SlideShare a Scribd company logo
1 of 3
Download to read offline
P AU L A. DE L IP S KI
225 E. Bellevue Avenue (650) 888-2633
San Mateo, CA 94401 pauldelipski@gmail.com
PROFILE SUMMARY
Driven, results oriented and innovative engineer with demonstrated expertise and extensive experience across
various industries with specialty in manufacturing and mechanical assemblies. Proven track record in all phases of
device development, from initial concept to full market release. Expert in prototyping. Recognized for mechanical
expertise, excellent problem solving skills and oversight of multiple successful projects. Strong interpersonal and
communication skills, at all levels, and across functions. Comfortable in fast-paced and diverse environments.
KEY COMPETENCIES
§ Problem Solving
§ Prototyping/FDM
§ Product Design &
Development
§ CAD Modeling
§ Manufacturing
§ Testing / V & V
§ Packaging
§ 6 Patent Applications
§ Training
§ Machine Shop equipment
§ Project Management
PROFESSIONAL EXPERIENCE
Google + Terra Bella (Adecco Group) Mt. View, CA 3/2016 – Present
Satellite Imaging Company
SPACE INSTRUMENT PROCESS ENGINEER
Responsible for project management of production schedule, building, testing and trouble shooting of satellite camera
assemblies
• Project management of production schedule for all camera assembly builds
• Developed and implemented production schedule to build 3+ cameras simultaneously
• Successfully implemented changes and corrective actions to improve speed & quality of camera production
• Production time was reduced by 1 to 2 weeks for multiple cameras
• Hands on build of space cameras per procedure and delivery to vendor for payload integration
• Develop, write and update standard operating procedures and assembly instructions as required
• Training of technicians to build cameras per procedure and current practices
• Support all efforts of camera builds, problem solving, contamination issues, FOD removal, ESD
• Design and modify production fixtures as required
SPIROX INC. MENLO PARK, CA 12/2015 – 3/2016
Medical Device Start up Company
R&D ENGINEER
Responsible for development of new medical devices, manufacturing and test fixtures, packaging and manufacturing activities.
• Supported design of implant and delivery device, including improvements to molded parts
• Supported design and improved manufacturing fixtures and design verification testing fixtures
• Conduct and support cadaver lab for implant and delivery device testing
• Trained and supported manufacturing personnel, monitored and improved manufacturing line for delivery device
• Supported design and testing of packaging for implant and delivery device, including sterilization and transit testing
• Successfully trouble shot problems with manufacturing fixtures, manufacturing line, DVT fixtures and packaging
• Collaborated with cross functional team members to remedy issues and meet deadlines
• Successfully took delivery device through initial Pre-DVT and DVT manufacturing builds
MAQUET CARDIOVASCULAR, SAN JOSE, CA
(FORMERLY BOSTON SCIENTIFIC 2006-2008, GUIDANT CORP. 2002-2006) 8/2002 – 3/2015
Medical Device Company
R & D ENGINEER II (3/2013 – 3/2015)
Responsible for research and development of new medical devices, designing and building prototypes, test and manufacturing
fixtures. Developing test methods, writing and executing protocols, creating CAD models and drawings.
• Supported redesign of implant delivery device and manufacturing line
• Researched, designed and tested prototypes for mitral valve repair
• Designed enhancements, built and tested 9 iterations of prototypes for initial testing and animal studies for RF and
heat sealing.
• Effectively collaborated with outside vendors to produce complex parts.
• Designed and developed fixtures and processes for applying complex ceramic coatings
• Successfully built working prototypes for use with a 3D camera system for an in-vivo animal study
SENIOR ADVANCED R&D TECHNICIAN (8/2002 – 3/2013)
Responsible for research and development of next generation Endoscopic Vessel Harvesting devices. Additional
responsibilities included prototyping & testing, V&V testing, test fixture design, manufacturing fixture design, training
manufacturing personnel, standard test method development and creating manufacturing instructions. Conducted live animal
labs.
• Launched Heart String 1 & 2, Vaso View 6, Vaso View 7, HemoPro 1 & 2, Vaso View 6 Pro
• Collaborated with cross-functional teams to overcome technical challenges while keeping project on track.
• Assisted manufacturing with process challenges, designing and implementing new fixtures, equipment and processes
on the production line, leading to increased yields and lower scrap rates on multiple product lines.
• Developed 3 working prototypes for the Heart String 2 loader to eliminate cracking of seals due to improper loading,
Co-developed production HS2 loader. HS2 Loader reduced complaints from 4% down to <1.5%.
• Designed, tested and implemented Heart String seal manufacturing fixture for seal production, increasing yield from
75% to 98%.
• Implemented a faceted cannula design for VV6 device to eliminate tunnel collapse. Tested and proved design.
Significantly reduced field complaints for this issue.
• Developed and designed test fixtures for use in design verification and process validation activities.
• Created Standard Test Methods and Manufacture Process Instructions to be used for transfer of product from
development into production.
• Managed R&D labs, ensured labs were in compliance and all tools and equipment was calibrated and in good
working order.
SPACE SYSTEMS/LORAL, Palo Alto, CA 5/1998 – 5/2002
Designers & Builders of Commercial and Government Satellites
ELECTRICAL TEST TECHNICIAN (1/2000 – 5/2002)
Responsible for spacecraft electrical integration and procedural testing
• Performed electrical tests via Unix-based workstations, created and altered test script files as necessary and reviewed post-test
electrical data
• Performed hands on checks and tests of satellite hardware and wiring harnesses using various electrical test instruments
• Diagnosed malfunctions and recommended corrective actions in conformance to engineering specifications
• Tested satellites for acoustic, vibration and thermal vacuum and performed electrical tests for all phases
• Performed final electrical tests and launch activities at launch sites
• Supported launch base testing and activities in French Guiana
SOLAR ARRAY TECHNICIAN (5/1998 – 1/2000)
Responsible for building and testing of solar arrays and deployment mechanisms per print and procedures
• Designed and built prototype solar array projects
• Supported thermal testing of solar arrays and mechanisms
• Completed solar cell repairs on solar array sub-straight
• Integrated solar array assemblies for satellite main body for fit and function
• Supported solar array integration and launch base operation in Cape Canaveral, Florida
YALE NORTHERN CALIFORNIA, INC., Union City, CA 1/1995 – 5/1998
Material Handling Equipment Supplier
FIELD SERVICE TECHNICIAN (1/1995 – 5/1998)
Responsible for service calls in the field including electric, propane, gasoline and diesel forklifts and hydraulic equipment. Interface with
customers, present diagnostic findings, make repairs.
• Repaired and maintained electrical and electromechanical systems, motors and components by use of electrical test instruments
and schematics
• Ensured all equipment was in good condition and in working order
• Responded to emergency calls and perform under strict timelines and pressure
• Trained customers, signed up new equipment for service, documented and maintained service contracts
CERTIFICATIONS
Aeronautical Maintenance and Operations
CERTIFICATES: Federal Aviation Administration, Airframe and Powerplant FAA Certificate #3525253
EDUCATION
Aeronautics - College of San Mateo, San Mateo, CA 1991
ADDITIONAL TRAINING
Maquet Cardiovascular, CA GoEngineer, Santa Clara, CA De Anza College, Cupertino, CA
Blood Borne Pathogens SolidWorks Essentials ProE WILDFIRE
NexRev, Santa Clara, CA Space SystemsLoral
ProE Wildfire Update 2.0 ESD Awareness, Contamination Control, Flight Harness and Cable,
NASA Soldering, Flight Bonding and Adhesives, Materials Handling

More Related Content

What's hot

Tamas Seres Resume 2016
Tamas Seres Resume 2016Tamas Seres Resume 2016
Tamas Seres Resume 2016Tamas Seres
 
VIEIRA_NIGEL_RESUME_2016
VIEIRA_NIGEL_RESUME_2016VIEIRA_NIGEL_RESUME_2016
VIEIRA_NIGEL_RESUME_2016Nigel Vieira
 
Suman Professional
Suman ProfessionalSuman Professional
Suman ProfessionalSuman Das
 
Taylor, Michael J Resume
Taylor, Michael J   ResumeTaylor, Michael J   Resume
Taylor, Michael J Resumemjtaylor52
 
Dluge Edward J Resume 6
Dluge Edward J Resume 6Dluge Edward J Resume 6
Dluge Edward J Resume 6ejd111
 
Amer malik resume
Amer malik resumeAmer malik resume
Amer malik resumeAmer Malik
 
Gary giblock resume 2 21-17
Gary giblock resume 2 21-17Gary giblock resume 2 21-17
Gary giblock resume 2 21-17Gary Giblock
 
Joe Daggett-Bruntz resume Rev1 2016
Joe Daggett-Bruntz resume Rev1 2016Joe Daggett-Bruntz resume Rev1 2016
Joe Daggett-Bruntz resume Rev1 2016Joe Bruntz Daggett
 
Phil Suter Resume April 22 2009 Rev 2
Phil Suter Resume April 22 2009  Rev 2Phil Suter Resume April 22 2009  Rev 2
Phil Suter Resume April 22 2009 Rev 2PhilSuter
 
Artificial lift engineer achievements
Artificial lift engineer achievementsArtificial lift engineer achievements
Artificial lift engineer achievementsJoseph Bracic
 
Quality harjeet gill 11 19_16
Quality harjeet gill 11 19_16Quality harjeet gill 11 19_16
Quality harjeet gill 11 19_16Harjeet Gill
 
Gary giblock resume 1 31-17
Gary giblock resume 1 31-17Gary giblock resume 1 31-17
Gary giblock resume 1 31-17Gary Giblock
 

What's hot (20)

Resume Mda2
Resume Mda2Resume Mda2
Resume Mda2
 
Tamas Seres Resume 2016
Tamas Seres Resume 2016Tamas Seres Resume 2016
Tamas Seres Resume 2016
 
VIEIRA_NIGEL_RESUME_2016
VIEIRA_NIGEL_RESUME_2016VIEIRA_NIGEL_RESUME_2016
VIEIRA_NIGEL_RESUME_2016
 
Suman Professional
Suman ProfessionalSuman Professional
Suman Professional
 
Taylor, Michael J Resume
Taylor, Michael J   ResumeTaylor, Michael J   Resume
Taylor, Michael J Resume
 
SSME030815
SSME030815SSME030815
SSME030815
 
Resume
Resume Resume
Resume
 
Dluge Edward J Resume 6
Dluge Edward J Resume 6Dluge Edward J Resume 6
Dluge Edward J Resume 6
 
Amer malik resume
Amer malik resumeAmer malik resume
Amer malik resume
 
Gary giblock resume 2 21-17
Gary giblock resume 2 21-17Gary giblock resume 2 21-17
Gary giblock resume 2 21-17
 
Isaac Landfair
Isaac LandfairIsaac Landfair
Isaac Landfair
 
Joe Daggett-Bruntz resume Rev1 2016
Joe Daggett-Bruntz resume Rev1 2016Joe Daggett-Bruntz resume Rev1 2016
Joe Daggett-Bruntz resume Rev1 2016
 
RBG_DQE_0117
RBG_DQE_0117RBG_DQE_0117
RBG_DQE_0117
 
Chetan Sonani
Chetan SonaniChetan Sonani
Chetan Sonani
 
Phil Suter Resume April 22 2009 Rev 2
Phil Suter Resume April 22 2009  Rev 2Phil Suter Resume April 22 2009  Rev 2
Phil Suter Resume April 22 2009 Rev 2
 
Artificial lift engineer achievements
Artificial lift engineer achievementsArtificial lift engineer achievements
Artificial lift engineer achievements
 
Zackhayer3
Zackhayer3Zackhayer3
Zackhayer3
 
CV Piping Supervisor
CV Piping SupervisorCV Piping Supervisor
CV Piping Supervisor
 
Quality harjeet gill 11 19_16
Quality harjeet gill 11 19_16Quality harjeet gill 11 19_16
Quality harjeet gill 11 19_16
 
Gary giblock resume 1 31-17
Gary giblock resume 1 31-17Gary giblock resume 1 31-17
Gary giblock resume 1 31-17
 

Viewers also liked

Ana Admin Resume 2016
Ana Admin Resume 2016Ana Admin Resume 2016
Ana Admin Resume 2016Ana Mendoza
 
R Anthony 9-2016 Resume
R Anthony 9-2016 ResumeR Anthony 9-2016 Resume
R Anthony 9-2016 ResumeRick Anthony
 
Salomon Soumbey resume
Salomon Soumbey resumeSalomon Soumbey resume
Salomon Soumbey resumesalomon alley
 
Los Angeles Locksmith
Los Angeles LocksmithLos Angeles Locksmith
Los Angeles LocksmithBrayn Shultz
 
Bob Price - Mechanical Engineer
Bob Price - Mechanical EngineerBob Price - Mechanical Engineer
Bob Price - Mechanical EngineerBob Price
 
Resume_Final_Anna Gottreich
Resume_Final_Anna GottreichResume_Final_Anna Gottreich
Resume_Final_Anna Gottreichanna gottreich
 
Gary m pearson_resume_18_dec15-2016
Gary m pearson_resume_18_dec15-2016Gary m pearson_resume_18_dec15-2016
Gary m pearson_resume_18_dec15-2016Gary Pearson
 

Viewers also liked (13)

Ana Admin Resume 2016
Ana Admin Resume 2016Ana Admin Resume 2016
Ana Admin Resume 2016
 
Ritu Bhargava
Ritu BhargavaRitu Bhargava
Ritu Bhargava
 
My resume
My resumeMy resume
My resume
 
R Anthony 9-2016 Resume
R Anthony 9-2016 ResumeR Anthony 9-2016 Resume
R Anthony 9-2016 Resume
 
Salomon Soumbey resume
Salomon Soumbey resumeSalomon Soumbey resume
Salomon Soumbey resume
 
Malcolm Taylor Resume
Malcolm Taylor ResumeMalcolm Taylor Resume
Malcolm Taylor Resume
 
Los Angeles Locksmith
Los Angeles LocksmithLos Angeles Locksmith
Los Angeles Locksmith
 
Chris Murray CV
Chris Murray CVChris Murray CV
Chris Murray CV
 
Chike-Amazu
Chike-AmazuChike-Amazu
Chike-Amazu
 
Bob Price - Mechanical Engineer
Bob Price - Mechanical EngineerBob Price - Mechanical Engineer
Bob Price - Mechanical Engineer
 
Resume_Final_Anna Gottreich
Resume_Final_Anna GottreichResume_Final_Anna Gottreich
Resume_Final_Anna Gottreich
 
Gary m pearson_resume_18_dec15-2016
Gary m pearson_resume_18_dec15-2016Gary m pearson_resume_18_dec15-2016
Gary m pearson_resume_18_dec15-2016
 
Brendan Naughton CV
Brendan Naughton CVBrendan Naughton CV
Brendan Naughton CV
 

Similar to RESUME PAUL DELIPSKI 2016

Similar to RESUME PAUL DELIPSKI 2016 (20)

W White Resume
W White ResumeW White Resume
W White Resume
 
Donald_L_Loocke_Resume_TEr3
Donald_L_Loocke_Resume_TEr3Donald_L_Loocke_Resume_TEr3
Donald_L_Loocke_Resume_TEr3
 
david melara current resume
david melara current resumedavid melara current resume
david melara current resume
 
Layne David Orr Rev 17
Layne David Orr Rev 17Layne David Orr Rev 17
Layne David Orr Rev 17
 
LinkedIn
LinkedInLinkedIn
LinkedIn
 
Steve Majors resume
Steve Majors resumeSteve Majors resume
Steve Majors resume
 
CV2015 Linkedin
CV2015 LinkedinCV2015 Linkedin
CV2015 Linkedin
 
Dennis Egry - Resume - 2015(2)
Dennis Egry - Resume - 2015(2)Dennis Egry - Resume - 2015(2)
Dennis Egry - Resume - 2015(2)
 
Resume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalResume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - Electrical
 
CV
CVCV
CV
 
CV
CVCV
CV
 
MJP Resume
MJP ResumeMJP Resume
MJP Resume
 
Crivac Mark
Crivac MarkCrivac Mark
Crivac Mark
 
Resume
ResumeResume
Resume
 
Todd Watson Resume
Todd Watson ResumeTodd Watson Resume
Todd Watson Resume
 
Res 10-30-15
Res 10-30-15Res 10-30-15
Res 10-30-15
 
Pattra Long Resume
Pattra Long ResumePattra Long Resume
Pattra Long Resume
 
2safety_JEN
2safety_JEN2safety_JEN
2safety_JEN
 
Jason_Harvey_Resume
Jason_Harvey_ResumeJason_Harvey_Resume
Jason_Harvey_Resume
 
S Perkins 8 22-2021
S Perkins 8 22-2021S Perkins 8 22-2021
S Perkins 8 22-2021
 

RESUME PAUL DELIPSKI 2016

  • 1. P AU L A. DE L IP S KI 225 E. Bellevue Avenue (650) 888-2633 San Mateo, CA 94401 pauldelipski@gmail.com PROFILE SUMMARY Driven, results oriented and innovative engineer with demonstrated expertise and extensive experience across various industries with specialty in manufacturing and mechanical assemblies. Proven track record in all phases of device development, from initial concept to full market release. Expert in prototyping. Recognized for mechanical expertise, excellent problem solving skills and oversight of multiple successful projects. Strong interpersonal and communication skills, at all levels, and across functions. Comfortable in fast-paced and diverse environments. KEY COMPETENCIES § Problem Solving § Prototyping/FDM § Product Design & Development § CAD Modeling § Manufacturing § Testing / V & V § Packaging § 6 Patent Applications § Training § Machine Shop equipment § Project Management PROFESSIONAL EXPERIENCE Google + Terra Bella (Adecco Group) Mt. View, CA 3/2016 – Present Satellite Imaging Company SPACE INSTRUMENT PROCESS ENGINEER Responsible for project management of production schedule, building, testing and trouble shooting of satellite camera assemblies • Project management of production schedule for all camera assembly builds • Developed and implemented production schedule to build 3+ cameras simultaneously • Successfully implemented changes and corrective actions to improve speed & quality of camera production • Production time was reduced by 1 to 2 weeks for multiple cameras • Hands on build of space cameras per procedure and delivery to vendor for payload integration • Develop, write and update standard operating procedures and assembly instructions as required • Training of technicians to build cameras per procedure and current practices • Support all efforts of camera builds, problem solving, contamination issues, FOD removal, ESD • Design and modify production fixtures as required SPIROX INC. MENLO PARK, CA 12/2015 – 3/2016 Medical Device Start up Company R&D ENGINEER Responsible for development of new medical devices, manufacturing and test fixtures, packaging and manufacturing activities. • Supported design of implant and delivery device, including improvements to molded parts • Supported design and improved manufacturing fixtures and design verification testing fixtures • Conduct and support cadaver lab for implant and delivery device testing • Trained and supported manufacturing personnel, monitored and improved manufacturing line for delivery device • Supported design and testing of packaging for implant and delivery device, including sterilization and transit testing • Successfully trouble shot problems with manufacturing fixtures, manufacturing line, DVT fixtures and packaging • Collaborated with cross functional team members to remedy issues and meet deadlines • Successfully took delivery device through initial Pre-DVT and DVT manufacturing builds
  • 2. MAQUET CARDIOVASCULAR, SAN JOSE, CA (FORMERLY BOSTON SCIENTIFIC 2006-2008, GUIDANT CORP. 2002-2006) 8/2002 – 3/2015 Medical Device Company R & D ENGINEER II (3/2013 – 3/2015) Responsible for research and development of new medical devices, designing and building prototypes, test and manufacturing fixtures. Developing test methods, writing and executing protocols, creating CAD models and drawings. • Supported redesign of implant delivery device and manufacturing line • Researched, designed and tested prototypes for mitral valve repair • Designed enhancements, built and tested 9 iterations of prototypes for initial testing and animal studies for RF and heat sealing. • Effectively collaborated with outside vendors to produce complex parts. • Designed and developed fixtures and processes for applying complex ceramic coatings • Successfully built working prototypes for use with a 3D camera system for an in-vivo animal study SENIOR ADVANCED R&D TECHNICIAN (8/2002 – 3/2013) Responsible for research and development of next generation Endoscopic Vessel Harvesting devices. Additional responsibilities included prototyping & testing, V&V testing, test fixture design, manufacturing fixture design, training manufacturing personnel, standard test method development and creating manufacturing instructions. Conducted live animal labs. • Launched Heart String 1 & 2, Vaso View 6, Vaso View 7, HemoPro 1 & 2, Vaso View 6 Pro • Collaborated with cross-functional teams to overcome technical challenges while keeping project on track. • Assisted manufacturing with process challenges, designing and implementing new fixtures, equipment and processes on the production line, leading to increased yields and lower scrap rates on multiple product lines. • Developed 3 working prototypes for the Heart String 2 loader to eliminate cracking of seals due to improper loading, Co-developed production HS2 loader. HS2 Loader reduced complaints from 4% down to <1.5%. • Designed, tested and implemented Heart String seal manufacturing fixture for seal production, increasing yield from 75% to 98%. • Implemented a faceted cannula design for VV6 device to eliminate tunnel collapse. Tested and proved design. Significantly reduced field complaints for this issue. • Developed and designed test fixtures for use in design verification and process validation activities. • Created Standard Test Methods and Manufacture Process Instructions to be used for transfer of product from development into production. • Managed R&D labs, ensured labs were in compliance and all tools and equipment was calibrated and in good working order. SPACE SYSTEMS/LORAL, Palo Alto, CA 5/1998 – 5/2002 Designers & Builders of Commercial and Government Satellites ELECTRICAL TEST TECHNICIAN (1/2000 – 5/2002) Responsible for spacecraft electrical integration and procedural testing • Performed electrical tests via Unix-based workstations, created and altered test script files as necessary and reviewed post-test electrical data • Performed hands on checks and tests of satellite hardware and wiring harnesses using various electrical test instruments • Diagnosed malfunctions and recommended corrective actions in conformance to engineering specifications • Tested satellites for acoustic, vibration and thermal vacuum and performed electrical tests for all phases • Performed final electrical tests and launch activities at launch sites • Supported launch base testing and activities in French Guiana SOLAR ARRAY TECHNICIAN (5/1998 – 1/2000) Responsible for building and testing of solar arrays and deployment mechanisms per print and procedures • Designed and built prototype solar array projects • Supported thermal testing of solar arrays and mechanisms • Completed solar cell repairs on solar array sub-straight • Integrated solar array assemblies for satellite main body for fit and function • Supported solar array integration and launch base operation in Cape Canaveral, Florida
  • 3. YALE NORTHERN CALIFORNIA, INC., Union City, CA 1/1995 – 5/1998 Material Handling Equipment Supplier FIELD SERVICE TECHNICIAN (1/1995 – 5/1998) Responsible for service calls in the field including electric, propane, gasoline and diesel forklifts and hydraulic equipment. Interface with customers, present diagnostic findings, make repairs. • Repaired and maintained electrical and electromechanical systems, motors and components by use of electrical test instruments and schematics • Ensured all equipment was in good condition and in working order • Responded to emergency calls and perform under strict timelines and pressure • Trained customers, signed up new equipment for service, documented and maintained service contracts CERTIFICATIONS Aeronautical Maintenance and Operations CERTIFICATES: Federal Aviation Administration, Airframe and Powerplant FAA Certificate #3525253 EDUCATION Aeronautics - College of San Mateo, San Mateo, CA 1991 ADDITIONAL TRAINING Maquet Cardiovascular, CA GoEngineer, Santa Clara, CA De Anza College, Cupertino, CA Blood Borne Pathogens SolidWorks Essentials ProE WILDFIRE NexRev, Santa Clara, CA Space SystemsLoral ProE Wildfire Update 2.0 ESD Awareness, Contamination Control, Flight Harness and Cable, NASA Soldering, Flight Bonding and Adhesives, Materials Handling