SlideShare a Scribd company logo
Page 1 of 5
A SURESHA RAO
Phone : 0091 9987081510
Email: suresha.a.rao@ril.com
OBJECTIVE
Seeking a Challenging Career in Project Management with an organization of high repute.
PROFESSIONAL SYNOPSIS
Mechanical engineer with 22 years of overall experience presently working in Reliance Industries
as Project Manager for Petroleum and Petrochemical Projects.
Employed with reputed dynamic growth oriented organizations in the projects of Oil and Gas,
Petrochemical, Off sites and utilities, Petroleum Distribution and Pressure vessel manufacturing
industry.
Result driven professional with refined business acumen and strongly committed to successfully
accomplish business targets.
Confident and decision making skills to sustain high scale project management operations. In
depth knowledge in cross-functional skills, safety, ensuring on-time deliverables, monitoring
project progress, planning, schedule, cost and quality control.
Skillful in identifying and resolving constraints in different stages of project execution.
Excellent experience in EPC co-ordination in various stages of project.
Presently working on a multi-billion dollar petrochemical project at Dahej, India.
Page 2 of 5
Qualification: Bachelor degree in Mechanical engineering from Bangalore University. Year of
pass out: 1992.
CORE COMPETENCIES
Project Management
 Execution of project by proper planning, as per safety norms, project procedures and
specifications within in time & cost.
 Preparation of plant design basis documents.
 Identify and evaluate scope of work.
 Preparation of project execution plan.
 Preparation of project budget and obtaining approval for the same.
 Identify the critical path.
 Identify the risk, evaluate and mitigation scheme.
 Preparation of design change notes and obtain approval.
 Identify cost adders if any, reporting and obtaining approval.
 Liasoning with external agencies such as client, process licensors, contractors and vendors
during execution of the project.
 Building an efficient and energetic project team.
 Coordinating with Engineering, Procurement and Construction (EPC) team for timely release
of engineering documents, supply of material and construction.
 Release of engineering deliverables like Data sheets, MRQ, TBE,MRP, Vendor drawing
review, Process design basis, PFD, SS, P&ID, Hazop, Piping GA, ISO, 3D Modeling, model
review, procurement and construction drawings for civil/electrical/instrumentation.
 Guiding a team of multiple disciplines for seamless flow of information, documents &
materials.
 Reviewing the project progress on all aspects viz. material availability, drawings and actual
site construction with senior site staff regularly and taking necessary corrective actions
required to meet the project program.
 Ensure all aspects of project quality management and control system through project quality
plan and procedures.
 Reporting to Top management about resource requirement, project progress & areas of
concern.
 Prepare the catch-up plan for any schedule slippage and discuss with Client and senior
management.
 Reviewing with project regarding contract changes and variations and ensuring the timely
resolutions.
 Coordinating with Project Engineers on technical and construction issues through regular
coordination meetings.
 Ensure compliance to all statutory requirements.
 Coordination of commissioning activities with construction and O&M team.
 Preparation of project close out report.
Quality Management and Quality control
 Identify the scope of work.
 Preparation of various quality control procedures.
 Preparation of various inspection and test plans.
 Preparation of Welding procedure specifications (WPS), procedure qualifications records
Page 3 of 5
(PQR),Welder performance Qualifications (WPQ),
 Preparation various NDT procedures – DPT, RT, UT, and heat treatment procedures.
 Material identification, In process inspection, NDT, Final dimensional inspection, Heat
treatment, Hydro testing, final inspection, Pneumatic testing & Helium leak testing for tube to
tube sheet joints, Dispatch clearance.
 Conducting various quality audits and reporting the quality slandered, issue Non
Conformance Report (if required).
 Resolution for NCR.
 Compilation of lessons learnt during project execution.
Team Management
 Selecting, guiding and mentoring the team, thereby ensuring optimum performance.
 Building team effectiveness by proper delegation, regular reviews & feedback and by
promoting a spirit of cooperation among team members.
 Creating and sustaining an environment that fosters development opportunities and
motivating the team members for enhancing the existing performance levels.
EMPLOYMENT HISTORY
Present Employment : Duration : December 1997 – Till date
Organization: Reliance Industries Ltd. ( EPC division)
Present Role: Project Manager.
Present Location: Mumbai – India.
Present Project: MEG storage, loading and transfer facilities at GCPTCL Dahej.
Facilities include 2 numbers 21KT fixed cone roof, CS, epoxy coated tanks for MEG storage, Substation
and control room, 12 numbers road tanker loading facilities for distribution of MEG, MEG transfer pumps,
weigh bridge.
Responsibilities: Design basis, Budgeting, Detailed engineering, Procurement, construction and hand over
to O&M.
Commissioning schedule: 31st May 2016.
Previous Project-I: Ethylene loading facilities at Dahej. Ethylene to be used as refrigerant for
compressors of Px plant at Jamnagar. Since RIL Dahej plant is producing Ethylene, facilities required for
loading of ethylene road tankers are built in DMD during this project.
Responsibilities: Design basis, Budgeting, Detailed engineering, Procurement, construction and hand over
to O&M.
Previous Project-II: Project management for Off-site and Utilities required for PTA, PET, PSF plants at
Dahej.
 Facilities includes storage tanks for Paraxylene, Acetic Acid, MEG, Caustic, Methanol, Mother
liquor, Transfer pumps, Pipeline from Jetty till tanks, inter connecting Piping between tanks and
plants, Piping between Utility generation plant and process plants, Pipe racks / Sleepers .
 Tie-ins (shut down-180 nos and hot tap-30 nos) with existing systems.
 PTA ware house, substations, control rooms and other Non-plant buildings.
 Responsible for release of engineering deliverables required for procurement and construction,
like Data sheets, MRQ, TBE,MRP, Vendor drawing review, Process design basis, PFD, SS, P&ID,
Hazop, Piping GA, ISO, 3D Modeling, model review for all diciplines
(civil/electrical/instrumentation).
 EPC scheduling, material planning, identifying critical path and action plan to complete the same
with in target date.
Page 4 of 5
Previous Project-III: Styrene butadiene rubber. Duration: October 2009 to September 2010.
Responsibilities: Preparation of project scope document, Design basis documents, Execution plan,
Budgeting.
Previous Project-IV : Jamnagar Export Refinery Project (Alkylation plant). Duration: January 2006 to
September 2009.
Responsibilities: Project management for Alkylation plant. Responsible for release of engineering
deliverables like Data sheets, MRQ, TBE,MRP, Vendor drawing review, Process design basis, PFD, SS,
P&ID, Hazop, Piping GA, ISO, 3D Modeling, model review, procurement & construction drawings for
civil/electrical/instrumentation, commissioning activities. Was located in M/s Bechtel office London for
two years (2006 & 2007) to co-ordinate procurement and engineering activities pertaining to equipment
including Alkylation reactors, settlers, DIB columns, exchangers, vessels and all internals pertaining to
refinery columns.
Previous Project- V: Petroleum Refinery project at Jamnagar (RILs first petroleum refinery). Duration:
December 1997 to Dec 2005.
Scope: Tankage and piping facilities inside Marine Tank Farm (MTF) of RIL’s first petroleum refinery.
Includes crude and product tanks, connected piping and one (4 KM X 20” dia) multi product pipeline from
tank farm to jetty.
Primary responsibilities:
(1) Quality management: Ensure implementation of project specifications, standards and procedures.
(2) Ensure latest P&IDs, drawings are followed during construction of facilities.
(3) Ensure complete documentation.
(4) Handover of completed systems to O&M with signed system handover dossier.
___________________________________________________________________________________
Previous Employment -I : Duration : September 1996 to December 1997
Organization: M/s. Artson Engineering Works.
Designation: Senior Engineer.
Location: Nashik– India.
Project: Manufacturing of pressure vessels and heat exchangers.
Primary responsibilities: Quality control in shop floor during manufacture of pressure vessels and heat
exchangers as per ASME standards. Preparation of Quality assurance plan (QAP), Inspection and test
plan (ITP), welding procedure specifications (WPS), procedure qualifications records (PQR),Welder
performance Qualifications (WPQ),Various NDT procedures – DPT, RT,UT, and heat treatment
procedures. Material identification, In process inspection, NDT, Final dimensional inspection, Heat
treatment, Hydro testing, final inspection, Pneumatic testing & Helium leak testing for tube to tube sheet
joints, Dispatch clearance.
___________________________________________________________________________________
Previous Employment -II: Duration :November 1992 to August 1996
Organization: M/s. GR Engineering Works.
Designation: Engineer.
Location: Bangalore and Tarapur– India.
Project: Manufacturing of pressure vessels and heat exchangers.
Prima Primary responsibilities: Quality control in shop floor during manufacture of pressure vessels and heat
exchangers as per ASME standards. Preparation of Quality assurance plan (QAP), Inspection and test
plan (ITP), welding procedure specifications (WPS), procedure qualifications records (PQR),Welder
performance Qualifications (WPQ),Various NDT procedures – DPT, RT,UT, and heat treatment
procedures. Material identification, In process inspection, NDT, Final dimensional inspection, Heat
treatment, Hydro testing, final inspection, Pneumatic testing & Helium leak testing for tube to tube sheet
joints, Dispatch clearance.
Page 5 of 5
PERSONAL DETAILS
 Date of Birth : 1st
July 1970
 Nationality : Indian
 Languages : English / Hindi / Kannada/Tulu
 Passport No./Exp : F-0427805 under renewal.
 Marital Status : Married with One daughter
 Notice period : 8 Weeks

 Overseas experience (VISA): Worked in UK from 2006 till .
2008. For USA B1/B2 VISA
Available valid Up to 2016.
 Address for Communication : Flat 401, Mahaavir Asta.
Plot No. 2. Sector-07.
Kharghar, Navi Mumbai.
Maharastra- 410210.India.
 Present CTC : 25.00 lakhs p.a.
 Expected CTC : 30 lakhs p.a.
 Notice period: : 45 days

More Related Content

What's hot (19)

Shoaib Resume
Shoaib ResumeShoaib Resume
Shoaib Resume
 
SRCV
SRCVSRCV
SRCV
 
ilayaraja_piping designer
ilayaraja_piping designerilayaraja_piping designer
ilayaraja_piping designer
 
C.V. OF Mr.Arindam Guha.
C.V. OF Mr.Arindam Guha.C.V. OF Mr.Arindam Guha.
C.V. OF Mr.Arindam Guha.
 
joy S resume
joy S resumejoy S resume
joy S resume
 
Resume final(17.11.16) of Anoop Gupta
Resume  final(17.11.16) of Anoop GuptaResume  final(17.11.16) of Anoop Gupta
Resume final(17.11.16) of Anoop Gupta
 
Arun Sahu_ Project Management _ Oil & Gas _ Petrochemical
Arun Sahu_ Project Management _ Oil & Gas _ PetrochemicalArun Sahu_ Project Management _ Oil & Gas _ Petrochemical
Arun Sahu_ Project Management _ Oil & Gas _ Petrochemical
 
Resume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping DesignerResume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping Designer
 
Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016
 
Salman Resume 2016
Salman Resume  2016Salman Resume  2016
Salman Resume 2016
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
CV_RBMerida
CV_RBMeridaCV_RBMerida
CV_RBMerida
 
vinoth-projects
vinoth-projectsvinoth-projects
vinoth-projects
 
SSNair-CV-Latest-2016
SSNair-CV-Latest-2016SSNair-CV-Latest-2016
SSNair-CV-Latest-2016
 
cv
cvcv
cv
 
Latest HVAC Supervisor
Latest HVAC SupervisorLatest HVAC Supervisor
Latest HVAC Supervisor
 
Ketan's resume
Ketan's resumeKetan's resume
Ketan's resume
 
Resume
ResumeResume
Resume
 
my CV Hashim project/Site engineer
my CV   Hashim project/Site engineermy CV   Hashim project/Site engineer
my CV Hashim project/Site engineer
 

Viewers also liked

Eureka Moment
Eureka MomentEureka Moment
Eureka MomentThenz801
 
ATD Austin Yellow Pages Solution
ATD Austin Yellow Pages Solution ATD Austin Yellow Pages Solution
ATD Austin Yellow Pages Solution Kekacobb
 
93. the climb. endavant
93. the climb. endavant93. the climb. endavant
93. the climb. endavantjoanacervello
 
Second_Floor_Sleeve_And_Penetration_Layout
Second_Floor_Sleeve_And_Penetration_LayoutSecond_Floor_Sleeve_And_Penetration_Layout
Second_Floor_Sleeve_And_Penetration_Layoutamroz S.K
 
certificate oracle
certificate oraclecertificate oracle
certificate oracleMajed Com
 
Sociable Software Delvery - An Introduction to BDD
Sociable Software Delvery - An Introduction to BDDSociable Software Delvery - An Introduction to BDD
Sociable Software Delvery - An Introduction to BDDTom Philip
 
Pp prezentacja zdjęcia_o_turcji
Pp prezentacja zdjęcia_o_turcjiPp prezentacja zdjęcia_o_turcji
Pp prezentacja zdjęcia_o_turcjiIzabela Bartczak
 
Formwork for Bridge and Centering Of Arch
Formwork for Bridge and Centering Of ArchFormwork for Bridge and Centering Of Arch
Formwork for Bridge and Centering Of ArchYash Patel
 

Viewers also liked (9)

Eureka Moment
Eureka MomentEureka Moment
Eureka Moment
 
ATD Austin Yellow Pages Solution
ATD Austin Yellow Pages Solution ATD Austin Yellow Pages Solution
ATD Austin Yellow Pages Solution
 
93. the climb. endavant
93. the climb. endavant93. the climb. endavant
93. the climb. endavant
 
Second_Floor_Sleeve_And_Penetration_Layout
Second_Floor_Sleeve_And_Penetration_LayoutSecond_Floor_Sleeve_And_Penetration_Layout
Second_Floor_Sleeve_And_Penetration_Layout
 
certificate oracle
certificate oraclecertificate oracle
certificate oracle
 
Sociable Software Delvery - An Introduction to BDD
Sociable Software Delvery - An Introduction to BDDSociable Software Delvery - An Introduction to BDD
Sociable Software Delvery - An Introduction to BDD
 
Khalid Amin C.V 2015
Khalid Amin C.V 2015Khalid Amin C.V 2015
Khalid Amin C.V 2015
 
Pp prezentacja zdjęcia_o_turcji
Pp prezentacja zdjęcia_o_turcjiPp prezentacja zdjęcia_o_turcji
Pp prezentacja zdjęcia_o_turcji
 
Formwork for Bridge and Centering Of Arch
Formwork for Bridge and Centering Of ArchFormwork for Bridge and Centering Of Arch
Formwork for Bridge and Centering Of Arch
 

Similar to A_suresha_rao_Jan_2015

Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16Venkatesh Rajendran
 
Resume for Senior Manager - projects
Resume for  Senior Manager -  projectsResume for  Senior Manager -  projects
Resume for Senior Manager - projectspramod patel
 
Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015Ravi Shankar
 
Updtd tbm-jkf-photo-cv 06032016
Updtd tbm-jkf-photo-cv 06032016Updtd tbm-jkf-photo-cv 06032016
Updtd tbm-jkf-photo-cv 06032016khaja jeelani
 
Erfan Farooqui CV- 17072016
Erfan Farooqui CV- 17072016Erfan Farooqui CV- 17072016
Erfan Farooqui CV- 17072016Erfan Farooqui
 
Resume_-_Sourav_Sengupta
Resume_-_Sourav_SenguptaResume_-_Sourav_Sengupta
Resume_-_Sourav_SenguptaSourav sengupta
 
Elamathi Panneerselvam CV
Elamathi Panneerselvam CVElamathi Panneerselvam CV
Elamathi Panneerselvam CVzetiengg
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant
 
S.Kumar CV - Piping - Copy
S.Kumar CV - Piping - CopyS.Kumar CV - Piping - Copy
S.Kumar CV - Piping - CopySharvan kumar
 
Javad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CVJavad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CVJavad Taghavi
 

Similar to A_suresha_rao_Jan_2015 (20)

RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16
 
Resume for Senior Manager - projects
Resume for  Senior Manager -  projectsResume for  Senior Manager -  projects
Resume for Senior Manager - projects
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Amitabha Chattopadhyay latest
Amitabha Chattopadhyay latest Amitabha Chattopadhyay latest
Amitabha Chattopadhyay latest
 
updated CV
updated CVupdated CV
updated CV
 
Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015
 
Updtd tbm-jkf-photo-cv 06032016
Updtd tbm-jkf-photo-cv 06032016Updtd tbm-jkf-photo-cv 06032016
Updtd tbm-jkf-photo-cv 06032016
 
Erfan Farooqui CV- 17072016
Erfan Farooqui CV- 17072016Erfan Farooqui CV- 17072016
Erfan Farooqui CV- 17072016
 
Resume_-_Sourav_Sengupta
Resume_-_Sourav_SenguptaResume_-_Sourav_Sengupta
Resume_-_Sourav_Sengupta
 
Elamathi Panneerselvam CV
Elamathi Panneerselvam CVElamathi Panneerselvam CV
Elamathi Panneerselvam CV
 
Pradeep-CV
Pradeep-CVPradeep-CV
Pradeep-CV
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
 
ARafer Resume
ARafer ResumeARafer Resume
ARafer Resume
 
My Fresh Cv.pdf
My Fresh Cv.pdfMy Fresh Cv.pdf
My Fresh Cv.pdf
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
S.Kumar CV - Piping - Copy
S.Kumar CV - Piping - CopyS.Kumar CV - Piping - Copy
S.Kumar CV - Piping - Copy
 
Javad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CVJavad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CV
 
M.elsayed CV
M.elsayed CVM.elsayed CV
M.elsayed CV
 
Cv's Nitinai_Ratchawat
Cv's Nitinai_RatchawatCv's Nitinai_Ratchawat
Cv's Nitinai_Ratchawat
 

A_suresha_rao_Jan_2015

  • 1. Page 1 of 5 A SURESHA RAO Phone : 0091 9987081510 Email: suresha.a.rao@ril.com OBJECTIVE Seeking a Challenging Career in Project Management with an organization of high repute. PROFESSIONAL SYNOPSIS Mechanical engineer with 22 years of overall experience presently working in Reliance Industries as Project Manager for Petroleum and Petrochemical Projects. Employed with reputed dynamic growth oriented organizations in the projects of Oil and Gas, Petrochemical, Off sites and utilities, Petroleum Distribution and Pressure vessel manufacturing industry. Result driven professional with refined business acumen and strongly committed to successfully accomplish business targets. Confident and decision making skills to sustain high scale project management operations. In depth knowledge in cross-functional skills, safety, ensuring on-time deliverables, monitoring project progress, planning, schedule, cost and quality control. Skillful in identifying and resolving constraints in different stages of project execution. Excellent experience in EPC co-ordination in various stages of project. Presently working on a multi-billion dollar petrochemical project at Dahej, India.
  • 2. Page 2 of 5 Qualification: Bachelor degree in Mechanical engineering from Bangalore University. Year of pass out: 1992. CORE COMPETENCIES Project Management  Execution of project by proper planning, as per safety norms, project procedures and specifications within in time & cost.  Preparation of plant design basis documents.  Identify and evaluate scope of work.  Preparation of project execution plan.  Preparation of project budget and obtaining approval for the same.  Identify the critical path.  Identify the risk, evaluate and mitigation scheme.  Preparation of design change notes and obtain approval.  Identify cost adders if any, reporting and obtaining approval.  Liasoning with external agencies such as client, process licensors, contractors and vendors during execution of the project.  Building an efficient and energetic project team.  Coordinating with Engineering, Procurement and Construction (EPC) team for timely release of engineering documents, supply of material and construction.  Release of engineering deliverables like Data sheets, MRQ, TBE,MRP, Vendor drawing review, Process design basis, PFD, SS, P&ID, Hazop, Piping GA, ISO, 3D Modeling, model review, procurement and construction drawings for civil/electrical/instrumentation.  Guiding a team of multiple disciplines for seamless flow of information, documents & materials.  Reviewing the project progress on all aspects viz. material availability, drawings and actual site construction with senior site staff regularly and taking necessary corrective actions required to meet the project program.  Ensure all aspects of project quality management and control system through project quality plan and procedures.  Reporting to Top management about resource requirement, project progress & areas of concern.  Prepare the catch-up plan for any schedule slippage and discuss with Client and senior management.  Reviewing with project regarding contract changes and variations and ensuring the timely resolutions.  Coordinating with Project Engineers on technical and construction issues through regular coordination meetings.  Ensure compliance to all statutory requirements.  Coordination of commissioning activities with construction and O&M team.  Preparation of project close out report. Quality Management and Quality control  Identify the scope of work.  Preparation of various quality control procedures.  Preparation of various inspection and test plans.  Preparation of Welding procedure specifications (WPS), procedure qualifications records
  • 3. Page 3 of 5 (PQR),Welder performance Qualifications (WPQ),  Preparation various NDT procedures – DPT, RT, UT, and heat treatment procedures.  Material identification, In process inspection, NDT, Final dimensional inspection, Heat treatment, Hydro testing, final inspection, Pneumatic testing & Helium leak testing for tube to tube sheet joints, Dispatch clearance.  Conducting various quality audits and reporting the quality slandered, issue Non Conformance Report (if required).  Resolution for NCR.  Compilation of lessons learnt during project execution. Team Management  Selecting, guiding and mentoring the team, thereby ensuring optimum performance.  Building team effectiveness by proper delegation, regular reviews & feedback and by promoting a spirit of cooperation among team members.  Creating and sustaining an environment that fosters development opportunities and motivating the team members for enhancing the existing performance levels. EMPLOYMENT HISTORY Present Employment : Duration : December 1997 – Till date Organization: Reliance Industries Ltd. ( EPC division) Present Role: Project Manager. Present Location: Mumbai – India. Present Project: MEG storage, loading and transfer facilities at GCPTCL Dahej. Facilities include 2 numbers 21KT fixed cone roof, CS, epoxy coated tanks for MEG storage, Substation and control room, 12 numbers road tanker loading facilities for distribution of MEG, MEG transfer pumps, weigh bridge. Responsibilities: Design basis, Budgeting, Detailed engineering, Procurement, construction and hand over to O&M. Commissioning schedule: 31st May 2016. Previous Project-I: Ethylene loading facilities at Dahej. Ethylene to be used as refrigerant for compressors of Px plant at Jamnagar. Since RIL Dahej plant is producing Ethylene, facilities required for loading of ethylene road tankers are built in DMD during this project. Responsibilities: Design basis, Budgeting, Detailed engineering, Procurement, construction and hand over to O&M. Previous Project-II: Project management for Off-site and Utilities required for PTA, PET, PSF plants at Dahej.  Facilities includes storage tanks for Paraxylene, Acetic Acid, MEG, Caustic, Methanol, Mother liquor, Transfer pumps, Pipeline from Jetty till tanks, inter connecting Piping between tanks and plants, Piping between Utility generation plant and process plants, Pipe racks / Sleepers .  Tie-ins (shut down-180 nos and hot tap-30 nos) with existing systems.  PTA ware house, substations, control rooms and other Non-plant buildings.  Responsible for release of engineering deliverables required for procurement and construction, like Data sheets, MRQ, TBE,MRP, Vendor drawing review, Process design basis, PFD, SS, P&ID, Hazop, Piping GA, ISO, 3D Modeling, model review for all diciplines (civil/electrical/instrumentation).  EPC scheduling, material planning, identifying critical path and action plan to complete the same with in target date.
  • 4. Page 4 of 5 Previous Project-III: Styrene butadiene rubber. Duration: October 2009 to September 2010. Responsibilities: Preparation of project scope document, Design basis documents, Execution plan, Budgeting. Previous Project-IV : Jamnagar Export Refinery Project (Alkylation plant). Duration: January 2006 to September 2009. Responsibilities: Project management for Alkylation plant. Responsible for release of engineering deliverables like Data sheets, MRQ, TBE,MRP, Vendor drawing review, Process design basis, PFD, SS, P&ID, Hazop, Piping GA, ISO, 3D Modeling, model review, procurement & construction drawings for civil/electrical/instrumentation, commissioning activities. Was located in M/s Bechtel office London for two years (2006 & 2007) to co-ordinate procurement and engineering activities pertaining to equipment including Alkylation reactors, settlers, DIB columns, exchangers, vessels and all internals pertaining to refinery columns. Previous Project- V: Petroleum Refinery project at Jamnagar (RILs first petroleum refinery). Duration: December 1997 to Dec 2005. Scope: Tankage and piping facilities inside Marine Tank Farm (MTF) of RIL’s first petroleum refinery. Includes crude and product tanks, connected piping and one (4 KM X 20” dia) multi product pipeline from tank farm to jetty. Primary responsibilities: (1) Quality management: Ensure implementation of project specifications, standards and procedures. (2) Ensure latest P&IDs, drawings are followed during construction of facilities. (3) Ensure complete documentation. (4) Handover of completed systems to O&M with signed system handover dossier. ___________________________________________________________________________________ Previous Employment -I : Duration : September 1996 to December 1997 Organization: M/s. Artson Engineering Works. Designation: Senior Engineer. Location: Nashik– India. Project: Manufacturing of pressure vessels and heat exchangers. Primary responsibilities: Quality control in shop floor during manufacture of pressure vessels and heat exchangers as per ASME standards. Preparation of Quality assurance plan (QAP), Inspection and test plan (ITP), welding procedure specifications (WPS), procedure qualifications records (PQR),Welder performance Qualifications (WPQ),Various NDT procedures – DPT, RT,UT, and heat treatment procedures. Material identification, In process inspection, NDT, Final dimensional inspection, Heat treatment, Hydro testing, final inspection, Pneumatic testing & Helium leak testing for tube to tube sheet joints, Dispatch clearance. ___________________________________________________________________________________ Previous Employment -II: Duration :November 1992 to August 1996 Organization: M/s. GR Engineering Works. Designation: Engineer. Location: Bangalore and Tarapur– India. Project: Manufacturing of pressure vessels and heat exchangers. Prima Primary responsibilities: Quality control in shop floor during manufacture of pressure vessels and heat exchangers as per ASME standards. Preparation of Quality assurance plan (QAP), Inspection and test plan (ITP), welding procedure specifications (WPS), procedure qualifications records (PQR),Welder performance Qualifications (WPQ),Various NDT procedures – DPT, RT,UT, and heat treatment procedures. Material identification, In process inspection, NDT, Final dimensional inspection, Heat treatment, Hydro testing, final inspection, Pneumatic testing & Helium leak testing for tube to tube sheet joints, Dispatch clearance.
  • 5. Page 5 of 5 PERSONAL DETAILS  Date of Birth : 1st July 1970  Nationality : Indian  Languages : English / Hindi / Kannada/Tulu  Passport No./Exp : F-0427805 under renewal.  Marital Status : Married with One daughter  Notice period : 8 Weeks   Overseas experience (VISA): Worked in UK from 2006 till . 2008. For USA B1/B2 VISA Available valid Up to 2016.  Address for Communication : Flat 401, Mahaavir Asta. Plot No. 2. Sector-07. Kharghar, Navi Mumbai. Maharastra- 410210.India.  Present CTC : 25.00 lakhs p.a.  Expected CTC : 30 lakhs p.a.  Notice period: : 45 days