SlideShare a Scribd company logo
RAJIB SHARMA
60, Kalinath Ghoshal Road, Manorama Abasan, Block – B, Flat – 3A, 3rd
Floor, Ariadaha, Kolkata – 700057 +91 94332 10815,
simplyrajib@rediffmail.com
Profile Title
Having 13 + years of experience in Projects Management, Design & Detailed Engineering in the Field of Electrical,
Instrumentation & Automation
OBJECTIVE
Seeking a senior position assignments and rewarding opportunity with an organization which recognizes my true potential and
effectively utilizes/ nurtures my excellent analytical and technical skills
PROFILE SUMMARY
 Highly inquisitive, creative and talented professional with rich in-depth exposure of over 13+ years in the field of Electrical,
Instrumentation& Automation across designing, detailed engineering, project management, execution of installation,
testing and Commissioning of Electrical, Electronics & Instrumentation Equipment’s and Automation System training/team,
currently spearheading functions as Project Manager in SHANTA COLIBRI (INDIA) PVT LTD.
 Proven expertise in planning, designing and scheduling electrical, instrumentation projects including judicious deployment
of resources to achieve project completion within agreed time/cost parameters.
 Professional strengths in managing expansion/modernization projects with strong record of delivering the projects
complete with detailed engineering within defined cost and timelines.
 Exhibit strong Project Management skills including project scheduling, and monitoring coupled with structured inputs for
optimal resource utilization, materials management, site management, cost rationalization and continuous improvement.
 Recognized as a hands-on, proactive professional who can rapidly identify problems, formulate tactical plans, initiate
change and implement effective programs in challenging and diverse environments.
JOB RESPOSIBILITIES
 Responsible for the Management of entire project like Design, Detailed Engineering, Supervision and execution of
installation, testing and commissioning, well relationship with client, vendor and contractor of Electrical, Electronics &
Instrumentation Equipment’s and Automation System.
 Accountable for the preparation of Engineering Drawings and documents for approval from Leading Consultants.
 Involved in the Preparation of Instruments List, Instruments range, data Sheets of different Instruments, Control Valve, IO
List & cable schedule.
 Initiating, planning, execution, tracking / monitoring, controlling and completing the project as scheduled and in
implementing operational processes for increased efficiency.
 Define the scope of projects while contributing to the project as the project architect and the areas of cost efficiency, time
management & manpower planning for the project execution.
 Successfully handle end to end execution of the design engineering projects and carried out detailed planning and
scheduling to ensure execution of projects as per the defined technical & functional specifications and within budgetary
parameters.
 Instrumental in procurement activities such as interaction with vendors, technical evaluation of bids and preparation of
purchase recommendation and also shop floor inspection.
EMPLOYENT HISTORY
EMPLOYER NAME TIME PERIOD DESIGNATION
SHANTA COLIBRI (INDIA) PVT LTD JUNE 2015 - PRESENT Project Manager
REAL TIME ENGINEERING PRIVATE LIMITED. AUGUST 2011 – MAY 2015 Assistant Project Manager
SHANTA COLIBRI (INDIA) PVT LTD (Formerly known as MA
SHANTA TECHNOSOFT PVT LTD).
JUNE 2003 – JULY 2011 O & M Engineer
PROJECTS HANDLED
PROJECT TITLE PROJECT
SCOPE/DETAILS
ROLE/CONTRIBUTION
KMC – Water
Supply
Management
System
“Improvement in
the Kolkata Water
Supply
Management
Project” (An Indo-
French Project)”
executed by
Seureca Space
Consulting
Engineers.
Consulted by Saha
Technical
Consultant.
Installation, testing
and Commissioning
of Flow and
Pressure and Only
Pressure
Monitoring Unit
and Operation and
maintenance of
F&P monitoring
stations, report
generation,
inventory
management,
spare management
and faulty
rectification of
water management
equipment.
ROLE – Engineer
Contribution –
To manage a team of engineers and technicians for an Operation-cum-maintenance
project of Kolkata Municipal Corporation (water Supply Dept.). Handling other
projects to help the company to achieve growth. Demonstrating the project to
guests of the Client and outsiders. Marketing the project concepts
 Installation, testing and commissioning of new F& P and Only Pressure
monitoring unit.
 Rectification of fault and maintenance of Probes & Control Panels of
different Flow & Pressure and Only Pressure monitoring units.
 Rectification faulty equipment’s like Flow meter, Logger, GSM Modem,
Battery Charger etc.
 Testing of isolation of Probe, Measuring of resistance of flow cable with
meager.
 Calibrate the pressure transducer with the help of Pressure Calibrator.
 Download F & P data with the help of Auto call, Manual call software
through G.S.M. communication network.
 Download & Upload Only Pressure data from Hand held to P.C through
RS232 cable.
 Generates F & P and Only Pressure data from Radcom to WIMS (Water
Infrastructure Management Software) through Radwin Software.
 Calculate water balance for pumping and booster pumping stations
between inlets and outlets.
Cast House Slag
Granulation Plant
of Blast Furnace
1/2/3 – Bokaro
Steel Plant, SAIL.
Instrumentation
and Automation.
ROLE – Site In charge
Contribution –
 Preparation of Instruments List, Instruments range & IO List with the help
of P & I diagram & PFD.
 Preparation of detail Engineering Data Sheets of different Instruments,
Flow Transmitter, Pressure Transmitter, Level Transmitter, Magnetic Flow
meter, Level Switches, Pressure Switch etc and approved those by
Consulting Engineer.
 Field engineering include preparation of instrument plot plan (points and
lines), hook up diagram, field termination diagram, cable list, estimation
of erection bill of material such cables, tubes, fittings and structural steel
for mounting of instruments etc.
 Commissioning of above instruments.
 Instrument procurement activities such as interaction with vendors and
preparation of purchase recommendation and also shop floor inspection.
 Made a good relation with Client Personals and sub-contractor personals.
 Preparation of Control Philosophy of the process.
Essential Water
Supply System of
Ladle Furnace 3 –
Durgapur Steel
Plant, SAIL.
Electrical,
Instrumentation
and Automation.
ROLE – Site In charge
Contribution –
 Preparation of Instruments List, Instruments range & IO List with the help of P
& I diagram & PFD.
 Preparation of detail Engineering Data Sheets of different Instruments, Flow
Transmitter, Pressure Transmitter, Temp. Transmitter, Ultrasonic Level
Transmitter, Pressure Switch etc and approved those by Consulting Engineer.
 Field engineering include preparation of instrument plot plan (points and
lines), hook up diagram, Cable Schedule, Field termination diagram, Cable
list, Estimation of erection bill of material such cables, tubes and
structural steel etc.
 Instrument procurement activities such as interaction with vendors,
technical evaluation of bids and preparation of purchase recommendation
and also shop floor inspection.
 Installation and Commissioning of One no of IMCC Panel with Soft Starter,
One no of PMCC Panel, One no. of PDB Panel, One no of MLDB panel, Five
nos of SLDB panel, One no of PLC Panel, Two nos of RIO Panel, UPS Panel,
Package AC Panel etc.
 Commissioning of 30 nos LTMR and 6 nos Soft Starter connected through
Modbus and TCP/IP protocol communication via ETG.
 Calibration of Field mounting Instruments with Hart Calibrator.
 Review of vender drawings like SLD, Wiring Diagram, GA/IGA of IMCC,
IMCP, PLC/RIO panel etc.
 Interaction with sub-vendors, client & consultant
 PLC Make – Schneider
 Software – Vijeo Citect (SCADA), Unity Pro Excel (Logic)
 Hardware - REDUNDANT PROCESSOR:CPU- Quantam
Gas Holder 3 &
Export System
Instrumentation
and Automation.
ROLE – Site In charge
Contribution –
 Preparation of Instruments List, Instruments range & IO List with the help
of P & I diagram & PFD.
 Preparation of detail Engineering Data Sheets of different Instruments,
Flow Transmitter, O2 Analyzer, CO detector, Magnetic Flow meter, Level
Switches etc and approved those by Consulting Engineer.
 Field engineering include preparation of instrument plot plan (points and
lines), hook up diagram, field termination diagram, cable list, estimation
of erection bill of material such cables, tubes, fittings and structural steel
for mounting of instruments etc.
 Commissioning of above instruments.
 Instrument procurement activities such as interaction with vendors and
preparation of purchase recommendation and also shop floor inspection.
 Made a good relation with Client Personals and sub-contractor personals.
Essential Water
Supply System of
BRC
Electrical,
Instrumentation
and Automation.
ROLE – Site In charge
Contribution –
 Preparation of Instruments List, Instruments range & IO List with the help
of P & I diagram & PFD.
 Preparation of detail Engineering Data Sheets of different Instruments,
Flow Transmitter, Pressure Transmitter, Temp. Transmitter, Ultrasonic
Level Transmitter, Pressure Switch etc and approved those by Consulting
Engineer.
 Field engineering include preparation of instrument plot plan (points and
lines), hook up diagram, Cable Schedule, Field termination diagram, Cable
list, Estimation of erection bill of material such cables, tubes and
structural steel etc.
 Instrument procurement activities such as interaction with vendors,
technical evaluation of bids and preparation of purchase recommendation
and also shop floor inspection.
 Installation and Commissioning of four nos of HT VCB, 2.0 KV & 1.6 KV dry
type Transformer, two nos of LTSS, one no of IMCC Panel, One no of PDB
Panel, Six nos. of MCP Panel (Soft Starter), One no of MLDB panel, Seven
nos of SLDB panel, One no of PLC Panel, Two nos of RIO Panel, UPS Panel,
Package AC Panel etc.
 Commissioning of 30 nos LTMR and 13 nos Soft Starter connected through
Modbus and TCP/IP protocol communication.
 Calibration of Field mounting Instruments with Hart Calibrator.
 Review of vender drawings like SLD, Wiring Diagram, GA/IGA of IMCC,
IMCP, PLC/RIO panel etc.
 Interaction with sub-vendors, client & consultant
 Automation Commissioning is continuing for this project.
 PLC Make – Siemens
 Software – Win CC (SCADA), Simatic S7(Logic)
 Hardware - REDUNDANT PROCESSOR: CPU- 417-4H
Flow Management
System for
Comprehensive
Distribution Under
the Command
Zone of 30 MGD
Dhapa WTP under
JnNURM.
Electronics &
Instrumentation
Equipments and
Automation
ROLE – Project Management
Contribution –
 Preparation and Estimation of BOM for entire project.
 Preparation of Instruments List, Instruments range & IO List with the help
of P & I diagram & PFD.
 Preparation of detail Engineering Data Sheets of different Instruments,
Electromagnetic Flow Meter, Pressure Transmitter, Ultrasonic Level
Transmitter, RTU etc.
 Instrument procurement activities such as interaction with vendors,
technical evaluation of bids and preparation of purchase recommendation
and also shop floor inspection.
 Installation and Commissioning of Flow and Pressure Monitoring Units.
 Communication Establishment with Data Logger and Water Monitoring
Software.
 Integrate GPRS data with SCADA system.
 Responsible for preparation of detailed Project Report, Engineering
drawing and documentation, specifications of different instrument and
GSM/GPRS based RTU with different type of communication protocol, good
relationship with Client, Vendor and contractor, and preparation of Tender
Documentation for Electrical, Instrumentation and Automation system for
Water Supply Management Projects.
ACADEMIA
Diploma in Electronics & Telecommunications, I.E.T.E (MHRD, Govt. of India), First Class
Class XII, WBSCHE, Second Class
Class X, WBBSE, First Class
PROFESSIONAL SKILLS/TRAIING
Professional Enhancement Trainings Attained : Network+, IIHT
Software’s : Radwin, WIMS (Water Infrastructure Management Software)
COMPUTER SKILLS
Operating System Windows (Win 10, 7.0, 8.0, Vista, XP, 2000, 1998).
Languages C Language
Packages MS Office, MS Project, AutoCAD
PERSONAL DETAILS
Date of Birth: 6th
Feb 1982
Current CTC: 5.2 Lacks
Notice Period: 1 month
References: Available on Request
I hereby declare that the particulars furnished above are true and correct to the best of my knowledge.
Place: Kolkata
Date:
Rajib Sharma

More Related Content

What's hot

Resume mep latest
Resume mep latestResume mep latest
Resume mep latest
Arun Das
 
Suman Professional
Suman ProfessionalSuman Professional
Suman Professional
Suman Das
 
SSPATILCV
SSPATILCVSSPATILCV
CV ROBIN JACOB
CV ROBIN JACOBCV ROBIN JACOB
CV ROBIN JACOB
robinjacob0101
 
vyasVP
vyasVPvyasVP
vyasVP
vimal_beic
 
Resume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineerResume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineer
Srivenkatesh Padmanaban
 
Latest resume
Latest resumeLatest resume
Latest resume
Arun Das
 
Latest resume
Latest resumeLatest resume
Latest resume
Arun Das
 
Jaime_Navarro_Resume
Jaime_Navarro_ResumeJaime_Navarro_Resume
Jaime_Navarro_Resume
Jaime Navarro
 
Latest resume
Latest resumeLatest resume
Latest resume
Arun Das
 
MOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_Engr
Mohammed Akbar
 
James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-
Stevie Nimmo
 
Resume srivenkatesh instrument engineer
Resume srivenkatesh instrument engineerResume srivenkatesh instrument engineer
Resume srivenkatesh instrument engineer
Srivenkatesh Padmanaban
 
Instrumentation Design Engineer
Instrumentation Design Engineer Instrumentation Design Engineer
Instrumentation Design Engineer
Parth Tailor
 
vikram 5+ years Experience
vikram 5+ years Experiencevikram 5+ years Experience
vikram 5+ years Experience
Vikram manni
 
Planning For Engineering
Planning For EngineeringPlanning For Engineering
Planning For Engineering
Joe Kalchbrenner
 
Tandur_Poornima_CV
Tandur_Poornima_CVTandur_Poornima_CV
Tandur_Poornima_CV
Poornima Tandur
 
WORKFLOW
WORKFLOW WORKFLOW
WORKFLOW
TW Carl
 
Anthony_M._Antigulas
Anthony_M._AntigulasAnthony_M._Antigulas
Anthony_M._Antigulas
ANTHONY ANTIGULAS
 

What's hot (19)

Resume mep latest
Resume mep latestResume mep latest
Resume mep latest
 
Suman Professional
Suman ProfessionalSuman Professional
Suman Professional
 
SSPATILCV
SSPATILCVSSPATILCV
SSPATILCV
 
CV ROBIN JACOB
CV ROBIN JACOBCV ROBIN JACOB
CV ROBIN JACOB
 
vyasVP
vyasVPvyasVP
vyasVP
 
Resume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineerResume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineer
 
Latest resume
Latest resumeLatest resume
Latest resume
 
Latest resume
Latest resumeLatest resume
Latest resume
 
Jaime_Navarro_Resume
Jaime_Navarro_ResumeJaime_Navarro_Resume
Jaime_Navarro_Resume
 
Latest resume
Latest resumeLatest resume
Latest resume
 
MOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_Engr
 
James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-
 
Resume srivenkatesh instrument engineer
Resume srivenkatesh instrument engineerResume srivenkatesh instrument engineer
Resume srivenkatesh instrument engineer
 
Instrumentation Design Engineer
Instrumentation Design Engineer Instrumentation Design Engineer
Instrumentation Design Engineer
 
vikram 5+ years Experience
vikram 5+ years Experiencevikram 5+ years Experience
vikram 5+ years Experience
 
Planning For Engineering
Planning For EngineeringPlanning For Engineering
Planning For Engineering
 
Tandur_Poornima_CV
Tandur_Poornima_CVTandur_Poornima_CV
Tandur_Poornima_CV
 
WORKFLOW
WORKFLOW WORKFLOW
WORKFLOW
 
Anthony_M._Antigulas
Anthony_M._AntigulasAnthony_M._Antigulas
Anthony_M._Antigulas
 

Viewers also liked

Nite idle watch ii sales presentation 3-1-15
Nite  idle watch ii sales presentation 3-1-15Nite  idle watch ii sales presentation 3-1-15
Nite idle watch ii sales presentation 3-1-15
Vanner Inc.
 
Merged document 118
Merged document 118Merged document 118
Merged document 118
Yogesh Sharma
 
Planos fotograficos y foto estudio
Planos fotograficos y foto estudioPlanos fotograficos y foto estudio
Planos fotograficos y foto estudio
stefanie perez
 
Social media plan
Social media planSocial media plan
Social media plan
Ignacio Dalessandro
 
Interior Design Portfolio
Interior Design PortfolioInterior Design Portfolio
Interior Design Portfolio
Natalia Pérez Coello
 
Actividad financiera del Estado venezolano
Actividad financiera del Estado venezolanoActividad financiera del Estado venezolano
Actividad financiera del Estado venezolano
Marisela-sira
 
Protocolo investigacion
Protocolo investigacionProtocolo investigacion
Protocolo investigacion
jfgalvisp
 
Presentación León Darío Espinosa, Director de Planeación Municipal
Presentación León Darío Espinosa, Director de Planeación MunicipalPresentación León Darío Espinosa, Director de Planeación Municipal
Presentación León Darío Espinosa, Director de Planeación Municipal
Consorcio Ciudadano
 
Visitor management system
Visitor management systemVisitor management system
Visitor management system
Arjun0981
 
Stcw guide english
Stcw guide englishStcw guide english
Stcw guide english
Brian Dsilva
 
Watch keeping duties , responsibilities and cargo documentation
Watch keeping duties ,  responsibilities and cargo documentationWatch keeping duties ,  responsibilities and cargo documentation
Watch keeping duties , responsibilities and cargo documentation
Oladokun Sulaiman Olanrewaju
 
Engine Watchkeeping
Engine Watchkeeping Engine Watchkeeping
Engine Watchkeeping
bontriumph
 
Principles of Management – Chpt 17 : Controlling
Principles of Management – Chpt 17 : ControllingPrinciples of Management – Chpt 17 : Controlling
Controlling 2 ppt
Controlling 2 pptControlling 2 ppt
Controlling ppt
Controlling pptControlling ppt
Controlling ppt
Shaweta Goyal
 
Topic 6 petty cash book
Topic 6 petty cash bookTopic 6 petty cash book
Topic 6 petty cash book
Srinivas Methuku
 
culturalismo y pluriétnismo
culturalismo y pluriétnismo culturalismo y pluriétnismo
culturalismo y pluriétnismo
98JOHA
 

Viewers also liked (20)

Nite idle watch ii sales presentation 3-1-15
Nite  idle watch ii sales presentation 3-1-15Nite  idle watch ii sales presentation 3-1-15
Nite idle watch ii sales presentation 3-1-15
 
Merged document 118
Merged document 118Merged document 118
Merged document 118
 
Paigam Madre Watan
Paigam Madre WatanPaigam Madre Watan
Paigam Madre Watan
 
Certified Planner
Certified PlannerCertified Planner
Certified Planner
 
Planos fotograficos y foto estudio
Planos fotograficos y foto estudioPlanos fotograficos y foto estudio
Planos fotograficos y foto estudio
 
Social media plan
Social media planSocial media plan
Social media plan
 
Opium
OpiumOpium
Opium
 
Interior Design Portfolio
Interior Design PortfolioInterior Design Portfolio
Interior Design Portfolio
 
Actividad financiera del Estado venezolano
Actividad financiera del Estado venezolanoActividad financiera del Estado venezolano
Actividad financiera del Estado venezolano
 
Protocolo investigacion
Protocolo investigacionProtocolo investigacion
Protocolo investigacion
 
Presentación León Darío Espinosa, Director de Planeación Municipal
Presentación León Darío Espinosa, Director de Planeación MunicipalPresentación León Darío Espinosa, Director de Planeación Municipal
Presentación León Darío Espinosa, Director de Planeación Municipal
 
Visitor management system
Visitor management systemVisitor management system
Visitor management system
 
Stcw guide english
Stcw guide englishStcw guide english
Stcw guide english
 
Watch keeping duties , responsibilities and cargo documentation
Watch keeping duties ,  responsibilities and cargo documentationWatch keeping duties ,  responsibilities and cargo documentation
Watch keeping duties , responsibilities and cargo documentation
 
Engine Watchkeeping
Engine Watchkeeping Engine Watchkeeping
Engine Watchkeeping
 
Principles of Management – Chpt 17 : Controlling
Principles of Management – Chpt 17 : ControllingPrinciples of Management – Chpt 17 : Controlling
Principles of Management – Chpt 17 : Controlling
 
Controlling 2 ppt
Controlling 2 pptControlling 2 ppt
Controlling 2 ppt
 
Controlling ppt
Controlling pptControlling ppt
Controlling ppt
 
Topic 6 petty cash book
Topic 6 petty cash bookTopic 6 petty cash book
Topic 6 petty cash book
 
culturalismo y pluriétnismo
culturalismo y pluriétnismo culturalismo y pluriétnismo
culturalismo y pluriétnismo
 

Similar to Resume-Rajib Sharma

Nadim Siddique CV
Nadim Siddique CVNadim Siddique CV
Nadim Siddique CV
Nadim Siddique
 
Resume electrical & instrumentation engg 10+ yrs exp
Resume  electrical & instrumentation engg 10+ yrs expResume  electrical & instrumentation engg 10+ yrs exp
Resume electrical & instrumentation engg 10+ yrs exp
Sudipto Majumder
 
Resume 2016 june
Resume 2016 juneResume 2016 june
Resume 2016 june
KAJA MOHIDEEN
 
Sr Lead Engineer - Instrumentation & control
Sr Lead Engineer - Instrumentation & controlSr Lead Engineer - Instrumentation & control
Sr Lead Engineer - Instrumentation & control
Bathrinath mangalamoorthi
 
BHARATH KUMAR REDDY
BHARATH KUMAR REDDYBHARATH KUMAR REDDY
BHARATH KUMAR REDDY
bharath reddy
 
Resume_Rangarajan (1)
Resume_Rangarajan (1)Resume_Rangarajan (1)
Resume_Rangarajan (1)
Rangarajan Dhamal
 
1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years exp1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years exp
Parthsarathy vijayan
 
Instrumentation & Control Engineer
Instrumentation &  Control EngineerInstrumentation &  Control Engineer
Instrumentation & Control Engineer
Kailas Patil
 
Paul_joshua_resume_JAN2016
Paul_joshua_resume_JAN2016Paul_joshua_resume_JAN2016
Paul_joshua_resume_JAN2016
paul joshua
 
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale
 
Ankit updated Resume
Ankit updated  ResumeAnkit updated  Resume
Ankit updated Resume
Ankit Agarwal
 
Resume raj bharath be
Resume raj bharath beResume raj bharath be
Resume raj bharath be
RajBharath Rathinam
 
Sourav chakraborty
Sourav chakrabortySourav chakraborty
Sourav chakraborty
Sourav Chakraborty
 
CV
CVCV
NAVEEN SUKUMAR PAKIRLA Resume1
NAVEEN SUKUMAR PAKIRLA Resume1NAVEEN SUKUMAR PAKIRLA Resume1
NAVEEN SUKUMAR PAKIRLA Resume1
Naveen Sukumar
 
Vipin Resume new qc
Vipin Resume new qcVipin Resume new qc
Vipin Resume new qc
vipin joy
 
Resume for experienced Enginneer
Resume for experienced EnginneerResume for experienced Enginneer
Resume for experienced Enginneer
Vikram Rawani
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument Engineer
Mukhtar Ahmad
 
Ardie cv
Ardie cvArdie cv
Ardie cv
Eduarde Lopez
 
instrumentation Engineering Cv
instrumentation Engineering Cvinstrumentation Engineering Cv
instrumentation Engineering Cv
sameer abdullah
 

Similar to Resume-Rajib Sharma (20)

Nadim Siddique CV
Nadim Siddique CVNadim Siddique CV
Nadim Siddique CV
 
Resume electrical & instrumentation engg 10+ yrs exp
Resume  electrical & instrumentation engg 10+ yrs expResume  electrical & instrumentation engg 10+ yrs exp
Resume electrical & instrumentation engg 10+ yrs exp
 
Resume 2016 june
Resume 2016 juneResume 2016 june
Resume 2016 june
 
Sr Lead Engineer - Instrumentation & control
Sr Lead Engineer - Instrumentation & controlSr Lead Engineer - Instrumentation & control
Sr Lead Engineer - Instrumentation & control
 
BHARATH KUMAR REDDY
BHARATH KUMAR REDDYBHARATH KUMAR REDDY
BHARATH KUMAR REDDY
 
Resume_Rangarajan (1)
Resume_Rangarajan (1)Resume_Rangarajan (1)
Resume_Rangarajan (1)
 
1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years exp1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years exp
 
Instrumentation & Control Engineer
Instrumentation &  Control EngineerInstrumentation &  Control Engineer
Instrumentation & Control Engineer
 
Paul_joshua_resume_JAN2016
Paul_joshua_resume_JAN2016Paul_joshua_resume_JAN2016
Paul_joshua_resume_JAN2016
 
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
 
Ankit updated Resume
Ankit updated  ResumeAnkit updated  Resume
Ankit updated Resume
 
Resume raj bharath be
Resume raj bharath beResume raj bharath be
Resume raj bharath be
 
Sourav chakraborty
Sourav chakrabortySourav chakraborty
Sourav chakraborty
 
CV
CVCV
CV
 
NAVEEN SUKUMAR PAKIRLA Resume1
NAVEEN SUKUMAR PAKIRLA Resume1NAVEEN SUKUMAR PAKIRLA Resume1
NAVEEN SUKUMAR PAKIRLA Resume1
 
Vipin Resume new qc
Vipin Resume new qcVipin Resume new qc
Vipin Resume new qc
 
Resume for experienced Enginneer
Resume for experienced EnginneerResume for experienced Enginneer
Resume for experienced Enginneer
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument Engineer
 
Ardie cv
Ardie cvArdie cv
Ardie cv
 
instrumentation Engineering Cv
instrumentation Engineering Cvinstrumentation Engineering Cv
instrumentation Engineering Cv
 

Resume-Rajib Sharma

  • 1. RAJIB SHARMA 60, Kalinath Ghoshal Road, Manorama Abasan, Block – B, Flat – 3A, 3rd Floor, Ariadaha, Kolkata – 700057 +91 94332 10815, simplyrajib@rediffmail.com Profile Title Having 13 + years of experience in Projects Management, Design & Detailed Engineering in the Field of Electrical, Instrumentation & Automation OBJECTIVE Seeking a senior position assignments and rewarding opportunity with an organization which recognizes my true potential and effectively utilizes/ nurtures my excellent analytical and technical skills PROFILE SUMMARY  Highly inquisitive, creative and talented professional with rich in-depth exposure of over 13+ years in the field of Electrical, Instrumentation& Automation across designing, detailed engineering, project management, execution of installation, testing and Commissioning of Electrical, Electronics & Instrumentation Equipment’s and Automation System training/team, currently spearheading functions as Project Manager in SHANTA COLIBRI (INDIA) PVT LTD.  Proven expertise in planning, designing and scheduling electrical, instrumentation projects including judicious deployment of resources to achieve project completion within agreed time/cost parameters.  Professional strengths in managing expansion/modernization projects with strong record of delivering the projects complete with detailed engineering within defined cost and timelines.  Exhibit strong Project Management skills including project scheduling, and monitoring coupled with structured inputs for optimal resource utilization, materials management, site management, cost rationalization and continuous improvement.  Recognized as a hands-on, proactive professional who can rapidly identify problems, formulate tactical plans, initiate change and implement effective programs in challenging and diverse environments. JOB RESPOSIBILITIES  Responsible for the Management of entire project like Design, Detailed Engineering, Supervision and execution of installation, testing and commissioning, well relationship with client, vendor and contractor of Electrical, Electronics & Instrumentation Equipment’s and Automation System.  Accountable for the preparation of Engineering Drawings and documents for approval from Leading Consultants.  Involved in the Preparation of Instruments List, Instruments range, data Sheets of different Instruments, Control Valve, IO List & cable schedule.  Initiating, planning, execution, tracking / monitoring, controlling and completing the project as scheduled and in implementing operational processes for increased efficiency.  Define the scope of projects while contributing to the project as the project architect and the areas of cost efficiency, time management & manpower planning for the project execution.  Successfully handle end to end execution of the design engineering projects and carried out detailed planning and scheduling to ensure execution of projects as per the defined technical & functional specifications and within budgetary parameters.  Instrumental in procurement activities such as interaction with vendors, technical evaluation of bids and preparation of purchase recommendation and also shop floor inspection. EMPLOYENT HISTORY EMPLOYER NAME TIME PERIOD DESIGNATION SHANTA COLIBRI (INDIA) PVT LTD JUNE 2015 - PRESENT Project Manager REAL TIME ENGINEERING PRIVATE LIMITED. AUGUST 2011 – MAY 2015 Assistant Project Manager SHANTA COLIBRI (INDIA) PVT LTD (Formerly known as MA SHANTA TECHNOSOFT PVT LTD). JUNE 2003 – JULY 2011 O & M Engineer PROJECTS HANDLED
  • 2. PROJECT TITLE PROJECT SCOPE/DETAILS ROLE/CONTRIBUTION KMC – Water Supply Management System “Improvement in the Kolkata Water Supply Management Project” (An Indo- French Project)” executed by Seureca Space Consulting Engineers. Consulted by Saha Technical Consultant. Installation, testing and Commissioning of Flow and Pressure and Only Pressure Monitoring Unit and Operation and maintenance of F&P monitoring stations, report generation, inventory management, spare management and faulty rectification of water management equipment. ROLE – Engineer Contribution – To manage a team of engineers and technicians for an Operation-cum-maintenance project of Kolkata Municipal Corporation (water Supply Dept.). Handling other projects to help the company to achieve growth. Demonstrating the project to guests of the Client and outsiders. Marketing the project concepts  Installation, testing and commissioning of new F& P and Only Pressure monitoring unit.  Rectification of fault and maintenance of Probes & Control Panels of different Flow & Pressure and Only Pressure monitoring units.  Rectification faulty equipment’s like Flow meter, Logger, GSM Modem, Battery Charger etc.  Testing of isolation of Probe, Measuring of resistance of flow cable with meager.  Calibrate the pressure transducer with the help of Pressure Calibrator.  Download F & P data with the help of Auto call, Manual call software through G.S.M. communication network.  Download & Upload Only Pressure data from Hand held to P.C through RS232 cable.  Generates F & P and Only Pressure data from Radcom to WIMS (Water Infrastructure Management Software) through Radwin Software.  Calculate water balance for pumping and booster pumping stations between inlets and outlets. Cast House Slag Granulation Plant of Blast Furnace 1/2/3 – Bokaro Steel Plant, SAIL. Instrumentation and Automation. ROLE – Site In charge Contribution –  Preparation of Instruments List, Instruments range & IO List with the help of P & I diagram & PFD.  Preparation of detail Engineering Data Sheets of different Instruments, Flow Transmitter, Pressure Transmitter, Level Transmitter, Magnetic Flow meter, Level Switches, Pressure Switch etc and approved those by Consulting Engineer.  Field engineering include preparation of instrument plot plan (points and lines), hook up diagram, field termination diagram, cable list, estimation of erection bill of material such cables, tubes, fittings and structural steel for mounting of instruments etc.  Commissioning of above instruments.  Instrument procurement activities such as interaction with vendors and preparation of purchase recommendation and also shop floor inspection.  Made a good relation with Client Personals and sub-contractor personals.  Preparation of Control Philosophy of the process. Essential Water Supply System of Ladle Furnace 3 – Durgapur Steel Plant, SAIL. Electrical, Instrumentation and Automation. ROLE – Site In charge Contribution –  Preparation of Instruments List, Instruments range & IO List with the help of P & I diagram & PFD.  Preparation of detail Engineering Data Sheets of different Instruments, Flow Transmitter, Pressure Transmitter, Temp. Transmitter, Ultrasonic Level Transmitter, Pressure Switch etc and approved those by Consulting Engineer.  Field engineering include preparation of instrument plot plan (points and lines), hook up diagram, Cable Schedule, Field termination diagram, Cable list, Estimation of erection bill of material such cables, tubes and structural steel etc.  Instrument procurement activities such as interaction with vendors, technical evaluation of bids and preparation of purchase recommendation and also shop floor inspection.  Installation and Commissioning of One no of IMCC Panel with Soft Starter, One no of PMCC Panel, One no. of PDB Panel, One no of MLDB panel, Five nos of SLDB panel, One no of PLC Panel, Two nos of RIO Panel, UPS Panel, Package AC Panel etc.
  • 3.  Commissioning of 30 nos LTMR and 6 nos Soft Starter connected through Modbus and TCP/IP protocol communication via ETG.  Calibration of Field mounting Instruments with Hart Calibrator.  Review of vender drawings like SLD, Wiring Diagram, GA/IGA of IMCC, IMCP, PLC/RIO panel etc.  Interaction with sub-vendors, client & consultant  PLC Make – Schneider  Software – Vijeo Citect (SCADA), Unity Pro Excel (Logic)  Hardware - REDUNDANT PROCESSOR:CPU- Quantam Gas Holder 3 & Export System Instrumentation and Automation. ROLE – Site In charge Contribution –  Preparation of Instruments List, Instruments range & IO List with the help of P & I diagram & PFD.  Preparation of detail Engineering Data Sheets of different Instruments, Flow Transmitter, O2 Analyzer, CO detector, Magnetic Flow meter, Level Switches etc and approved those by Consulting Engineer.  Field engineering include preparation of instrument plot plan (points and lines), hook up diagram, field termination diagram, cable list, estimation of erection bill of material such cables, tubes, fittings and structural steel for mounting of instruments etc.  Commissioning of above instruments.  Instrument procurement activities such as interaction with vendors and preparation of purchase recommendation and also shop floor inspection.  Made a good relation with Client Personals and sub-contractor personals. Essential Water Supply System of BRC Electrical, Instrumentation and Automation. ROLE – Site In charge Contribution –  Preparation of Instruments List, Instruments range & IO List with the help of P & I diagram & PFD.  Preparation of detail Engineering Data Sheets of different Instruments, Flow Transmitter, Pressure Transmitter, Temp. Transmitter, Ultrasonic Level Transmitter, Pressure Switch etc and approved those by Consulting Engineer.  Field engineering include preparation of instrument plot plan (points and lines), hook up diagram, Cable Schedule, Field termination diagram, Cable list, Estimation of erection bill of material such cables, tubes and structural steel etc.  Instrument procurement activities such as interaction with vendors, technical evaluation of bids and preparation of purchase recommendation and also shop floor inspection.  Installation and Commissioning of four nos of HT VCB, 2.0 KV & 1.6 KV dry type Transformer, two nos of LTSS, one no of IMCC Panel, One no of PDB Panel, Six nos. of MCP Panel (Soft Starter), One no of MLDB panel, Seven nos of SLDB panel, One no of PLC Panel, Two nos of RIO Panel, UPS Panel, Package AC Panel etc.  Commissioning of 30 nos LTMR and 13 nos Soft Starter connected through Modbus and TCP/IP protocol communication.  Calibration of Field mounting Instruments with Hart Calibrator.  Review of vender drawings like SLD, Wiring Diagram, GA/IGA of IMCC, IMCP, PLC/RIO panel etc.  Interaction with sub-vendors, client & consultant  Automation Commissioning is continuing for this project.  PLC Make – Siemens  Software – Win CC (SCADA), Simatic S7(Logic)  Hardware - REDUNDANT PROCESSOR: CPU- 417-4H
  • 4. Flow Management System for Comprehensive Distribution Under the Command Zone of 30 MGD Dhapa WTP under JnNURM. Electronics & Instrumentation Equipments and Automation ROLE – Project Management Contribution –  Preparation and Estimation of BOM for entire project.  Preparation of Instruments List, Instruments range & IO List with the help of P & I diagram & PFD.  Preparation of detail Engineering Data Sheets of different Instruments, Electromagnetic Flow Meter, Pressure Transmitter, Ultrasonic Level Transmitter, RTU etc.  Instrument procurement activities such as interaction with vendors, technical evaluation of bids and preparation of purchase recommendation and also shop floor inspection.  Installation and Commissioning of Flow and Pressure Monitoring Units.  Communication Establishment with Data Logger and Water Monitoring Software.  Integrate GPRS data with SCADA system.  Responsible for preparation of detailed Project Report, Engineering drawing and documentation, specifications of different instrument and GSM/GPRS based RTU with different type of communication protocol, good relationship with Client, Vendor and contractor, and preparation of Tender Documentation for Electrical, Instrumentation and Automation system for Water Supply Management Projects. ACADEMIA Diploma in Electronics & Telecommunications, I.E.T.E (MHRD, Govt. of India), First Class Class XII, WBSCHE, Second Class Class X, WBBSE, First Class PROFESSIONAL SKILLS/TRAIING Professional Enhancement Trainings Attained : Network+, IIHT Software’s : Radwin, WIMS (Water Infrastructure Management Software) COMPUTER SKILLS Operating System Windows (Win 10, 7.0, 8.0, Vista, XP, 2000, 1998). Languages C Language Packages MS Office, MS Project, AutoCAD PERSONAL DETAILS Date of Birth: 6th Feb 1982 Current CTC: 5.2 Lacks Notice Period: 1 month References: Available on Request I hereby declare that the particulars furnished above are true and correct to the best of my knowledge. Place: Kolkata Date: Rajib Sharma