
Link vue system and solar pv power plant protection
Link vue system and solar pv power plant protectionLink vue system and solar pv power plant protection
Link vue system and solar pv power plant protection
Mahesh Chandra Manav
 
Electrical Failure ,Short Circuit Reason Cables and Termination
Electrical Failure ,Short Circuit Reason Cables and TerminationElectrical Failure ,Short Circuit Reason Cables and Termination
Electrical Failure ,Short Circuit Reason Cables and Termination
Mahesh Chandra Manav
 
High speed electric sky pods for passenger and cargo presentation by link vue
High speed electric sky pods for passenger and cargo presentation by link vueHigh speed electric sky pods for passenger and cargo presentation by link vue
High speed electric sky pods for passenger and cargo presentation by link vue
Mahesh Chandra Manav
 
Presentation for power plant 2021 by link vue system
Presentation for power plant 2021 by link vue systemPresentation for power plant 2021 by link vue system
Presentation for power plant 2021 by link vue system
Mahesh Chandra Manav
 
Building management system from link vue system
Building management system  from link vue systemBuilding management system  from link vue system
Building management system from link vue system
Mahesh Chandra Manav
 
Safe you and your team from corona virus 2021 by link vue system
Safe you and your team from corona virus 2021 by link vue  systemSafe you and your team from corona virus 2021 by link vue  system
Safe you and your team from corona virus 2021 by link vue system
Mahesh Chandra Manav
 
Electric bus best public transport(hum safar)
Electric bus best public transport(hum safar)Electric bus best public transport(hum safar)
Electric bus best public transport(hum safar)
Mahesh Chandra Manav
 
War is not a Solution
War is not a SolutionWar is not a Solution
War is not a Solution
Mahesh Chandra Manav
 
A green corridor carbon free road transportation india 2021
A green corridor carbon free road transportation india 2021A green corridor carbon free road transportation india 2021
A green corridor carbon free road transportation india 2021
Mahesh Chandra Manav
 
India great intiative a carbon free silent road transportaion electric vehicle
India great intiative a carbon free silent road transportaion electric vehicleIndia great intiative a carbon free silent road transportaion electric vehicle
India great intiative a carbon free silent road transportaion electric vehicle
Mahesh Chandra Manav
 
Plug&Socket for All Equipment's&System from Link Vue
Plug&Socket for All Equipment's&System from Link VuePlug&Socket for All Equipment's&System from Link Vue
Plug&Socket for All Equipment's&System from Link Vue
Mahesh Chandra Manav
 
Platform touch voltage protection membrane system and other railways buildin...
Platform touch voltage protection membrane system  and other railways buildin...Platform touch voltage protection membrane system  and other railways buildin...
Platform touch voltage protection membrane system and other railways buildin...
Mahesh Chandra Manav
 
Aaab Khela HOBO a Dead Man Walking
Aaab Khela HOBO a Dead Man WalkingAaab Khela HOBO a Dead Man Walking
Aaab Khela HOBO a Dead Man Walking
Mahesh Chandra Manav
 

More from Mahesh Chandra Manav (20)

The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
The Ministry of Road Transport and Highways with Electric Vehicle Charging an...The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
 
Building Automation,Networking & Communication Presentation by LVS 2022.pdf
Building Automation,Networking & Communication Presentation by LVS 2022.pdfBuilding Automation,Networking & Communication Presentation by LVS 2022.pdf
Building Automation,Networking & Communication Presentation by LVS 2022.pdf
 
Indian railway&amp;metro rail,others electrical safety first periorty
Indian railway&amp;metro rail,others electrical safety first periortyIndian railway&amp;metro rail,others electrical safety first periorty
Indian railway&amp;metro rail,others electrical safety first periorty
 
National green building code 2021 india kaya kool hey hum by link vue system
National green building code 2021 india  kaya kool hey hum by link vue systemNational green building code 2021 india  kaya kool hey hum by link vue system
National green building code 2021 india kaya kool hey hum by link vue system
 
Lightning it's not joke kills or destry only safety first
Lightning it's not joke kills or destry only safety firstLightning it's not joke kills or destry only safety first
Lightning it's not joke kills or destry only safety first
 
Electric vehicle charging information. by linkvue system
Electric vehicle charging   information. by linkvue systemElectric vehicle charging   information. by linkvue system
Electric vehicle charging information. by linkvue system
 
Solar power and our application (2)
Solar power and our application (2)Solar power and our application (2)
Solar power and our application (2)
 
Link vue system and solar pv power plant protection
Link vue system and solar pv power plant protectionLink vue system and solar pv power plant protection
Link vue system and solar pv power plant protection
 
Electrical Failure ,Short Circuit Reason Cables and Termination
Electrical Failure ,Short Circuit Reason Cables and TerminationElectrical Failure ,Short Circuit Reason Cables and Termination
Electrical Failure ,Short Circuit Reason Cables and Termination
 
High speed electric sky pods for passenger and cargo presentation by link vue
High speed electric sky pods for passenger and cargo presentation by link vueHigh speed electric sky pods for passenger and cargo presentation by link vue
High speed electric sky pods for passenger and cargo presentation by link vue
 
Presentation for power plant 2021 by link vue system
Presentation for power plant 2021 by link vue systemPresentation for power plant 2021 by link vue system
Presentation for power plant 2021 by link vue system
 
Building management system from link vue system
Building management system  from link vue systemBuilding management system  from link vue system
Building management system from link vue system
 
Safe you and your team from corona virus 2021 by link vue system
Safe you and your team from corona virus 2021 by link vue  systemSafe you and your team from corona virus 2021 by link vue  system
Safe you and your team from corona virus 2021 by link vue system
 
Electric bus best public transport(hum safar)
Electric bus best public transport(hum safar)Electric bus best public transport(hum safar)
Electric bus best public transport(hum safar)
 
War is not a Solution
War is not a SolutionWar is not a Solution
War is not a Solution
 
A green corridor carbon free road transportation india 2021
A green corridor carbon free road transportation india 2021A green corridor carbon free road transportation india 2021
A green corridor carbon free road transportation india 2021
 
India great intiative a carbon free silent road transportaion electric vehicle
India great intiative a carbon free silent road transportaion electric vehicleIndia great intiative a carbon free silent road transportaion electric vehicle
India great intiative a carbon free silent road transportaion electric vehicle
 
Plug&Socket for All Equipment's&System from Link Vue
Plug&Socket for All Equipment's&System from Link VuePlug&Socket for All Equipment's&System from Link Vue
Plug&Socket for All Equipment's&System from Link Vue
 
Platform touch voltage protection membrane system and other railways buildin...
Platform touch voltage protection membrane system  and other railways buildin...Platform touch voltage protection membrane system  and other railways buildin...
Platform touch voltage protection membrane system and other railways buildin...
 
Aaab Khela HOBO a Dead Man Walking
Aaab Khela HOBO a Dead Man WalkingAaab Khela HOBO a Dead Man Walking
Aaab Khela HOBO a Dead Man Walking
 

Recently uploaded

spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
Divyam548318
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
Madhumitha Jayaram
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 

Recently uploaded (20)

spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 

Road train-tunnel project presentation by jmv lps (1)

  • 1. Welcome to Innovation of Rock Enginering(Tunnel and Automation
  • 2.
  • 3. Welcome Smart Tunnel Project EPC Team
  • 5. Sources for Extra Current /Voltages from different areas……  Signal Surges Generation due direct lightning  Switching operations of heavy duty machines like motors, lifts, AC units, refrigerator, welding machine etc.  Ground Potential Rise Short Circuit due Wire/ Cables
  • 6. An Arcing Fault is the flow of current through the air between phase conductors or phase conductors and neutral or ground. Concentrated radiant energy is released at the point of arcing an a small amount of time resulting in Extremely High Temperature.
  • 7. Fire Accident Reason Lose Contact Earthing Disorder and Lightning
  • 8. Follow Safety in Electrical Instalation Shocks
  • 9.
  • 10. Surge in Systems and Result
  • 11. Surge in DC Application
  • 13. Tunnel and Require Equipments
  • 14. Tunnel in Snow Area and Automation and Sign
  • 27. Tunnel Monitoring and Risk Management
  • 29. The 100% of lightning energy breaks down as follows: a) 50% of the lightning current will flow through the ground b) 50% of the lightning current will flow over the connected metal parts out of the building: • about 10% to the water pipe (metal) • about 10% to the gas pipe (metal) • about 10% to the oil pipe (metal tank) • about 10% to the sewage pipe • a out % to the po er supplier’s i o i g feed • max. 5% or 5 kA shared across all data lines 50 % 50 % Equipotential bonding for lightning protection according IEC 61024- 1 and IEC 61312-1; IEC62305 In India & Sri Lanka Only Chance is Power Line Approximately 50 % of Total Lightning Current has to be diverted to Power lines
  • 30. v
  • 31.
  • 33. Copper Cladded Conductor For Electrical Installation The Copper Clad Steel Grounding Conductor is made up of steel with the coating of 99.99% pure copper. These conductors/ wires or strands are equipped with the strength of steel with the conductivity and copper with the better corrosion resistance property. The concentric copper cladding is metallurgic ally bonded to a steel core through a continuous, solid cladding process using pressure rolling for primary bonding. The copper cladding thickness remains constant surrounding steel. We use different steel grades for the steel core result in Dead Soft Annealed, High strength and Extra High Strength Characteristics. The Copper Clad Steel Wire yields a composite conductivity of 21%, 30% and 40% IACS, and available in Annealed and Hard drawn. We are delivering products with varied conductivity and tensile strength as per the customer need. Further, the wire can be processed to be silver plated or tinned copper clad steel wire.
  • 34. Most Efficient JointProcess It is efficient and superior to all existing surface –to-surface mechanical retention connectors.
  • 35. What is Exothermic Welding System? Copper to Bi-Metal and Alumenium Types of Exothermic Joints: Possible to join any bi metal except aluminum Exothermic welding is a process of making maintain free highly molecular bonding process is superior in performance connection to any known mechanical or compression-type surface-to-surface contact connector. Exothermic weld connections provide current carrying (fusing) capacity equal to that of the conductor and will not deteriorate with age.  It offers Electrical connections between two or more copper to copper and copper to steel conductors.  Highly portable method as it does not require any external power source or heat source, so it can be done almost anywhere.  It provides strong permanent molecular bond among metallic conductors that cannot loosen and further will not deteriorate with age.  Connection does not corrode with time and it offers permanent conductivity.
  • 36. Copper Clad Steel Solid ROD and Conductor
  • 37.
  • 39. Facts about Lightning • A strike can average 100 million volts of electricity • Current of up to 200,000 amperes • Can generate 54,000 oF • 10/350MicroSec/50KA Fault Current/Discharge in Nano Sec Protection Earthing Design100KA Fault Current/Joints Exothermic /Flexible Down Conductor with Shortest Route & Less Corner
  • 40. • Lightning Protection Standard use in India (IS2309 Now IEC 62305-5)NBC2016 Working Principle Angullar No Compromise with Design Max Protection 30Mtrs from One No Product warrenty from Manufacturer High Maintenance Require NFC17-102(2011) Now Europeon Standard(ESE LA) Working Principle Radius Compromise with Design Possible with Increasing Qty of ESE Max Protection 109 Mtrs Radius from One Manufacturing Warrenty and Test Certificate for Products Available Maintenance on Call Basis
  • 41. Lightning Risk assessment Study is actually the measure of risk of a lightning strike and probability of damages. As Per IEC62305-2. All these calculations are based on: lightning strike density in that particular area (provided by OMV i.e. Ng = 8), Danger for people, Occupation coefficient of structure, Relative location of site, Fire Risk, Associated services, Electrical Lines, Lightning Protection Level, Surge Arrestor and Dimensions of installation.
  • 42. Lighting Strike Density (Ng) It is the measure of lightning strikes per kilometre square per year in the particular area. Higher the lighting strike density, higher the probability of lightning strike which needs higher level of lightning protection level. Danger for People (h) It is the factor of presence of people and panic in the building in case of a lightning strike No particular danger 1 Low panic level(<=2 floors, < 100 persons 2 Medium risk of panic (< 1000 persons) 5 Difficult to evacuate (disabled people, hospitals) 5 High risk of panic (> 1000 persons) 10 Hazard for surroundings or environment 20 Contamination of surroundings or environment 50 Occupancy Coefficient (Lf1) It is the risk reduction factor with respect to theoccupancy of the building / installation. For example, loss due to lighting strike is higher in hospital as compared to a store / warehouse. Structure unoccupied 0.1 Structure normally occupied 0.01 Relative Location of Site (Cd) It is the risk reduction factor with respect to the location and surrounding of the building / installation. For example, chance of lighting strike is minimized if the building is near to a high tower. Structure surrounded by higher objects or trees 0.25 Structure surrounded by similar or lower objects 0.5 Isolated structure-No other objects nearby 1 Isolated structure on top of a hill or a hillock 2 Fire Risk (rf) It is the risk reduction factor with respect to the flammability of the material present in the building / installation. For example, in case of lighting strike, loss will be very high at a gas station as compare to the cement store. Explosion 1 High 0.1 Ordinary 0.01 Low 0.001
  • 43. Lightning Risk Calcuator as per IEC6305 LIGHTNING RISK ASSESSMENT CALCULATIONS Building / Installation : KTC Tower Building ID No. KTC, Mall Road LIGHTNING DENSITY Ng= 8 STRUCTURE Length L(m) L= 12 Width W(m) W= 15 Height H(m) Hi= 10 Chimney/Tower height (m) T= 2 DANGER FOR PEOPLE h= No particular danger OCCUPATION OF THE STRUCTURE Lf1= Structure normally occupied LIGHTNING CONDUCTOR Pd= Protection Level IV Electrical Line Ai= Underground RELATIVE LOCATION OF THE STRUCTURE Cd= Structure surrounded by higher objects or trees FIRE RISK rf= Low SERVICE Lf2= Gas, water SURGE ARRESTOR Pi= None RESULTS OF THE RISK ASSESSMENT Risk of human loss R1= ACCEPTABLE Risk of loss of service R2= ACCEPTABLE Risk of loss of cultural heritage R3= ACCEPTABLE
  • 45. The Simple Rod air terminal is composed from a metallic rod with 2 to 8 m height dominating the structure to protect, and linked to 2 down conductors minimum, and 2 earthing systems. The protection radius ensured by this air terminal which is limited to 30 m more or less (Protection level IV, height = 60 m), especially dedicated to the protection of small structures or areas like to ers, hi eys, ta ks, ater to er, a te a asts… The EN -3 standard describes the installation procedure for these air terminals. 13 Simple Rods, 13 down conductors, and 13 earthing systems are necessary to ensure the protection below :
  • 46. The meshed cage protection is composed from a meshing in roof surface and in the front face around the uildi g. Surrou di g the roof surfa e, a d o high poi ts, apture poi ts are positio ed. A o du tors’ network is placed at the outer perimeter of the roof. This network is completed by transverse conductors. The size of the meshing is 5 to meters, and depends on the efficiency needed for the protection. On the front face of the building, the down conductors are linked at the top to the meshing of the roof. And, down, to specific earthing systems. The distance between two conductors is 10 to 25 meters, and depend on the efficiency needed for the protection. The EN 62305-3 describes the installation procedure for this method. Generally, this method is heavy and expensive, due to the complexity of the structures to protect. 26 capture points, 26 down conductors and a grounded loop earthing system are necessaries to ensure the protection of the structure here below :
  • 47. The catenary wires protection is a method closed to the meshed cage principle, because it is constituted with meshing of the conductors far from the structure to protect, to avoid any contact with lightning current. Catenary wires are located over the structure to protect, connected to down conductors and specific earthing systems. The width of the meshing and distance between the down conductors must respect the same rules as for the meshed cage. The EN 62305-3 describes the installation procedure for this method. Generally, this method is heavy and expensive, due to the complexity of the structures to protect.
  • 48. The ESE air terminal is a terminal which enables to generate artificially an upward leader earlier than a simple rod, with an ionization system, in order to establish a special impact on its point. The capture of the lightning strike being faster than a simple rod, this technology enables to benefit from larger protection areas, ensuring protection for large dimensions structures. The ge erated prote tio radius depe ds o the early strea er e issio alue of the air ter i al Δt i µs , its height, and the efficiency of the protection. The protection radius ensured by this type of air terminal is 120 m (Protection level IV, height = 60 m , early streamer emission time 60µs) The NFC 17-102 standard describes the installation procedure for this type of air terminal. The installation of this type of air terminal is easy and cheaper than other technologies. It can protect whole buildings with one E.S.E. air terminal. It enables the protection of a structure and its environment, the protection of opened areas and well integrate in the architecture of a structure without aesthetic alteration. 1 ESE, 2 down conductors and 2 earthing systems are necessary to ensure the protection below :
  • 49. Installation ESE AT with radius protection form 32 mtr to 107 mtr. DMC Insulator . GI/FRP Mast . Down Conductor Copper / Copper Cadmium Cable 70 sq. mm Copper Bonded Ground Earthing
  • 50. Step – 1 Step – 2 Step – 3 Joint all phase wire/ cable with the help of crimping tools and lugs Fixed the separation sheet between all wires/ cables Close the filled Silicon enclosure from top and bottom , complete installation is done. Thimble Separation Sheet Gel / Silicon
  • 51. Features : Provides cable with cable connections and jointing wires in switchboard / electric boxes Being a jelly it can be easily fit into molds of any shape and size. Helps in safeguarding electrical connections and also protects electrical connection joints from catching fire, sparking and leakage current. Eradicates all the possibilities of fire, electric shocks and sparks, etc. causes due to improper electrical connection joints and safeguards structure, equipment and person. Offers safety to your electrical joints from ageing, corrosion, moisture and also observes leakage current. Advantages : Nontoxic Insulating Highly reliable operation Maintenance Free Repairable Cost Effective High repeat value Elasticity Shape retention
  • 52.
  • 53.
  • 54.
  • 55.
  • 57. Neeraj Saini – 9910398538 Rahul Verma – 9910398535 Manav Chandra - 9910398999 manav@jmv.co.in