Lean & Agile
Project Management

          Dr. David F. Rico, PMP, CSM

                  Website: http://davidfrico.com
        LinkedIn: http://www.linkedin.com/in/davidfrico
 Facebook: http://www.facebook.com/profile.php?id=1540017424
Author Info
   DoD contractor with 28+ years of IT experience
   B.S. Comp. Sci., M.S. Soft. Eng., & D.M. Info. Sys.
   Large gov’t projects in U.S., Far/Mid-East, & Europe




        Published six books & numerous journal articles
        Adjunct at George Washington, UMUC, & Argosy
        Agile Program Management & Lean Development
        Specializes in metrics, models, & cost engineering
        Six Sigma, CMMI, ISO 9001, DoDAF, & DoD 5000
        Cloud Computing, SOA, Web Services, FOSS, etc.
                                                              2
Table of Contents


 Introduction
  Types of Virtual Teams
  Key Practices & Techniques
  Key Tools & Technologies
  Key Case Studies
  Conclusions & Summary


                               3
What is Agility?
   A-gil-i-ty (ə-'ji-lə-tē) Property consisting of quickness,
    lightness, and ease of movement; To be very nimble
       The ability to create and respond to change in order to
        profit in a turbulent global business environment
       The ability to quickly reprioritize use of resources when
        requirements, technology, and knowledge shift
       A very fast response to sudden market changes and
        emerging threats by intensive customer interaction
       Use of evolutionary, incremental, and iterative delivery
        to converge on an optimal customer solution

      Maximizing BUSINESS VALUE with right sized, just-
        enough, and just-in-time processes and documentation                                                   
                 Highsmith, J. A. (2002). Agile software development ecosystems. Boston, MA: Addison-Wesley.

                                                                                                               4
What is Agile Project Mgt.?
   People-centric way to create innovative solutions
   Market-centric model to maximize business value
   Demand-centric model that supports lean principles
      Agile Methods                                           Agile Methods                                          Traditional Methods
         ‘Values’                                              ‘Principles’                                                 ‘Values’
       Customer                        also                     Customer                         valued                      Contract
                                     known as                                                   more than
      Collaboration                                            Interaction                                                  Negotiation

      Individuals &                    also             High Performance                         valued                      Processes
                                     known as                                                   more than
       Interactions                                           Teams                                                           & Tools

        Working                        also                   Iterative                          valued                 Comprehensive
                                     known as                                                   more than
        Systems                                             Development                                                 Documentation

      Responding                       also                  Adaptability                        valued                      Following
       to Change                     known as                                                   more than                     a Plan
                                                             or Flexibility



         Agile Manifesto. (2001). Manifesto for agile software development. Retrieved September 3, 2008, from http://www.agilemanifesto.org.

                                                                                                                                               5
How Do Lean & Agile Intersect?
   Agile is naturally lean and based on small batches
   Agile directly supports six principles of lean thinking
   Agile may be converted to a continuous flow system
Agile Values       Lean Pillars Lean Principles                                    Lean & Agile Practices                                    Flow Principles
                                                                  Customer relationships, satisfaction, trust, and loyalty
Empowered                                Relationships            Team authority, empowerment, and resources                                Decentralization
  Teams                                                           Team identification, cohesion, and communication
                                                        Product vision, mission, needs, and capabilities
                     Respect
                                        Customer Value  Product scope, constraints, and business value                                       Economic View
                    for People                          Product objectives, specifications, and performance
 Customer
                                                                  As is policies, processes, procedures, and instructions
Collaboration                                                     To be business processes, flowcharts, and swim lanes
                                                                                                                                              WIP Constraints
                                          Value Stream
                                                                  Initial workflow analysis, metrication, and optimization                     & Kanban
                                                        Batch size, work in process, and artifact size constraints
                                                                                                                                             Control Cadence
  Iterative                            Continuous Flow  Cadence, queue size, buffers, slack, and bottlenecks
  Delivery                                              Workflow, test, integration, and deployment automation                              & Small Batches
                                                                  Roadmaps, releases, iterations, and product priorities
                   Continuous                                     Epics, themes, feature sets, features, and user stories
                                         Customer Pull                                                                                         Fast Feedback
                  Improvement                                     Product demonstrations, feedback, and new backlogs
Responding
                                                                  Refactor, test driven design, and continuous integration
 to Change                                                        Standups, retrospectives, and process improvements
                                                                                                                                             Manage Queues/
                                            Perfection
                                                                  Organization, project, and process adaptability/flexibility               Exploit Variability

                                                                                                                                                     
     Highsmith, J. A. (2002). Agile software development ecosystems. Boston, MA: Addison-Wesley.
     Larman, C., & Vodde, B. (2008). Scaling lean and agile development: Thinking and organizational tools for large-scale scrum. Boston, MA: Addison-Wesley.
     Womack, J. P., & Jones, D. T. (1996). Lean thinking: Banish waste and create wealth in your corporation. New York, NY: Free Press.
     Reinertsen, D. G. (2009). The principles of product development flow: Second generation lean product development. New York, NY: Celeritas.                    6
Lean & Agile Proj. Mgt. Model
   Created by Jim Highsmith at Cutter in 2003
   Radical project mgt., Scrum, & XP hybrid model
   Includes strategic, program, and project mgt. tools
                                                                Innovation Lifecycle
           Envision                     Speculate                       Explore                        Launch                           Close

      Product Vision              Gather Requirements           Iteration Planning            Final Review                 Close Open Items
      Product Architecture        Product Backlog               Technical Practices           Final Acceptance             Support Material
      Project Objectives          Release Planning              Team Development              Final QA                     Final Retrospective
      Project Community           Risk Planning                 Team Decisions                Final Documentation          Final Reports
      Delivery Approach           Cost Estimation               Collaboration                 Final Deployment             Project Celebration



                                                                  Iterative Delivery
     Technical Planning                Development, Test, and Evaluation                      Operational Testing                       Adapt

      Story Analysis              Development Pairing                                      Integration Testing              Focus Groups
      Task Development            Unit Test Development                                    System Testing                   Technical Reviews
      Task Estimation             Simple Designs                                           Operational Testing              Team Evaluations
      Task Splitting              Coding and Refactoring                                   Usability Testing                Project Reporting
      Task Planning               Unit and Component Testing                               Acceptance Testing               Adaptive Action


                                                       Continuous
                                                                                                                                Story Deployment
      Standups, Architecture, Design, Build, Integration, Documentation, Change, Migration, and Integration




                      Highsmith, J. A. (2010). Agile project management: Creating innovative products. Boston, MA: Pearson Education.
                                                                                                                                                      7
What are Virtual Teams?
   Virtual teams are often non-collocated project teams
   Often communicate using asynchronous technology
   Geographically and sometimes nationally dispersed
                                                              Zigurs                  Curseu               Schlenkrich                  Ahuja
            Traditional vs Virtual
                                                               2003                    2008                   2009                      2010
          Collocated vs distributed
                                                                                                                                        
      F2F vs electronic collaboration
                                                                                                                                        
         Different vs similar goals

          Similar vs different hours
                                                                                                                 
                                                                                                                                          
         Similar vs diverse culture
                                                                                                                                          
       Same vs different organization                                                                             
       Specialized vs cross functional
                                                                                                                  
            Single vs multiple teams                                                                                                      
             Static vs shifting teams
                                                                                                                                          
        Office bldg vs telecommuting
                                                                                                                                           
      Zigurs, I. (2003). Leadership in virtual teams: Oxymoron or opportunity? Organizational Dynamics, 31(4), 339-351.
      Curseu, P. L., Schalk, R., & Wessel, I. (2008). How to virtual teams process information? Journal of Managerial Psychology, 23(6), 628-652.
      Schlenkrich, L., & Upfold, C. (2009). A guideline for virtual team managers. Electronic Journal of Information Systems Evaluation, 12(1), 109-118.
      Ahuja, J. (2010). A study of virtuality impact on team performance. IUP Journal of Management Research, 9(5), 27-56.                                 8
Why Use Virtual Teams?
     Oft cited benefit of virtual teams is reduced expenses
     Access to global talent pool is probably best reason
     Other advantages such as cycle time are oft cited
                                                         Bergiel                Labrosse                 Shachaf             Kuruppuara-                 Siebdrat
    Advantage of Virtual Teams
                                                          2008                    2008                    2008               chchi 2009                    2009
  Reduced operating expenses
                                                                                                                                                          
      Utilize global talent pool
                                                                                                                                                         
           Staffing flexibility
                                                                                                                                    
        Improved productivity
                                                                                                                                    
            Workforce diversity
                                                                                                                                                          
        Reduced travel expenses
                                                                                                                                                          
              Faster cycle time
                                                                                                                                                           
         Better work life balance
                                                                                                                                     
   Reduced environmental footprint
                                                                                     
     Improved business advantage
                                                                                                                                                          
Bergiel, B. J., Bergiel, E. B., & Balsmeier, P. W. (2008). Nature of virtual teams: A summary of their advantages and disadvantages. Management Research News, 31(2), 99-110.
LaBrosse, M. (2008). Managing virtual teams. Employment Relations Today, 35(2), 81-86.
Shachaf, P. (2008). Cultural diversity and information and communication technology impacts on global virtual teams. Information & Management, 45(2), 131-142.
Kuruppuarachchi, P. R. (2009). Virtual team concepts in projects: A case study. Project Management Journal, 40(2), 19-33.
Siebdrat, F., Hoegl, M., & Ernst, H. (2009). How to manage virtual teams. MIT Sloan Management Review, 50(4), 63-68.                                                            9
What are the Pitfalls?
   Culture and language difference most oft cited pitfalls
   Time zones and communications are frequently cited
   Lack of visioning, context, and requirements are key
    Disadvantage of Virtual Teams                        A          B         C         D          E         F          G         H          I         J
          Cultural differences
                                                                                             
         Language differences
                                                                                              
                  Time zone
                                                                                             
       Coordination breakdown
                                                                                            
             Lack of visioning
                                                                                              
           Technology issues
                                                                                              
    Loss of communication richness                        
          Loss of team cohesion
                                                                                                                                                    
                  Lack of trust                                                                           
      Lack of F2F communications                                                                                                           
        Ambiguous requirements
                                                                                                                               
     Alves, C. H., et al. (2008). A qualitative risk model for offshoring IT applications. IEEE SIEDS Conference, Charlottsville, Virginia, USA, 317-322
     Chatfield, A. T., & Wanninayaka, P. (2008). IT offshoring risks and governance capabilities. 41st HICSS Conference, Waikaloa, Hawaii, USA, 436-444.
     Yalaho, A., & Nahar, N. (2008). Risk management in offshore outsourcing of software projects. PICMET Conference, Cape Town, South Africa, 1721-1748.
                                                                                                                                                            10
What is the Paradox?
      Collocation & F2F interaction are a means to success
      Virtual teams communicate less undermining success
      Low productivity, quality, customer satisfaction results

                                  Customer
                                 Satisfaction

                                   Quality
    Virtual Team “Performance”




                                    Fast
                                  Feedback
                                    Fast
                                 Cycle Time

                                 Productivity


                                  Synergy


                                    Trust


                                   Identity


                                  Cohesion


                                 Interaction


                                                  Compatible Collocated      F2F         Video      Audio     Instant       Electronic      Blog           Wiki      Document
                                                    Team       Team         Meeting    Conference Conference Messaging         Mail      Interaction   Interaction    Review

                                                                             “Loss” of Virtual Team “Communication Quality”

                                                Rico, D. F. (2010). The paradox of agile project management and virtual teams. Gantthead.
                                                Carmel, E. (1999). Global software teams: Collaborating across borders and time zones. Upper Saddle River, NJ: Prentice-Hall.   11
Table of Contents

  Introduction

 Types of Virtual Teams
  Key Practices & Techniques
  Key Tools & Technologies
  Key Case Studies
  Conclusions & Summary


                               12
Basic Varieties of Teams
   Lipnack created a model for virtual teams in 1997
   Distribution & organization are its major dimensions
   Distributed, cross organizational teams most complex


                                                                                     Distributed
                       Different




                                        Distributed
                                                                                  Cross Organization
           Spacetime




                                                                                     Collocated
                                        Collocated
                       Same




                                                                                  Cross Organization


                                                 Same                                             Different

                                                                     Organization

      Lipnack, J., & Stamps, J. (1997). Virtual teams: Reaching across space, time, and organizations with technology. New York, NY: John Wiley & Sons.
                                                                                                                                                          13
Varieties of Virtuality
   Lipnack extended her model for virtual teams in 2000
   Included notion of external joint ventures & alliances
   External, global alliances are most complex types

                                              Global                               Global                                        Global
                Global




                                              Sites                          Cross Organization                                 Alliance
    Spacetime




                                          Distributed                              Local                                         Local
                Local




                                             Sites                           Cross Organization                                 Alliance
                Same Place




                                          Traditional                           Collocated                                       Joint
                                           Work Unit                         Cross Organization                                 Venture

                                        Same Organization                            Cross Internal                           Cross External

                                                                                       Organization

                             Lipnack, J., & Stamps, J. (2000). Virtual teams: People working across boundaries with technology. New York, NY: John Wiley & Sons.
                                                                                                                                                                   14
More Varieties of Virtuality
   Fisher developed a three dimensional model in 2001
   Includes the dimensions of time, place, and culture
   Type 2 multi cultural projects are most ambitious
                                                          Time

                                                                        Type 5                            Type 6
                                                                Shift Workers               Mono Cultural Global Project
                                                       Different Time
                                                                                        Different Time
                                                                                        
                                                    Same Place                       Different Place
                                                 Same Culture
                                                                                  Same Culture
                                                                                  




                                          Type 1                             Type 2
                                Multi Cultural Shift Workers      Multi Cultural Global Project                            Type 7
                                  Different Time                   Different Time                                  Intra
                                  Same Place                       Different Place                               Regional
                                  Different Culture                Different Culture                      Same Time
                                                                                                            Different Place
                                                                                                            Same
                                                                                                             Culture
                                                                                                                                    Place
                                          Type 3                             Type 4
                                    Multi Cultural Team                 Same Longitude

                                  Same Time                        Same Time
                                  Same Place                       Different Place
                                  Different Culture                Different Culture



                     Culture

    Fisher, K., & Fisher, M. D. (2001). The distance manager: A hands on guide to managing off site employees and virtual teams. New York, NY: McGraw Hill.
                                                                                                                                                              15
Outsourcing vs. Offshoring
   Schaaf compared outsourcing vs. onshoring in 2004
   His model disambiguates outsourcing vs. onshoring
   Combining outsourcing & offshoring is the riskiest
                    International




                                                Offshore                                          Offshore
                                              Subsidiaries                                       Outsourcing
       Offshoring




                                            Internal                                              Onshore
                    Domestic




                                        Service Provision                                        Outsourcing


                                                       Internal                                           External

                                                                            Outsourcing

                           Schaaf, J. (2004). Offshoring: Globalisation wave reaches services sector. Frankfurt, Germany: Deutsche Bank Research.
                                                                                                                                                    16
Rightshoring vs. Offshoring
   Hendel introduced the concept of rightshoring in 2004
   There are alternatives to just onshoring vs. offshoring
   A popular notion is to nearshore to similar timezones

                                         Nearshore                                            Offshore
                     International




                                      Retain Project HQ                           Retain Project HQ
                                      Same Timezone                               Differing Timezone
        Offshoring




                                          Onshore                                             Onshore
                     Domestic




                                      Retain Project HQ                           Retain Project HQ
                                      Same Timezone                               Differing Timezone


                                         Same Timezone                                     Differing Timezone

                                                                    Rightshoring

            Hendel, A., Messner, W., & Thun, F. (2004). Rightshore: Successfully industrialize SAP projects offshore. Berlin, Germany: Springer.
                                                                                                                                                   17
Team Dispersion
   Siebdrat simplified types of virtual teams in 2009
   Time, space, and cultural distance introduces risks
   Increased virtuality increases risk if not managed well
                     High




                                                   Effectiveness
       Performance




                                                                           Efficiency
                     Low




                                  Same            Same             Same            Same            Same           Same           Different
                                  Floor          Building           Site            City          Country       Continent        Continent

                                                                               Dispersion

                            Siebdrat, F., Hoegl, M., & Ernst, H. (2009). How to manage virtual teams. MIT Sloan Management Review, 50(4), 63-68.
                                                                                                                                                   18
Agile Distributed Teams
   Woodard created basic model of agile teams in 2010
   It compares asynchronous activities vs. distribution
   Synchronous activities also needed for success
                                  High
         Levels of Distribution
                                  Low




                                                                       Collocated           Distributed With Distributed Without
                                             Collocated                Part Time           Overlapping Hours Overlapping Hours

                                                                       Amount of Asynchronous Activity

                                  Woodward, E., Surdek, S., & Ganis, M. (2010). A practical guide to distributed scrum. Indianapolis, IN: IBM Press.
                                                                                                                                                       19
Table of Contents

  Introduction
  Types of Virtual Teams

 Key Practices & Techniques
  Key Tools & Technologies
  Key Case Studies
  Conclusions & Summary


                               20
Standard Practices
   Standard practices is an oft cited aid to virtual teams
   Agile methodologies are not known in every country
   Training should be provided and standards created


                                                                                                    VIDEO
                                                                                                    Video used to record and playback
                                                                                                    communications

                                                                                             CODING
                                                                                             Coding conventions are established

                                                                                   WIRE FRAMES
                                                                                   Wire frames are used for visual support

                                                                        USER STORIES
                                                                        Customer needs are captured in user stories

                                                            TEMPLATES
                                                            Templates are established for project communications
                                         PROCESSES
                                         Entire team follows the same agile process
                     TRAINING
                     Entire team is trained on agile methods


      Young, C., & Terashima, H. (2008). How did we adapt agile processes to our distributed development? Agile Conference, Toronto, Canada, 304-309.
                                                                                                                                                        21
Virtual Infrastructure
   Infrastructure needs are most often overlooked
   Many countries do not have adequate computers
   Internet service is also a luxury in across the globe


                                                                                              SECURITY
                                                                                              Information security is established to
                                                                                              protect project information

                                                                                       SUPPORT
                                                                                       24x7 infrastructure support is available

                                                                             INTERNET
                                                                             Broadband Internet is leased and utilized

                                                                 SOFTWARE
                                                                 Synchronous and asynchronous tools are selected

                                                     SERVERS
                                                     Dedicated servers are established for project information
                                  LAPTOPS
                                  Entire team is provided with laptops for office and home use
              MOBILE
              Entire team is provided with cell phones, smart phones, tablets, etc.


          Vax, M., & Michaud, S. (2008). Distributed agile: Growing a practice together. Agile Conference, Toronto, Canada, 310-314.
                                                                                                                                       22
Virtual Tools
    Many projects do not standardize development tools
    Complete development tools are easy to assemble
    Development environments should be integrated


                                                                                                              MULTIMEDIA
                                                                                                              Development tools with collaborative
                                                                                                              capabilities are utilized

                                                                                                       CONTENT
                                                                                                       Wikis and other repositories are utilized

                                                                                             METRICS
                                                                                             Code metrics and defect tracking tools are used

                                                                                 TESTING
                                                                                 Unit, system, and acceptance testing tools are used

                                                                    BUILD
                                                                    Build tools are used for continuous integration and deployment
                                                 VERSIONING
                                                 Configuration management tools are used to manage source code
                            WORKFLOW
                            Release and iteration workflow tools are used


    Cannizzo, F., Marcionetti, G., & Moser, P. (2008). Evolution of the tools and practices of a large distributed agile team. Agile Conference, Toronto, Canada, 513-518.
                                                                                                                                                                             23
Virtual Meetings
   Frequent communication is a key to project success
   Communication is better than documentation alone
   A critical key is to encourage frequent interactions


                                                                                             SPLINTER
                                                                                             Virtual splinter group meetings are
                                                                                             held, i.e., design, brainstorming, etc.

                                                                                      RETROSPECTIVE
                                                                                      Virtual iteration retrospectives are held

                                                                           DEMONSTRATION
                                                                           Entire team participates in virtual demonstrations

                                                                DEVELOPMENT
                                                                Virtual development meetings held, i.e., pair programming

                                                   STANDUP
                                                   Entire team participates in virtual daily standup meetings
                                 ITERATION
                                 Entire team participates in virtual iteration planning meetings
            RELEASE
            Entire team participates in virtual release planning sessions


          Summers, S. (2008). Insights into an agile adventure with offshore partners. Agile Conference, Toronto, Canada, 513-518.
                                                                                                                                       24
Light Coordination
   The work of two or more teams requires facilitation
   Local/remote team leaders must communicate often
   All team leaders can then pass on critical information


                                                                                                 FEEDBACK
                                                                                                 Customer feedback to developers is
                                                                                                 provided very quickly

                                                                                          REPORTING
                                                                                          Manual and automated status reporting

                                                                                FACILITATION
                                                                                Proactive management of intercultural dissonance

                                                                     TECHNICAL
                                                                     Coordination between local and remote technical leaders

                                                        GOVERNANCE
                                                        Lightweight governance teams with local and remote members
                                      LEADERSHIP
                                      Regular communications between local and remote process leaders
                  CUSTOMER
                  Regular communications between customers and remote teams


       Drummond, B. S., & Unson, J. F. (2008). Yahoo distributed agile: Notes from the world over. Agile Conference, Toronto, Canada, 315-321.
                                                                                                                                                 25
Periodic Rotations
   Periodic F2F interaction is a CSF for virtual teams
   Teams should meet at critical junctures, i.e., kickoff
   Rotating customers and leaders helps establish trust


                                                                                               ENDPOINTS
                                                                                               Teams collocate at critical junctures,
                                                                                               i.e., kickoff, middle, closeout, etc.

                                                                                        DEVELOPMENT
                                                                                        Teams periodically collocate for iterations

                                                                             PLANNING
                                                                             Teams collocate for release and iteration planning

                                                                 PERSONNEL
                                                                 Individuals rotate to maintain healthy relationships

                                                    LEADERS
                                                    Project leaders keep local and remote teams in-synch
                                 AMBASSADORS
                                 Ambassadors are exchanged to minimize intercultural dissonance
            CUSTOMERS
            Customer apprises remote teams of product vision, mission, goals, objectives, etc.


          Robarts, J. M. (2008). Practical considerations for distributed agile projects. Agile Conference, Toronto, Canada, 327-332.
                                                                                                                                        26
Regional Localization
   Minimizing interfaces between timezones is oft cited
   Products should be structured to localize activities
   It’s easier to communicate with nearshore teams


                                                                                                  DEVELOPMENT
                                                                                                  Subsystem interfaces are devised to
                                                                                                  localize development activities

                                                                                           SOCIALIZATION
                                                                                           Remote teams engage in social activities

                                                                                 EMPOWERMENT
                                                                                 Empower remote teams to make technical decisions

                                                                      MEETINGS
                                                                      Hold synchronous meetings at the local level

                                                         LEADERS
                                                         Empower local personnel to serve as process facilitators
                                       CUSTOMERS
                                       Empower local personnel to serve as customer proxies
                   TIMEZONES
                   Minimize organizational interfaces and organize teams by timezones


       Ramesh, B., Cao, L., Mohan, K., & Xu, P. (2006). Can distributed software development be agile? Communications of the ACM, 41(10), 41-46.
                                                                                                                                                   27
Table of Contents

  Introduction
  Types of Virtual Teams
  Key Practices & Techniques

 Key Tools & Technologies
  Key Case Studies
  Conclusions & Summary


                               28
VersionOne
   One of the first APM tools created in 2003
   Has about 36% of the marketshare for APM tools
   Free for small teams, but increases sharply thereafter
                  Product Roadmapping                                       Iteration Closeout Reviews


                                                                
                Roadmap Authoring                                             Sprint Reviews
                Customization                                                 Sprint Retrospectives
                Collaboration                                                 Issue and Action Item Tracking
                Publishing                                                    Backlog reconciliation

                     Product Planning                                                     Tracking


                                                                
                Backlog Planning and Management                               Sprint and Member Tracking
                Epics, Goals, Themes, Feature Groups                          Storyboard Wall
                Customer Requests and Idea Management                         Task Board and Test Board
                Product Roadmapping Features                                  My Work and My Dashboard

                     Release Planning                                           Reporting and Analytics


                                                                
                Release Planning                                              Program Dashboard
                Release Forecasting                                           Project Dashboard
                Cross Project Planning and Scheduling                         Iteration Dashboard
                Regression Test Planning                                      Burnup/Burndown Reports

                      Sprint Planning                                                 Other Features


                                                                
                High Level Sprint Planning                                    Agile Closeout Reviews
                Detailed Sprint Planning                                      Test Management
                Capacity Planning                                             Collaboration
                Issue Management Features                                     Open Source Integration



                                                http://www.versionone.com
                                                                                                                 29
Rally
   One of the first web-based APM tools created in 2004
   Has about 20-30% of the marketshare for APM tools
   Also free for small teams and gets more expensive
             Agile Project Management                                           Communication and Collaboration


                                                                     
               High Level Roadmap Decomposition                                      Customizable Role Dashboards
               Epic, Theme, and Feature Tracking                                     Rich Text, Email, and RSS Support
               User Story Planning and Tracking                                      Social Media Style Interfaces
               User Story Breakdown Management                                       Comments, Discussions, and IM

                Multi-Team Management                                              Development Management


                                                                     
               Organization Chart Mirroring                                          Requirements Management
               Multi Level Project Hierarchies                                       Test Management
               Common Progress and Status Views                                      Defect Management
               Program, Feature, and Resource Rollup                                 Build and Source Code Traceability

                    Release Planning                                                            Reporting


                                                                     
               Step by Step Release Planning                                         Flexible Queries and Filters
               Team Velocity Determination                                           Customer Tabular Graphical Reports
               Release and Iteration Schedules                                       Burnup/Burndown Reporting, etc.
               User Story Allocation to Iterations                                   User Generated Mashup Support

                    Iteration Planning                                                  Product Management


                                                                     
               Iteration Goal and Theme Support                                      Customer Feedback Management
               Team Capacity Determination                                           Product Field Support
               Backlog Item Prioritization                                           Demand Management
               Task Creation, Estimation, and Tracking                               CRM Integration and Support



                                                      http://www.rallydev.com
                                                                                                                            30
ScrumWorks
   Scrum project management tool created circa 2004
   Similar size of user base to VersionOne and Rally
   Leadership in agile metrics and business value
                 Product Management                                        Real Time Custom Dashboards


                                                                 
               Project Milestone Management                                   Velocity Charts
               Epics for Project Scope Goals                                  Milestone Charts
               Categorization using Themes                                    Cycle Time Charts
               Business Weighting and ROI                                     Cross Product Status Reporting

                 Program Management                                                 Data Accessibility


                                                                 
               Coordination of Multiple Projects                              Full Excel Import/Export
               Manage and Track Overlapping Goals                             Print to User Story Cards
               Shared Component/System Modeling                               Web Services API
               High Level Feature Management                                  Backups and Notifications

                 Iteration Management                                               User Management


                                                                 
               Drag and Drop Iteration Planning                               Full Access Control
               Team Task Board                                                Role Based Access Permissions
               Sprint Task Tracking                                           Cross Site Role Templates
               Impediment Tracking                                            Security Management

                Reporting and Analytics                                                 Integration


                                                                 
               Release Date Forecasting                                       Commercial Environment Integration
               Basic Burnup/Burndown Reporting                                Open Source Environment Integration
               Canned and Custom Report Generation                            Issue and Defect Tracking Integration
               Analysis of Planned vs. Actuals                                Support for Tool Plugins



                                                   http://www.danube.com
                                                                                                                        31
Extreme Planner
   XP project management tool created around 2004
   Noted commercial tool for managing XP projects
   No free version, although it is moderately priced
                  Multiple Project Support                                               Test Management


                                                                   
                 Multiple Project Definition                                       Test Criteria Generation
                 Multiple Project Status Tracking                                  Test Case Generation and Capture
                 Multiple Project Report Generation                                Test Case Initiation
                 Multiple Project Task Tracking                                    Test Status Reporting

                   User Story Generation                                         Integrated Issue Tracking


                                                                   
                 Cross Project Story Themes                                        Track Customer Support Requests
                 Create a Story from an Issue                                      Track Bug Reports
                 Theme and Story Template Reuse                                    Track Ad Hoc Suggestions
                 Inter Project Story Management                                    Transition Issues to User Stories

                      Release Planning                                                  Report Generation


                                                                   
                 Capture User Stories Generated                                    Velocity and Task Tracking
                 Estimate and Prioritize User Stories                              Iteration Burnup/Burndown Charts
                 View Schedule Stories for Releases                                Cumulative Workflow Diagrams
                 View Estimated Effort for Releases                                User Defined Reports

            Drag and Drop Iteration Planning                                          Notification and Alerts


                                                                   
                 Iteration Generation and Management                               Email Notifications
                 Drag and Drop User Story Management                               Notification Capture and Management
                 Iteration Effort Estimation                                       Notification Viewing and Filtering
                 Iteration Status Reporting                                        User Selectable Notifications



                                                 http://www.extremeplanner.com
                                                                                                                           32
Mingle
   APM tool created by ThoughtWorks in late 2007
   Extensible templates for multiple agile methods
   Growing user base that is free for small teams
                  Program Management                                                      Test Management


                                                                 
                Support for Multiple Projects                                       Visual Defect Workflows
                Multi Project Status Tracking                                       User Story and Defect Traceability
                Multi Project Report Generation                                     RSS and Email Test Alerting
                Resource Allocation and Management                                  Wiki Support for Screenshots and Reports

                   Project Management                                                   Project Collaboration


                                                                 
                Multi Agile Method Support                                          Virtual Drag and Drop Card Walls
                Customizable Dashboards                                             Integrated Wiki
                Workflow Generators                                                 RSS Feeds and Email Alerts
                User Management and Access Control                                  Murmurs, Queues , and Comments

            Release and Iteration Planning                                               Enterprise Support


                                                                 
                Hierarchical Card Trees                                             Application Life Cycle Management
                Prioritized Card Ranking                                            Integration with IDEs
                User Story Searching and Recall                                     Integration with Versioning Tools
                Global User Story Updating                                          Integration with Build/Deployment Tools

                 Tracking and Reporting                                                  External Interfaces


                                                                 
                Customizable Templates                                              I/O from Common Data Formats
                Customizable Tabs, Favorites, and Views                             Integration with External Databases
                Advanced Filtering, Properties, and Tags                            Integration with Workflow Tools
                Burndown, Velocity, and Ad Hoc Reports                              Integration with External Software



                                            http://www.thoughtworks-studios.com
                                                                                                                                 33
Target Process
   APM tool originally created for XP circa 2004
   Now includes support Scrum, Lean, Kanban, etc.
   Also free for small teams and then price rises sharply
             Agile Planning and Tracking                                               Quality Assurance


                                                                  
                Backlog Management and Prioritization                            Test Plan and Test Case Generation
                Release and Iteration Planning                                   Automated Test Initiation
                Task Boards and Personal To Do Lists                             User Story/Test Case Traceability
                Impediments and Blockage Management                              Defect Tracking and Management

                    Lean Development                                               Reports and Dashboards


                                                                  
                Value Stream Mapping                                             Customizable Dashboards
                Kanban Boards                                                    Release and Iteration Forecasting
                Cumulative Workflow Diagrams                                     Release and Iteration Burndown Charts
                Work in Process Limits                                           Task, User Story, and Iteration Progress

                       Customization                                                      Collaboration


                                                                  
                Customizable Development Process                                 Customizable Email Notifications
                Customizable User Roles and Terminology                          Content Sharing and Management
                Customizable Navigation and Lists                                Support for Multiple Content Types
                Customizable Fields and Other Attributes                         Integration with Synchronous Tools

                         Integration                                                    Product Support


                                                                  
                Web Services API                                                 Customer Help Desk Portal
                Visual Studio and Eclipse IDE Integration                        Ideas and Issues Tracking
                Subversion, Bugzilla, JUnit, and Selenium                        Bug Reports Traceable to User Stories
                Single Sign On Support                                           Full Customer Email Integration



                                                http://www.targetprocess.com
                                                                                                                              34
Other APM Tools
   There are literally dozens, if not 100s of APM tools
   There are dozens of free open source software tools
   Annual tool & price surveys are frequently conducted




             VersionOne. (2010). 5th annual state of agile survey. Atlanta, GA: Author.
             Allen, W. (2008). Agile PM tools (hosted). Retrieved May 11, 2011 from http://weblogs.asp.net/wallen.   35
Table of Contents

  Introduction
  Types of Virtual Teams
  Key Practices & Techniques
  Key Tools & Technologies

 Key Case Studies
  Conclusions & Summary


                               36
British Telecom
    Middleware products for phone call processing
    Goal was to obtain fast feedback with virtual teams
    Satisfied using intensive automation for fast feedback
                     Maximum Status Visibility                                                                          Immediate Feedback
                    Virtual Release Planning                                                                      Virtual Static Analysis Reporting
                    Virtual Iteration Tracking                                                                    Virtual Build and Test Reporting
                    Virtual Build and Test Status                                                                 Virtual Iteration Status Reporting

                                                                               Feedback
                                                                        Telecommunications
                                                                        XP and Scrum
                                                                        Five Sites
                                                                        UK, US, India
                                                                        50 People
                                                                         Intensive Automation




                         Ruthless Automation                                                                         Effective Communication
                    Virtual Static Analysis                                                                       Virtual Video Conferences
                    Virtual Operational Builds                                                                    Virtual Content Wikis
                    Virtual Software Testing                                                                      Periodic F2F and Collocation




    Cannizzo, F., Marcionetti, G., & Moser, P. (2008). Evolution of the tools and practices of a large distributed agile team. Agile Conference, Toronto, Canada, 513-518.
                                                                                                                                                                             37
Yahoo!
   Development of commercial Internet services
   Goal was to adapt agile methods for virtual teams
   Satisfied by minimizing use of synchronous meetings
                Localized Meetings                                                                          Localized Proxies
          Localized Scrum Meetings                                                                   Localized Product Owners
          Periodic Leadership Meetings                                                               Localized Scrum Masters
          Reporting Good and Bad News                                                                Periodic Meetings to Synchronize

                                                                  Adaptation
                                                            Internet Services
                                                            Scrum
              Periodic F2F Meetings                         Six Sites                                Near Realtime Info Sharing
                                                            US, India, Norway, UK
          Quarterly F2F Release Planning                   90 People                                Localized Information Radiators
          Periodic F2F Sprint Planning                                                               Virtual Wiki Content Repositories
          Periodic F2F Sprint Collocation                  Reduce Dependencies                       Shared Electronic Image Content




              Virtual Sprint Planning                                                                       Task Localization
          Virtual Sprint Planning Initiation                                                         Reduce Cross Site Dependency
          Localized Sprint Planning Closure                                                          Localized Team Independence
          Virtual Sprint Planning Followups                                                          Periodic Virtual Scrum of Scrums




       Drummond, B. S., & Unson, J. F. (2008). Yahoo distributed agile: Notes from the world over. Agile Conference, Toronto, Canada, 315-321.
                                                                                                                                                 38
ThoughtWorks
   Development of web applications for global clients
   Goal was to maintain high levels of communications
   Satisfied with F2F visits and detailed status reporting
              Visits & Rotations                                                                         Common Understanding
         Face to Face Kickoff Meetings                                                                Agree on Development Practices
         Customer and Leadership Visits                                                               Setup Wiki Process Repositories
         Developer and Tester Rotations                                                               Share Templates and Artifacts

                                                              Communication
                                                           Web Applications
                                                           Scrum
               Sharing Progress                            Three Sites                                 Regional Accommodations
                                                           US, India, HK, and China
         Virtual Timezone Standups                        115 People                                 Plan for Local Non Work Days
         Localized Standup Meetings                                                                   Exchange Data Before Absences
         Virtual Daily Leadership Meetings                    Status Reporting                        Use Overlapping Work Schedules




               Communications                                 Product Visioning                             Infrastructure Needs
         Periodic Reporting Between Sites             Periodic Visioning Meetings                    Supply Laptops to All Personnel
         Following Up Meetings with Notes             Localized Prototypes and Models                Supply Mobile Computing Devices
         Up To Date Wiki Content Sharing              Recorded Expert Videos                         Supply Internet Services




             Robarts, J. M. (2008). Practical considerations for distributed agile projects. Agile Conference, Toronto, Canada, 327-332.
                                                                                                                                           39
Wipro Technologies
   Development of software engineering products
   Goal was to be productive across different cultures
   Satisfied by use of intensive coaching and mentoring
                  Project Setup                                                                         Local & Remote Mentoring
         Setup Release Planning Tools                                                                 Use Mentors as Customers
         Setup Modeling Tools                                                                         Assign Automation Advisors
         Setup Code and Defect Tools                                                                  Use Release Planning Tools
         Setup Automated Test Tools                                                                   Daily Standups with Mentoring
         Setup Wiki Content Repository                          Ramping Up                            Post Daily Standups Data in Wiki
                                                            Software tools
                                                            XP
                                                            Two Sites
                                                            India, China
                                                            24 People
                                                            Coaching & Mentoring




                                                                Project Kickoff
                                                         Face to Face Kickoff Meeting
                                                         Communicate Using Diagrams
                                                         Use Wikis for Content Sharing
                                                         Localize Work if Needed
                                                         Periodically Merge Code



        Shrinivasavadhani, J., & Panicker, V. (2008). Remote mentoring a distributed agile team. Agile Conference, Toronto, Canada, 322-326.
                                                                                                                                               40
CampusSoft
   Development of software systems for academia
   Goal was to improve quality results of global teams
   Achieved by using agile methods and onsite visioning
              Product Visioning                                                                            Working Practices
         Onsite Product Visioning                                                                   Standardized Development Tools
         Virtual Product Owner Meetings                                                             Virtual Shared Content Wikis
         Open Communications                                                                        Virtual Defect Tracking Tools
         Utilize Stories for Discussion                                                             Virtual Source Code Repositories
         Start With Easy User Stories                             Quality                           Virtual Build and Integration Tools
                                                          Educational Software
                                                          Scrum
                                                          Three Sites
                                                          UK, Romania, India
                                                          44 People
                                                              Agile & Visioning




                Sprint Planning                              Ongoing Meetings                           Testing and Integration
         Virtual Release Planning                    Periodic Face to Face Sprints                 Joint Early Test Planning
         Local Release Planning Experts              Virtual Brainstorming Meetings                Automated Testing
         Virtual Planning Poker Sessions             Virtual Daily Standup Meetings                Localized Testing and Debugging
         Virtual Sharing During Planning             Virtual Sprint Review Meetings                Automated Deployments
         Wikis for Release Planning Data             Virtual Retrospective Meetings                Virtual Daily Operational Builds




             Summers, S. (2008). Insights into an agile adventure with offshore partners. Agile Conference, Toronto, Canada, 513-518.
                                                                                                                                            41
Elastic Path/Luxoft
   Development of electronic commerce websites
   Goal was to maintain context with distributed team
   Satisfied with coordination in overlapping time zones
            Nearshore Resources                                                                              Coordination
         Use Nearby Coordinators                                                                  Virtual Scrum of Scrums
         Use Resources Within Timezone                                                            Scrummasters as Product Owners
         Use Face to Face Interactions                                                            Unrestricted Communications
         Interaction within Two Timezones                                                         Create Architecture Liaison
                                                                  Context
                                                         E-Commerce
                                                         Scrum
                                                         Five Sites
                                                         Canada, Russia
                                                         14 People
                                                            Partial Nearshoring




             Processes and Tools                         Communication Plans                            Shared Workspaces
         Standard Agile Practices                   Provide Mobile Computing Tools               Establish Infrastructure Servers
         Virtual Release Planning Tools             Periodic Virtual Standup Meetings            Virtual Content Workspaces
         Virtual Source Code Repository             Use Asynchronous Retrospectives              Establish Security Measures
         Virtual Build and Testing Tools            Use Multi Media Communications               24x7 Infrastructure Support




           Vax, M., & Michaud, S. (2008). Distributed agile: Growing a practice together. Agile Conference, Toronto, Canada, 310-314.
                                                                                                                                        42
Scandinavia
    Development of internal & external web applications
    Goal was to determine if agile practices are scalable
    Satisfied with routine face-to-face & virtual meetings
                             Scrum Meetings                                                                               Communication
                      Virtual Audio Standup Meetings                                                              Periodic Leadership Rotations
                      Weekly Video Standup Meetings                                                               Periodic Personnel Rotations
                      Multimedia Splinter Meetings                                                                Periodic Face to Face Sprints
                      Virtual Weekly Scrum of Scrums                                                              Multimedia Communication
                                                                             Scalability
                                                                      Backoffice Systems
                                                                      Scrum
                                   Sprints                            Six Sites                                    Development Environment
                                                                      Fin, Latvia, DE, NO, Malay.
                      Synchronized Sprints                           67 People                                   Virtual Sprint Planning/Tracking
                      One to Many Sprints                                                                         Virtual Backlog Management
                      Clear Sprint Deadlines and Goals                F2F & Virtual Meetings                      Virtual Wiki Content Servers
                      Periodic Release Sprints                                                                    Shared Development Tools




                              Sprint Planning                                                                       Reviews & Retrospectives
                      Virtual Sprint Planning                                                                     Virtual Sprint Review Meetings
                      Virtual Sprint Application Sharing                                                          Virtual Sprint Review Sharing
                      Periodic F2F Sprint Planning                                                                Periodic F2F Sprint Reviews
                      Virtual Audio Planning Followups                                                            Virtual Sprint Retrospectives




Paasivaara, M., Durasiewicz, S., & Lassenius, C. (2009). Using scrum in distributed agile development. Global Software Engineering Conference, Limerick, Ireland, 195-204.
                                                                                                                                                                             43
Table of Contents

  Introduction
  Types of Virtual Teams
  Key Practices & Techniques
  Key Tools & Technologies
  Key Case Studies

 Conclusions & Summary

                               44
Leadership Considerations
   Agile management is delegated to the lowest level
   There remain key leadership roles & responsibilities
   Communication, coaching, & facilitation are key ones
       Customer Communication
                                         Facilitate selection of methods for obtaining and maintaining executive commitment, project
                                         resources, corporate communications, and customer interaction
           Product Visioning
                                         Facilitate selection of methods for communicating product purpose, goals, objectives, mission,
                                         vision, business value, scope, performance, budget, assumptions, constraints, etc.

          Distribution Strategy          Facilitate selection of virtual team distribution strategy to satisfy project goals and objectives

           Team Development
                                         Facilitate selection of methods for training, coaching, mentoring, and other team building
                                         approaches
        Standards & Practices
                                         Facilitate selection of project management and technical practices, conventions, roles,
                                         responsibilities, and performance measures

         Telecom Infrastructure          Facilitate selection of high bandwidth telecommunication products and services

           Development Tools             Facilitate selection of agile project management tools and interactive development environment

         High Context Meetings           Facilitate selection of high context agile project management and development meetings
        Coordination Meetings
                                         Facilitate selection of meetings and forums for regular communications between site
                                         coordinators

          F2F Communications
                                         Facilitate selection of methods for maximizing periodic face to face interactions and
                                         collaboration

       Performance Management
                                         Facilities selection of methods for process improvement, problem resolution, conflict
                                         management, team recognition, product performance, and customer satisfaction


    Maholtra, A., Majchrzak, A., & Rosen, B. (2007). Leading virtual teams. Academy of Management Perspectives, 21(1), 60-70.
    Hunsaker, P. L., & Hunsaker, P. L. (2008). Virtual teams: A leadership guide. Team Performance Management, 14(1/2), 86-101.
    Fisher, K., & Fisher, M. D. (2001). The distance manager: A hands on guide to managing off site employees and virtual teams. New York, NY: McGraw-Hill.
                                                                                                                                                              45
Lean & Agile Proj. Mgt. Metrics
   Agile metrics include trust/communication principles
   Lean metrics align lean principles & agile practices
   Flow metrics embody advanced lean principles
     Agile Values            Agile Metrics             Lean Pillars                             Lean Metrics                               Flow Metrics
                           Empowered Teams                                                       Relationships
                         Team competence                                   Customer relationships, satisfaction, trust, and loyalty       Decentralization
     Individuals &       Team motivation                                   Team authority, empowerment, and resources
                         Team cooperation                                  Team identification, cohesion, and communication
      Interactions       Team trust
                         Team cohesion                                                         Customer Value
                         Team communication              Respect           Product vision, mission, needs, and capabilities
                                                                                                                                            Economic view
                          Customer Interaction           For People         Product scope, constraints, and business value
                         Interaction frequency                             Product objectives, specifications, and performance
      Customer           Communication quality
                         Relationship strength
                                                                                                  Value Stream
     Collaboration                                                          As is policies, processes, procedures, and instructions        WIP constraints
                         Customer trust
                         Customer loyalty                                  To be business processes, flowcharts, and swim lanes           Kanban
                         Customer satisfaction                             Initial workflow analysis, metrication, and optimization

                             Iterative Delivery                                                Continuous Flow
                         Iteration size                                    Batch size, work in process, and artifact size constraints     Control cadence
       Working           Iteration number                                  Cadence, queue size, buffers, slack, and bottlenecks           Small batches
                         Iteration frequency                               Workflow, test, integration, and deployment automation
       Software          Continuous iterations
                         Operational iterations                                                 Customer Pull
                         Validated iterations          Continuous          Roadmaps, releases, iterations, and product priorities         Fast feedback
                        Adaptability & Flexibility     Improvement          Epics, themes, feature sets, features, and user stories
                         Organization flexibility                          Product demonstrations, feedback, and new backlogs
     Responding          Management flexibility
                         Individual flexibility                                                    Perfection
      to Change                                                             Refactor, test driven design, and continuous integration       Manage queues
                         Process flexibility
                         Design flexibility                                Standups, retrospectives, and process improvements             Exploit variability
                         Technology flexibility                            Organization, project, and process adaptability/flexibility



      Womack, J. P., & Jones, D. T. (1996). Lean thinking: Banish waste and create wealth in your corporation. New York, NY: Free Press.
      Reinertsen, D. G. (2009). The principles of product development flow: Second generation lean product development. New York, NY: Celeritas.                   46
Offshore Outsourcing Metrics
    Vashistha has complete guide to offshore outsourcing
    Strategic framework for evaluating offshore locations
    Offers metrics and data to support decision making
          Factors                 Subfactors            India       Phil       China     Canada     Lat Am      Ireland    Czech      Poland     Hungary      Russia

       Exogenous            Geopolitical Environment

    Factors that define       Government Support
     the characteristics
       of the country         Educational System
    beyond influence of
        organization
                              Infrastructure

                             Cost Advantage
         Catalyst
                                 Language
     Factors that drive
      offshore service
                                   Culture
    delivery in a country
                                 Timezone

                                Labor Pool
        Business
    Factors related to            Competency
    direct advantages,
    supplier skills, and            Quality
     business issues
                                    Attrition



             Vashistha, A., & Vashistha, A (2006). Offshore nation: Strategies for success in global outsourcing and offshoring. New York, NY: McGraw-Hill.
                                                                                                                                                                       47
Costs and Benefits
    Unfacilitated virtual teams are less effective than F2F
    Offshoring saves about 25% due to lower labor costs
    Offshore savings vary based on leadership methods
     Variable              F2F         Virtual                         Variable                          %           Cost           Low           Med          High
    Team score             82%           78%                          Wage rate                        46%        $17.5m           $2.2m         $4.8m         $8.7m
    Interactions           24.9           17.6                    Comm system                          20%         $7.6m           $1.0m         $2.1m         $3.8m
    Task effort           5.8 hrs       7.1 hrs                      Infrastructure                     7%          $2.7m          $0.3m         $0.7m         $1.3m
       Trust               84%           72%                Transition and governance                   4%          $1.5m          $0.2m         $0.4m         $0.8m
     Cohesion              79%           66%                  Resource redeployment                     1%          $0.4m          $0.0m         $0.1m         $0.2m
    Outcome sat            86%           78%                 Training and productivity                  9%          $3.4m          $0.4m         $0.9m         $1.7m
    Process sat            86%           76%                     Business continuity                    3%          $1.1m          $0.1m         $0.3m         $0.6m
Emergent leader            60%            75%                     Advisory services                     4%          $1.5m          $0.2m         $0.4m         $0.8m
    Free riders             2%             9%                         Travel costs                      3%          $1.1m          $0.1m         $0.3m         $0.6m
     Deserters              0%             2%                   Currency fluctuation                    3%          $1.1m          $0.1m         $0.3m         $0.6m
                           83%           74%                                                                      $38.0m           $4.8m        $10.5m $19.0m



           Vashistha, A., & Vashistha, A (2006). Offshore nation: Strategies for success in global outsourcing and offshoring. New York, NY: McGraw-Hill.
           De Pillis, E., & Furumo, K. (2007). Counting the cost of virtual teams: Studying the performance, satisfaction, and group dynamics of virtual and
           face to face teams. Communications of the ACM, 50(12), 93-95.
                                                                                                                                                                       48
Current Trends & Directions
   Virtual teamwork is 21st century business model
   Opens the door to offshore/nearshore outsourcing
   Farshoring is normal but nearshoring is also popular




                                                                                                           


             Gidwana, J. (2005). Research summary: Mapping offshore markets update. San Ramon, CA: NeoIT.
                                                                                                                49
Key Points & Takeaways
      Virtual teams communicate less undermining success
      A key is not to eliminate them in favor of F2F teams
      A better answer is to support them with leadership

                                  Customer                                                                                                                                    Process
                                 Satisfaction                                                                                                                               Improvement

                                   Quality                                                                                                                                    Rotation
    Virtual Team “Performance”




                                                                                                                                                                                             Virtual Team “Leadership”
                                    Fast
                                                                                                                                                                            Coordination
                                  Feedback
                                    Fast
                                                                                                                                                                              Coaching
                                 Cycle Time

                                 Productivity                                                                                                                                 Training

                                                                                                                                                                            Development
                                  Synergy
                                                                                                                                                                               Tools

                                    Trust                                                                                                                                   Infrastructure

                                                                                                                                                                            Standards &
                                   Identity
                                                                                                                                                                             Practices

                                  Cohesion                                                                                                                                    Visioning


                                 Interaction                                                                                                                                Rightshoring


                                                Compatible   Collocated    F2F        Video      Audio     Instant      Electronic      Blog           Wiki      Document
                                                  Team         Team       Meeting   Conference Conference Messaging        Mail      Interaction   Interaction    Review

                                                                           “Loss” of Virtual Team “Communication Quality”

                                 Rico, D. F. (2010). The paradox of agile project management and virtual teams. Gantthead.
                                 Garton, C., & Wegryn, K. (2006). Managing without walls: Maximize success with virtual, global, and cross cultural teams. Lewisville, TX: MC Press.                                     50
Books—Agile Virtual Teams
   Virtual teams are the last frontier in agile methods
   Numerous books emerging on agile virtual teams
   Books by Woodward & Eckstein among the best




Woodward, E., Surdek, S., & Ganis, M. (2010). A practical guide to distributed scrum. Indianapolis, IN: IBM Press.
Eckstein, J. (2010). Agile software development with distributed teams: Staying agile in a global world. New York, NY: Dorset House.
Upadrista, V. (2008). Managing offshore development projects: An agile approach. Oshawa, Canada: Multi-Media Publications.
Ambler, S., & Aguanno, K. (2010). Adapting agile for use with distributed teams. Oshawa, Canada: Multi-Media Publications.
Mite, D., Moe, N. B., & Ågerfalk, P. J. (2010). Agility across time and space: Implementing agile methods in global software projects. Berlin, Germany: Springer-Verlag.
                                                                                                                                                                           51

Lean & Agile Project Management: For Large Distributed Virtual Teams

  • 1.
    Lean & Agile ProjectManagement Dr. David F. Rico, PMP, CSM Website: http://davidfrico.com LinkedIn: http://www.linkedin.com/in/davidfrico Facebook: http://www.facebook.com/profile.php?id=1540017424
  • 2.
    Author Info  DoD contractor with 28+ years of IT experience  B.S. Comp. Sci., M.S. Soft. Eng., & D.M. Info. Sys.  Large gov’t projects in U.S., Far/Mid-East, & Europe  Published six books & numerous journal articles  Adjunct at George Washington, UMUC, & Argosy  Agile Program Management & Lean Development  Specializes in metrics, models, & cost engineering  Six Sigma, CMMI, ISO 9001, DoDAF, & DoD 5000  Cloud Computing, SOA, Web Services, FOSS, etc. 2
  • 3.
    Table of Contents Introduction Types of Virtual Teams Key Practices & Techniques Key Tools & Technologies Key Case Studies Conclusions & Summary 3
  • 4.
    What is Agility?  A-gil-i-ty (ə-'ji-lə-tē) Property consisting of quickness, lightness, and ease of movement; To be very nimble  The ability to create and respond to change in order to profit in a turbulent global business environment  The ability to quickly reprioritize use of resources when requirements, technology, and knowledge shift  A very fast response to sudden market changes and emerging threats by intensive customer interaction  Use of evolutionary, incremental, and iterative delivery to converge on an optimal customer solution   Maximizing BUSINESS VALUE with right sized, just- enough, and just-in-time processes and documentation  Highsmith, J. A. (2002). Agile software development ecosystems. Boston, MA: Addison-Wesley. 4
  • 5.
    What is AgileProject Mgt.?  People-centric way to create innovative solutions  Market-centric model to maximize business value  Demand-centric model that supports lean principles Agile Methods Agile Methods Traditional Methods ‘Values’ ‘Principles’ ‘Values’ Customer also Customer valued Contract known as more than Collaboration Interaction Negotiation Individuals & also High Performance valued Processes known as more than Interactions Teams & Tools Working also Iterative valued Comprehensive known as more than Systems Development Documentation Responding also Adaptability valued Following to Change known as more than a Plan or Flexibility Agile Manifesto. (2001). Manifesto for agile software development. Retrieved September 3, 2008, from http://www.agilemanifesto.org. 5
  • 6.
    How Do Lean& Agile Intersect?  Agile is naturally lean and based on small batches  Agile directly supports six principles of lean thinking  Agile may be converted to a continuous flow system Agile Values Lean Pillars Lean Principles Lean & Agile Practices Flow Principles  Customer relationships, satisfaction, trust, and loyalty Empowered Relationships  Team authority, empowerment, and resources Decentralization Teams  Team identification, cohesion, and communication  Product vision, mission, needs, and capabilities Respect Customer Value  Product scope, constraints, and business value Economic View for People  Product objectives, specifications, and performance Customer  As is policies, processes, procedures, and instructions Collaboration  To be business processes, flowcharts, and swim lanes WIP Constraints Value Stream  Initial workflow analysis, metrication, and optimization & Kanban  Batch size, work in process, and artifact size constraints Control Cadence Iterative Continuous Flow  Cadence, queue size, buffers, slack, and bottlenecks Delivery  Workflow, test, integration, and deployment automation & Small Batches  Roadmaps, releases, iterations, and product priorities Continuous  Epics, themes, feature sets, features, and user stories Customer Pull Fast Feedback Improvement  Product demonstrations, feedback, and new backlogs Responding  Refactor, test driven design, and continuous integration to Change  Standups, retrospectives, and process improvements Manage Queues/ Perfection  Organization, project, and process adaptability/flexibility Exploit Variability    Highsmith, J. A. (2002). Agile software development ecosystems. Boston, MA: Addison-Wesley. Larman, C., & Vodde, B. (2008). Scaling lean and agile development: Thinking and organizational tools for large-scale scrum. Boston, MA: Addison-Wesley. Womack, J. P., & Jones, D. T. (1996). Lean thinking: Banish waste and create wealth in your corporation. New York, NY: Free Press. Reinertsen, D. G. (2009). The principles of product development flow: Second generation lean product development. New York, NY: Celeritas. 6
  • 7.
    Lean & AgileProj. Mgt. Model  Created by Jim Highsmith at Cutter in 2003  Radical project mgt., Scrum, & XP hybrid model  Includes strategic, program, and project mgt. tools Innovation Lifecycle Envision Speculate Explore Launch Close  Product Vision  Gather Requirements  Iteration Planning  Final Review  Close Open Items  Product Architecture  Product Backlog  Technical Practices  Final Acceptance  Support Material  Project Objectives  Release Planning  Team Development  Final QA  Final Retrospective  Project Community  Risk Planning  Team Decisions  Final Documentation  Final Reports  Delivery Approach  Cost Estimation  Collaboration  Final Deployment  Project Celebration Iterative Delivery Technical Planning Development, Test, and Evaluation Operational Testing Adapt  Story Analysis  Development Pairing  Integration Testing  Focus Groups  Task Development  Unit Test Development  System Testing  Technical Reviews  Task Estimation  Simple Designs  Operational Testing  Team Evaluations  Task Splitting  Coding and Refactoring  Usability Testing  Project Reporting  Task Planning  Unit and Component Testing  Acceptance Testing  Adaptive Action Continuous Story Deployment  Standups, Architecture, Design, Build, Integration, Documentation, Change, Migration, and Integration Highsmith, J. A. (2010). Agile project management: Creating innovative products. Boston, MA: Pearson Education. 7
  • 8.
    What are VirtualTeams?  Virtual teams are often non-collocated project teams  Often communicate using asynchronous technology  Geographically and sometimes nationally dispersed Zigurs Curseu Schlenkrich Ahuja Traditional vs Virtual 2003 2008 2009 2010 Collocated vs distributed     F2F vs electronic collaboration      Different vs similar goals Similar vs different hours     Similar vs diverse culture   Same vs different organization  Specialized vs cross functional  Single vs multiple teams   Static vs shifting teams   Office bldg vs telecommuting  Zigurs, I. (2003). Leadership in virtual teams: Oxymoron or opportunity? Organizational Dynamics, 31(4), 339-351. Curseu, P. L., Schalk, R., & Wessel, I. (2008). How to virtual teams process information? Journal of Managerial Psychology, 23(6), 628-652. Schlenkrich, L., & Upfold, C. (2009). A guideline for virtual team managers. Electronic Journal of Information Systems Evaluation, 12(1), 109-118. Ahuja, J. (2010). A study of virtuality impact on team performance. IUP Journal of Management Research, 9(5), 27-56. 8
  • 9.
    Why Use VirtualTeams?  Oft cited benefit of virtual teams is reduced expenses  Access to global talent pool is probably best reason  Other advantages such as cycle time are oft cited Bergiel Labrosse Shachaf Kuruppuara- Siebdrat Advantage of Virtual Teams 2008 2008 2008 chchi 2009 2009 Reduced operating expenses     Utilize global talent pool      Staffing flexibility   Improved productivity   Workforce diversity     Reduced travel expenses     Faster cycle time    Better work life balance  Reduced environmental footprint  Improved business advantage     Bergiel, B. J., Bergiel, E. B., & Balsmeier, P. W. (2008). Nature of virtual teams: A summary of their advantages and disadvantages. Management Research News, 31(2), 99-110. LaBrosse, M. (2008). Managing virtual teams. Employment Relations Today, 35(2), 81-86. Shachaf, P. (2008). Cultural diversity and information and communication technology impacts on global virtual teams. Information & Management, 45(2), 131-142. Kuruppuarachchi, P. R. (2009). Virtual team concepts in projects: A case study. Project Management Journal, 40(2), 19-33. Siebdrat, F., Hoegl, M., & Ernst, H. (2009). How to manage virtual teams. MIT Sloan Management Review, 50(4), 63-68. 9
  • 10.
    What are thePitfalls?  Culture and language difference most oft cited pitfalls  Time zones and communications are frequently cited  Lack of visioning, context, and requirements are key Disadvantage of Virtual Teams A B C D E F G H I J Cultural differences        Language differences       Time zone      Coordination breakdown     Lack of visioning     Technology issues     Loss of communication richness    Loss of team cohesion    Lack of trust    Lack of F2F communications    Ambiguous requirements    Alves, C. H., et al. (2008). A qualitative risk model for offshoring IT applications. IEEE SIEDS Conference, Charlottsville, Virginia, USA, 317-322 Chatfield, A. T., & Wanninayaka, P. (2008). IT offshoring risks and governance capabilities. 41st HICSS Conference, Waikaloa, Hawaii, USA, 436-444. Yalaho, A., & Nahar, N. (2008). Risk management in offshore outsourcing of software projects. PICMET Conference, Cape Town, South Africa, 1721-1748. 10
  • 11.
    What is theParadox?  Collocation & F2F interaction are a means to success  Virtual teams communicate less undermining success  Low productivity, quality, customer satisfaction results Customer Satisfaction Quality Virtual Team “Performance” Fast Feedback Fast Cycle Time Productivity Synergy Trust Identity Cohesion Interaction Compatible Collocated F2F Video Audio Instant Electronic Blog Wiki Document Team Team Meeting Conference Conference Messaging Mail Interaction Interaction Review “Loss” of Virtual Team “Communication Quality” Rico, D. F. (2010). The paradox of agile project management and virtual teams. Gantthead. Carmel, E. (1999). Global software teams: Collaborating across borders and time zones. Upper Saddle River, NJ: Prentice-Hall. 11
  • 12.
    Table of Contents Introduction  Types of Virtual Teams Key Practices & Techniques Key Tools & Technologies Key Case Studies Conclusions & Summary 12
  • 13.
    Basic Varieties ofTeams  Lipnack created a model for virtual teams in 1997  Distribution & organization are its major dimensions  Distributed, cross organizational teams most complex Distributed Different Distributed Cross Organization Spacetime Collocated Collocated Same Cross Organization Same Different Organization Lipnack, J., & Stamps, J. (1997). Virtual teams: Reaching across space, time, and organizations with technology. New York, NY: John Wiley & Sons. 13
  • 14.
    Varieties of Virtuality  Lipnack extended her model for virtual teams in 2000  Included notion of external joint ventures & alliances  External, global alliances are most complex types Global Global Global Global Sites Cross Organization Alliance Spacetime Distributed Local Local Local Sites Cross Organization Alliance Same Place Traditional Collocated Joint Work Unit Cross Organization Venture Same Organization Cross Internal Cross External Organization Lipnack, J., & Stamps, J. (2000). Virtual teams: People working across boundaries with technology. New York, NY: John Wiley & Sons. 14
  • 15.
    More Varieties ofVirtuality  Fisher developed a three dimensional model in 2001  Includes the dimensions of time, place, and culture  Type 2 multi cultural projects are most ambitious Time Type 5 Type 6 Shift Workers Mono Cultural Global Project  Different Time   Different Time   Same Place  Different Place  Same Culture   Same Culture  Type 1 Type 2 Multi Cultural Shift Workers Multi Cultural Global Project Type 7  Different Time  Different Time Intra  Same Place  Different Place Regional  Different Culture  Different Culture  Same Time  Different Place  Same Culture Place Type 3 Type 4 Multi Cultural Team Same Longitude  Same Time  Same Time  Same Place  Different Place  Different Culture  Different Culture Culture Fisher, K., & Fisher, M. D. (2001). The distance manager: A hands on guide to managing off site employees and virtual teams. New York, NY: McGraw Hill. 15
  • 16.
    Outsourcing vs. Offshoring  Schaaf compared outsourcing vs. onshoring in 2004  His model disambiguates outsourcing vs. onshoring  Combining outsourcing & offshoring is the riskiest International Offshore Offshore Subsidiaries Outsourcing Offshoring Internal Onshore Domestic Service Provision Outsourcing Internal External Outsourcing Schaaf, J. (2004). Offshoring: Globalisation wave reaches services sector. Frankfurt, Germany: Deutsche Bank Research. 16
  • 17.
    Rightshoring vs. Offshoring  Hendel introduced the concept of rightshoring in 2004  There are alternatives to just onshoring vs. offshoring  A popular notion is to nearshore to similar timezones Nearshore Offshore International  Retain Project HQ  Retain Project HQ  Same Timezone  Differing Timezone Offshoring Onshore Onshore Domestic  Retain Project HQ  Retain Project HQ  Same Timezone  Differing Timezone Same Timezone Differing Timezone Rightshoring Hendel, A., Messner, W., & Thun, F. (2004). Rightshore: Successfully industrialize SAP projects offshore. Berlin, Germany: Springer. 17
  • 18.
    Team Dispersion  Siebdrat simplified types of virtual teams in 2009  Time, space, and cultural distance introduces risks  Increased virtuality increases risk if not managed well High Effectiveness Performance Efficiency Low Same Same Same Same Same Same Different Floor Building Site City Country Continent Continent Dispersion Siebdrat, F., Hoegl, M., & Ernst, H. (2009). How to manage virtual teams. MIT Sloan Management Review, 50(4), 63-68. 18
  • 19.
    Agile Distributed Teams  Woodard created basic model of agile teams in 2010  It compares asynchronous activities vs. distribution  Synchronous activities also needed for success High Levels of Distribution Low Collocated Distributed With Distributed Without Collocated Part Time Overlapping Hours Overlapping Hours Amount of Asynchronous Activity Woodward, E., Surdek, S., & Ganis, M. (2010). A practical guide to distributed scrum. Indianapolis, IN: IBM Press. 19
  • 20.
    Table of Contents Introduction Types of Virtual Teams  Key Practices & Techniques Key Tools & Technologies Key Case Studies Conclusions & Summary 20
  • 21.
    Standard Practices  Standard practices is an oft cited aid to virtual teams  Agile methodologies are not known in every country  Training should be provided and standards created VIDEO Video used to record and playback communications CODING Coding conventions are established WIRE FRAMES Wire frames are used for visual support USER STORIES Customer needs are captured in user stories TEMPLATES Templates are established for project communications PROCESSES Entire team follows the same agile process TRAINING Entire team is trained on agile methods Young, C., & Terashima, H. (2008). How did we adapt agile processes to our distributed development? Agile Conference, Toronto, Canada, 304-309. 21
  • 22.
    Virtual Infrastructure  Infrastructure needs are most often overlooked  Many countries do not have adequate computers  Internet service is also a luxury in across the globe SECURITY Information security is established to protect project information SUPPORT 24x7 infrastructure support is available INTERNET Broadband Internet is leased and utilized SOFTWARE Synchronous and asynchronous tools are selected SERVERS Dedicated servers are established for project information LAPTOPS Entire team is provided with laptops for office and home use MOBILE Entire team is provided with cell phones, smart phones, tablets, etc. Vax, M., & Michaud, S. (2008). Distributed agile: Growing a practice together. Agile Conference, Toronto, Canada, 310-314. 22
  • 23.
    Virtual Tools  Many projects do not standardize development tools  Complete development tools are easy to assemble  Development environments should be integrated MULTIMEDIA Development tools with collaborative capabilities are utilized CONTENT Wikis and other repositories are utilized METRICS Code metrics and defect tracking tools are used TESTING Unit, system, and acceptance testing tools are used BUILD Build tools are used for continuous integration and deployment VERSIONING Configuration management tools are used to manage source code WORKFLOW Release and iteration workflow tools are used Cannizzo, F., Marcionetti, G., & Moser, P. (2008). Evolution of the tools and practices of a large distributed agile team. Agile Conference, Toronto, Canada, 513-518. 23
  • 24.
    Virtual Meetings  Frequent communication is a key to project success  Communication is better than documentation alone  A critical key is to encourage frequent interactions SPLINTER Virtual splinter group meetings are held, i.e., design, brainstorming, etc. RETROSPECTIVE Virtual iteration retrospectives are held DEMONSTRATION Entire team participates in virtual demonstrations DEVELOPMENT Virtual development meetings held, i.e., pair programming STANDUP Entire team participates in virtual daily standup meetings ITERATION Entire team participates in virtual iteration planning meetings RELEASE Entire team participates in virtual release planning sessions Summers, S. (2008). Insights into an agile adventure with offshore partners. Agile Conference, Toronto, Canada, 513-518. 24
  • 25.
    Light Coordination  The work of two or more teams requires facilitation  Local/remote team leaders must communicate often  All team leaders can then pass on critical information FEEDBACK Customer feedback to developers is provided very quickly REPORTING Manual and automated status reporting FACILITATION Proactive management of intercultural dissonance TECHNICAL Coordination between local and remote technical leaders GOVERNANCE Lightweight governance teams with local and remote members LEADERSHIP Regular communications between local and remote process leaders CUSTOMER Regular communications between customers and remote teams Drummond, B. S., & Unson, J. F. (2008). Yahoo distributed agile: Notes from the world over. Agile Conference, Toronto, Canada, 315-321. 25
  • 26.
    Periodic Rotations  Periodic F2F interaction is a CSF for virtual teams  Teams should meet at critical junctures, i.e., kickoff  Rotating customers and leaders helps establish trust ENDPOINTS Teams collocate at critical junctures, i.e., kickoff, middle, closeout, etc. DEVELOPMENT Teams periodically collocate for iterations PLANNING Teams collocate for release and iteration planning PERSONNEL Individuals rotate to maintain healthy relationships LEADERS Project leaders keep local and remote teams in-synch AMBASSADORS Ambassadors are exchanged to minimize intercultural dissonance CUSTOMERS Customer apprises remote teams of product vision, mission, goals, objectives, etc. Robarts, J. M. (2008). Practical considerations for distributed agile projects. Agile Conference, Toronto, Canada, 327-332. 26
  • 27.
    Regional Localization  Minimizing interfaces between timezones is oft cited  Products should be structured to localize activities  It’s easier to communicate with nearshore teams DEVELOPMENT Subsystem interfaces are devised to localize development activities SOCIALIZATION Remote teams engage in social activities EMPOWERMENT Empower remote teams to make technical decisions MEETINGS Hold synchronous meetings at the local level LEADERS Empower local personnel to serve as process facilitators CUSTOMERS Empower local personnel to serve as customer proxies TIMEZONES Minimize organizational interfaces and organize teams by timezones Ramesh, B., Cao, L., Mohan, K., & Xu, P. (2006). Can distributed software development be agile? Communications of the ACM, 41(10), 41-46. 27
  • 28.
    Table of Contents Introduction Types of Virtual Teams Key Practices & Techniques  Key Tools & Technologies Key Case Studies Conclusions & Summary 28
  • 29.
    VersionOne  One of the first APM tools created in 2003  Has about 36% of the marketshare for APM tools  Free for small teams, but increases sharply thereafter Product Roadmapping Iteration Closeout Reviews    Roadmap Authoring  Sprint Reviews  Customization  Sprint Retrospectives  Collaboration  Issue and Action Item Tracking  Publishing  Backlog reconciliation Product Planning Tracking    Backlog Planning and Management  Sprint and Member Tracking  Epics, Goals, Themes, Feature Groups  Storyboard Wall  Customer Requests and Idea Management  Task Board and Test Board  Product Roadmapping Features  My Work and My Dashboard Release Planning Reporting and Analytics    Release Planning  Program Dashboard  Release Forecasting  Project Dashboard  Cross Project Planning and Scheduling  Iteration Dashboard  Regression Test Planning  Burnup/Burndown Reports Sprint Planning Other Features    High Level Sprint Planning  Agile Closeout Reviews  Detailed Sprint Planning  Test Management  Capacity Planning  Collaboration  Issue Management Features  Open Source Integration http://www.versionone.com 29
  • 30.
    Rally  One of the first web-based APM tools created in 2004  Has about 20-30% of the marketshare for APM tools  Also free for small teams and gets more expensive Agile Project Management Communication and Collaboration    High Level Roadmap Decomposition  Customizable Role Dashboards  Epic, Theme, and Feature Tracking  Rich Text, Email, and RSS Support  User Story Planning and Tracking  Social Media Style Interfaces  User Story Breakdown Management  Comments, Discussions, and IM Multi-Team Management Development Management    Organization Chart Mirroring  Requirements Management  Multi Level Project Hierarchies  Test Management  Common Progress and Status Views  Defect Management  Program, Feature, and Resource Rollup  Build and Source Code Traceability Release Planning Reporting    Step by Step Release Planning  Flexible Queries and Filters  Team Velocity Determination  Customer Tabular Graphical Reports  Release and Iteration Schedules  Burnup/Burndown Reporting, etc.  User Story Allocation to Iterations  User Generated Mashup Support Iteration Planning Product Management    Iteration Goal and Theme Support  Customer Feedback Management  Team Capacity Determination  Product Field Support  Backlog Item Prioritization  Demand Management  Task Creation, Estimation, and Tracking  CRM Integration and Support http://www.rallydev.com 30
  • 31.
    ScrumWorks  Scrum project management tool created circa 2004  Similar size of user base to VersionOne and Rally  Leadership in agile metrics and business value Product Management Real Time Custom Dashboards    Project Milestone Management  Velocity Charts  Epics for Project Scope Goals  Milestone Charts  Categorization using Themes  Cycle Time Charts  Business Weighting and ROI  Cross Product Status Reporting Program Management Data Accessibility    Coordination of Multiple Projects  Full Excel Import/Export  Manage and Track Overlapping Goals  Print to User Story Cards  Shared Component/System Modeling  Web Services API  High Level Feature Management  Backups and Notifications Iteration Management User Management    Drag and Drop Iteration Planning  Full Access Control  Team Task Board  Role Based Access Permissions  Sprint Task Tracking  Cross Site Role Templates  Impediment Tracking  Security Management Reporting and Analytics Integration    Release Date Forecasting  Commercial Environment Integration  Basic Burnup/Burndown Reporting  Open Source Environment Integration  Canned and Custom Report Generation  Issue and Defect Tracking Integration  Analysis of Planned vs. Actuals  Support for Tool Plugins http://www.danube.com 31
  • 32.
    Extreme Planner  XP project management tool created around 2004  Noted commercial tool for managing XP projects  No free version, although it is moderately priced Multiple Project Support Test Management    Multiple Project Definition  Test Criteria Generation  Multiple Project Status Tracking  Test Case Generation and Capture  Multiple Project Report Generation  Test Case Initiation  Multiple Project Task Tracking  Test Status Reporting User Story Generation Integrated Issue Tracking    Cross Project Story Themes  Track Customer Support Requests  Create a Story from an Issue  Track Bug Reports  Theme and Story Template Reuse  Track Ad Hoc Suggestions  Inter Project Story Management  Transition Issues to User Stories Release Planning Report Generation    Capture User Stories Generated  Velocity and Task Tracking  Estimate and Prioritize User Stories  Iteration Burnup/Burndown Charts  View Schedule Stories for Releases  Cumulative Workflow Diagrams  View Estimated Effort for Releases  User Defined Reports Drag and Drop Iteration Planning Notification and Alerts    Iteration Generation and Management  Email Notifications  Drag and Drop User Story Management  Notification Capture and Management  Iteration Effort Estimation  Notification Viewing and Filtering  Iteration Status Reporting  User Selectable Notifications http://www.extremeplanner.com 32
  • 33.
    Mingle  APM tool created by ThoughtWorks in late 2007  Extensible templates for multiple agile methods  Growing user base that is free for small teams Program Management Test Management    Support for Multiple Projects  Visual Defect Workflows  Multi Project Status Tracking  User Story and Defect Traceability  Multi Project Report Generation  RSS and Email Test Alerting  Resource Allocation and Management  Wiki Support for Screenshots and Reports Project Management Project Collaboration    Multi Agile Method Support  Virtual Drag and Drop Card Walls  Customizable Dashboards  Integrated Wiki  Workflow Generators  RSS Feeds and Email Alerts  User Management and Access Control  Murmurs, Queues , and Comments Release and Iteration Planning Enterprise Support    Hierarchical Card Trees  Application Life Cycle Management  Prioritized Card Ranking  Integration with IDEs  User Story Searching and Recall  Integration with Versioning Tools  Global User Story Updating  Integration with Build/Deployment Tools Tracking and Reporting External Interfaces    Customizable Templates  I/O from Common Data Formats  Customizable Tabs, Favorites, and Views  Integration with External Databases  Advanced Filtering, Properties, and Tags  Integration with Workflow Tools  Burndown, Velocity, and Ad Hoc Reports  Integration with External Software http://www.thoughtworks-studios.com 33
  • 34.
    Target Process  APM tool originally created for XP circa 2004  Now includes support Scrum, Lean, Kanban, etc.  Also free for small teams and then price rises sharply Agile Planning and Tracking Quality Assurance    Backlog Management and Prioritization  Test Plan and Test Case Generation  Release and Iteration Planning  Automated Test Initiation  Task Boards and Personal To Do Lists  User Story/Test Case Traceability  Impediments and Blockage Management  Defect Tracking and Management Lean Development Reports and Dashboards    Value Stream Mapping  Customizable Dashboards  Kanban Boards  Release and Iteration Forecasting  Cumulative Workflow Diagrams  Release and Iteration Burndown Charts  Work in Process Limits  Task, User Story, and Iteration Progress Customization Collaboration    Customizable Development Process  Customizable Email Notifications  Customizable User Roles and Terminology  Content Sharing and Management  Customizable Navigation and Lists  Support for Multiple Content Types  Customizable Fields and Other Attributes  Integration with Synchronous Tools Integration Product Support    Web Services API  Customer Help Desk Portal  Visual Studio and Eclipse IDE Integration  Ideas and Issues Tracking  Subversion, Bugzilla, JUnit, and Selenium  Bug Reports Traceable to User Stories  Single Sign On Support  Full Customer Email Integration http://www.targetprocess.com 34
  • 35.
    Other APM Tools  There are literally dozens, if not 100s of APM tools  There are dozens of free open source software tools  Annual tool & price surveys are frequently conducted VersionOne. (2010). 5th annual state of agile survey. Atlanta, GA: Author. Allen, W. (2008). Agile PM tools (hosted). Retrieved May 11, 2011 from http://weblogs.asp.net/wallen. 35
  • 36.
    Table of Contents Introduction Types of Virtual Teams Key Practices & Techniques Key Tools & Technologies  Key Case Studies Conclusions & Summary 36
  • 37.
    British Telecom  Middleware products for phone call processing  Goal was to obtain fast feedback with virtual teams  Satisfied using intensive automation for fast feedback Maximum Status Visibility Immediate Feedback  Virtual Release Planning  Virtual Static Analysis Reporting  Virtual Iteration Tracking  Virtual Build and Test Reporting  Virtual Build and Test Status  Virtual Iteration Status Reporting Feedback  Telecommunications  XP and Scrum  Five Sites  UK, US, India  50 People Intensive Automation Ruthless Automation Effective Communication  Virtual Static Analysis  Virtual Video Conferences  Virtual Operational Builds  Virtual Content Wikis  Virtual Software Testing  Periodic F2F and Collocation Cannizzo, F., Marcionetti, G., & Moser, P. (2008). Evolution of the tools and practices of a large distributed agile team. Agile Conference, Toronto, Canada, 513-518. 37
  • 38.
    Yahoo!  Development of commercial Internet services  Goal was to adapt agile methods for virtual teams  Satisfied by minimizing use of synchronous meetings Localized Meetings Localized Proxies  Localized Scrum Meetings  Localized Product Owners  Periodic Leadership Meetings  Localized Scrum Masters  Reporting Good and Bad News  Periodic Meetings to Synchronize Adaptation  Internet Services  Scrum Periodic F2F Meetings  Six Sites Near Realtime Info Sharing  US, India, Norway, UK  Quarterly F2F Release Planning  90 People  Localized Information Radiators  Periodic F2F Sprint Planning  Virtual Wiki Content Repositories  Periodic F2F Sprint Collocation Reduce Dependencies  Shared Electronic Image Content Virtual Sprint Planning Task Localization  Virtual Sprint Planning Initiation  Reduce Cross Site Dependency  Localized Sprint Planning Closure  Localized Team Independence  Virtual Sprint Planning Followups  Periodic Virtual Scrum of Scrums Drummond, B. S., & Unson, J. F. (2008). Yahoo distributed agile: Notes from the world over. Agile Conference, Toronto, Canada, 315-321. 38
  • 39.
    ThoughtWorks  Development of web applications for global clients  Goal was to maintain high levels of communications  Satisfied with F2F visits and detailed status reporting Visits & Rotations Common Understanding  Face to Face Kickoff Meetings  Agree on Development Practices  Customer and Leadership Visits  Setup Wiki Process Repositories  Developer and Tester Rotations  Share Templates and Artifacts Communication  Web Applications  Scrum Sharing Progress  Three Sites Regional Accommodations  US, India, HK, and China  Virtual Timezone Standups  115 People  Plan for Local Non Work Days  Localized Standup Meetings  Exchange Data Before Absences  Virtual Daily Leadership Meetings Status Reporting  Use Overlapping Work Schedules Communications Product Visioning Infrastructure Needs  Periodic Reporting Between Sites  Periodic Visioning Meetings  Supply Laptops to All Personnel  Following Up Meetings with Notes  Localized Prototypes and Models  Supply Mobile Computing Devices  Up To Date Wiki Content Sharing  Recorded Expert Videos  Supply Internet Services Robarts, J. M. (2008). Practical considerations for distributed agile projects. Agile Conference, Toronto, Canada, 327-332. 39
  • 40.
    Wipro Technologies  Development of software engineering products  Goal was to be productive across different cultures  Satisfied by use of intensive coaching and mentoring Project Setup Local & Remote Mentoring  Setup Release Planning Tools  Use Mentors as Customers  Setup Modeling Tools  Assign Automation Advisors  Setup Code and Defect Tools  Use Release Planning Tools  Setup Automated Test Tools  Daily Standups with Mentoring  Setup Wiki Content Repository Ramping Up  Post Daily Standups Data in Wiki  Software tools  XP  Two Sites  India, China  24 People Coaching & Mentoring Project Kickoff  Face to Face Kickoff Meeting  Communicate Using Diagrams  Use Wikis for Content Sharing  Localize Work if Needed  Periodically Merge Code Shrinivasavadhani, J., & Panicker, V. (2008). Remote mentoring a distributed agile team. Agile Conference, Toronto, Canada, 322-326. 40
  • 41.
    CampusSoft  Development of software systems for academia  Goal was to improve quality results of global teams  Achieved by using agile methods and onsite visioning Product Visioning Working Practices  Onsite Product Visioning  Standardized Development Tools  Virtual Product Owner Meetings  Virtual Shared Content Wikis  Open Communications  Virtual Defect Tracking Tools  Utilize Stories for Discussion  Virtual Source Code Repositories  Start With Easy User Stories Quality  Virtual Build and Integration Tools  Educational Software  Scrum  Three Sites  UK, Romania, India  44 People Agile & Visioning Sprint Planning Ongoing Meetings Testing and Integration  Virtual Release Planning  Periodic Face to Face Sprints  Joint Early Test Planning  Local Release Planning Experts  Virtual Brainstorming Meetings  Automated Testing  Virtual Planning Poker Sessions  Virtual Daily Standup Meetings  Localized Testing and Debugging  Virtual Sharing During Planning  Virtual Sprint Review Meetings  Automated Deployments  Wikis for Release Planning Data  Virtual Retrospective Meetings  Virtual Daily Operational Builds Summers, S. (2008). Insights into an agile adventure with offshore partners. Agile Conference, Toronto, Canada, 513-518. 41
  • 42.
    Elastic Path/Luxoft  Development of electronic commerce websites  Goal was to maintain context with distributed team  Satisfied with coordination in overlapping time zones Nearshore Resources Coordination  Use Nearby Coordinators  Virtual Scrum of Scrums  Use Resources Within Timezone  Scrummasters as Product Owners  Use Face to Face Interactions  Unrestricted Communications  Interaction within Two Timezones  Create Architecture Liaison Context  E-Commerce  Scrum  Five Sites  Canada, Russia  14 People Partial Nearshoring Processes and Tools Communication Plans Shared Workspaces  Standard Agile Practices  Provide Mobile Computing Tools  Establish Infrastructure Servers  Virtual Release Planning Tools  Periodic Virtual Standup Meetings  Virtual Content Workspaces  Virtual Source Code Repository  Use Asynchronous Retrospectives  Establish Security Measures  Virtual Build and Testing Tools  Use Multi Media Communications  24x7 Infrastructure Support Vax, M., & Michaud, S. (2008). Distributed agile: Growing a practice together. Agile Conference, Toronto, Canada, 310-314. 42
  • 43.
    Scandinavia  Development of internal & external web applications  Goal was to determine if agile practices are scalable  Satisfied with routine face-to-face & virtual meetings Scrum Meetings Communication  Virtual Audio Standup Meetings  Periodic Leadership Rotations  Weekly Video Standup Meetings  Periodic Personnel Rotations  Multimedia Splinter Meetings  Periodic Face to Face Sprints  Virtual Weekly Scrum of Scrums  Multimedia Communication Scalability  Backoffice Systems  Scrum Sprints  Six Sites Development Environment  Fin, Latvia, DE, NO, Malay.  Synchronized Sprints  67 People  Virtual Sprint Planning/Tracking  One to Many Sprints  Virtual Backlog Management  Clear Sprint Deadlines and Goals F2F & Virtual Meetings  Virtual Wiki Content Servers  Periodic Release Sprints  Shared Development Tools Sprint Planning Reviews & Retrospectives  Virtual Sprint Planning  Virtual Sprint Review Meetings  Virtual Sprint Application Sharing  Virtual Sprint Review Sharing  Periodic F2F Sprint Planning  Periodic F2F Sprint Reviews  Virtual Audio Planning Followups  Virtual Sprint Retrospectives Paasivaara, M., Durasiewicz, S., & Lassenius, C. (2009). Using scrum in distributed agile development. Global Software Engineering Conference, Limerick, Ireland, 195-204. 43
  • 44.
    Table of Contents Introduction Types of Virtual Teams Key Practices & Techniques Key Tools & Technologies Key Case Studies  Conclusions & Summary 44
  • 45.
    Leadership Considerations  Agile management is delegated to the lowest level  There remain key leadership roles & responsibilities  Communication, coaching, & facilitation are key ones Customer Communication Facilitate selection of methods for obtaining and maintaining executive commitment, project resources, corporate communications, and customer interaction  Product Visioning Facilitate selection of methods for communicating product purpose, goals, objectives, mission, vision, business value, scope, performance, budget, assumptions, constraints, etc. Distribution Strategy Facilitate selection of virtual team distribution strategy to satisfy project goals and objectives Team Development Facilitate selection of methods for training, coaching, mentoring, and other team building approaches  Standards & Practices Facilitate selection of project management and technical practices, conventions, roles, responsibilities, and performance measures Telecom Infrastructure Facilitate selection of high bandwidth telecommunication products and services Development Tools Facilitate selection of agile project management tools and interactive development environment High Context Meetings Facilitate selection of high context agile project management and development meetings  Coordination Meetings Facilitate selection of meetings and forums for regular communications between site coordinators F2F Communications Facilitate selection of methods for maximizing periodic face to face interactions and collaboration Performance Management Facilities selection of methods for process improvement, problem resolution, conflict management, team recognition, product performance, and customer satisfaction Maholtra, A., Majchrzak, A., & Rosen, B. (2007). Leading virtual teams. Academy of Management Perspectives, 21(1), 60-70. Hunsaker, P. L., & Hunsaker, P. L. (2008). Virtual teams: A leadership guide. Team Performance Management, 14(1/2), 86-101. Fisher, K., & Fisher, M. D. (2001). The distance manager: A hands on guide to managing off site employees and virtual teams. New York, NY: McGraw-Hill. 45
  • 46.
    Lean & AgileProj. Mgt. Metrics  Agile metrics include trust/communication principles  Lean metrics align lean principles & agile practices  Flow metrics embody advanced lean principles Agile Values Agile Metrics Lean Pillars Lean Metrics Flow Metrics Empowered Teams Relationships  Team competence  Customer relationships, satisfaction, trust, and loyalty  Decentralization Individuals &  Team motivation  Team authority, empowerment, and resources  Team cooperation  Team identification, cohesion, and communication Interactions  Team trust  Team cohesion Customer Value  Team communication Respect  Product vision, mission, needs, and capabilities  Economic view Customer Interaction For People  Product scope, constraints, and business value  Interaction frequency  Product objectives, specifications, and performance Customer  Communication quality  Relationship strength Value Stream Collaboration  As is policies, processes, procedures, and instructions  WIP constraints  Customer trust  Customer loyalty  To be business processes, flowcharts, and swim lanes  Kanban  Customer satisfaction  Initial workflow analysis, metrication, and optimization Iterative Delivery Continuous Flow  Iteration size  Batch size, work in process, and artifact size constraints  Control cadence Working  Iteration number  Cadence, queue size, buffers, slack, and bottlenecks  Small batches  Iteration frequency  Workflow, test, integration, and deployment automation Software  Continuous iterations  Operational iterations Customer Pull  Validated iterations Continuous  Roadmaps, releases, iterations, and product priorities  Fast feedback Adaptability & Flexibility Improvement  Epics, themes, feature sets, features, and user stories  Organization flexibility  Product demonstrations, feedback, and new backlogs Responding  Management flexibility  Individual flexibility Perfection to Change  Refactor, test driven design, and continuous integration  Manage queues  Process flexibility  Design flexibility  Standups, retrospectives, and process improvements  Exploit variability  Technology flexibility  Organization, project, and process adaptability/flexibility Womack, J. P., & Jones, D. T. (1996). Lean thinking: Banish waste and create wealth in your corporation. New York, NY: Free Press. Reinertsen, D. G. (2009). The principles of product development flow: Second generation lean product development. New York, NY: Celeritas. 46
  • 47.
    Offshore Outsourcing Metrics  Vashistha has complete guide to offshore outsourcing  Strategic framework for evaluating offshore locations  Offers metrics and data to support decision making Factors Subfactors India Phil China Canada Lat Am Ireland Czech Poland Hungary Russia Exogenous Geopolitical Environment Factors that define Government Support the characteristics of the country Educational System beyond influence of organization Infrastructure Cost Advantage Catalyst Language Factors that drive offshore service Culture delivery in a country Timezone Labor Pool Business Factors related to Competency direct advantages, supplier skills, and Quality business issues Attrition Vashistha, A., & Vashistha, A (2006). Offshore nation: Strategies for success in global outsourcing and offshoring. New York, NY: McGraw-Hill. 47
  • 48.
    Costs and Benefits  Unfacilitated virtual teams are less effective than F2F  Offshoring saves about 25% due to lower labor costs  Offshore savings vary based on leadership methods Variable F2F Virtual Variable % Cost Low Med High Team score 82% 78% Wage rate 46% $17.5m $2.2m $4.8m $8.7m Interactions 24.9 17.6 Comm system 20% $7.6m $1.0m $2.1m $3.8m Task effort 5.8 hrs 7.1 hrs Infrastructure 7% $2.7m $0.3m $0.7m $1.3m Trust 84% 72% Transition and governance 4% $1.5m $0.2m $0.4m $0.8m Cohesion 79% 66% Resource redeployment 1% $0.4m $0.0m $0.1m $0.2m Outcome sat 86% 78% Training and productivity 9% $3.4m $0.4m $0.9m $1.7m Process sat 86% 76% Business continuity 3% $1.1m $0.1m $0.3m $0.6m Emergent leader 60% 75% Advisory services 4% $1.5m $0.2m $0.4m $0.8m Free riders 2% 9% Travel costs 3% $1.1m $0.1m $0.3m $0.6m Deserters 0% 2% Currency fluctuation 3% $1.1m $0.1m $0.3m $0.6m 83% 74% $38.0m $4.8m $10.5m $19.0m Vashistha, A., & Vashistha, A (2006). Offshore nation: Strategies for success in global outsourcing and offshoring. New York, NY: McGraw-Hill. De Pillis, E., & Furumo, K. (2007). Counting the cost of virtual teams: Studying the performance, satisfaction, and group dynamics of virtual and face to face teams. Communications of the ACM, 50(12), 93-95. 48
  • 49.
    Current Trends &Directions  Virtual teamwork is 21st century business model  Opens the door to offshore/nearshore outsourcing  Farshoring is normal but nearshoring is also popular   Gidwana, J. (2005). Research summary: Mapping offshore markets update. San Ramon, CA: NeoIT. 49
  • 50.
    Key Points &Takeaways  Virtual teams communicate less undermining success  A key is not to eliminate them in favor of F2F teams  A better answer is to support them with leadership Customer Process Satisfaction Improvement Quality Rotation Virtual Team “Performance” Virtual Team “Leadership” Fast Coordination Feedback Fast Coaching Cycle Time Productivity Training Development Synergy Tools Trust Infrastructure Standards & Identity Practices Cohesion Visioning Interaction Rightshoring Compatible Collocated F2F Video Audio Instant Electronic Blog Wiki Document Team Team Meeting Conference Conference Messaging Mail Interaction Interaction Review “Loss” of Virtual Team “Communication Quality” Rico, D. F. (2010). The paradox of agile project management and virtual teams. Gantthead. Garton, C., & Wegryn, K. (2006). Managing without walls: Maximize success with virtual, global, and cross cultural teams. Lewisville, TX: MC Press. 50
  • 51.
    Books—Agile Virtual Teams  Virtual teams are the last frontier in agile methods  Numerous books emerging on agile virtual teams  Books by Woodward & Eckstein among the best Woodward, E., Surdek, S., & Ganis, M. (2010). A practical guide to distributed scrum. Indianapolis, IN: IBM Press. Eckstein, J. (2010). Agile software development with distributed teams: Staying agile in a global world. New York, NY: Dorset House. Upadrista, V. (2008). Managing offshore development projects: An agile approach. Oshawa, Canada: Multi-Media Publications. Ambler, S., & Aguanno, K. (2010). Adapting agile for use with distributed teams. Oshawa, Canada: Multi-Media Publications. Mite, D., Moe, N. B., & Ågerfalk, P. J. (2010). Agility across time and space: Implementing agile methods in global software projects. Berlin, Germany: Springer-Verlag. 51