SlideShare a Scribd company logo
MD. ABDULLAHAHAMAD
Mobile No: +91-9032282509
E-mail id: m286786@gmail.com
Skype Id: abdullah.sameer60
APPLYING FOR THE POST:- INSTRUMENTATION FOREMAN
Summary:
 Possess Five years of professional experience in Erection, Commissioning, Troubleshooting
and Maintenance of Electrical and Instrumentation systems. 
 Ability to troubleshoot, repair and maintain instruments and instrumentation systems. 
 Instrument Cable routing / tray layouts, Cable schedule, Block diagrams of Instruments,
Instrument location plans, layouts Instrument Installation & Hookup drawings. 
 Performing Instrument Loop and Logic diagrams, wiring / schematic, Interconnection
diagram, termination details. 
 Supervision of installation and commissioning of the field instruments like Sensors, Alarms,
Transducers, Differential Pressure Switches, 2-way, 3-way Control Valves.
 Possess excellent critical thinking with problem solving skills.
 Ability to handle tasks efficiently with minimum supervision. 
 Highly skilled in ladder logic and PLC Programming. 
 Oversee development of detailed design drawings including Instrument Plans, Details,
Wiring, Loops, and Fabrication Drawings.
 Perform on-site installation of systems and equipment and ongoing preventive maintenance,
repair and calibration after installation.


Education:
 Completed Bachelor of Technology in Electronics and Communication Engineering from
Jawaharlal Nehru Technological University.

 Completed PG. Diploma in Electronics process & Instrumentation Engineering.
Computerskills:
 Proficient with MS Office: MS Word, 
 MS Excel, 
 MS Power-Point 
Certification Courses:
 Field Instrumentation
 Process Instrumentation & Control
 Industrial pressure measurement and Control
 S7-300/400 Siemens programming
 DCS programming for process Control( HC 900 Controller Honeywell)
 SCADA programming for DCS
Experience:5 years(Till date)
Company: BRIDGE & ROOF CO. (India)LTD.
Site : POWER PLANT PANIPAT
Role: Instrumentation and Control Engineer
Duration: May, 2012 to Aug, 2013
Duties:
 Evaluate all approval systems for new and revised maintenance jobs and monitor all work
instructions and maintain all deliverables for projects to maintain optimal qualities within
required timeframe and coordinate with client to analyze all project requirements. 

 Responsible for safe operation of reliable control systems and reliable plant. 

 Handled the responsibilities of control system checkout, tuning and set-up. 

 Maintained and modified existing systems. 
 Extensive knowledge of instrument communication systems and approaches of measurement
technologies. 

 Supervision of the Field Instruments such as Smart Transmitters like Pressure, Flow,
Temperature, Level, Differential Pressure Transmitter etc. 

 Supervise & attend periodical preventive electrical maintenance schedules of all Machines &
Equipments. 

 In-depth knowledge of data sheets, instrument drawings, I/O wiring diagrams. 

 Technical inspection of Installation of LT equipments and Testing, Submission of Installation
Check List, Testing, No-load Trails & Commissioning Reports. 
 Observing safety in accordance with government and company standards.
 Preparation of material indents for all Instrumentation Spares/Equipments as per the
requirement.
 Study the proposed site and verify finer details of the plan before executing it.
 Preparation and review of various documents such as Instrument Index, Alarm Set Point List,
Data sheet, Instrument Wiring Connection list, Loop drawing, Instrument Wiring Hook-up. 

 Inspect the work of supervisors, contractors and engineers and check for any deviations in
executing the plan. 
 Make certain that the raw materials and equipments are used and stored as per the safety
guidelines of the organization. 

 From time to time visit site to oversee installation, operation, maintenance, and repair to
ensure that equipment is installed and functioning according to specifications. 
 Installation, repairing and maintenance of instrumentation, electrical and electronic related
equipments through the coordination of maintenance teams.

 Electrical and Instrument Cable routing, tray layouts, Cable schedule, Block diagrams of
Instruments, Instrument location plans as per the approved drawings. 
 Compilation of Electrical & Instrumentation project documentation (i.e. Equipment Lists,
Datasheets, Installation Procedures, Test Procedures, Installation, Commissioning and O&M
Manuals etc.)
 Site Supervision Services for Calibration of Instruments, Erection of Instruments and Control
Systems, Testing of Instruments Control Systems, Loop checking and Assistance during
Commissioning and Guarantee Test run.
 Supervise & attend all Electrical brake-downs and address the issues on time.
 Analyze all load programs and perform required calculations on same and manage all
electrical and instrumentation requirements for project and recommend improvements.

Company: GAMMON INDIA LIMITED.
Client: Maintenance andcommissioning ofPLC.
Site: Delhi
Role: Instrumentation Engineer, (S7-300/400 PLC)
Duration: Sep- 2013 to April-2015.
Duties:
 Inspecting and testing the operation of instruments and systems to diagnose faults using
testing devices. 

 Repairing and adjusting system components or removing and replacing defective parts. 
 Calibrating components and instruments, Performing scheduled preventive maintenance
work. 

 Maintenance & calibration of PID controllers, Transmitter used for Pressure, Temperature,
Level, Flow, Recorders, Data Logger and Scanner etc. 

 Installing control and measurement instruments on existing or new plant equipment. 
 Preparing the I/O Points list according to the requirements of the Project Specification. 

 Making the bill of quantity (BOQ) as per the Points List. 
 Prepare Equipment list, Price Quotations, Single line Diagrams/Schematics, System 
- proposals in response of customer requirements.
 Prepare contract documents and evaluate tenders for construction and maintenance of the
system. 
 Designing the appropriate locations of controllers and Panels. 
 Supervision of Loop checking activities of the PLC Controller to the control room. 

 Troubleshooting & calibration of GE Fanuc, Siemens, Allen Bradley PLC/ SCADA systems. 
 Maintaining calibration records of all Field Instruments as per the calibration schedule.
 Writing maintenance reports. 
 Researching, designing, installing, operating and maintaining of Instrumentation products,
equipment, system and process requirements and engineering principles. 
 Fire alarm and fire security system and its troubleshooting.


PERSONNAL DETAILS:
 NAME MD.ABDULLAH AHAMAD
 DATE OF BIRTH 01-07-1990
 MARITIAL STATUS SINGLE
 RELIGION ISLAM
 NATIONALITY INDIAN
 LANGUAGES KNOWN ENGLISH,URDU,HINDI
 PERMANENT ADDRESS VILL-SAIDPURA
POST-BAGHI BAZAR
PS-KATEYA
DIST-GOPALGANJ
STATE-BIHAR
 PASSPORT DETAILS L8696572
DATE OF ISSUE: 08-04-2014
DATE OF EXPIRY: 07-04-2024
PLACE OF ISSUE: PATNA
Date. 28-10-015 (MD.ABDULLAH AHAMAD)
Place. Mumbai, India

More Related Content

What's hot (18)

Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar Kaviti
 
Antony Praveen
Antony PraveenAntony Praveen
Antony Praveen
 
Resume E&I
Resume E&IResume E&I
Resume E&I
 
RESUME C&I
RESUME C&IRESUME C&I
RESUME C&I
 
My final resume
My final resumeMy final resume
My final resume
 
JAI RESUME
JAI RESUMEJAI RESUME
JAI RESUME
 
ROHIT JOSHI JI
ROHIT JOSHI JIROHIT JOSHI JI
ROHIT JOSHI JI
 
PankajKPrajapati
PankajKPrajapatiPankajKPrajapati
PankajKPrajapati
 
Resume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceResume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experience
 
11602279
1160227911602279
11602279
 
AMIT (1)
AMIT (1)AMIT (1)
AMIT (1)
 
Geoffrey Rowling CV
Geoffrey Rowling CVGeoffrey Rowling CV
Geoffrey Rowling CV
 
CURRENT PROFILE 1_2016
CURRENT PROFILE 1_2016CURRENT PROFILE 1_2016
CURRENT PROFILE 1_2016
 
Alfred CV
Alfred CVAlfred CV
Alfred CV
 
Mr DD update resume
Mr DD update resumeMr DD update resume
Mr DD update resume
 
Resume_Instrumentation Engineer_7.5 year experience
Resume_Instrumentation Engineer_7.5 year experienceResume_Instrumentation Engineer_7.5 year experience
Resume_Instrumentation Engineer_7.5 year experience
 
Latest resume
Latest resumeLatest resume
Latest resume
 
FREEBORN CV.NNPC POSITIVE
FREEBORN CV.NNPC POSITIVEFREEBORN CV.NNPC POSITIVE
FREEBORN CV.NNPC POSITIVE
 

Viewers also liked

Instrument and Control Engineer
Instrument and Control EngineerInstrument and Control Engineer
Instrument and Control EngineerVICTORIA NGOZI U.
 
ENGINEER B.G. OGOLO
ENGINEER B.G. OGOLOENGINEER B.G. OGOLO
ENGINEER B.G. OGOLOBoma Gibson
 
Presentation on e&i supports
Presentation on e&i supportsPresentation on e&i supports
Presentation on e&i supportssyamdev1968
 
Jason Fong - Instrumentation Engineering Technologist update April 18
Jason Fong - Instrumentation Engineering Technologist update April 18Jason Fong - Instrumentation Engineering Technologist update April 18
Jason Fong - Instrumentation Engineering Technologist update April 18Jason Fong
 
Carrers in instrumentation engineering
Carrers in instrumentation engineeringCarrers in instrumentation engineering
Carrers in instrumentation engineeringentranzz123
 
Reverse engineering and instrumentation of android apps
Reverse engineering and instrumentation of android appsReverse engineering and instrumentation of android apps
Reverse engineering and instrumentation of android appsGaurav Lochan
 
Mechanical, Electrical and Instrumentation Engineering for Non-Engineers
Mechanical, Electrical and Instrumentation Engineering for Non-EngineersMechanical, Electrical and Instrumentation Engineering for Non-Engineers
Mechanical, Electrical and Instrumentation Engineering for Non-EngineersLiving Online
 
Emerging Trends in Electrical, Electronics & Instrumentation Engineering: An ...
Emerging Trends in Electrical, Electronics & Instrumentation Engineering: An ...Emerging Trends in Electrical, Electronics & Instrumentation Engineering: An ...
Emerging Trends in Electrical, Electronics & Instrumentation Engineering: An ...eeiej
 
Instrumentation Engineering : Transducers, THE GATE ACADEMY
 Instrumentation Engineering : Transducers, THE GATE ACADEMY Instrumentation Engineering : Transducers, THE GATE ACADEMY
Instrumentation Engineering : Transducers, THE GATE ACADEMYklirantga
 
Big picture of electronics and instrumentation engineering
Big picture of electronics and instrumentation engineeringBig picture of electronics and instrumentation engineering
Big picture of electronics and instrumentation engineeringRMK ENGINEERING COLLEGE, CHENNAI
 
Electrical and Instrumentation (E&I) Engineering for Oil and Gas Facilities
Electrical and Instrumentation (E&I) Engineering for Oil and Gas FacilitiesElectrical and Instrumentation (E&I) Engineering for Oil and Gas Facilities
Electrical and Instrumentation (E&I) Engineering for Oil and Gas FacilitiesLiving Online
 
PRESSURE INSTRUMENTATION
PRESSURE INSTRUMENTATIONPRESSURE INSTRUMENTATION
PRESSURE INSTRUMENTATIONsanket kulkarni
 

Viewers also liked (17)

Instrument and Control Engineer
Instrument and Control EngineerInstrument and Control Engineer
Instrument and Control Engineer
 
OSAS-CV5
OSAS-CV5OSAS-CV5
OSAS-CV5
 
ENGINEER B.G. OGOLO
ENGINEER B.G. OGOLOENGINEER B.G. OGOLO
ENGINEER B.G. OGOLO
 
CV-IHNweke.TH
CV-IHNweke.THCV-IHNweke.TH
CV-IHNweke.TH
 
C.V Sam-April 2016
C.V Sam-April 2016C.V Sam-April 2016
C.V Sam-April 2016
 
Presentation on e&i supports
Presentation on e&i supportsPresentation on e&i supports
Presentation on e&i supports
 
Jason Fong - Instrumentation Engineering Technologist update April 18
Jason Fong - Instrumentation Engineering Technologist update April 18Jason Fong - Instrumentation Engineering Technologist update April 18
Jason Fong - Instrumentation Engineering Technologist update April 18
 
Lecture 10
Lecture 10Lecture 10
Lecture 10
 
Carrers in instrumentation engineering
Carrers in instrumentation engineeringCarrers in instrumentation engineering
Carrers in instrumentation engineering
 
Reverse engineering and instrumentation of android apps
Reverse engineering and instrumentation of android appsReverse engineering and instrumentation of android apps
Reverse engineering and instrumentation of android apps
 
Mechanical, Electrical and Instrumentation Engineering for Non-Engineers
Mechanical, Electrical and Instrumentation Engineering for Non-EngineersMechanical, Electrical and Instrumentation Engineering for Non-Engineers
Mechanical, Electrical and Instrumentation Engineering for Non-Engineers
 
Emerging Trends in Electrical, Electronics & Instrumentation Engineering: An ...
Emerging Trends in Electrical, Electronics & Instrumentation Engineering: An ...Emerging Trends in Electrical, Electronics & Instrumentation Engineering: An ...
Emerging Trends in Electrical, Electronics & Instrumentation Engineering: An ...
 
Instrumentation Engineering : Transducers, THE GATE ACADEMY
 Instrumentation Engineering : Transducers, THE GATE ACADEMY Instrumentation Engineering : Transducers, THE GATE ACADEMY
Instrumentation Engineering : Transducers, THE GATE ACADEMY
 
Big picture of electronics and instrumentation engineering
Big picture of electronics and instrumentation engineeringBig picture of electronics and instrumentation engineering
Big picture of electronics and instrumentation engineering
 
Electrical and Instrumentation (E&I) Engineering for Oil and Gas Facilities
Electrical and Instrumentation (E&I) Engineering for Oil and Gas FacilitiesElectrical and Instrumentation (E&I) Engineering for Oil and Gas Facilities
Electrical and Instrumentation (E&I) Engineering for Oil and Gas Facilities
 
Instrumentation Engineering
Instrumentation EngineeringInstrumentation Engineering
Instrumentation Engineering
 
PRESSURE INSTRUMENTATION
PRESSURE INSTRUMENTATIONPRESSURE INSTRUMENTATION
PRESSURE INSTRUMENTATION
 

Similar to instrumentation Engineering Cv

Similar to instrumentation Engineering Cv (20)

Manu Mohan_resume
Manu Mohan_resumeManu Mohan_resume
Manu Mohan_resume
 
DIPESH KUMAR
DIPESH KUMARDIPESH KUMAR
DIPESH KUMAR
 
Fahad CV
Fahad CVFahad CV
Fahad CV
 
asif sup new (4)
asif sup new (4)asif sup new (4)
asif sup new (4)
 
BHARATH KUMAR REDDY
BHARATH KUMAR REDDYBHARATH KUMAR REDDY
BHARATH KUMAR REDDY
 
E&I QA QC MD LATEEFUR RAHMAN (2)
E&I QA QC MD LATEEFUR RAHMAN (2)E&I QA QC MD LATEEFUR RAHMAN (2)
E&I QA QC MD LATEEFUR RAHMAN (2)
 
Resume
Resume Resume
Resume
 
Vipin Resume new qc
Vipin Resume new qcVipin Resume new qc
Vipin Resume new qc
 
AVINASH . Basrur
AVINASH . BasrurAVINASH . Basrur
AVINASH . Basrur
 
Selva_CV
Selva_CVSelva_CV
Selva_CV
 
Lijo_cv updated 27.04.2015
Lijo_cv updated 27.04.2015Lijo_cv updated 27.04.2015
Lijo_cv updated 27.04.2015
 
Latest resume
Latest resumeLatest resume
Latest resume
 
Latest resume
Latest resumeLatest resume
Latest resume
 
Elv project engineer
Elv project engineerElv project engineer
Elv project engineer
 
Elv project engineer
Elv project engineerElv project engineer
Elv project engineer
 
CV
CVCV
CV
 
vinodh
vinodhvinodh
vinodh
 
Electrical Engineer 2
Electrical Engineer 2Electrical Engineer 2
Electrical Engineer 2
 
SANJAY PATEL
SANJAY PATELSANJAY PATEL
SANJAY PATEL
 
ELV Project Engineer
ELV Project EngineerELV Project Engineer
ELV Project Engineer
 

Recently uploaded

Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringC Sai Kiran
 
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationKIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationDr. Radhey Shyam
 
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfKamal Acharya
 
fundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionfundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionjeevanprasad8
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdfKamal Acharya
 
A case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfA case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfKamal Acharya
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGKOUSTAV SARKAR
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationRobbie Edward Sayers
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdfKamal Acharya
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsAtif Razi
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-IVigneshvaranMech
 
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamDr. Radhey Shyam
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxMd. Shahidul Islam Prodhan
 
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfRESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Peek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfPeek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfAyahmorsy
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxwendy cai
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf884710SadaqatAli
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
 

Recently uploaded (20)

Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationKIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
 
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
 
fundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionfundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projection
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdf
 
A case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfA case study of cinema management system project report..pdf
A case study of cinema management system project report..pdf
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
 
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfRESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
 
Peek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfPeek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdf
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptx
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 

instrumentation Engineering Cv

  • 1. MD. ABDULLAHAHAMAD Mobile No: +91-9032282509 E-mail id: m286786@gmail.com Skype Id: abdullah.sameer60 APPLYING FOR THE POST:- INSTRUMENTATION FOREMAN Summary:  Possess Five years of professional experience in Erection, Commissioning, Troubleshooting and Maintenance of Electrical and Instrumentation systems.   Ability to troubleshoot, repair and maintain instruments and instrumentation systems.   Instrument Cable routing / tray layouts, Cable schedule, Block diagrams of Instruments, Instrument location plans, layouts Instrument Installation & Hookup drawings.   Performing Instrument Loop and Logic diagrams, wiring / schematic, Interconnection diagram, termination details.   Supervision of installation and commissioning of the field instruments like Sensors, Alarms, Transducers, Differential Pressure Switches, 2-way, 3-way Control Valves.  Possess excellent critical thinking with problem solving skills.  Ability to handle tasks efficiently with minimum supervision.   Highly skilled in ladder logic and PLC Programming.   Oversee development of detailed design drawings including Instrument Plans, Details, Wiring, Loops, and Fabrication Drawings.  Perform on-site installation of systems and equipment and ongoing preventive maintenance, repair and calibration after installation.   Education:  Completed Bachelor of Technology in Electronics and Communication Engineering from Jawaharlal Nehru Technological University.   Completed PG. Diploma in Electronics process & Instrumentation Engineering.
  • 2. Computerskills:  Proficient with MS Office: MS Word,   MS Excel,   MS Power-Point  Certification Courses:  Field Instrumentation  Process Instrumentation & Control  Industrial pressure measurement and Control  S7-300/400 Siemens programming  DCS programming for process Control( HC 900 Controller Honeywell)  SCADA programming for DCS Experience:5 years(Till date) Company: BRIDGE & ROOF CO. (India)LTD. Site : POWER PLANT PANIPAT Role: Instrumentation and Control Engineer Duration: May, 2012 to Aug, 2013 Duties:  Evaluate all approval systems for new and revised maintenance jobs and monitor all work instructions and maintain all deliverables for projects to maintain optimal qualities within required timeframe and coordinate with client to analyze all project requirements.    Responsible for safe operation of reliable control systems and reliable plant.    Handled the responsibilities of control system checkout, tuning and set-up.    Maintained and modified existing systems.   Extensive knowledge of instrument communication systems and approaches of measurement technologies.    Supervision of the Field Instruments such as Smart Transmitters like Pressure, Flow, Temperature, Level, Differential Pressure Transmitter etc.    Supervise & attend periodical preventive electrical maintenance schedules of all Machines & Equipments.    In-depth knowledge of data sheets, instrument drawings, I/O wiring diagrams.    Technical inspection of Installation of LT equipments and Testing, Submission of Installation Check List, Testing, No-load Trails & Commissioning Reports.   Observing safety in accordance with government and company standards.  Preparation of material indents for all Instrumentation Spares/Equipments as per the requirement.
  • 3.  Study the proposed site and verify finer details of the plan before executing it.  Preparation and review of various documents such as Instrument Index, Alarm Set Point List, Data sheet, Instrument Wiring Connection list, Loop drawing, Instrument Wiring Hook-up.    Inspect the work of supervisors, contractors and engineers and check for any deviations in executing the plan.   Make certain that the raw materials and equipments are used and stored as per the safety guidelines of the organization.    From time to time visit site to oversee installation, operation, maintenance, and repair to ensure that equipment is installed and functioning according to specifications.   Installation, repairing and maintenance of instrumentation, electrical and electronic related equipments through the coordination of maintenance teams.   Electrical and Instrument Cable routing, tray layouts, Cable schedule, Block diagrams of Instruments, Instrument location plans as per the approved drawings.   Compilation of Electrical & Instrumentation project documentation (i.e. Equipment Lists, Datasheets, Installation Procedures, Test Procedures, Installation, Commissioning and O&M Manuals etc.)  Site Supervision Services for Calibration of Instruments, Erection of Instruments and Control Systems, Testing of Instruments Control Systems, Loop checking and Assistance during Commissioning and Guarantee Test run.  Supervise & attend all Electrical brake-downs and address the issues on time.  Analyze all load programs and perform required calculations on same and manage all electrical and instrumentation requirements for project and recommend improvements.  Company: GAMMON INDIA LIMITED. Client: Maintenance andcommissioning ofPLC. Site: Delhi Role: Instrumentation Engineer, (S7-300/400 PLC) Duration: Sep- 2013 to April-2015. Duties:  Inspecting and testing the operation of instruments and systems to diagnose faults using testing devices.    Repairing and adjusting system components or removing and replacing defective parts.   Calibrating components and instruments, Performing scheduled preventive maintenance work.    Maintenance & calibration of PID controllers, Transmitter used for Pressure, Temperature, Level, Flow, Recorders, Data Logger and Scanner etc.    Installing control and measurement instruments on existing or new plant equipment.   Preparing the I/O Points list according to the requirements of the Project Specification.    Making the bill of quantity (BOQ) as per the Points List.   Prepare Equipment list, Price Quotations, Single line Diagrams/Schematics, System 
  • 4. - proposals in response of customer requirements.  Prepare contract documents and evaluate tenders for construction and maintenance of the system.   Designing the appropriate locations of controllers and Panels.   Supervision of Loop checking activities of the PLC Controller to the control room.    Troubleshooting & calibration of GE Fanuc, Siemens, Allen Bradley PLC/ SCADA systems.   Maintaining calibration records of all Field Instruments as per the calibration schedule.  Writing maintenance reports.   Researching, designing, installing, operating and maintaining of Instrumentation products, equipment, system and process requirements and engineering principles.   Fire alarm and fire security system and its troubleshooting.   PERSONNAL DETAILS:  NAME MD.ABDULLAH AHAMAD  DATE OF BIRTH 01-07-1990  MARITIAL STATUS SINGLE  RELIGION ISLAM  NATIONALITY INDIAN  LANGUAGES KNOWN ENGLISH,URDU,HINDI  PERMANENT ADDRESS VILL-SAIDPURA POST-BAGHI BAZAR PS-KATEYA DIST-GOPALGANJ STATE-BIHAR  PASSPORT DETAILS L8696572 DATE OF ISSUE: 08-04-2014 DATE OF EXPIRY: 07-04-2024 PLACE OF ISSUE: PATNA Date. 28-10-015 (MD.ABDULLAH AHAMAD) Place. Mumbai, India