RESUME PAGE (I )
Personal Data
Full Name Salah Eddeen Mahmoud Abd Elatif
D.O.B 1st
June, 1975
P.O.B Cairo, Egypt
Gender Male
Nationality Egyptian
Military Status Exempt
Marital Status Married
Driving license Egypt, Saudi Arabia, International
Contact Data
Address Bahra Amody, Jeddah, Saudi Arabia
Mobile +966569667977
E-Mail Address wwwsala7@yahoo.com
OBJECTIVE
• Seeking an interested job in the field of engineering applications that will take advantage of my academic
studies as will as my previous financial and administrative experience to practical situations in real world of work.
• My goal is to be professional in my career and increase my skills with more responsibilities through big firms and
organizations like your honor organization.
Educational Degrees
University Ain Shams University
Collage Faculty of Engineering
Department Design &Production Department
Degree B.Sc in Mechanical Design& Production, Engineering May 2003
Final Year Grade Good
Graduation Estimation Good
Graduation Project
Tasks Design & Manufacturing an abrasive flow machining technique
Product Design and Production for improvement of internal surface roughness
Estimation Excellent: Score (198 / 200) Points
Computer skills
Good command of both software and hardware.
Wide knowledge in computer (maintenance) and up dative for the new products.
Xsteel (Professional) Solid Works ( user)
AutoCAD (professional) Visual basic (user)
Primavera 6 (professional)
GLOBAL Software: Microsoft package (word, excel, PowerPoint, and outlook) Good user for internet and browsing.
Linguistic Performance
1st
Arabic Mother tongue
2nd
English Oral Writing
Excellent Excellent
RESUME PAGE (II )
Work Experience
From 1/06/2006 Till NowDuration
Company Arabian International Company (Egypt).
Job Title Technical office engineer, Modeling and Detailing steel structure Drawings (Main steel
Miscellaneous – Gratings) up to shop Drawings and single parts drawing.
Company Arabian International Company (Saudi Arabia).
Job Title Senior planning engineer (present job),
Job Tasks:
• Scheduling of steel structure projects using primavera p6 and Orion system
• Reviewing client Drawings for any comments can be discussed,
• Following up Material status and shop drawings for every Project,
• Prepare monthly fabrication plan and distribute the load at the workshop.
• Participate in preparation of Planning & Cost control management framework including systems, processes, &
procedures
• Participate in preparation, updating and propagation of Project Execution Instructions covering planning,
progress measurement guidelines, estimating, budgeting and cost control, invoicing & change control, and
progress reporting, for application in projects during engineering, procurement and construction phases to
facilitate building of highly reliable, safe and cost effective industrial facilities.
• Contribute so that Total Project Cost is prepared /updated against all projects estimates, for controlling and
monitoring the details of the actual commitment, expenditures, trends and forecast in comparison to the
approved budget.
• Involve in Monitor the review and analyze of Projects Schedule and Cost status, highlight
variance/issues in schedule and cost, critical path and provide recommendations for effective
mitigation
• Involve in Monitor the review and analysis of Contractor's Schedule, highlight issues and give
recommendations for effective resolutions with Contractors
• Completely review the contractor's schedule to ensure all requirements are fulfilled for smooth
running.
• Review, consolidate and prepare comments on Contractor's monthly progress report.
• Coordinate so that projects detailed schedule is resource & cost loaded for all project.
• Participate in review of project man-hours and the allocation of man-hours in conjunction with
planning on monthly basis
• Coordinate to integrate of work, schedule and cost using a work breakdown structure (WBS)
• Monitoring of man-hours, machineries and materials utilized on projects against the original
Plan.
• Monitoring of projects' achievement of key milestones against the original plan.
• Provide regular analysis of work progress, resource utilization and milestone achievement in
forecasting of impacts on project completion.
RESUME PAGE (III )
Projects
Working on Steel Structures projects for ARAMCO, JGC, HHI, NEM, CMI, SAIPEM, and ALSTOM such as:
Client Name Project Name
• TECHNIP Spa, ITALY JUBAIL EXPORT REFINERY PROJECT
• SK ENGINEERING & CONSTRUCTION CO SATORP - JUBAIL EXPORT REFINERY
• TECNICAS REUNIDAS S.A SATORP-JUBAIL EXPORT REFINERY PROJECT
• TECHIP Spa ITALY JUBAIL EXPORT REFINERY PROJEC
• HYUNDAI ENGINEERING & CONSTRUCTION CO. LTD MANIFA POWER TRANSMISSION SUBSTATION
• JGC CORPORATION HABSHAN - 5 - PROCESS PLANT - PACKAGE 2
• CHIYODA PETROSTAR / SAMSUNG SAUDI ARABIA
(CPSA) JUBAIL EXPORT REFINERY PROJECT
• HYUNDAI ENGINEERING & CONSTRUCTION CO LTD KARAN GAS FACILITIES PROJECT
• JGC CORPORATION HABSHAN - 5- PROCESS PLANT - PACKAGE 4
• SAUDI ARAMCO / JACOBS ENGINEERING UK LTD. KING ABDULLAH PETROLEUM STUDIES & RESEARCH CENTRE
• BECHTEL INTERNATIONAL LTD. MAADEN - RAS AZ ZAWR ALUMINIUM SMELTER
• CHINA RAILWAY CONSTRUCTION CORPORATION HRS MAKKAH PROJECT
• JGC CORPORATION SAUDI ARAMCO - MANIFA PROJET
• SAIPEM S.P.A. QATAR FERTILIZER COMPANY
• ALSTOM POWER - SWEDEN SHOAIBA POWER PLANT - PHASE III - UNIT 14
• SNAMPROGETTI S.P.A. QATAR FERTILIZER COMPANY
• SAIPEM SPA - ITALY ALGERIA - SONATRACH-ARZEW-GNL 3Z PROJECT
• SAIPEM S.P.A. QATAR FERTILIZER COMPANY
• DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO RABIGH POWER PLANT - STAGE No. 2
• TECNICAS REUNIDAS S.A. ARAMCO - YANBU EXPORT REFINERY PROJECT
• JGC - TECNIMONT JV INTEGRATED GAS DEVELOPMENT PROJECT
Additional Knowledge. Wide knowledge of Welding types and standards.
Wide knowledge of Painting types and standards).
NDT course (MT, PT and UT) and (BGAS) painting course
From 1/12/2004 Till 1/06/2006Duration
Company Arma food industries
Job Title Production Engineer, managing and directing all production processes in Arma oil
Filling plant such as:
• Plastic deformation process and M/CS
 Oil filling lines production and achieving required plans.
 Quality and purity of oil products
 Maintenance of filling and plastic machines.
 R&D for improvement of productivity.
 Training of manpower to improve work level.
From 1/10/2003 Till 1/12/2004Duration
Company Mobica for integrated manufactures
Job title Planning engineer, to manage and direct all production planning operations such as:
 Issue of the production planning orders for manufacturing plants
 Arrangement of the operations that every order has to pass to finish.
RESUME PAGE (IV )
 Estimation of the production time for every order
 Following up the orders in every stage of production.
 All these tasks achieved using primavera project planner program.
Additional courses
 Designing& Maintenance of automotive air conditions.
 Performance management process.
 Art of managing people managerial skills and building teamwork.
 Time management.
 NDT course( UT,RT,PT)
REFRENCES
Available Upon request.
SIGNATURE
ENG. Salah Eddeen Mahmoud.

CV

  • 1.
    RESUME PAGE (I) Personal Data Full Name Salah Eddeen Mahmoud Abd Elatif D.O.B 1st June, 1975 P.O.B Cairo, Egypt Gender Male Nationality Egyptian Military Status Exempt Marital Status Married Driving license Egypt, Saudi Arabia, International Contact Data Address Bahra Amody, Jeddah, Saudi Arabia Mobile +966569667977 E-Mail Address wwwsala7@yahoo.com OBJECTIVE • Seeking an interested job in the field of engineering applications that will take advantage of my academic studies as will as my previous financial and administrative experience to practical situations in real world of work. • My goal is to be professional in my career and increase my skills with more responsibilities through big firms and organizations like your honor organization. Educational Degrees University Ain Shams University Collage Faculty of Engineering Department Design &Production Department Degree B.Sc in Mechanical Design& Production, Engineering May 2003 Final Year Grade Good Graduation Estimation Good Graduation Project Tasks Design & Manufacturing an abrasive flow machining technique Product Design and Production for improvement of internal surface roughness Estimation Excellent: Score (198 / 200) Points Computer skills Good command of both software and hardware. Wide knowledge in computer (maintenance) and up dative for the new products. Xsteel (Professional) Solid Works ( user) AutoCAD (professional) Visual basic (user) Primavera 6 (professional) GLOBAL Software: Microsoft package (word, excel, PowerPoint, and outlook) Good user for internet and browsing. Linguistic Performance 1st Arabic Mother tongue 2nd English Oral Writing Excellent Excellent
  • 2.
    RESUME PAGE (II) Work Experience From 1/06/2006 Till NowDuration Company Arabian International Company (Egypt). Job Title Technical office engineer, Modeling and Detailing steel structure Drawings (Main steel Miscellaneous – Gratings) up to shop Drawings and single parts drawing. Company Arabian International Company (Saudi Arabia). Job Title Senior planning engineer (present job), Job Tasks: • Scheduling of steel structure projects using primavera p6 and Orion system • Reviewing client Drawings for any comments can be discussed, • Following up Material status and shop drawings for every Project, • Prepare monthly fabrication plan and distribute the load at the workshop. • Participate in preparation of Planning & Cost control management framework including systems, processes, & procedures • Participate in preparation, updating and propagation of Project Execution Instructions covering planning, progress measurement guidelines, estimating, budgeting and cost control, invoicing & change control, and progress reporting, for application in projects during engineering, procurement and construction phases to facilitate building of highly reliable, safe and cost effective industrial facilities. • Contribute so that Total Project Cost is prepared /updated against all projects estimates, for controlling and monitoring the details of the actual commitment, expenditures, trends and forecast in comparison to the approved budget. • Involve in Monitor the review and analyze of Projects Schedule and Cost status, highlight variance/issues in schedule and cost, critical path and provide recommendations for effective mitigation • Involve in Monitor the review and analysis of Contractor's Schedule, highlight issues and give recommendations for effective resolutions with Contractors • Completely review the contractor's schedule to ensure all requirements are fulfilled for smooth running. • Review, consolidate and prepare comments on Contractor's monthly progress report. • Coordinate so that projects detailed schedule is resource & cost loaded for all project. • Participate in review of project man-hours and the allocation of man-hours in conjunction with planning on monthly basis • Coordinate to integrate of work, schedule and cost using a work breakdown structure (WBS) • Monitoring of man-hours, machineries and materials utilized on projects against the original Plan. • Monitoring of projects' achievement of key milestones against the original plan. • Provide regular analysis of work progress, resource utilization and milestone achievement in forecasting of impacts on project completion.
  • 3.
    RESUME PAGE (III) Projects Working on Steel Structures projects for ARAMCO, JGC, HHI, NEM, CMI, SAIPEM, and ALSTOM such as: Client Name Project Name • TECHNIP Spa, ITALY JUBAIL EXPORT REFINERY PROJECT • SK ENGINEERING & CONSTRUCTION CO SATORP - JUBAIL EXPORT REFINERY • TECNICAS REUNIDAS S.A SATORP-JUBAIL EXPORT REFINERY PROJECT • TECHIP Spa ITALY JUBAIL EXPORT REFINERY PROJEC • HYUNDAI ENGINEERING & CONSTRUCTION CO. LTD MANIFA POWER TRANSMISSION SUBSTATION • JGC CORPORATION HABSHAN - 5 - PROCESS PLANT - PACKAGE 2 • CHIYODA PETROSTAR / SAMSUNG SAUDI ARABIA (CPSA) JUBAIL EXPORT REFINERY PROJECT • HYUNDAI ENGINEERING & CONSTRUCTION CO LTD KARAN GAS FACILITIES PROJECT • JGC CORPORATION HABSHAN - 5- PROCESS PLANT - PACKAGE 4 • SAUDI ARAMCO / JACOBS ENGINEERING UK LTD. KING ABDULLAH PETROLEUM STUDIES & RESEARCH CENTRE • BECHTEL INTERNATIONAL LTD. MAADEN - RAS AZ ZAWR ALUMINIUM SMELTER • CHINA RAILWAY CONSTRUCTION CORPORATION HRS MAKKAH PROJECT • JGC CORPORATION SAUDI ARAMCO - MANIFA PROJET • SAIPEM S.P.A. QATAR FERTILIZER COMPANY • ALSTOM POWER - SWEDEN SHOAIBA POWER PLANT - PHASE III - UNIT 14 • SNAMPROGETTI S.P.A. QATAR FERTILIZER COMPANY • SAIPEM SPA - ITALY ALGERIA - SONATRACH-ARZEW-GNL 3Z PROJECT • SAIPEM S.P.A. QATAR FERTILIZER COMPANY • DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO RABIGH POWER PLANT - STAGE No. 2 • TECNICAS REUNIDAS S.A. ARAMCO - YANBU EXPORT REFINERY PROJECT • JGC - TECNIMONT JV INTEGRATED GAS DEVELOPMENT PROJECT Additional Knowledge. Wide knowledge of Welding types and standards. Wide knowledge of Painting types and standards). NDT course (MT, PT and UT) and (BGAS) painting course From 1/12/2004 Till 1/06/2006Duration Company Arma food industries Job Title Production Engineer, managing and directing all production processes in Arma oil Filling plant such as: • Plastic deformation process and M/CS  Oil filling lines production and achieving required plans.  Quality and purity of oil products  Maintenance of filling and plastic machines.  R&D for improvement of productivity.  Training of manpower to improve work level. From 1/10/2003 Till 1/12/2004Duration Company Mobica for integrated manufactures Job title Planning engineer, to manage and direct all production planning operations such as:  Issue of the production planning orders for manufacturing plants  Arrangement of the operations that every order has to pass to finish.
  • 4.
    RESUME PAGE (IV)  Estimation of the production time for every order  Following up the orders in every stage of production.  All these tasks achieved using primavera project planner program. Additional courses  Designing& Maintenance of automotive air conditions.  Performance management process.  Art of managing people managerial skills and building teamwork.  Time management.  NDT course( UT,RT,PT) REFRENCES Available Upon request. SIGNATURE ENG. Salah Eddeen Mahmoud.