Gary Fielding has over 25 years of experience in project estimating, scheduling, quality assurance, purchasing, project management, and commissioning for industrial construction projects in mining, oil and gas, and pulp and paper. He has worked as both a construction manager and project manager for companies like Ferrovial Agroman Canada and JDS Energy & Mining. Gary has a proven track record of strong supervision skills and experience managing all aspects of construction projects from estimating through commissioning.
Ed Batista, Interpersonal Dynamics, Class 7: InfluenceEd Batista
This is a condensed deck from the seventh class of my Winter 2016 section of Interpersonal Dynamics (aka Touchy Feely) at the Stanford Graduate School of Business (aka @StanfordBiz).
Webinar: Carbon capture through innovative comercial structuring in the canad...Global CCS Institute
North West Redwater Partnership (NWR) is building the world’s first direct to fuels bitumen refinery to combine gasification technology with an integrated carbon capture and storage program. The project was proposed to meet the rising demand for upgrading of increasing bitumen production from the Alberta oil sands and for production of low-carbon fuels with reduced greenhouse gas emissions. The project will be built in three phases, each converting approximately 50,000 barrels per day of bitumen plus diluent to produce a range of refined petroleum products and petrochemical feedstocks with the advantage of having both higher added value and a lower carbon footprint than traditional upgraders or refineries. This presentation will profile the NWR project and discuss the innovative technological approach to incorporate large scale carbon capture in a greenfield Canadian bitumen refinery development.
1. Gary Fielding– ConstructionManager, 20+ Years Industry Experience
Gary has 25 years’ experience as an industrial Project Estimator/Project & Construction Manager including
mining, oil and gas, pulp and paper projects throughout Western Canada. His duties include estimating,
scheduling,QA/QC, purchasing and project management and project commissioning. His experience in the
field as both a pipefitter and millwright has made him versatile at all aspects of construction. Gary has a
proven record of strong supervision and leadership abilities.
Major Responsibilities
Projectreportingincludingbudget,costs,forecastingandschedule
Liaisingwithownersandcontractors
Promote andpractice safetyand environmentmanagementandensure implementation
Provide supportservicesformaterial andequipmentpurchasesbyfieldstaff
Auditall invoicesfromoutsideservice contractors
Site development and construction oversight
Commissioningandstartup
Ensure data, progresstracking,contractorand engineeringmanagementsystemsare developedand
implementedprojectwide
Ensure projectQualityAssurance (QA) managementisestablishedinengineeringandconstruction
RelevantIndustry Experience 2015 - Present
Ferrovial Agroman Canada Inc.
SeniorProject Manager
SeniorProjectManagerresponsible forseetingupIndustrial Constructiondivision
Oversee all industrial constructionprojects.
Implementrequiredsafetyandqualityprograms
JDS Energy & Mining,KelownaB.C. 2013 - 2015
ConstructionManager
ConstructionManagerfor EPCMteamat Gahcho Kue Diamond Mine
Project management and estimating for various mining projects.
Project estimating, commissioning and startup
Dowland Industrial Ltd., Kamloops,BC 1996 – 2013
General Manager/ChiefEstimator
Projects:
PCS Rocanville Thickener MPEI Installation, Raw Ore Handling MPEI Installation
Saskpower Poplar River Superheated Steam Pipe Replacement
Spectra Energy N4 Station Upgrade
PCS Allan Lamella Hydroseparator, Summer shutdown Mechanical and Piping, Fine Salt Thickener
Installation
Enpower Savona/150 Mile Waste Heat Recovery Power Generation Facility
Zeballos Lake Hydro Electric Project – Turnkey Hydro Electric Facility
ERG Facility – Enpower Green Energy Generation
Duke Energy Compressor Stations, CS-2B,CS-6A, CS-7, CS-8
Zinc Leach Autoclave - Cominco Ltd.
Piping & Mechanical - B.C. Gas, Savona Station
Compressor Unit Addition - West Coast Energy, Savona Station
2. Gary Fielding
Pumphouse Foundations - Royal Oak Mines, Kemess Site
Brenda Mines Waste Water Treatment Plant
Benzene Reduction Column - Husky Oil, Prince George B.C.
Equity Mines Waste Water Treatment Plant
Afton Mines Ball Mill Removal
Premier Mines Sag Mill Removal
Husky Oil Prince George Sulphur Reduction 3 Separate Contracts
Gibralter Mines Sag Mill Foundations
Gibralter Mines Flot Cell Demo/Addition
Ledcor IndustriesLtd. 1994 - 1996
Estimator
Projects:
Westcoast Energy
Compressor Station Kobes
Piping & Mechanical Addition
MacMillan Bloedel Ltd.
Port Alberni Nexgen
Piping, Mechanical, Civil, Structural Modifications to #5 paper machine
Slocan Forest Products
OSB Plant, Ft. Nelson B.C.
Ledcor IndustriesLtd. 1990 - 1994
Millwright/Pipefitter
Mount Hundere Lead/Zinc Watson Lake YK
Nexgen Pilot Coater Burnaby B.C.
Line Creek Sparwood B.C.
GreenHills/FordingRiver