1. ABHISHEK KUMAR SINGH, CMIT
2003H, Gorman Street | Raleigh, NC 27606 | (984)-244-4702 | asingh23@ncsu.edu |
https://www.linkedin.com/pub/abhishek-singh/16/4a/250
OBJECTIVE
Actively seeking an internship opportunity in Project Controls & Management, Planning and Scheduling, Risk & Strategic
Management, Consulting & Facilities Management, Field Engineering.
EDUCATION
North Carolina State University, Raleigh, North Carolina Aug 2015 - Dec 2016
Masters in Construction Engineering and Management GPA: 3.33/4
National Institute of Technology Jamshedpur, Jamshedpur, India Aug 2008 - May 2012
Bachelor of Technology in Civil Engineering CGPA: 8.01/10
RELEVANT COURSEWORK
Lean Construction, Construction Industry Institute-Best Practices, Project Planning and Management, Construction Safety,
Supply Chain & Business Management, Legal aspects of contracting, Risk & Finance Management and Global Construction.
WORK EXPERIENCE
Larsen & Toubro Limited Project Engineer (Building, Factories & Airports)
May 2013 to July 2015
Name of the Project: C17 (Aircraft) Beddown infrastructure Facilities for Indian Airforce, India ($350 Million)
Clients - United States Army Corps of Engineers (USACE) and The BOEING Company
PMC - CH2M HILL and TURNER Construction Company. (Design Build Project)
Roles & Responsibilities:-
Assisted in project scheduling, project cost control, work order control (Change orders, RFI`s, Submittals).
Finalized subcontractors and their scope of work as per the contract documents.
Prepared regular reports related to project scope, schedule and financial health (Pay applications).
Estimation of Quantities from Approved drawings and Coordinate with the Material Management system.
Implemented on field safety & quality control (as per OSHA, EM 385, and UFGS), and monitored site execution works.
Acted as a Formwork Design coordinator for the shop drawings of Hangar Facility, Over Head tanks & other Buildings.
Conducted value engineering with the team by optimizing surplus and unusable formwork inventory through ABC
analysis which resulted in cost saving of approximately $15,500.
Headed the Precast works for approximately 1000 different manholes in the External Development package and
successfully completed the work in time and with quality and safety with the use of Lean principles.
July 2012 to Apr 2013
Name of the Project: - Honda Siel Cars Limited (Diesel plant & Expansion), India ($200 Million)
Client – Honda PMC – Shimizu Corporation
Roles & Responsibilities:-
Preparation of Job/ Item Rate Analysis for Vendors/Sub Contractors.
Endeavored to execute the work in a more efficient and profitable manner than contemplated in the estimate.
Functioned in Formwork Design Co-coordinator role for the preparation of schematic drawings of buildings.
Preparation of Monthly Bills and Checking of Sub-Contractors Bills according to the Quantity Executed v/s Actual.
Planned ahead for sufficient material and equipment resources for efficient and economical installations.
Kept track of punch lists and rectified the project deficiencies.
Summer Internship May 2011 to Aug 2011
Jusco (Tata Steel Limited) Client – British Oxygen Company (BOC)
Name of project: 2550TPD (Tons per day) BOC Air Separation Unit, Jamshedpur, India ($95 Million)
CERTIFICATIONS
Certification: Construction Manager in Training (CMIT), CMAA, Jan 2016.
Certified Scaffold Engineer for Frames, Tube & Coupler, & System Scaffolding, SCAFFOLD
TRAINING INSTITUTE, Houston, TX, US, 2013
Software packages: Primavera P6, Revit 2014, Navisworks, AutoCAD, Adobe Photoshop, MS Office.
ACHIEVEMENTS & INVOLVEMENTS
Certificate of Appreciation for Excellence in Quality Control (EQC) by The Boeing Company in 2015.
Certificate of Appreciation for EQC by U.S.Army Corps of Engineers, Alaska District in 2014.
Rated as the Top Performer for two consecutive financial year (13-14 & 14 -15) in the annual appraisal process of
Larsen & Toubro.