HAYDON MEDIA
Risk Assessment
Producer: Jack Bowyer ProductionDetails: Filming
Types of Risk: PersonalInjury /Health & Safety / Damage to equipment/ Halting Production
RiskType Detailsof Risk Ways to minimiserisk Person(s) Responsible
Trippingoverwires Due to usinga lot of instrumentswhilst
filming,there willbe manywiresacrossthe
floor
To avoid such an incident from happen I will
restrict movement of the musician to areas
where there are no wires..
Jack
Instrumentscouldbe
dropped
Couldsmashor cause damagedto people by
landingonthemor splintering
To avoidsuch an occurrence fromhappen,the
artistswhenstandingupand holding
instrumentstheywill have straparoundit.
Benand Greg
People notturnupon
time
Due to work andschool;people maybe
limitedfortime whichwill haltthe
productions
Findtime slotsinwhicheveryisable to
film/attend
Jack
Rainhaltingprogress Rainand overbad weathercouldhaltthe
progress
I was originallygoingtofilmoutsidebutbecause
of badweathermove the productioninsidefor
the whole video.
Jack

Risk assessment

  • 1.
    HAYDON MEDIA Risk Assessment Producer:Jack Bowyer ProductionDetails: Filming Types of Risk: PersonalInjury /Health & Safety / Damage to equipment/ Halting Production RiskType Detailsof Risk Ways to minimiserisk Person(s) Responsible Trippingoverwires Due to usinga lot of instrumentswhilst filming,there willbe manywiresacrossthe floor To avoid such an incident from happen I will restrict movement of the musician to areas where there are no wires.. Jack Instrumentscouldbe dropped Couldsmashor cause damagedto people by landingonthemor splintering To avoidsuch an occurrence fromhappen,the artistswhenstandingupand holding instrumentstheywill have straparoundit. Benand Greg People notturnupon time Due to work andschool;people maybe limitedfortime whichwill haltthe productions Findtime slotsinwhicheveryisable to film/attend Jack Rainhaltingprogress Rainand overbad weathercouldhaltthe progress I was originallygoingtofilmoutsidebutbecause of badweathermove the productioninsidefor the whole video. Jack