SlideShare a Scribd company logo
(+971) 564747767 | A7md.Bedeir@Gmail.com
Ahmed Bedeir Abdel Mawla
Civil Engineer (Site/Tech-office)
Quick learner, and highly efficient Engineer seeking a challenging role in a
leading and ambitious company that offers career development and
advancement.
E X P E R I E N C E
Feb 2019 - present (Gulf Phamaraceutical Industies Julphar-Ras Al-Khaimah-UAE).
Projects &facility Management Department
- Hiring subcontractors and ensure that all materials used and work executed as
per specifications.
- Supervisor of construction team.
- Preparation of Plans & review planning reports and identify product that needs to
be purchased.
- Coordinate meetings between department teams during projects timelines.
- Updating programs and preparation of reports.
- Coordinate details of events such as conferences, exhibition, group meeting,
product launches, national events and virtual events.
- Cooperates with marketing and PR to facilitate event execution plan.
- Work with end users, partners and designers to execute event artwork and
branding.
May 2018 – Feb 2019 Technical Consultations Bureau El Sahly – El Sawy (TCB-Egypt)
Integrated Design & Engineering Services (IDENS)
Project:(Creating Republican Guard ,New Administrative Capital )
Creating Military Buildings.
(Flat slabs – solid slabs – strap footing – Hinged Frame – Fixed frame)
(Warehouses. Mosques .Petrol stations, soldiers buildings, Playgrounds and Stores
Tasks: (Supervising & Consultant Engineer).
Dec. 2017 till May 2018 Cooperative Society for Consulting Engineering Services (Meet Ghamr-Egypt)
Project :(creating 600 house units, 3th Settlement,Qattamya ).
Duties & Responsibilities
1.Responsible for execution of structure work activities like P.C, R.C, stub wall, and slab
on grade.
2. Responsible for execution of block&mason work. plaster work, tile & marble work,
painting work,and roof water & heat proofing.
3. Approval from consultants for all structure & finishing activities.
4. Preparation of weekly and monthly targets program.
5.Manpower allocation for different activity according to standard tasks & productivity.
6.Managing site staff and labors with all respects.
7. Hiring subcontractors and ensure that all materials used and work executed as
per specifications.
8. Quantification and arrangements for construction materials.
9. Responsible for production and quality for the resources utilized for current projects.
10.Maintaining quality system, documentation, remove trouble shooting and provide
safe working environment in all ongoing sites.
Oct. 2016 till Nov 2017 Military Services (Implementation of Military Projects)
- Creating Two Soldiers Rooming.
- Increase the efficiency of 3 Stores.
(+971) 564747767 | A7md.Bedeir@Gmail.com
Jan. 2016 till May 2016 Al-Arabiya Construction Company ( 10th Ramdan-Egypt)
Position : site Engineer
Project : Increase the efficiency for educational buildings (30 school)
Ras Ghareb Red Sea
Intership
Aug. 2015 till Nov 2015 ARCONS( Heliopolis,cairo)
Internship at Factory (Tech-office/Qc&Qa Training).
Feb. 2015 Al-Israa Engineering Office (Al-hussainya-Sharkia)
Position: site trainee
Project: (Al hussainia Primary School)
E D U C A T I O N
Jan 2016 Bachlor Degree .in Civil Engineering
New Cairo Academy – Higher Technological Institute
5th Settlement, Cairo.
Project: Restoration & Strengthening of Structure.
Project Grade: B+.
S K I L L S
AutoCAD
MS (Office-Excel-Projects)
Quantity surveying
Primavera P6.
Appreciate Teamwork Spirit.
L A N G U A G E S
Arabic: Mother Tongue.
English: Good Good.
P E R S O N A L I N F O .
Date of Birth: May. 10th, 1992.
Military Status: Completed.
Mobile No.: (+971) 564747767
Address: Ras Al-Khaima (Flexible to relocate).
E-mail: A7md.Bedeir@Gmail.com
LinkedIn: linkedin.com/in/a7mdbedeir

More Related Content

What's hot

Suresh Lead CAD Technician
Suresh Lead CAD TechnicianSuresh Lead CAD Technician
Suresh Lead CAD TechnicianSURESH KUMAR
 
My CV
My CVMy CV
professionalResume e
professionalResume eprofessionalResume e
professionalResume epandiyaraj k
 
Ali, Ahsin resume
Ali, Ahsin resumeAli, Ahsin resume
Ali, Ahsin resume
Ahsan Ravian
 
Pemex Global
Pemex GlobalPemex Global
Pemex Global
Pemex Global
 
Daryna Pasyuta portfolio
Daryna Pasyuta portfolioDaryna Pasyuta portfolio
Daryna Pasyuta portfolio
Дарина Пасюта
 
Daryna Pasyuta portfolio
Daryna Pasyuta portfolioDaryna Pasyuta portfolio
Daryna Pasyuta portfolio
Дарина Пасюта
 
Cv ahmed mahmoud
Cv ahmed mahmoudCv ahmed mahmoud
Cv ahmed mahmoud
Ahmed Mahmoud
 
Ahmed gamal badawi
Ahmed gamal badawi Ahmed gamal badawi
Ahmed gamal badawi
Ahmed Gamal
 

What's hot (20)

Suresh Lead CAD Technician
Suresh Lead CAD TechnicianSuresh Lead CAD Technician
Suresh Lead CAD Technician
 
Rihan CV
Rihan CVRihan CV
Rihan CV
 
Youssef Amin CV
Youssef Amin CVYoussef Amin CV
Youssef Amin CV
 
My CV
My CVMy CV
My CV
 
Resume
ResumeResume
Resume
 
X 2016
X 2016X 2016
X 2016
 
Ahmed Serry CV
Ahmed Serry CVAhmed Serry CV
Ahmed Serry CV
 
professionalResume e
professionalResume eprofessionalResume e
professionalResume e
 
Ali, Ahsin resume
Ali, Ahsin resumeAli, Ahsin resume
Ali, Ahsin resume
 
ResumeV15
ResumeV15ResumeV15
ResumeV15
 
akram CV
akram CVakram CV
akram CV
 
KASHIRAM ANE - CV
KASHIRAM ANE - CVKASHIRAM ANE - CV
KASHIRAM ANE - CV
 
Pemex Global
Pemex GlobalPemex Global
Pemex Global
 
Daryna Pasyuta portfolio
Daryna Pasyuta portfolioDaryna Pasyuta portfolio
Daryna Pasyuta portfolio
 
Michal Dimayuga1
Michal Dimayuga1Michal Dimayuga1
Michal Dimayuga1
 
Daryna Pasyuta portfolio
Daryna Pasyuta portfolioDaryna Pasyuta portfolio
Daryna Pasyuta portfolio
 
Cv ahmed mahmoud
Cv ahmed mahmoudCv ahmed mahmoud
Cv ahmed mahmoud
 
Ahmed gamal badawi
Ahmed gamal badawi Ahmed gamal badawi
Ahmed gamal badawi
 
Marina_basta
Marina_bastaMarina_basta
Marina_basta
 
RATHISH NEW_CV Updated
RATHISH NEW_CV UpdatedRATHISH NEW_CV Updated
RATHISH NEW_CV Updated
 

Similar to Resume

C.V@ Haytham2015 final
C.V@ Haytham2015 finalC.V@ Haytham2015 final
C.V@ Haytham2015 finalHaytham Taalab
 
MY C.V final 2000
MY C.V final 2000MY C.V final 2000
MY C.V final 2000Ahmed Adel
 
Mohamed_Huseiny CV-2016+exp.cert
Mohamed_Huseiny CV-2016+exp.certMohamed_Huseiny CV-2016+exp.cert
Mohamed_Huseiny CV-2016+exp.certMohamed El-huseiny
 
C.V. Civil Engineer Mohamed Elsayed
C.V. Civil Engineer Mohamed ElsayedC.V. Civil Engineer Mohamed Elsayed
C.V. Civil Engineer Mohamed Elsayed
Mohamed Essayed
 
Fadi abu kuwaik full cv,NEW
Fadi abu kuwaik full cv,NEWFadi abu kuwaik full cv,NEW
Fadi abu kuwaik full cv,NEWfadi kuwaik
 
My cv
My cvMy cv
M.samir resume
M.samir resume M.samir resume
M.samir resume
Mohamed Samir
 
Cv said mohamed_1810
Cv said mohamed_1810Cv said mohamed_1810
Cv said mohamed_1810
Mohamed Said Amer
 
Amgad_ Reda_Barakat.CV
Amgad_ Reda_Barakat.CVAmgad_ Reda_Barakat.CV
Amgad_ Reda_Barakat.CVAmgad Barakat
 
Hazem a.maher
Hazem a.maherHazem a.maher
Hazem a.maher
Hazem Maher
 
Eng.Mohamed Kamal_CV_Curriculum Vitae.pdf
Eng.Mohamed Kamal_CV_Curriculum Vitae.pdfEng.Mohamed Kamal_CV_Curriculum Vitae.pdf
Eng.Mohamed Kamal_CV_Curriculum Vitae.pdf
MohamedKamalAbdAlaal
 
CV Eng Abanob Adel Edward1122
CV Eng Abanob Adel Edward1122CV Eng Abanob Adel Edward1122
CV Eng Abanob Adel Edward1122Abanob Edward
 

Similar to Resume (20)

Ehab Radwan
Ehab RadwanEhab Radwan
Ehab Radwan
 
Moh CV Updated
Moh CV UpdatedMoh CV Updated
Moh CV Updated
 
C.V@ Haytham2015 final
C.V@ Haytham2015 finalC.V@ Haytham2015 final
C.V@ Haytham2015 final
 
cv.akram sabri
cv.akram sabricv.akram sabri
cv.akram sabri
 
MY C.V final 2000
MY C.V final 2000MY C.V final 2000
MY C.V final 2000
 
Mohamed_Huseiny CV-2016+exp.cert
Mohamed_Huseiny CV-2016+exp.certMohamed_Huseiny CV-2016+exp.cert
Mohamed_Huseiny CV-2016+exp.cert
 
cv.
cv.cv.
cv.
 
C.V Mohd Dardar
C.V Mohd DardarC.V Mohd Dardar
C.V Mohd Dardar
 
C.V. Civil Engineer Mohamed Elsayed
C.V. Civil Engineer Mohamed ElsayedC.V. Civil Engineer Mohamed Elsayed
C.V. Civil Engineer Mohamed Elsayed
 
Fadi abu kuwaik full cv,NEW
Fadi abu kuwaik full cv,NEWFadi abu kuwaik full cv,NEW
Fadi abu kuwaik full cv,NEW
 
My cv
My cvMy cv
My cv
 
M.samir resume
M.samir resume M.samir resume
M.samir resume
 
Cv said mohamed_1810
Cv said mohamed_1810Cv said mohamed_1810
Cv said mohamed_1810
 
Amgad_ Reda_Barakat.CV
Amgad_ Reda_Barakat.CVAmgad_ Reda_Barakat.CV
Amgad_ Reda_Barakat.CV
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Mohamed Sabry CV
Mohamed Sabry CVMohamed Sabry CV
Mohamed Sabry CV
 
Hazem a.maher
Hazem a.maherHazem a.maher
Hazem a.maher
 
Eng.Mohamed Kamal_CV_Curriculum Vitae.pdf
Eng.Mohamed Kamal_CV_Curriculum Vitae.pdfEng.Mohamed Kamal_CV_Curriculum Vitae.pdf
Eng.Mohamed Kamal_CV_Curriculum Vitae.pdf
 
Ahmed Abdallah Resume
Ahmed Abdallah ResumeAhmed Abdallah Resume
Ahmed Abdallah Resume
 
CV Eng Abanob Adel Edward1122
CV Eng Abanob Adel Edward1122CV Eng Abanob Adel Edward1122
CV Eng Abanob Adel Edward1122
 

Recently uploaded

Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 

Recently uploaded (20)

Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 

Resume

  • 1. (+971) 564747767 | A7md.Bedeir@Gmail.com Ahmed Bedeir Abdel Mawla Civil Engineer (Site/Tech-office) Quick learner, and highly efficient Engineer seeking a challenging role in a leading and ambitious company that offers career development and advancement. E X P E R I E N C E Feb 2019 - present (Gulf Phamaraceutical Industies Julphar-Ras Al-Khaimah-UAE). Projects &facility Management Department - Hiring subcontractors and ensure that all materials used and work executed as per specifications. - Supervisor of construction team. - Preparation of Plans & review planning reports and identify product that needs to be purchased. - Coordinate meetings between department teams during projects timelines. - Updating programs and preparation of reports. - Coordinate details of events such as conferences, exhibition, group meeting, product launches, national events and virtual events. - Cooperates with marketing and PR to facilitate event execution plan. - Work with end users, partners and designers to execute event artwork and branding. May 2018 – Feb 2019 Technical Consultations Bureau El Sahly – El Sawy (TCB-Egypt) Integrated Design & Engineering Services (IDENS) Project:(Creating Republican Guard ,New Administrative Capital ) Creating Military Buildings. (Flat slabs – solid slabs – strap footing – Hinged Frame – Fixed frame) (Warehouses. Mosques .Petrol stations, soldiers buildings, Playgrounds and Stores Tasks: (Supervising & Consultant Engineer). Dec. 2017 till May 2018 Cooperative Society for Consulting Engineering Services (Meet Ghamr-Egypt) Project :(creating 600 house units, 3th Settlement,Qattamya ). Duties & Responsibilities 1.Responsible for execution of structure work activities like P.C, R.C, stub wall, and slab on grade. 2. Responsible for execution of block&mason work. plaster work, tile & marble work, painting work,and roof water & heat proofing. 3. Approval from consultants for all structure & finishing activities. 4. Preparation of weekly and monthly targets program. 5.Manpower allocation for different activity according to standard tasks & productivity. 6.Managing site staff and labors with all respects. 7. Hiring subcontractors and ensure that all materials used and work executed as per specifications. 8. Quantification and arrangements for construction materials. 9. Responsible for production and quality for the resources utilized for current projects. 10.Maintaining quality system, documentation, remove trouble shooting and provide safe working environment in all ongoing sites. Oct. 2016 till Nov 2017 Military Services (Implementation of Military Projects) - Creating Two Soldiers Rooming. - Increase the efficiency of 3 Stores.
  • 2. (+971) 564747767 | A7md.Bedeir@Gmail.com Jan. 2016 till May 2016 Al-Arabiya Construction Company ( 10th Ramdan-Egypt) Position : site Engineer Project : Increase the efficiency for educational buildings (30 school) Ras Ghareb Red Sea Intership Aug. 2015 till Nov 2015 ARCONS( Heliopolis,cairo) Internship at Factory (Tech-office/Qc&Qa Training). Feb. 2015 Al-Israa Engineering Office (Al-hussainya-Sharkia) Position: site trainee Project: (Al hussainia Primary School) E D U C A T I O N Jan 2016 Bachlor Degree .in Civil Engineering New Cairo Academy – Higher Technological Institute 5th Settlement, Cairo. Project: Restoration & Strengthening of Structure. Project Grade: B+. S K I L L S AutoCAD MS (Office-Excel-Projects) Quantity surveying Primavera P6. Appreciate Teamwork Spirit. L A N G U A G E S Arabic: Mother Tongue. English: Good Good. P E R S O N A L I N F O . Date of Birth: May. 10th, 1992. Military Status: Completed. Mobile No.: (+971) 564747767 Address: Ras Al-Khaima (Flexible to relocate). E-mail: A7md.Bedeir@Gmail.com LinkedIn: linkedin.com/in/a7mdbedeir