SlideShare a Scribd company logo
1 of 2
Paranthaman Krishnasamy
212 Washington Ave, Apt #1124, Towson, MD-21204 • 443-968-5033 •parankrish@gmail.com
PROFILE
Project Controls Management Professional
● Results - oriented leader with a high degree of business acumen and ability to manage multiple functions
looking for a position in Project Control Management
● 28 years of International Experience in Renewable Energy, Oil & Gas, Petrochemical, Fine-Chemicals,
Energy and Infrastructure including Offshore
● Areas ofExpertise - Project Controls Management, Construction Management, Market Development,
Market Research,Logistics and Coordination
● Professional Affiliations: Member of Project Management Institute of America since January 1998; Member
of Association for Total Cost Management of America since September 1993
● Computer Skills: Proficient with ERP,Primavera, SAP, MS Project and Microsoft Office
● Language Skills: Fluent in English and Tamil, Working knowledge of Telugu and Hindi
PROFESSIONAL ACHIEVEMENTS
● Identified new business opportunities for Bharat Heavy Electricals Limited with an estimated potential of
around US$500 million
● Project Controls Manager for Kvaerner Process with more than 1200 full time consultants with an annual
turnover of US$1Billion
● Identified project hurdles for Schering Plough Project, Singapore with a $300 million USD budget and made
savings of $3 million USD
● Project Coordinator for the World’s first Floating Production Storage and Offloading System for Petrobras at
Egypt
PROFESSIONAL EXPERIENCE
TSP Engineers and Consultants Trichy, India
Project Controls Management Consultant Jun 2001 - Present
● Project Manager for EPC projects from 5KW to 150KW Solar Power Project and Project Controls Manager
for BHEL’s Pipe Laying Contracts with a total value of $50 million USD
● Managed a 10 MW Solar Power project with a budget of $13 million USD consisting of 33,160 panels with a
cost saving of $500,000 USD
● Analysed the cost and schedule reports for 600 MW power plant project and identified areas for cost overrun;
Recommended the corrective actions resulting in cost- saving to the tune of $12 million USD
● Developed new methodology for the cost control system for Solar Projects of 1 MW and above
Kvaerner ProcessInc. Bridgewater, NJ
Project Controls Manager Jul 1998 – Jun 2001
● Project Controls Engineer for Silica Project, CABOT Corporation, Midland, MI
● Project Controls Manager for MI Eastman cGMP Small Scale Manufacturing Facility, Batesville, AR and
Imclone Product Launch Project, Somerville, NJ
● Managed the cost, schedule reports and MIS reports for various projects
Damian Corporation (Payroll Division) Chicago, IL
Business Consultant May 1998 – Jul 1998
● Project: Development of the Payroll System
● Studied the existing payroll system in detail and identified new requirements; Conducted interviews with
various levels of users and developed system requirements; Analyzed different packages available in the
market and proposed a suitable system
Yonkers Industries Inc. Raleigh, NC
Project Controls Engineer Aug 1996 - Jul 1997
● Project: Construction Management of Bulk PharmaceuticalManufacturing Facility in Singapore
● Developed the Monthly reports detailing cost, schedule and earned value; Integrated the cost and accounting
to track expenses with the schedule
● Developed and monitored the Construction Progress measurement tools
● Achieved cost saving of $1 million USD by analyzing the sub-contractor’s progress reports and advising on
corrective actions
Nippon Steel Corporation Tokyo, Japan
Operations Manager Apr 1996 – Aug 1996
● Project: EPC of Offshore Platforms, POGO - Tantawan Field Development in Thailand
● Completed a US$ 5 million turnkey contract for offshore platforms installation on schedule with a saving of
$400,000 USD
Kvaerner ProcessInc. Bridgewater, NJ
Project Engineer Sep 1995 – Apr 1996
● Project: Engineering & Procurement of Bulk PharmaceuticalManufacturing Facility in Singapore
● Coordinated the E&P activities between Home Office, Client, Consultants and Constructor; Forecasted the
project flow and recorded and transferred data to progress reporting system; Analyzed the variation requests
from consultants and advised on the same accordingly
Oil Tools Engineering Services Inc Singapore
Project Coordinator Nov 1993 – Sep 1995
● Projects
▪ Floating Production Storage and Offloading Facility, Petrobras - Egypt
▪ PUB Gas Off-take Stations, Singapore
● Developed the Decision Support System used for outsourcing
● Conducted a feasibility study for a package refinery in Russia with a capacity of 10,000 Barrels per day
Jufal Naif Obaid Co. Al-Jubail, Saudi Arabia
Project Analyst Oct 1992 – Sep 1993
● Project: Petrokemya Olefins Project, Saudi Arabia
● Developed and monitored the project reporting system based on the project requirements; Identified the delay
areas and advised on corrective action; Coordinated project control issues among the client, consultant,
contractors and others
Bharat Heavy Electricals Limited Trichy, India
Project Engineer Oct 1986 – Oct 1992
● Reengineered the project process flow with a cost saving of $5 million USD in overall project cost; Managed
and completed turnkey power projects in a record time from 36 months to 24 months
● Developed new methodology for competitive bidding with annual cost savings of $1 million; Project leader of
the department developing ISO9001
EDUCATION
Loyola University Chicago, IL
Master of Business Administration May 2000
Bharathidasan University, Trichy, India
M.B.A. - Project Management May 1987
Madurai Kamaraj University, Madurai, India
B.E. - Mechanical Engineering May 1985

More Related Content

What's hot

Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineerSankar Sundaram PMP
 
CV_Tarun Kumar Behera
CV_Tarun Kumar BeheraCV_Tarun Kumar Behera
CV_Tarun Kumar BeheraTarun Behera
 
RESUME _2016 Rev (A1)
RESUME  _2016 Rev (A1)RESUME  _2016 Rev (A1)
RESUME _2016 Rev (A1)Ken Gates
 
Christina l brown_2016_o&g resume
Christina l brown_2016_o&g resumeChristina l brown_2016_o&g resume
Christina l brown_2016_o&g resumeChristina Brown
 
Christinalbrown2016ogresume 160707183304
Christinalbrown2016ogresume 160707183304Christinalbrown2016ogresume 160707183304
Christinalbrown2016ogresume 160707183304Christina Brown
 
Anthony R. Moore 06_24_16
Anthony R. Moore  06_24_16Anthony R. Moore  06_24_16
Anthony R. Moore 06_24_16Anthony Moore
 
Abdullah Jaber Civil Eng CV EXP. 5 yrs
Abdullah Jaber Civil Eng CV EXP. 5 yrsAbdullah Jaber Civil Eng CV EXP. 5 yrs
Abdullah Jaber Civil Eng CV EXP. 5 yrsAbdullah Jaber
 
Portfolio Large Projects
Portfolio Large ProjectsPortfolio Large Projects
Portfolio Large Projectsdaveluke
 

What's hot (19)

CV_SUMAN MUKHERJEE- JULY-16
CV_SUMAN MUKHERJEE- JULY-16CV_SUMAN MUKHERJEE- JULY-16
CV_SUMAN MUKHERJEE- JULY-16
 
Ben-Coleman II
Ben-Coleman IIBen-Coleman II
Ben-Coleman II
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
 
Sachin Mohelay
Sachin MohelaySachin Mohelay
Sachin Mohelay
 
GMR
GMRGMR
GMR
 
CV_Tarun Kumar Behera
CV_Tarun Kumar BeheraCV_Tarun Kumar Behera
CV_Tarun Kumar Behera
 
RESUME _2016 Rev (A1)
RESUME  _2016 Rev (A1)RESUME  _2016 Rev (A1)
RESUME _2016 Rev (A1)
 
Christina l brown_2016_o&g resume
Christina l brown_2016_o&g resumeChristina l brown_2016_o&g resume
Christina l brown_2016_o&g resume
 
Christinalbrown2016ogresume 160707183304
Christinalbrown2016ogresume 160707183304Christinalbrown2016ogresume 160707183304
Christinalbrown2016ogresume 160707183304
 
SC Biodata 2016_v1
SC Biodata 2016_v1SC Biodata 2016_v1
SC Biodata 2016_v1
 
resume'2016.docx
resume'2016.docxresume'2016.docx
resume'2016.docx
 
Julian_Carroll resume 2015 link
Julian_Carroll resume 2015 linkJulian_Carroll resume 2015 link
Julian_Carroll resume 2015 link
 
Anthony R. Moore 06_24_16
Anthony R. Moore  06_24_16Anthony R. Moore  06_24_16
Anthony R. Moore 06_24_16
 
Resume Acc
Resume AccResume Acc
Resume Acc
 
Abdullah Jaber Civil Eng CV EXP. 5 yrs
Abdullah Jaber Civil Eng CV EXP. 5 yrsAbdullah Jaber Civil Eng CV EXP. 5 yrs
Abdullah Jaber Civil Eng CV EXP. 5 yrs
 
Portfolio Large Projects
Portfolio Large ProjectsPortfolio Large Projects
Portfolio Large Projects
 
Reda Amin1
Reda Amin1Reda Amin1
Reda Amin1
 
CV_Muhammad Iqbal
CV_Muhammad IqbalCV_Muhammad Iqbal
CV_Muhammad Iqbal
 
Mike C LeBlanc REV3
Mike C LeBlanc REV3Mike C LeBlanc REV3
Mike C LeBlanc REV3
 

Viewers also liked

次のステージへ~実践するSharing をSociety~ from コワーキングスペース秘密基地/一般社団法人まちはチームだ
次のステージへ~実践するSharing をSociety~ from コワーキングスペース秘密基地/一般社団法人まちはチームだ次のステージへ~実践するSharing をSociety~ from コワーキングスペース秘密基地/一般社団法人まちはチームだ
次のステージへ~実践するSharing をSociety~ from コワーキングスペース秘密基地/一般社団法人まちはチームだTakeshi Shibuya
 
dapoaugury_overview_nov2015_for_dapo
dapoaugury_overview_nov2015_for_dapodapoaugury_overview_nov2015_for_dapo
dapoaugury_overview_nov2015_for_dapoMeng Choon Tan
 
2016 China Sports Industry Update - Chinese version
2016 China Sports Industry Update - Chinese version2016 China Sports Industry Update - Chinese version
2016 China Sports Industry Update - Chinese versionTing Zhang
 
Aspectos Éticos y Legales
Aspectos Éticos y LegalesAspectos Éticos y Legales
Aspectos Éticos y LegalesZayuri_Alejandra
 
Design businessssss
Design businessssssDesign businessssss
Design businessssssdvalente1
 
Робота МО початкових класів в фотографіях. 1 частина
Робота МО початкових класів в фотографіях. 1 частинаРобота МО початкових класів в фотографіях. 1 частина
Робота МО початкових класів в фотографіях. 1 частинаAlusya
 
God is, en werkt door
God is, en werkt doorGod is, en werkt door
God is, en werkt doorEben Haezer
 
The lenses used for photography worldwide
The lenses used for photography worldwideThe lenses used for photography worldwide
The lenses used for photography worldwideAmit Dash
 
Cultura Emprendedora y Empresarial
Cultura Emprendedora y EmpresarialCultura Emprendedora y Empresarial
Cultura Emprendedora y EmpresarialJose Sande
 
The Range Rover Evoque
The Range Rover Evoque The Range Rover Evoque
The Range Rover Evoque Saxton 4x4
 
power point alumnas terciario
power point alumnas terciariopower point alumnas terciario
power point alumnas terciarioCeci Roera
 

Viewers also liked (17)

CV (4)
CV (4)CV (4)
CV (4)
 
次のステージへ~実践するSharing をSociety~ from コワーキングスペース秘密基地/一般社団法人まちはチームだ
次のステージへ~実践するSharing をSociety~ from コワーキングスペース秘密基地/一般社団法人まちはチームだ次のステージへ~実践するSharing をSociety~ from コワーキングスペース秘密基地/一般社団法人まちはチームだ
次のステージへ~実践するSharing をSociety~ from コワーキングスペース秘密基地/一般社団法人まちはチームだ
 
dapoaugury_overview_nov2015_for_dapo
dapoaugury_overview_nov2015_for_dapodapoaugury_overview_nov2015_for_dapo
dapoaugury_overview_nov2015_for_dapo
 
2016 China Sports Industry Update - Chinese version
2016 China Sports Industry Update - Chinese version2016 China Sports Industry Update - Chinese version
2016 China Sports Industry Update - Chinese version
 
Aspectos Éticos y Legales
Aspectos Éticos y LegalesAspectos Éticos y Legales
Aspectos Éticos y Legales
 
The Time Has Come
The Time Has ComeThe Time Has Come
The Time Has Come
 
One v one ver1.1
One v one ver1.1 One v one ver1.1
One v one ver1.1
 
Consultant Course
Consultant CourseConsultant Course
Consultant Course
 
Design businessssss
Design businessssssDesign businessssss
Design businessssss
 
Робота МО початкових класів в фотографіях. 1 частина
Робота МО початкових класів в фотографіях. 1 частинаРобота МО початкових класів в фотографіях. 1 частина
Робота МО початкових класів в фотографіях. 1 частина
 
Mercato dm italia uk
Mercato dm italia ukMercato dm italia uk
Mercato dm italia uk
 
God is, en werkt door
God is, en werkt doorGod is, en werkt door
God is, en werkt door
 
This Kingdom
This KingdomThis Kingdom
This Kingdom
 
The lenses used for photography worldwide
The lenses used for photography worldwideThe lenses used for photography worldwide
The lenses used for photography worldwide
 
Cultura Emprendedora y Empresarial
Cultura Emprendedora y EmpresarialCultura Emprendedora y Empresarial
Cultura Emprendedora y Empresarial
 
The Range Rover Evoque
The Range Rover Evoque The Range Rover Evoque
The Range Rover Evoque
 
power point alumnas terciario
power point alumnas terciariopower point alumnas terciario
power point alumnas terciario
 

Similar to Resume-ParanthamanKrishnasamy

Similar to Resume-ParanthamanKrishnasamy (20)

Quantity Surveyor CV
Quantity Surveyor CVQuantity Surveyor CV
Quantity Surveyor CV
 
Professional with almost 4+ years of rich experience in Business Development ...
Professional with almost 4+ years of rich experience in Business Development ...Professional with almost 4+ years of rich experience in Business Development ...
Professional with almost 4+ years of rich experience in Business Development ...
 
Prashant Wani1
Prashant Wani1Prashant Wani1
Prashant Wani1
 
Kristina M Klingler Resume
Kristina M Klingler ResumeKristina M Klingler Resume
Kristina M Klingler Resume
 
Word Doc CV
Word Doc CVWord Doc CV
Word Doc CV
 
Rohit Resume
Rohit ResumeRohit Resume
Rohit Resume
 
Venkatesh- planning CV
Venkatesh- planning CVVenkatesh- planning CV
Venkatesh- planning CV
 
Ravi CV 2016
Ravi CV 2016Ravi CV 2016
Ravi CV 2016
 
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CV
 
Cv goutam sen (1)
Cv goutam sen (1)Cv goutam sen (1)
Cv goutam sen (1)
 
CV-Balamurugan.
CV-Balamurugan.CV-Balamurugan.
CV-Balamurugan.
 
CV of Dinesh
CV of DineshCV of Dinesh
CV of Dinesh
 
CV
CVCV
CV
 
CV-Goutam Sen
CV-Goutam SenCV-Goutam Sen
CV-Goutam Sen
 
Ajay Latest CV 20 Mar
Ajay Latest CV 20 MarAjay Latest CV 20 Mar
Ajay Latest CV 20 Mar
 
Resume of R N Chaudhuri
Resume of R N ChaudhuriResume of R N Chaudhuri
Resume of R N Chaudhuri
 
Mohammed vasil k.
Mohammed vasil k.Mohammed vasil k.
Mohammed vasil k.
 
Samrat Khanorkar_Resume
Samrat Khanorkar_ResumeSamrat Khanorkar_Resume
Samrat Khanorkar_Resume
 
Pankaj K. Jha_ Senior Project_Engg__Resume-
Pankaj K. Jha_ Senior Project_Engg__Resume-Pankaj K. Jha_ Senior Project_Engg__Resume-
Pankaj K. Jha_ Senior Project_Engg__Resume-
 
KHURRAM ASHFAQ KHAN CV updated
KHURRAM ASHFAQ KHAN  CV updatedKHURRAM ASHFAQ KHAN  CV updated
KHURRAM ASHFAQ KHAN CV updated
 

Resume-ParanthamanKrishnasamy

  • 1. Paranthaman Krishnasamy 212 Washington Ave, Apt #1124, Towson, MD-21204 • 443-968-5033 •parankrish@gmail.com PROFILE Project Controls Management Professional ● Results - oriented leader with a high degree of business acumen and ability to manage multiple functions looking for a position in Project Control Management ● 28 years of International Experience in Renewable Energy, Oil & Gas, Petrochemical, Fine-Chemicals, Energy and Infrastructure including Offshore ● Areas ofExpertise - Project Controls Management, Construction Management, Market Development, Market Research,Logistics and Coordination ● Professional Affiliations: Member of Project Management Institute of America since January 1998; Member of Association for Total Cost Management of America since September 1993 ● Computer Skills: Proficient with ERP,Primavera, SAP, MS Project and Microsoft Office ● Language Skills: Fluent in English and Tamil, Working knowledge of Telugu and Hindi PROFESSIONAL ACHIEVEMENTS ● Identified new business opportunities for Bharat Heavy Electricals Limited with an estimated potential of around US$500 million ● Project Controls Manager for Kvaerner Process with more than 1200 full time consultants with an annual turnover of US$1Billion ● Identified project hurdles for Schering Plough Project, Singapore with a $300 million USD budget and made savings of $3 million USD ● Project Coordinator for the World’s first Floating Production Storage and Offloading System for Petrobras at Egypt PROFESSIONAL EXPERIENCE TSP Engineers and Consultants Trichy, India Project Controls Management Consultant Jun 2001 - Present ● Project Manager for EPC projects from 5KW to 150KW Solar Power Project and Project Controls Manager for BHEL’s Pipe Laying Contracts with a total value of $50 million USD ● Managed a 10 MW Solar Power project with a budget of $13 million USD consisting of 33,160 panels with a cost saving of $500,000 USD ● Analysed the cost and schedule reports for 600 MW power plant project and identified areas for cost overrun; Recommended the corrective actions resulting in cost- saving to the tune of $12 million USD ● Developed new methodology for the cost control system for Solar Projects of 1 MW and above Kvaerner ProcessInc. Bridgewater, NJ Project Controls Manager Jul 1998 – Jun 2001 ● Project Controls Engineer for Silica Project, CABOT Corporation, Midland, MI ● Project Controls Manager for MI Eastman cGMP Small Scale Manufacturing Facility, Batesville, AR and Imclone Product Launch Project, Somerville, NJ ● Managed the cost, schedule reports and MIS reports for various projects Damian Corporation (Payroll Division) Chicago, IL Business Consultant May 1998 – Jul 1998 ● Project: Development of the Payroll System ● Studied the existing payroll system in detail and identified new requirements; Conducted interviews with various levels of users and developed system requirements; Analyzed different packages available in the market and proposed a suitable system
  • 2. Yonkers Industries Inc. Raleigh, NC Project Controls Engineer Aug 1996 - Jul 1997 ● Project: Construction Management of Bulk PharmaceuticalManufacturing Facility in Singapore ● Developed the Monthly reports detailing cost, schedule and earned value; Integrated the cost and accounting to track expenses with the schedule ● Developed and monitored the Construction Progress measurement tools ● Achieved cost saving of $1 million USD by analyzing the sub-contractor’s progress reports and advising on corrective actions Nippon Steel Corporation Tokyo, Japan Operations Manager Apr 1996 – Aug 1996 ● Project: EPC of Offshore Platforms, POGO - Tantawan Field Development in Thailand ● Completed a US$ 5 million turnkey contract for offshore platforms installation on schedule with a saving of $400,000 USD Kvaerner ProcessInc. Bridgewater, NJ Project Engineer Sep 1995 – Apr 1996 ● Project: Engineering & Procurement of Bulk PharmaceuticalManufacturing Facility in Singapore ● Coordinated the E&P activities between Home Office, Client, Consultants and Constructor; Forecasted the project flow and recorded and transferred data to progress reporting system; Analyzed the variation requests from consultants and advised on the same accordingly Oil Tools Engineering Services Inc Singapore Project Coordinator Nov 1993 – Sep 1995 ● Projects ▪ Floating Production Storage and Offloading Facility, Petrobras - Egypt ▪ PUB Gas Off-take Stations, Singapore ● Developed the Decision Support System used for outsourcing ● Conducted a feasibility study for a package refinery in Russia with a capacity of 10,000 Barrels per day Jufal Naif Obaid Co. Al-Jubail, Saudi Arabia Project Analyst Oct 1992 – Sep 1993 ● Project: Petrokemya Olefins Project, Saudi Arabia ● Developed and monitored the project reporting system based on the project requirements; Identified the delay areas and advised on corrective action; Coordinated project control issues among the client, consultant, contractors and others Bharat Heavy Electricals Limited Trichy, India Project Engineer Oct 1986 – Oct 1992 ● Reengineered the project process flow with a cost saving of $5 million USD in overall project cost; Managed and completed turnkey power projects in a record time from 36 months to 24 months ● Developed new methodology for competitive bidding with annual cost savings of $1 million; Project leader of the department developing ISO9001 EDUCATION Loyola University Chicago, IL Master of Business Administration May 2000 Bharathidasan University, Trichy, India M.B.A. - Project Management May 1987 Madurai Kamaraj University, Madurai, India B.E. - Mechanical Engineering May 1985