Menara Putrajaya Holdings (Lot 2C2)
Design architect
Cox Architect
Consultant architect
Jafri Merican Architects
Client
Putrajaya Holdings Sdn Bhd
Builder
Putra Perdana Construction Sdn Bhd
Consultants
Kemasepakat Sdn Bhd, Meinhardt Façade Technology (S) Pte Ltd, Norman Disney Young Sdn
Bhd
Building introduction
 Location Lot 2C2, Precinct 2, 62100, W.P. Putrajaya
 Start date: 28 January 2010
Completion date: 30 June 2012
 12 Storey Office Tower
 4 Storey Podium Office + 2 Level Basement Carpark
2
Map of Putrajaya Precincts [Map]. (n.d.). Retrieved from http://www.lcct.com.my/help/faqs/how-to-go-to-putrajaya-from-
lcct
Situated linearly along the waterway, Precinct1 to Precinct 5 serves as the Core Area defining the
identity of Putrajaya, the federal administration centre for Malaysia. According to (Jafri Merican
Architect, 2009), Lot 2C2 originally got its name from the abbreviation Precinct 2, commercial
building, parcel 2. Being 25 kilometers South to Kuala Lumpur, it is an office building with a garden
by the side, locating next to a waterfront sited at Precinct 2 Putrajaya. Built on a slope, Lot 2C2 has
a high foyer space connecting two main building parts while functions as a main circulation path for
the building.
3
Primary views
Secondary views
(Author, 2014)
Putrajaya Seri Wawasan Bridge
(Author, 2014)
Putra Mosque
Primary view
Secondary view
(Author, 2014)
Ministry of Finance building
(Author, 2014)
National Space Agency building
4
Site Map of Lot 2C2
Floor plans
LEVEL 1: Level of the main front entrance
LEVEL 3: Office floor level
A
B B
A
5
LEVEL 4: Roofs of the 4 stories office podium
LEVEL 12: Level containing the rain water tanks
ROOF PLAN: Roof designed for rainwater harvesting
6
Sections
Section A-A
Section B-B
Passive design features
1. Building envelope- Sun shading louvers
2. Building orientation
 Building form
 Solar
 Wind
7
Certifications
1. PAM Awards 2013 Silver (Category 11: Commercial – High rise office)
2. Green Building Index Gold
Green features:-
Solar renewable energy
Grey water recycling system
Light colored interior surfaces
with appropriate office layouts
Multiple shading building
envelope design
Natural ventilation
Rain water harvesting
Optimal building orientation
Site layout to reduce vehicles
carbon emissions
8
 Optimal building orientation
 Multiple shading building envelope design
 Site layout to reduce vehicles carbon emissions
 Natural ventilation
 Rain water harvesting
 Grey water recycling system
9
 Light colored interior surfaces with appropriate office layouts
 Solar renewable energy
10
Putrajaya, Malaysia’s Climate
The graph displaying the temperature varies throughout the year and as an obvious point of
metric system for the building to consider regarding its passive heating and cooling design.
Malaysia being in the tropical rainforest climate, having the average temperature ranges
between 24 degree Celsius and 32 degree Celsius. With an eight degree Celsius differences
between the maximum and minimum temperatures.
The average amount of sunshine hours mostly depends on the monsoon season which
determined the amount of rainfall annually. For Malaysia, the average hour of sunshine is 8
hours.
34 35 35 35 36 35 34 35 35 35 34 35
30 31 32 33 32 32 31 31 31 32 32 31
25 25 25
23
26 26 26 26 26
24 24 25
23 23
21 22 23
21 22 22 23 23 23 22
0
5
10
15
20
25
30
35
40 Temperatures: Average and Extreme
Absolute Max Average Max Average Min Absolute Min
6
8
7
8
8
8
8
8
8
7
6
6
JANUARY
FEBRUARY
MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
NOVEMBER
DECEMBER
SUNSHINE HOURS IN PUTRAJAYA, MALAYSIA
Hours
Source: http://www.myweather2.com/City-Town/Malaysia/Putrajaya/climate-profile.aspx
Source: http://www.holiday-weather.com/kuala_lumpur/averages/#chart-humidity
11
The rainfall each year ranges from 1500 mm to 3000 mm depending on the location. The
months with the most rainfall in Putrajaya are from November to February, which is during
the Northeast Monsoon season. As from May to September, the amount of rainfall declines
due to the Southwest Monsoon season.
The level of humidity is similar for both Malaysia and Singapore, where in the morning hours,
the humidity percentage are high and then it began to drop as it reaches the afternoon but
continues to hike once the sun begins to set. For Malaysia, the average humidity level is
79.5% which is lower compared to Singapore.
230
200
260
240
190
160
150
160
200
280
290
250
AVERAGE RAINFALL
mm
78
76
77
80
79
78
78
78
79
81
83
81
HUMIDITY
Percentage
Source: http://www.holiday-weather.com/kuala_lumpur/averages/#chart-humidity
Source: http://www.holiday-weather.com/kuala_lumpur/averages/#chart-humidity
12
In Putrajaya, the wind speed is relatively low as to compare with the site in Singapore. The
maximum wind speed in Putrajaya is 74km/h which is comparatively high when measured
with the other months.
The range for the average wind speed in Putrajaya is 2m/s to 3.6m/s which falls on 2 in the
Beaufort Scale, which the strength are desired as it does not cause irritant to the human yet
able to allow ventilation.
11 12 8 5 7 8 9 9 8 7 6 10
39 37
37 43 37
74
43
35 31
50
35
43
WIND SPEED [KM/H]
Average Maximum
Month Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec
Year
round
Wind
direction
SSW SSW SSW NNE NNW NNW NNW NNW NNW ESE SE SSW NNE
Average
Wind speed
(m/s)
2.6 2.6 2.6 2.6 2.6 2.6 3.1 3.1 2.6 2.6 2 2.6 2.6
Average Air
temperature
(°C)
29 30 29 30 30 30 29 29 29 29 29 29 29
Source: http://www.myweather2.com/City-Town/Malaysia/Putrajaya/climate-profile.aspx
13
Thermal comfort
The thermal comfort range for Malaysia is 22 to 32 degree Celcius for temperature and 70%
to 80% for relative humidity.
Source: http://www.windfinder.com/windstatistics/morib_kuala_lumpur?fspot=putrajaya_lake
14
Passive feature 1: Building Orientation and Form
Image source: (http://www.world-architects.com/en/projects/41019_Putrajaya_Lot_2C2)
15
Below shows the effect of building form on environmental control strategies.
Figure 1.1
( Stein, B., Reynolds, J., & McGuinness, W. J. (1992). Mechanical and electrical equipment for buildings. New York: J. Wiley &
Sons.)
a) Solar Analysis
Figure 1.2
Menara PjH Lot 2C2 office building is built up in thin combo building design. As compared to
a thick building which requires more artificial lighting, thinner building allows most of its
interior spaces to be exposed to daylighting especially in the core of the block. This is
because spaces in thin combo building are closer to its outer shell. The usage of the shading
devices as part of the control systems to allow appropriate amount of sunlight and heat gain
to ensure thermal comfort can also be seen in Menara PjH.
THIN COMBO BUILDING
Daylighting Ventilation
Complete daylighting
for most spaces
Natural ventilation is
easily accomplished
16
Figure 1.3
The longer sides of Lot 2C2 building which is the A tower is positioned between east and
west. East and west direction is the most critical position where the sun has maximum
exposure to the tower. Therefore, the solution is to corporate sun shading devices on the
façades. Even so, this taller A tower provides shading for the lower B,C,D office podiums
especially during the afternoon while still allowing certain amount of natural sunlight to
penetrate through the entire building.
Figure 1.4
Besides that, there are three parts of the building which are extended towards east. These 3
office podiums provide shading to each other and the pedestrian areas in the between the
blocks when the sun faces west as shown in the diagram.
A
B
C
D
17
b) Wind Analysis
Figure 1.5
According to the wind rose diagram, the overall wind direction comes from every direction,
there is not one point where wind is not received. In order to obtain maximum wind
exposure, the direction to face is the South-southeast direction, where there is a 9% of wind
distributed annually. Direction where wind is least obtainable would be the North and East-
southeast direction which just 3% from each direction.
18
Figure 1.6
With wind coming from all direction at any possible period, the architect has to coordinate
the building in an orientation that serves the wind while providing proper ventilation to host
the user. Constructing a building form of a ‘W’ allows air to be deflected along its current, a
passive way of forcing the wind in motion, to provide a cooling effect for the occupants,
exterior wise, based on Figure 1.6. This provides thermal comfort in the outdoor for the users
and indirectly encourages the user to walk to surrounding places instead of using a vehicle
which is not an environmental alternative.
Using the wind rose diagram, forming the connection between the winds distributed from the
South-southeast and Northeast direction and the building form, optimum air can be
manipulated to cool down the building. Warm air could be replaced by cooler air. The lake
next to the site also could be used to cool down the warmer breeze during hot days.
Next, the supply of outdoor air that flow through building from the left structure (shown by the
black arrow) allows hot air and cool air to interchange, creating a circulation of air flow within
the structure. According to (Yeang, 1996), when internal wind speed has improved, the rate
of fresh air in structure improved for micro-climate cooling and healthier internal
environment.
Cool air
Warm air
South-southeast wind
Northeast wind
19
Due to form of the building in a shape of “W”, the building form is thinner and ventilation is
achieved easily. On the other hand, if the form of structure is a singular block, it would be
harder to ventilate the building as there would be too many partitions among the interior
space obstructing the air ventilation.
Heat from the building can also be transferred easily outwards with the separated blocks
form. Moreover, due to the building form, more wind could be brought into the spaces
between the blocks allowing more heat to be taken away compared to a single block building
and thus interior heat could be taken away by the wind in a faster rate.
Figure 1.7
When constructing a lower structure in front of a taller building, the wind force’s impact on
the taller building would be much reduced, enhancing stability of the structure from the wind
load. Analysis from the wind speed has shown that the maximum wind speed could range up
to 74km/h and there are not many tall buildings adjacent around Menara PjH to share and
minimize the impact. Hence this step is taken as a precaution of firmness in a passive way.
Impact of the foundation is also minimized, creating lesser stress towards the earth since the
live load has been decreased.
20
According to the temperature chart of Putrajaya, the average minimum temperature is 25
degree Celcius while the average maximum temperature is 35 degree Celcius. With building
being built out of high thermal mass materials such as concrete, the 10 degree Celcius
difference between the day and night might not be able to remove much stored daytime heat
during the night time. Therefore a thermally light building should be considered. With Menara
PjH Lot 2C2 being built using high amounts of glass and metals for the exteriors, combining
the thin combo form with separated blocks, the building has lower thermal mass. This allows
much heat to be removed at night.
Based on the study by (Kwok & Grondzik, 2009, p. 105), high humidity may be avoided only
by sealing and air conditioning buildings. As seen from the humidity graph in page 11, the
average humidity in Putrajaya is 79.5% while the thermal comfort level for humidity in Kuala
Lumpur is averagely 75%. Besides according to MS1525 (2007), the recommended relative
humidity is from 75% to 70%. This explains why Menara PjH is fully sealed in order to avoid
high humidity in interior spaces causing thermally discomfort.
In MS1525 (2007), the long directional axis of buildings facing North-South is the best
orientation for a building in which the structure is orientated to minimize the east-west
orientation. This is useful for a structure built in a climatic zone near the equator. But in the
case of Menara PjH, the taller office tower is orientated 20 degrees towards the Northwest,
with the longitudinal elevations facing east-west while the lower office podiums conform to
the orientation guide in MS1525 (2007) with the longer facades facing North-South. Due to
the orientation of the office tower, thus many shading devices are installed on it.
As a conclusion, with a thin combo building, complete daylighting for most spaces and
natural ventilation could be easily proficient (Brown & DeKay, 2001, p. 45).
21
Passive features 2: Building Envelope- Exterior Shading Systems
g
Image source: Rupajiwa Studio, 2013
22
The facades of Menara PjH (Lot 2C2) consisted mostly of glass making it very prone to high
solar heat gain in a tropical country like Malaysia. Therefore sun shading designs are
needed in order to minimize the heat gain. In this case, high amount of external shading
devices are used in Menara PjH because it is the most thermally efficient as external
shading blocked out the solar energy before it enters the building as shown in Figure 2.1
below.
Figure 2.1 Analysis on interior and exterior shading
Baker, N. (2014). Solar controls and shading [Figure]. Retrieved from
http://www.architecture.com/SustainabilityHub/Designstrategies/Fire/1-4-1-6-
Solarcontrolsandshading.aspx
23
a) Vertical sun shading louvers
The red bold lines in Figure 2.2 are where the vertical sun shading louvres are placed on the
12 storeys office building as can be seen in the picture above.
NorthEast
20˚ West to SouthWest
SouthEast
Figure 2.2 Placement of vertical sun shading louvers
24
The ratio, R2 (width of vertical projection/ Length of window) is 0.5 for Menara PjH.
Shading coefficients for vertical projections
According to the table in the Malaysian Standard: 1525 for non-residential buildings, vertical
louvres facing Northeast/Southeast orientation will have a 0.77 coefficient, which is the
lowest in the 0.5 – 0.7 ratio, R2 category. Meanwhile the Southwest façade has a coefficient
of 0.79.
In hot climate, a lower shading coefficient is more suitable because more sunlight and solar
heat can be prevented from entering the building.
Figure 2.3 Elevation of building with vertical sun shading louvres
Width of louvres
Length of
window
Table 2.1
25
Advantages:
 The vertical louvers can be pre-fixed to the most optimum angle according to the
sun’s position.
 The vertical louvers used by Menara PjH have a gap in between the louvers and the
glass walls. While the louvers act as a barrier between the radiant heat from the sun
and the reflective glass, the air in the gap acts as a medium for heat convection from
the louvers to the glass. Because of this, the air in the space is heated in the present
of the sun.
Surrounding air enters the gap and circulates in the spaces between the vertical
louvers and the glass surface allowing the hot air in the space to be removed.
Besides, heat from the building also transferred outwards and cool down by the
circulating air in the gap. This combination of reflective glass and the vertical louvers
as the envelope design produces a passive cooling system for the building (The
Ambler | Passive Cooling, 2009).
 Allows daylight to penetrate the building and reduce electricity needed for lighting.
Disadvantage:
 Views are obstructed
Surrounding Air Warm Air Removed
Gap
Heat from Building
Figure 2.4 Diagram of air circulation in vertical louvers
26
b) Horizontal overhangs
The green bold lines in Figure 2.5 represent the horizontal overhangs located at the 4
storeys office podiums. There are 4 Northeast/ Southeast facades, 3 Northwest facing
facades, and 2 East facades.
SE
NE
NW
E
E
NW
SE
SE
NW
Figure 2.5 Placement of horizontal overhangs
27
Shading coefficients for horizontal projections
According to Table 2.2 above, the Northeast/ Southeast facing horizontal projections with the
ratio, R1 0.5- 0.7 has a shading coefficient of 0.69. For the overhangs facing East has the
lowest of all, which is 0.68 and for the Northwest facing overhangs is 0.72.
3pm Vernal Equinox [21 March]
Table 2.2
28
3pm Summer solstices [22 June]
3pm Autumn Equinox [23 September]
3pm Winter Solstice [22 December]
29
Due to the Northwest facades having the highest shading coefficient, therefore extra shading
devices are added at the Northwest façade (red circle). It is also the only facade that is
exposed to the sun the most in the afternoon.
Advantages:
 Allows 100% ventilation when windows are opened
 Views are not obstructed by any louvers
 Enables daylighting inside the building
 Reduce sun glare which is suitable for office work
Disadvantages:
 Exterior views being disrupted
Figure 2.6 Horizontal louvers added at the Northwest façade
View
Sunlight
Ventilation
30
References
Baker, N. (2014). Solar controls and shading [Figure]. Retrieved from
http://www.architecture.com/SustainabilityHub/Designstrategies/Fire/1-4-1-6-
Solarcontrolsandshading.aspx
Brown, G. Z., & DeKay, M. (2001). Sun, wind & light: Architectural design
strategies(2nd ed.). NewYork: Wiley.
Building orientation. (n.d.). Retrieved from
http://www.architecture.com/SustainabilityHub/Designstrategies/Earth/1-1-3-2
Buildingorientation.aspx
Jafri Merican Architect (2010, July 26). Jafri Merican Architect: 2C2 Green Office Building,
Putrajaya [Web log post]. Retrieved from
http://jafrimericanarchitect.blogspot.com/2010/07/2c2-green-office-building-
putrajaya.html
Kwok, A. G., & Grondzik, W. (2009). Mechanical and Electrical Equipment for Buildings,
Eleventh Edition. John Wiley & Sons.
Maartje :: Sustainable Systems & Designs. (n.d.). Retrieved from
http://www.ics.ele.tue.nl/~akash/maartje/getSystemDetail.php?ID=203
Map of Putrajaya Precincts [Map]. (n.d.). Retrieved from
http://www.lcct.com.my/help/faqs/how-to-go-to-putrajaya-from-lcct
Rupajiwa Studio (2013, February 22). Menara PjH [Photography]. Retrieved from
https://www.facebook.com/photo.php?fbid=10151328525872424&set=a.10151328525
332424.463404.139599347423&type=3&theater
Stein, B., Reynolds, J., & McGuinness, W. J. (1992). Mechanical and electrical equipment
for buildings. New York: J. Wiley & Sons.
The Ambler | Passive Cooling, A Resort Trend at Work On Isla Palenque | Amble Resorts.
(2009).Retrieved from http://amble.com/ambler/2009/08/press release-ambles
new-panama-resort-taps-trend-in-passive-cooling/
Universiti Tun Hussein Onn Malaysia (2007). Malaysian Standard MS 1525:2007.
Department of Standards Malaysia.
31
Yeang, K. (1996). The skyscraper bioclimatically considered: A design primer. London:
Academy

More Related Content

What's hot

BUILDING SCIENCE 1 PTM GEO 1
BUILDING SCIENCE 1 PTM GEO 1BUILDING SCIENCE 1 PTM GEO 1
BUILDING SCIENCE 1 PTM GEO 1Yaseen Syed
 
Slide petaling st
Slide petaling stSlide petaling st
Slide petaling st
jerryycc
 
MITEC : Building Service System
MITEC : Building Service System MITEC : Building Service System
MITEC : Building Service System
chiwunloi
 
Jalan pudu case study
Jalan pudu case studyJalan pudu case study
Jalan pudu case study
Jy Chong
 
Building Services Assignment 1
Building Services Assignment 1Building Services Assignment 1
Building Services Assignment 1
Nur Zaas
 
Assignment 2 - Jaya Shopping Centre
Assignment 2 - Jaya Shopping CentreAssignment 2 - Jaya Shopping Centre
Assignment 2 - Jaya Shopping Centre
Kai Yun Pang
 
Building Services
Building Services Building Services
Building Services
Joshua Lee
 
National mosque malaysia
National mosque malaysiaNational mosque malaysia
National mosque malaysia
limziahuei
 
DOCUMENTATION OF STADIUM NEGARA
DOCUMENTATION OF STADIUM NEGARADOCUMENTATION OF STADIUM NEGARA
DOCUMENTATION OF STADIUM NEGARA
Yen Min Khor
 
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATIONINDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
Construction Tech. and Mgmt., VNIT Nagpur
 
Architecture Culture & History II : Project 2 -report
Architecture Culture & History II : Project 2 -reportArchitecture Culture & History II : Project 2 -report
Architecture Culture & History II : Project 2 -report
Lee Wan Xuan
 
Menara Tabung Haji Case Study
Menara Tabung Haji Case StudyMenara Tabung Haji Case Study
Menara Tabung Haji Case Study
Lovie Tey
 
National Mosque Malaysia Precedent Studies
National Mosque Malaysia Precedent Studies National Mosque Malaysia Precedent Studies
National Mosque Malaysia Precedent Studies
Tay Jit Ying
 
Building science report [malaysia] final
Building science report [malaysia] finalBuilding science report [malaysia] final
Building science report [malaysia] finalmiranazrin
 
Building Service Project 2 Year 2016 (Taylors University Lakeside Campus)
Building Service Project 2 Year 2016 (Taylors University Lakeside Campus)Building Service Project 2 Year 2016 (Taylors University Lakeside Campus)
Building Service Project 2 Year 2016 (Taylors University Lakeside Campus)
Ong Seng Peng Jeff
 
Building service project2
Building service project2Building service project2
Building service project2
limziahuei
 
Building Services System in PKNS Complex, Shah Alam
Building Services System in PKNS Complex, Shah AlamBuilding Services System in PKNS Complex, Shah Alam
Building Services System in PKNS Complex, Shah Alam
Lee Pei Gie
 
Stadium negara report history2
Stadium negara report history2Stadium negara report history2
Stadium negara report history2
ForestedTiger
 
Mechanical ventilation case study
Mechanical ventilation case studyMechanical ventilation case study
Mechanical ventilation case study
Rohit Saxena
 
NATIONAL MOSQUE - CULTURE AND HISTORY 2 REPORT
NATIONAL MOSQUE - CULTURE AND HISTORY 2 REPORTNATIONAL MOSQUE - CULTURE AND HISTORY 2 REPORT
NATIONAL MOSQUE - CULTURE AND HISTORY 2 REPORT
Atiqah Ghazali
 

What's hot (20)

BUILDING SCIENCE 1 PTM GEO 1
BUILDING SCIENCE 1 PTM GEO 1BUILDING SCIENCE 1 PTM GEO 1
BUILDING SCIENCE 1 PTM GEO 1
 
Slide petaling st
Slide petaling stSlide petaling st
Slide petaling st
 
MITEC : Building Service System
MITEC : Building Service System MITEC : Building Service System
MITEC : Building Service System
 
Jalan pudu case study
Jalan pudu case studyJalan pudu case study
Jalan pudu case study
 
Building Services Assignment 1
Building Services Assignment 1Building Services Assignment 1
Building Services Assignment 1
 
Assignment 2 - Jaya Shopping Centre
Assignment 2 - Jaya Shopping CentreAssignment 2 - Jaya Shopping Centre
Assignment 2 - Jaya Shopping Centre
 
Building Services
Building Services Building Services
Building Services
 
National mosque malaysia
National mosque malaysiaNational mosque malaysia
National mosque malaysia
 
DOCUMENTATION OF STADIUM NEGARA
DOCUMENTATION OF STADIUM NEGARADOCUMENTATION OF STADIUM NEGARA
DOCUMENTATION OF STADIUM NEGARA
 
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATIONINDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
 
Architecture Culture & History II : Project 2 -report
Architecture Culture & History II : Project 2 -reportArchitecture Culture & History II : Project 2 -report
Architecture Culture & History II : Project 2 -report
 
Menara Tabung Haji Case Study
Menara Tabung Haji Case StudyMenara Tabung Haji Case Study
Menara Tabung Haji Case Study
 
National Mosque Malaysia Precedent Studies
National Mosque Malaysia Precedent Studies National Mosque Malaysia Precedent Studies
National Mosque Malaysia Precedent Studies
 
Building science report [malaysia] final
Building science report [malaysia] finalBuilding science report [malaysia] final
Building science report [malaysia] final
 
Building Service Project 2 Year 2016 (Taylors University Lakeside Campus)
Building Service Project 2 Year 2016 (Taylors University Lakeside Campus)Building Service Project 2 Year 2016 (Taylors University Lakeside Campus)
Building Service Project 2 Year 2016 (Taylors University Lakeside Campus)
 
Building service project2
Building service project2Building service project2
Building service project2
 
Building Services System in PKNS Complex, Shah Alam
Building Services System in PKNS Complex, Shah AlamBuilding Services System in PKNS Complex, Shah Alam
Building Services System in PKNS Complex, Shah Alam
 
Stadium negara report history2
Stadium negara report history2Stadium negara report history2
Stadium negara report history2
 
Mechanical ventilation case study
Mechanical ventilation case studyMechanical ventilation case study
Mechanical ventilation case study
 
NATIONAL MOSQUE - CULTURE AND HISTORY 2 REPORT
NATIONAL MOSQUE - CULTURE AND HISTORY 2 REPORTNATIONAL MOSQUE - CULTURE AND HISTORY 2 REPORT
NATIONAL MOSQUE - CULTURE AND HISTORY 2 REPORT
 

Viewers also liked

Green building index
Green building index Green building index
Green building index
hott1771
 
An Architect’S Guide To Sustainable Window Coverings Ppt
An Architect’S Guide To Sustainable Window Coverings PptAn Architect’S Guide To Sustainable Window Coverings Ppt
An Architect’S Guide To Sustainable Window Coverings PptNeil Gordon
 
Aa case study project 1 (elaine bong 0310432)
Aa case study project 1 (elaine bong 0310432)Aa case study project 1 (elaine bong 0310432)
Aa case study project 1 (elaine bong 0310432)
Elaine Bong
 
Shading Devices
Shading DevicesShading Devices
Shading Devices
Suyash Sahu
 
Solar control
Solar controlSolar control
Solar control
komal rathore
 
Presentation on the Energy Efficiency Building Code
Presentation on the Energy Efficiency Building CodePresentation on the Energy Efficiency Building Code
Presentation on the Energy Efficiency Building Code
emmak781
 
Shading devices by richa malik
Shading devices by richa malikShading devices by richa malik
Shading devices by richa malik
Richa Malik
 
Green Building Index
Green Building IndexGreen Building Index
Green Building Index
Eraz
 
Teri, bangalore & solar passive techniques(rupesh)
Teri, bangalore & solar passive techniques(rupesh)Teri, bangalore & solar passive techniques(rupesh)
Teri, bangalore & solar passive techniques(rupesh)
Rupesh Chaurasia
 
Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.
Vinay M
 

Viewers also liked (11)

Green building index
Green building index Green building index
Green building index
 
Artisan_DATA
Artisan_DATAArtisan_DATA
Artisan_DATA
 
An Architect’S Guide To Sustainable Window Coverings Ppt
An Architect’S Guide To Sustainable Window Coverings PptAn Architect’S Guide To Sustainable Window Coverings Ppt
An Architect’S Guide To Sustainable Window Coverings Ppt
 
Aa case study project 1 (elaine bong 0310432)
Aa case study project 1 (elaine bong 0310432)Aa case study project 1 (elaine bong 0310432)
Aa case study project 1 (elaine bong 0310432)
 
Shading Devices
Shading DevicesShading Devices
Shading Devices
 
Solar control
Solar controlSolar control
Solar control
 
Presentation on the Energy Efficiency Building Code
Presentation on the Energy Efficiency Building CodePresentation on the Energy Efficiency Building Code
Presentation on the Energy Efficiency Building Code
 
Shading devices by richa malik
Shading devices by richa malikShading devices by richa malik
Shading devices by richa malik
 
Green Building Index
Green Building IndexGreen Building Index
Green Building Index
 
Teri, bangalore & solar passive techniques(rupesh)
Teri, bangalore & solar passive techniques(rupesh)Teri, bangalore & solar passive techniques(rupesh)
Teri, bangalore & solar passive techniques(rupesh)
 
Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.
 

Similar to Report on Lot 2C2 - Malaysia [BSC]

B.science report solaris
B.science report solarisB.science report solaris
B.science report solaris
Daniel Yap
 
The Pinnacle passive design strategies report
The Pinnacle passive design strategies reportThe Pinnacle passive design strategies report
The Pinnacle passive design strategies report
Carra Chin
 
Building science report [malaysia]
Building science report [malaysia] Building science report [malaysia]
Building science report [malaysia]
Soh Shing
 
Building science report [malaysia] final
Building science report [malaysia] finalBuilding science report [malaysia] final
Building science report [malaysia] finalJannah Jailani
 
B.science report pinnacle
B.science report pinnacleB.science report pinnacle
B.science report pinnacle
Daniel Yap
 
Parkroyal on Pickering Analysis Report
Parkroyal on Pickering Analysis ReportParkroyal on Pickering Analysis Report
Parkroyal on Pickering Analysis Report
Charlene Chan
 
Parkroyalfinalforsubmission 140717004033-phpapp02
Parkroyalfinalforsubmission 140717004033-phpapp02Parkroyalfinalforsubmission 140717004033-phpapp02
Parkroyalfinalforsubmission 140717004033-phpapp02
phanngoc Tien
 
Solaris, Singapore passive design strategies report
Solaris, Singapore passive design strategies reportSolaris, Singapore passive design strategies report
Solaris, Singapore passive design strategies report
Carra Chin
 
:Design of principle Bioclimatic Technology Menara Mesiniaga Tower presentati...
:Design of principle Bioclimatic Technology Menara Mesiniaga Tower presentati...:Design of principle Bioclimatic Technology Menara Mesiniaga Tower presentati...
:Design of principle Bioclimatic Technology Menara Mesiniaga Tower presentati...
AdnanSwat1
 
REPORT OF MESINIAGA, MALAYSIA
REPORT OF MESINIAGA, MALAYSIAREPORT OF MESINIAGA, MALAYSIA
REPORT OF MESINIAGA, MALAYSIATing Ting Kee
 
Setia International Centre Analysis Report
Setia International Centre Analysis ReportSetia International Centre Analysis Report
Setia International Centre Analysis Report
Charlene Chan
 
One city
One cityOne city
One city
Christiody Lim
 
BUILDING SCIENCE 1 SOLARIS
BUILDING SCIENCE 1 SOLARISBUILDING SCIENCE 1 SOLARIS
BUILDING SCIENCE 1 SOLARISYaseen Syed
 
Project 2 gizmo
Project 2 gizmoProject 2 gizmo
Project 2 gizmo
Teo Kean Hui
 
Park Royal Building Science Report
Park Royal Building Science ReportPark Royal Building Science Report
Park Royal Building Science Report
Dexter Ng
 
E&t2
E&t2E&t2
E&t2
Teo Kean Hui
 
ENT 2 PROJECT 1
ENT 2 PROJECT 1ENT 2 PROJECT 1
ENT 2 PROJECT 1
Beh Nianzi
 
Ong seng peng (jeff) ent 2 project 2 core optimization handbook c
Ong seng peng (jeff) ent 2 project 2 core optimization handbook cOng seng peng (jeff) ent 2 project 2 core optimization handbook c
Ong seng peng (jeff) ent 2 project 2 core optimization handbook c
Ong Seng Peng Jeff
 

Similar to Report on Lot 2C2 - Malaysia [BSC] (20)

B.science report solaris
B.science report solarisB.science report solaris
B.science report solaris
 
The Pinnacle passive design strategies report
The Pinnacle passive design strategies reportThe Pinnacle passive design strategies report
The Pinnacle passive design strategies report
 
Building science report [malaysia]
Building science report [malaysia] Building science report [malaysia]
Building science report [malaysia]
 
Building science report [malaysia] final
Building science report [malaysia] finalBuilding science report [malaysia] final
Building science report [malaysia] final
 
B.science report pinnacle
B.science report pinnacleB.science report pinnacle
B.science report pinnacle
 
Parkroyal on Pickering Analysis Report
Parkroyal on Pickering Analysis ReportParkroyal on Pickering Analysis Report
Parkroyal on Pickering Analysis Report
 
Parkroyalfinalforsubmission 140717004033-phpapp02
Parkroyalfinalforsubmission 140717004033-phpapp02Parkroyalfinalforsubmission 140717004033-phpapp02
Parkroyalfinalforsubmission 140717004033-phpapp02
 
Ntu
NtuNtu
Ntu
 
Solaris, Singapore passive design strategies report
Solaris, Singapore passive design strategies reportSolaris, Singapore passive design strategies report
Solaris, Singapore passive design strategies report
 
:Design of principle Bioclimatic Technology Menara Mesiniaga Tower presentati...
:Design of principle Bioclimatic Technology Menara Mesiniaga Tower presentati...:Design of principle Bioclimatic Technology Menara Mesiniaga Tower presentati...
:Design of principle Bioclimatic Technology Menara Mesiniaga Tower presentati...
 
REPORT OF MESINIAGA, MALAYSIA
REPORT OF MESINIAGA, MALAYSIAREPORT OF MESINIAGA, MALAYSIA
REPORT OF MESINIAGA, MALAYSIA
 
Setia International Centre Analysis Report
Setia International Centre Analysis ReportSetia International Centre Analysis Report
Setia International Centre Analysis Report
 
One city
One cityOne city
One city
 
BUILDING SCIENCE 1 SOLARIS
BUILDING SCIENCE 1 SOLARISBUILDING SCIENCE 1 SOLARIS
BUILDING SCIENCE 1 SOLARIS
 
Project 2 gizmo
Project 2 gizmoProject 2 gizmo
Project 2 gizmo
 
Park Royal Building Science Report
Park Royal Building Science ReportPark Royal Building Science Report
Park Royal Building Science Report
 
Finalgeo part1
Finalgeo part1Finalgeo part1
Finalgeo part1
 
E&t2
E&t2E&t2
E&t2
 
ENT 2 PROJECT 1
ENT 2 PROJECT 1ENT 2 PROJECT 1
ENT 2 PROJECT 1
 
Ong seng peng (jeff) ent 2 project 2 core optimization handbook c
Ong seng peng (jeff) ent 2 project 2 core optimization handbook cOng seng peng (jeff) ent 2 project 2 core optimization handbook c
Ong seng peng (jeff) ent 2 project 2 core optimization handbook c
 

More from Esther Lau

Building Structure Analysis Report
Building Structure Analysis ReportBuilding Structure Analysis Report
Building Structure Analysis Report
Esther Lau
 
Lau Ee Tian [0309596] report
Lau Ee Tian [0309596] reportLau Ee Tian [0309596] report
Lau Ee Tian [0309596] report
Esther Lau
 
Bechtler Museum Report [BCON2]
Bechtler Museum Report [BCON2]Bechtler Museum Report [BCON2]
Bechtler Museum Report [BCON2]
Esther Lau
 
Report - Project 1 [BCON2]
Report - Project 1 [BCON2]Report - Project 1 [BCON2]
Report - Project 1 [BCON2]
Esther Lau
 
Report on Solaris - Singapore [BSC]
Report on Solaris - Singapore  [BSC]Report on Solaris - Singapore  [BSC]
Report on Solaris - Singapore [BSC]
Esther Lau
 
The old standard chartered bank
The old standard chartered bankThe old standard chartered bank
The old standard chartered bankEsther Lau
 

More from Esther Lau (7)

Building Structure Analysis Report
Building Structure Analysis ReportBuilding Structure Analysis Report
Building Structure Analysis Report
 
Lau Ee Tian [0309596] report
Lau Ee Tian [0309596] reportLau Ee Tian [0309596] report
Lau Ee Tian [0309596] report
 
Bechtler Museum Report [BCON2]
Bechtler Museum Report [BCON2]Bechtler Museum Report [BCON2]
Bechtler Museum Report [BCON2]
 
Report - Project 1 [BCON2]
Report - Project 1 [BCON2]Report - Project 1 [BCON2]
Report - Project 1 [BCON2]
 
Report on Solaris - Singapore [BSC]
Report on Solaris - Singapore  [BSC]Report on Solaris - Singapore  [BSC]
Report on Solaris - Singapore [BSC]
 
ESD
ESDESD
ESD
 
The old standard chartered bank
The old standard chartered bankThe old standard chartered bank
The old standard chartered bank
 

Recently uploaded

Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
Balvir Singh
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
Anna Sz.
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
Ashokrao Mane college of Pharmacy Peth-Vadgaon
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
Pavel ( NSTU)
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
JosvitaDsouza2
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Po-Chuan Chen
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
TechSoup
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
vaibhavrinwa19
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
Nguyen Thanh Tu Collection
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
DhatriParmar
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
Jisc
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
kaushalkr1407
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
EverAndrsGuerraGuerr
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
Levi Shapiro
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
siemaillard
 

Recently uploaded (20)

Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 

Report on Lot 2C2 - Malaysia [BSC]

  • 1. 1 (Author, 2014) Menara Putrajaya Holdings (Lot 2C2) Design architect Cox Architect Consultant architect Jafri Merican Architects Client Putrajaya Holdings Sdn Bhd Builder Putra Perdana Construction Sdn Bhd Consultants Kemasepakat Sdn Bhd, Meinhardt Façade Technology (S) Pte Ltd, Norman Disney Young Sdn Bhd Building introduction  Location Lot 2C2, Precinct 2, 62100, W.P. Putrajaya  Start date: 28 January 2010 Completion date: 30 June 2012  12 Storey Office Tower  4 Storey Podium Office + 2 Level Basement Carpark
  • 2. 2 Map of Putrajaya Precincts [Map]. (n.d.). Retrieved from http://www.lcct.com.my/help/faqs/how-to-go-to-putrajaya-from- lcct Situated linearly along the waterway, Precinct1 to Precinct 5 serves as the Core Area defining the identity of Putrajaya, the federal administration centre for Malaysia. According to (Jafri Merican Architect, 2009), Lot 2C2 originally got its name from the abbreviation Precinct 2, commercial building, parcel 2. Being 25 kilometers South to Kuala Lumpur, it is an office building with a garden by the side, locating next to a waterfront sited at Precinct 2 Putrajaya. Built on a slope, Lot 2C2 has a high foyer space connecting two main building parts while functions as a main circulation path for the building.
  • 3. 3 Primary views Secondary views (Author, 2014) Putrajaya Seri Wawasan Bridge (Author, 2014) Putra Mosque Primary view Secondary view (Author, 2014) Ministry of Finance building (Author, 2014) National Space Agency building
  • 4. 4 Site Map of Lot 2C2 Floor plans LEVEL 1: Level of the main front entrance LEVEL 3: Office floor level A B B A
  • 5. 5 LEVEL 4: Roofs of the 4 stories office podium LEVEL 12: Level containing the rain water tanks ROOF PLAN: Roof designed for rainwater harvesting
  • 6. 6 Sections Section A-A Section B-B Passive design features 1. Building envelope- Sun shading louvers 2. Building orientation  Building form  Solar  Wind
  • 7. 7 Certifications 1. PAM Awards 2013 Silver (Category 11: Commercial – High rise office) 2. Green Building Index Gold Green features:- Solar renewable energy Grey water recycling system Light colored interior surfaces with appropriate office layouts Multiple shading building envelope design Natural ventilation Rain water harvesting Optimal building orientation Site layout to reduce vehicles carbon emissions
  • 8. 8  Optimal building orientation  Multiple shading building envelope design  Site layout to reduce vehicles carbon emissions  Natural ventilation  Rain water harvesting  Grey water recycling system
  • 9. 9  Light colored interior surfaces with appropriate office layouts  Solar renewable energy
  • 10. 10 Putrajaya, Malaysia’s Climate The graph displaying the temperature varies throughout the year and as an obvious point of metric system for the building to consider regarding its passive heating and cooling design. Malaysia being in the tropical rainforest climate, having the average temperature ranges between 24 degree Celsius and 32 degree Celsius. With an eight degree Celsius differences between the maximum and minimum temperatures. The average amount of sunshine hours mostly depends on the monsoon season which determined the amount of rainfall annually. For Malaysia, the average hour of sunshine is 8 hours. 34 35 35 35 36 35 34 35 35 35 34 35 30 31 32 33 32 32 31 31 31 32 32 31 25 25 25 23 26 26 26 26 26 24 24 25 23 23 21 22 23 21 22 22 23 23 23 22 0 5 10 15 20 25 30 35 40 Temperatures: Average and Extreme Absolute Max Average Max Average Min Absolute Min 6 8 7 8 8 8 8 8 8 7 6 6 JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER SUNSHINE HOURS IN PUTRAJAYA, MALAYSIA Hours Source: http://www.myweather2.com/City-Town/Malaysia/Putrajaya/climate-profile.aspx Source: http://www.holiday-weather.com/kuala_lumpur/averages/#chart-humidity
  • 11. 11 The rainfall each year ranges from 1500 mm to 3000 mm depending on the location. The months with the most rainfall in Putrajaya are from November to February, which is during the Northeast Monsoon season. As from May to September, the amount of rainfall declines due to the Southwest Monsoon season. The level of humidity is similar for both Malaysia and Singapore, where in the morning hours, the humidity percentage are high and then it began to drop as it reaches the afternoon but continues to hike once the sun begins to set. For Malaysia, the average humidity level is 79.5% which is lower compared to Singapore. 230 200 260 240 190 160 150 160 200 280 290 250 AVERAGE RAINFALL mm 78 76 77 80 79 78 78 78 79 81 83 81 HUMIDITY Percentage Source: http://www.holiday-weather.com/kuala_lumpur/averages/#chart-humidity Source: http://www.holiday-weather.com/kuala_lumpur/averages/#chart-humidity
  • 12. 12 In Putrajaya, the wind speed is relatively low as to compare with the site in Singapore. The maximum wind speed in Putrajaya is 74km/h which is comparatively high when measured with the other months. The range for the average wind speed in Putrajaya is 2m/s to 3.6m/s which falls on 2 in the Beaufort Scale, which the strength are desired as it does not cause irritant to the human yet able to allow ventilation. 11 12 8 5 7 8 9 9 8 7 6 10 39 37 37 43 37 74 43 35 31 50 35 43 WIND SPEED [KM/H] Average Maximum Month Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec Year round Wind direction SSW SSW SSW NNE NNW NNW NNW NNW NNW ESE SE SSW NNE Average Wind speed (m/s) 2.6 2.6 2.6 2.6 2.6 2.6 3.1 3.1 2.6 2.6 2 2.6 2.6 Average Air temperature (°C) 29 30 29 30 30 30 29 29 29 29 29 29 29 Source: http://www.myweather2.com/City-Town/Malaysia/Putrajaya/climate-profile.aspx
  • 13. 13 Thermal comfort The thermal comfort range for Malaysia is 22 to 32 degree Celcius for temperature and 70% to 80% for relative humidity. Source: http://www.windfinder.com/windstatistics/morib_kuala_lumpur?fspot=putrajaya_lake
  • 14. 14 Passive feature 1: Building Orientation and Form Image source: (http://www.world-architects.com/en/projects/41019_Putrajaya_Lot_2C2)
  • 15. 15 Below shows the effect of building form on environmental control strategies. Figure 1.1 ( Stein, B., Reynolds, J., & McGuinness, W. J. (1992). Mechanical and electrical equipment for buildings. New York: J. Wiley & Sons.) a) Solar Analysis Figure 1.2 Menara PjH Lot 2C2 office building is built up in thin combo building design. As compared to a thick building which requires more artificial lighting, thinner building allows most of its interior spaces to be exposed to daylighting especially in the core of the block. This is because spaces in thin combo building are closer to its outer shell. The usage of the shading devices as part of the control systems to allow appropriate amount of sunlight and heat gain to ensure thermal comfort can also be seen in Menara PjH. THIN COMBO BUILDING Daylighting Ventilation Complete daylighting for most spaces Natural ventilation is easily accomplished
  • 16. 16 Figure 1.3 The longer sides of Lot 2C2 building which is the A tower is positioned between east and west. East and west direction is the most critical position where the sun has maximum exposure to the tower. Therefore, the solution is to corporate sun shading devices on the façades. Even so, this taller A tower provides shading for the lower B,C,D office podiums especially during the afternoon while still allowing certain amount of natural sunlight to penetrate through the entire building. Figure 1.4 Besides that, there are three parts of the building which are extended towards east. These 3 office podiums provide shading to each other and the pedestrian areas in the between the blocks when the sun faces west as shown in the diagram. A B C D
  • 17. 17 b) Wind Analysis Figure 1.5 According to the wind rose diagram, the overall wind direction comes from every direction, there is not one point where wind is not received. In order to obtain maximum wind exposure, the direction to face is the South-southeast direction, where there is a 9% of wind distributed annually. Direction where wind is least obtainable would be the North and East- southeast direction which just 3% from each direction.
  • 18. 18 Figure 1.6 With wind coming from all direction at any possible period, the architect has to coordinate the building in an orientation that serves the wind while providing proper ventilation to host the user. Constructing a building form of a ‘W’ allows air to be deflected along its current, a passive way of forcing the wind in motion, to provide a cooling effect for the occupants, exterior wise, based on Figure 1.6. This provides thermal comfort in the outdoor for the users and indirectly encourages the user to walk to surrounding places instead of using a vehicle which is not an environmental alternative. Using the wind rose diagram, forming the connection between the winds distributed from the South-southeast and Northeast direction and the building form, optimum air can be manipulated to cool down the building. Warm air could be replaced by cooler air. The lake next to the site also could be used to cool down the warmer breeze during hot days. Next, the supply of outdoor air that flow through building from the left structure (shown by the black arrow) allows hot air and cool air to interchange, creating a circulation of air flow within the structure. According to (Yeang, 1996), when internal wind speed has improved, the rate of fresh air in structure improved for micro-climate cooling and healthier internal environment. Cool air Warm air South-southeast wind Northeast wind
  • 19. 19 Due to form of the building in a shape of “W”, the building form is thinner and ventilation is achieved easily. On the other hand, if the form of structure is a singular block, it would be harder to ventilate the building as there would be too many partitions among the interior space obstructing the air ventilation. Heat from the building can also be transferred easily outwards with the separated blocks form. Moreover, due to the building form, more wind could be brought into the spaces between the blocks allowing more heat to be taken away compared to a single block building and thus interior heat could be taken away by the wind in a faster rate. Figure 1.7 When constructing a lower structure in front of a taller building, the wind force’s impact on the taller building would be much reduced, enhancing stability of the structure from the wind load. Analysis from the wind speed has shown that the maximum wind speed could range up to 74km/h and there are not many tall buildings adjacent around Menara PjH to share and minimize the impact. Hence this step is taken as a precaution of firmness in a passive way. Impact of the foundation is also minimized, creating lesser stress towards the earth since the live load has been decreased.
  • 20. 20 According to the temperature chart of Putrajaya, the average minimum temperature is 25 degree Celcius while the average maximum temperature is 35 degree Celcius. With building being built out of high thermal mass materials such as concrete, the 10 degree Celcius difference between the day and night might not be able to remove much stored daytime heat during the night time. Therefore a thermally light building should be considered. With Menara PjH Lot 2C2 being built using high amounts of glass and metals for the exteriors, combining the thin combo form with separated blocks, the building has lower thermal mass. This allows much heat to be removed at night. Based on the study by (Kwok & Grondzik, 2009, p. 105), high humidity may be avoided only by sealing and air conditioning buildings. As seen from the humidity graph in page 11, the average humidity in Putrajaya is 79.5% while the thermal comfort level for humidity in Kuala Lumpur is averagely 75%. Besides according to MS1525 (2007), the recommended relative humidity is from 75% to 70%. This explains why Menara PjH is fully sealed in order to avoid high humidity in interior spaces causing thermally discomfort. In MS1525 (2007), the long directional axis of buildings facing North-South is the best orientation for a building in which the structure is orientated to minimize the east-west orientation. This is useful for a structure built in a climatic zone near the equator. But in the case of Menara PjH, the taller office tower is orientated 20 degrees towards the Northwest, with the longitudinal elevations facing east-west while the lower office podiums conform to the orientation guide in MS1525 (2007) with the longer facades facing North-South. Due to the orientation of the office tower, thus many shading devices are installed on it. As a conclusion, with a thin combo building, complete daylighting for most spaces and natural ventilation could be easily proficient (Brown & DeKay, 2001, p. 45).
  • 21. 21 Passive features 2: Building Envelope- Exterior Shading Systems g Image source: Rupajiwa Studio, 2013
  • 22. 22 The facades of Menara PjH (Lot 2C2) consisted mostly of glass making it very prone to high solar heat gain in a tropical country like Malaysia. Therefore sun shading designs are needed in order to minimize the heat gain. In this case, high amount of external shading devices are used in Menara PjH because it is the most thermally efficient as external shading blocked out the solar energy before it enters the building as shown in Figure 2.1 below. Figure 2.1 Analysis on interior and exterior shading Baker, N. (2014). Solar controls and shading [Figure]. Retrieved from http://www.architecture.com/SustainabilityHub/Designstrategies/Fire/1-4-1-6- Solarcontrolsandshading.aspx
  • 23. 23 a) Vertical sun shading louvers The red bold lines in Figure 2.2 are where the vertical sun shading louvres are placed on the 12 storeys office building as can be seen in the picture above. NorthEast 20˚ West to SouthWest SouthEast Figure 2.2 Placement of vertical sun shading louvers
  • 24. 24 The ratio, R2 (width of vertical projection/ Length of window) is 0.5 for Menara PjH. Shading coefficients for vertical projections According to the table in the Malaysian Standard: 1525 for non-residential buildings, vertical louvres facing Northeast/Southeast orientation will have a 0.77 coefficient, which is the lowest in the 0.5 – 0.7 ratio, R2 category. Meanwhile the Southwest façade has a coefficient of 0.79. In hot climate, a lower shading coefficient is more suitable because more sunlight and solar heat can be prevented from entering the building. Figure 2.3 Elevation of building with vertical sun shading louvres Width of louvres Length of window Table 2.1
  • 25. 25 Advantages:  The vertical louvers can be pre-fixed to the most optimum angle according to the sun’s position.  The vertical louvers used by Menara PjH have a gap in between the louvers and the glass walls. While the louvers act as a barrier between the radiant heat from the sun and the reflective glass, the air in the gap acts as a medium for heat convection from the louvers to the glass. Because of this, the air in the space is heated in the present of the sun. Surrounding air enters the gap and circulates in the spaces between the vertical louvers and the glass surface allowing the hot air in the space to be removed. Besides, heat from the building also transferred outwards and cool down by the circulating air in the gap. This combination of reflective glass and the vertical louvers as the envelope design produces a passive cooling system for the building (The Ambler | Passive Cooling, 2009).  Allows daylight to penetrate the building and reduce electricity needed for lighting. Disadvantage:  Views are obstructed Surrounding Air Warm Air Removed Gap Heat from Building Figure 2.4 Diagram of air circulation in vertical louvers
  • 26. 26 b) Horizontal overhangs The green bold lines in Figure 2.5 represent the horizontal overhangs located at the 4 storeys office podiums. There are 4 Northeast/ Southeast facades, 3 Northwest facing facades, and 2 East facades. SE NE NW E E NW SE SE NW Figure 2.5 Placement of horizontal overhangs
  • 27. 27 Shading coefficients for horizontal projections According to Table 2.2 above, the Northeast/ Southeast facing horizontal projections with the ratio, R1 0.5- 0.7 has a shading coefficient of 0.69. For the overhangs facing East has the lowest of all, which is 0.68 and for the Northwest facing overhangs is 0.72. 3pm Vernal Equinox [21 March] Table 2.2
  • 28. 28 3pm Summer solstices [22 June] 3pm Autumn Equinox [23 September] 3pm Winter Solstice [22 December]
  • 29. 29 Due to the Northwest facades having the highest shading coefficient, therefore extra shading devices are added at the Northwest façade (red circle). It is also the only facade that is exposed to the sun the most in the afternoon. Advantages:  Allows 100% ventilation when windows are opened  Views are not obstructed by any louvers  Enables daylighting inside the building  Reduce sun glare which is suitable for office work Disadvantages:  Exterior views being disrupted Figure 2.6 Horizontal louvers added at the Northwest façade View Sunlight Ventilation
  • 30. 30 References Baker, N. (2014). Solar controls and shading [Figure]. Retrieved from http://www.architecture.com/SustainabilityHub/Designstrategies/Fire/1-4-1-6- Solarcontrolsandshading.aspx Brown, G. Z., & DeKay, M. (2001). Sun, wind & light: Architectural design strategies(2nd ed.). NewYork: Wiley. Building orientation. (n.d.). Retrieved from http://www.architecture.com/SustainabilityHub/Designstrategies/Earth/1-1-3-2 Buildingorientation.aspx Jafri Merican Architect (2010, July 26). Jafri Merican Architect: 2C2 Green Office Building, Putrajaya [Web log post]. Retrieved from http://jafrimericanarchitect.blogspot.com/2010/07/2c2-green-office-building- putrajaya.html Kwok, A. G., & Grondzik, W. (2009). Mechanical and Electrical Equipment for Buildings, Eleventh Edition. John Wiley & Sons. Maartje :: Sustainable Systems & Designs. (n.d.). Retrieved from http://www.ics.ele.tue.nl/~akash/maartje/getSystemDetail.php?ID=203 Map of Putrajaya Precincts [Map]. (n.d.). Retrieved from http://www.lcct.com.my/help/faqs/how-to-go-to-putrajaya-from-lcct Rupajiwa Studio (2013, February 22). Menara PjH [Photography]. Retrieved from https://www.facebook.com/photo.php?fbid=10151328525872424&set=a.10151328525 332424.463404.139599347423&type=3&theater Stein, B., Reynolds, J., & McGuinness, W. J. (1992). Mechanical and electrical equipment for buildings. New York: J. Wiley & Sons. The Ambler | Passive Cooling, A Resort Trend at Work On Isla Palenque | Amble Resorts. (2009).Retrieved from http://amble.com/ambler/2009/08/press release-ambles new-panama-resort-taps-trend-in-passive-cooling/ Universiti Tun Hussein Onn Malaysia (2007). Malaysian Standard MS 1525:2007. Department of Standards Malaysia.
  • 31. 31 Yeang, K. (1996). The skyscraper bioclimatically considered: A design primer. London: Academy