As Director I am accountable for the bulk of these risks, however it is important to remember that general health and safety rules and
most importantly common sense should be followed to at all time.

Risk Identified

Shooting Location

Responsibility

Illness/Injury

All

Jen, Joe, Actors

Actor inconveniences/Clashes

All

Jen, Joe, Actors

Weather

Outdoors

N/A

Prevention
In this case of an actor being ill,
I will ensure there is a plan B
and have a substitute in place
with a few days’ notice.
In a case of a team member
being ill, imminent rescheduling
will take place.
On occasion there may be
unforeseen circumstances in
which the actor or a team
member is unable to make a
shoot due to clashes with other
events. To prevent this, face to
face communication will be
maintained to ensure the
reliability of the actors.
The weather forecast will be
checked regularly on a day to
day basis and to ensure that it
will be appropriate for a
relevant scene. Weather such as
heavy wind will affect the sound
on the camera, therefore
interfering with the timing in
specific shots when editing.
Memory Card full/Camera
malfunction

All

Jen, Joe

Broken Equipment

All

Jen, Joe

No props on time

The Studio

Jen, Joe

Poor performance from actors

All

Jen, Joe, Actors

Lighting

All

Jen, Joe

It will be ensured that a backup
memory card and camera is
taken to all shooting locations in
case the memory card fills up or
there is a low battery during the
shoot. Meaning I will be able to
carry on with shooting and the
shoot will not be affected.
The equipment used in the
sequence will be provided by
the college, however it will be
my responsibility in my
possession. A thorough check of
the equipment will be made a
day before the shoot.
Although the actors may assist
in bring in specific instruments,
it is up to the team members to
ensure all equipment is in
college the day before the shoot
so everything is prepared and
set up.
Although this is predominantly
the fault of the actor, it is the
team members’ fault for
choosing an unreliable poor
actor. This will be prevented by
choosing actors who are
performing arts students or are
themselves in a band.
The default lighting in the
studio may not be adequate for
the style we are aiming for. To
ensure sufficient lighting, I will
do a check an hour before the
shoot to maintain the perfect
lighting style.

Location Safety/Unavailability

All

Jen/Joe

Trip Hazards

The Studio

Jen, Joe

Electricals

The Studio

Jen/Joe

Software

Post Production
Editing Suite

The main problem that may
arise coming to locations is the
studio in the college. It is open
to all students, to ensure
availability, I will book the
studio a week in advance.
Location safety is all covered
due to the majority of the
filming being filmed indoors,
reducing the risks dramatically.
Trip hazards are an extreme
precaution to be taken to
prevent injury. This will be
prevented by securing all wires
to walls as the studio can be
quite hazardous.
Using electrical equipment
mainly the studio lighting

Jen/Joe

The software I will use for my
editing (final cut) may crash or
unexpectedly quit, this had
occurred during the creation on
my animatic. I will save my
work after every render.
Poor quality video

N/A

Jen/Joe

It is important to maintain a
balance between following
conventions and being creative,
I will ensure that I follow my
storyboard and my planning to
make sure I have the perfect
balance.
When editing I will make sure
that I have great continuity
quality so my video makes
sense. All of these factors if not
followed correctly can make a
poor quality video, as I am
aware of this possible problem,
I will check every aspect of my
final video to make sure it is of
excellent quality and suitable
for my target audience.

More Related Content

What's hot

Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
ElliottChyi
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
LaurenJiggins
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
LiamMcDonough
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
DunkanCA
 
Risk assesment
Risk assesment Risk assesment
Risk assesment
christotty95
 
Risk assesment - Actual
Risk assesment - Actual Risk assesment - Actual
Risk assesment - Actual
Thomashut
 
Risk assesment
Risk assesmentRisk assesment
Risk assesment
CallumEnglish1
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
JoshMartinMediaG324
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
MattSwinbourne
 
Risk assessment
Risk assessment   Risk assessment
Risk assessment
britneysullivan
 
Risk Assesment
Risk AssesmentRisk Assesment
Risk Assesment
CallumThornhill
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
04myersr
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
Jack Bowyer
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
alllllexx
 
Risk Assesment
Risk AssesmentRisk Assesment
Risk Assesment
kenyabell1998
 
Beast rampz skatepark risk assessment
Beast rampz skatepark risk assessmentBeast rampz skatepark risk assessment
Beast rampz skatepark risk assessment
LewisDunn
 
Risk assessment
Risk assessment Risk assessment
Risk assessment
philiphargraveblogger
 

What's hot (17)

Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Risk assesment
Risk assesment Risk assesment
Risk assesment
 
Risk assesment - Actual
Risk assesment - Actual Risk assesment - Actual
Risk assesment - Actual
 
Risk assesment
Risk assesmentRisk assesment
Risk assesment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessment   Risk assessment
Risk assessment
 
Risk Assesment
Risk AssesmentRisk Assesment
Risk Assesment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk Assesment
Risk AssesmentRisk Assesment
Risk Assesment
 
Beast rampz skatepark risk assessment
Beast rampz skatepark risk assessmentBeast rampz skatepark risk assessment
Beast rampz skatepark risk assessment
 
Risk assessment
Risk assessment Risk assessment
Risk assessment
 

Viewers also liked

Shot Count - Jimi Hendrix 'Bleeding Heart'
Shot Count - Jimi Hendrix 'Bleeding Heart'Shot Count - Jimi Hendrix 'Bleeding Heart'
Shot Count - Jimi Hendrix 'Bleeding Heart'
jenhutton
 
Security measure
Security measureSecurity measure
Security measure
sanizah_md
 
Treatment sheet
Treatment sheet Treatment sheet
Treatment sheet
jenhutton
 
Shooting schedule
Shooting scheduleShooting schedule
Shooting schedule
jenhutton
 
Prepare homeforphotography best
Prepare homeforphotography bestPrepare homeforphotography best
Prepare homeforphotography best
LanceUEP
 
Digital technologies
Digital technologiesDigital technologies
Digital technologies
jenhutton
 
Risk assessment 1
Risk assessment 1Risk assessment 1
Risk assessment 1
kieranlowen123
 
Skills Audit
Skills AuditSkills Audit
Skills Audit
jenhutton
 
9 frame analysis
9 frame analysis9 frame analysis
9 frame analysis
jenhutton
 
How to write an rfp
How to write an rfpHow to write an rfp
How to write an rfp
Wayne Smith
 
Prepare homeforphotography better
Prepare homeforphotography betterPrepare homeforphotography better
Prepare homeforphotography better
LanceUEP
 
Badminton rules
Badminton rulesBadminton rules
Badminton rulessanizah_md
 
2012 carolinas festival overall results
2012 carolinas festival overall results2012 carolinas festival overall results
2012 carolinas festival overall results
Wayne Smith
 
How to write an rfp
How to write an rfpHow to write an rfp
How to write an rfp
Wayne Smith
 
Question 4
Question 4Question 4
Question 4
jenhutton
 
Lyrics breakdown / Track Analysis
Lyrics breakdown / Track AnalysisLyrics breakdown / Track Analysis
Lyrics breakdown / Track Analysis
jenhutton
 
Lyrics breakdown / Track Analysis 2
Lyrics breakdown / Track Analysis 2Lyrics breakdown / Track Analysis 2
Lyrics breakdown / Track Analysis 2
jenhutton
 
Audience analysis
Audience analysisAudience analysis
Audience analysis
jenhutton
 

Viewers also liked (18)

Shot Count - Jimi Hendrix 'Bleeding Heart'
Shot Count - Jimi Hendrix 'Bleeding Heart'Shot Count - Jimi Hendrix 'Bleeding Heart'
Shot Count - Jimi Hendrix 'Bleeding Heart'
 
Security measure
Security measureSecurity measure
Security measure
 
Treatment sheet
Treatment sheet Treatment sheet
Treatment sheet
 
Shooting schedule
Shooting scheduleShooting schedule
Shooting schedule
 
Prepare homeforphotography best
Prepare homeforphotography bestPrepare homeforphotography best
Prepare homeforphotography best
 
Digital technologies
Digital technologiesDigital technologies
Digital technologies
 
Risk assessment 1
Risk assessment 1Risk assessment 1
Risk assessment 1
 
Skills Audit
Skills AuditSkills Audit
Skills Audit
 
9 frame analysis
9 frame analysis9 frame analysis
9 frame analysis
 
How to write an rfp
How to write an rfpHow to write an rfp
How to write an rfp
 
Prepare homeforphotography better
Prepare homeforphotography betterPrepare homeforphotography better
Prepare homeforphotography better
 
Badminton rules
Badminton rulesBadminton rules
Badminton rules
 
2012 carolinas festival overall results
2012 carolinas festival overall results2012 carolinas festival overall results
2012 carolinas festival overall results
 
How to write an rfp
How to write an rfpHow to write an rfp
How to write an rfp
 
Question 4
Question 4Question 4
Question 4
 
Lyrics breakdown / Track Analysis
Lyrics breakdown / Track AnalysisLyrics breakdown / Track Analysis
Lyrics breakdown / Track Analysis
 
Lyrics breakdown / Track Analysis 2
Lyrics breakdown / Track Analysis 2Lyrics breakdown / Track Analysis 2
Lyrics breakdown / Track Analysis 2
 
Audience analysis
Audience analysisAudience analysis
Audience analysis
 

Similar to Risk assessment

Risk assessment
Risk assessmentRisk assessment
Risk assessment
DavidDrewett
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
Tomwhieldon
 
Risk assessment
Risk assessment Risk assessment
Risk assessment
Millett
 
Risk assesment
Risk assesmentRisk assesment
Risk assesment
RobsonBoyd
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
electricdreams1
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
ianjamiealexben
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
GillyFerries
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
ShaunMoat
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
jesschilvers
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
KatyMarwood
 
Risk
RiskRisk
Risk
RiskRisk
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
LydiaMarleyLawson1
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
Lukkather
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
kellymorris92
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
georgia morrell
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
bethdavies5
 
Risk assesment
Risk assesmentRisk assesment
Risk assesment
jesusisafriendofmine
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
GillyFerries
 
Risk assesment
Risk assesmentRisk assesment
Risk assesment
Emel1234
 

Similar to Risk assessment (20)

Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessment Risk assessment
Risk assessment
 
Risk assesment
Risk assesmentRisk assesment
Risk assesment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk
RiskRisk
Risk
 
Risk
RiskRisk
Risk
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assesment
Risk assesmentRisk assesment
Risk assesment
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Risk assesment
Risk assesmentRisk assesment
Risk assesment
 

More from jenhutton

Post production
Post productionPost production
Post production
jenhutton
 
Q2
Q2Q2
Q2
Q2Q2
Call sheet 4
Call sheet 4Call sheet 4
Call sheet 4
jenhutton
 
Call sheet 3
Call sheet 3Call sheet 3
Call sheet 3
jenhutton
 
Call sheet 2
Call sheet 2Call sheet 2
Call sheet 2
jenhutton
 
Call sheet 1
Call sheet 1Call sheet 1
Call sheet 1
jenhutton
 
Music Video Analysis - Everybody Hurts REM
Music Video Analysis - Everybody Hurts REMMusic Video Analysis - Everybody Hurts REM
Music Video Analysis - Everybody Hurts REM
jenhutton
 
Call sheet
Call sheetCall sheet
Call sheet
jenhutton
 
Se7en timeline
Se7en timelineSe7en timeline
Se7en timeline
jenhutton
 
Micro analysis of ‘m’
Micro analysis of ‘m’Micro analysis of ‘m’
Micro analysis of ‘m’
jenhutton
 

More from jenhutton (11)

Post production
Post productionPost production
Post production
 
Q2
Q2Q2
Q2
 
Q2
Q2Q2
Q2
 
Call sheet 4
Call sheet 4Call sheet 4
Call sheet 4
 
Call sheet 3
Call sheet 3Call sheet 3
Call sheet 3
 
Call sheet 2
Call sheet 2Call sheet 2
Call sheet 2
 
Call sheet 1
Call sheet 1Call sheet 1
Call sheet 1
 
Music Video Analysis - Everybody Hurts REM
Music Video Analysis - Everybody Hurts REMMusic Video Analysis - Everybody Hurts REM
Music Video Analysis - Everybody Hurts REM
 
Call sheet
Call sheetCall sheet
Call sheet
 
Se7en timeline
Se7en timelineSe7en timeline
Se7en timeline
 
Micro analysis of ‘m’
Micro analysis of ‘m’Micro analysis of ‘m’
Micro analysis of ‘m’
 

Risk assessment

  • 1. Risk Assessment As Director I am accountable for the bulk of these risks, however it is important to remember that general health and safety rules and most importantly common sense should be followed to at all time. Risk Identified Shooting Location Responsibility Illness/Injury All Jen, Joe, Actors Actor inconveniences/Clashes All Jen, Joe, Actors Weather Outdoors N/A Prevention In this case of an actor being ill, I will ensure there is a plan B and have a substitute in place with a few days’ notice. In a case of a team member being ill, imminent rescheduling will take place. On occasion there may be unforeseen circumstances in which the actor or a team member is unable to make a shoot due to clashes with other events. To prevent this, face to face communication will be maintained to ensure the reliability of the actors. The weather forecast will be checked regularly on a day to day basis and to ensure that it will be appropriate for a relevant scene. Weather such as heavy wind will affect the sound on the camera, therefore interfering with the timing in specific shots when editing.
  • 2. Memory Card full/Camera malfunction All Jen, Joe Broken Equipment All Jen, Joe No props on time The Studio Jen, Joe Poor performance from actors All Jen, Joe, Actors Lighting All Jen, Joe It will be ensured that a backup memory card and camera is taken to all shooting locations in case the memory card fills up or there is a low battery during the shoot. Meaning I will be able to carry on with shooting and the shoot will not be affected. The equipment used in the sequence will be provided by the college, however it will be my responsibility in my possession. A thorough check of the equipment will be made a day before the shoot. Although the actors may assist in bring in specific instruments, it is up to the team members to ensure all equipment is in college the day before the shoot so everything is prepared and set up. Although this is predominantly the fault of the actor, it is the team members’ fault for choosing an unreliable poor actor. This will be prevented by choosing actors who are performing arts students or are themselves in a band. The default lighting in the studio may not be adequate for the style we are aiming for. To ensure sufficient lighting, I will do a check an hour before the
  • 3. shoot to maintain the perfect lighting style. Location Safety/Unavailability All Jen/Joe Trip Hazards The Studio Jen, Joe Electricals The Studio Jen/Joe Software Post Production Editing Suite The main problem that may arise coming to locations is the studio in the college. It is open to all students, to ensure availability, I will book the studio a week in advance. Location safety is all covered due to the majority of the filming being filmed indoors, reducing the risks dramatically. Trip hazards are an extreme precaution to be taken to prevent injury. This will be prevented by securing all wires to walls as the studio can be quite hazardous. Using electrical equipment mainly the studio lighting Jen/Joe The software I will use for my editing (final cut) may crash or unexpectedly quit, this had occurred during the creation on my animatic. I will save my work after every render.
  • 4. Poor quality video N/A Jen/Joe It is important to maintain a balance between following conventions and being creative, I will ensure that I follow my storyboard and my planning to make sure I have the perfect balance. When editing I will make sure that I have great continuity quality so my video makes sense. All of these factors if not followed correctly can make a poor quality video, as I am aware of this possible problem, I will check every aspect of my final video to make sure it is of excellent quality and suitable for my target audience.