CONTENTS 
1. Drivers of AT&C LOSSES 
2. GIS MAP SAMPLE HAMIRPUR 
3. AT&C Calculation of DISTRIBUTION TRANSFORMER 
4. Pre-requisites for obtaining baseline AT&C LOSSES 
5. Ring Fencing Diagram 
2
Drivers for AT&C Losses 
TECHNICAL LOSSES COMMERCIAL LOSSES 
 Overloading of system elements like 
Feeders, Transformers & Conductors 
 Absence of up gradation of Old Lines 
and Equipment's 
 Non Installation of Capacitors 
 Low Metering/Billing/Collection Efficiency 
 Theft, Pilferage and tampering of meters 
 Inadequate Revenue Collection 
 Faulty Meter Reading
GIS MAP SMAPLE (HAMIRPUR) 
4 
33/11 KV 
SUBSTATION
REPRESENTATION OF SUSPECETED THEFT CASES 
5 
BILL NOT SHOWN/DOOR LOCK 
NO CONNECTIONS 
VALID CONNECTIONS
AT&C LOSS CALCULATION AT DTR LEVEL 
6 
DTR 
DTR, 25KVA 
DTR, 25 KVA 
(13 CONSUMERS 
CONNECTED) 
DT INPUT ENERGY: 3020 KWH 
BILLED UNIT: 3020 
DT INPUT ENERGY: 3020 KWH 
TOTAL ASSESMENT: 15793.77 
REALISATION: 11843 INR 
BILLED UNIT : 2868 KWH 
AT&C LOSS : 28.79% 
ASSESMENT: 15793.77 INR 
REALISATION : 11843 INR 
AT&C LOSS : 28.71%
CALCULATION of AT&C LOSS : BILLING EFFICIENCY 
7 
SI No. 
DT INPUT 
ENERGY (KWH) 
ACCOUNT ID 
METER 
STATUS 
BILL_BASIS CONSUMPTION 
1 6368004000 FAULTY ASSESMENT (METER DEFECTIVE) 80 
2 4485004000 ACTIVE METERED UNIT 400 
3 7884004000 ACTIVE METERED UNIT 740 
4 3872893000 FAULTY ASSESMENT (METER DEFECTIVE) 160 
5 4414004000 FAULTY ASSESMENT (METER DEFECTIVE) 160 
6 6492993000 ACTIVE METERED UNIT 291 
7 872893000 ACTIVE METERED UNIT 160 
8 7712004000 FAULTY ASSESMENT (METER DEFECTIVE) 245 
9 2046993000 FAULTY ASSESMENT (METER DEFECTIVE) 80 
10 942893000 FAULTY ASSESMENT (METER DEFECTIVE) 160 
11 5797004000 ACTIVE METERED UNIT 157 
12 2125993000 ACTIVE PROVISIONAL (HOUSE LOCKED) 104 
13 5715893000 ACTIVE METERED UNIT 131 
Total 2868 
3020 
Billing Efficiency= (Billed Unit/DT Energy) x 100 = 2868/3020 x 100 = 94.96 %
CALCULATION of AT&C LOSS : COLLECTION EFFICIENCY 
SI No. ACCOUNT ID CURRENT_ASSESSMENT LAST_PAY_AMT LAST_PAY_DATE 
1 6368004000 239.06 239 25-Aug-14 
2 4485004000 2156.8 2157 25-Aug-14 
3 7884004000 4042.76 4043 26-Aug-14 
4 3872893000 862.4 0 26-Jul-14 
5 4414004000 1421.71 0 30-Mar-85 
6 6492993000 1540.7 1541 25-Aug-14 
7 872893000 867 0 12-Apr-14 
8 7712004000 1161.98 1161 26-Aug-14 
9 2046993000 218.95 219 19-Aug-14 
10 942893000 853.59 854 19-Aug-14 
11 5797004000 828.37 829 25-Aug-14 
12 2125993000 1221.36 0 1-Jan-11 
13 5715893000 379.09 800 20-Aug-14 
TOTAL 15793.77 11843 
8 
 Collection Efficiency: (Collected Payment/Billed Amount) x 100 
= 11843/15793.77 x 100= 74.98%
CONCEPT OF AT&C LOSS 
COMMERCIAL LOSSES 
Factors causing Commercial Losses: 
 Meter tampering 
 Bypassing of meters 
 Usage of MAGNETS to slow down the meters 
 Tampering of PT circuits 
 CT/PT ratios (In case of HT meters) 
9
CONCEPT OF AT&C LOSS 
COMMERCIAL LOSSES :- COLLECTION EFFICIENCY 
 Utility is not being able to collect the complete amount billed by 
it. 
 Absence of Energy Accounting & Auditing 
 In case of unavailability of arrear figures, the collection efficiency 
figures can be more than 100%. 
 Revenue collected shall exclude the arrears. 
 In above cases efficiency needs to be restricted to 100% and shall 
be used for computation of AT&C losses. 
10
PRE-REQUISITES FOR OBTAINING BASELINE AT&C LOSSES 
 Metering of Energy Input Points of Project Area 
 On incoming lines of 33/11 kV sub-stations located within project area. 
 On 33 KV, 11 KV feeders emanating from sub-station located outside project 
area but supplying power to HT/LT consumers located within project area. 
11
PRE-REQUISITES FOR OBTAINING BASELINE AT&C LOSSES 
 Ring-fencing of Project area Electrical Network 
 Import/Export meters at the boundary of those lines that are feeding 
outside as well as inside project area so that import and export of 
energy can be measured for project area. These lines may emanate 
from the sub-stations located within or outside project area. 
 Import/Export meters on the dedicated feeder emanating from sub-stations 
located within project area but feeding outside project area. 
 Import/Export meters on 33/11 KV Sub-Stations 
12
RING FENCING DIAGRAM 
13
14

More Related Content

What's hot

What is load management
What is load managementWhat is load management
What is load management
Power System Operation
 
SAP IS-U Tables
SAP IS-U TablesSAP IS-U Tables
SAP IS-U Tables
Mpho Molefe
 
Sap tr um_dm_meter reading order creation, assignment and meter reading sheet...
Sap tr um_dm_meter reading order creation, assignment and meter reading sheet...Sap tr um_dm_meter reading order creation, assignment and meter reading sheet...
Sap tr um_dm_meter reading order creation, assignment and meter reading sheet...
UF Technology
 
Thermal power plant efficiency
Thermal power plant efficiencyThermal power plant efficiency
Thermal power plant efficiency
Manohar Tatwawadi
 
DM Serial Switching
DM Serial SwitchingDM Serial Switching
DM Serial Switching
Rakesh Dasgupta
 
ENERGY-MANAGEMENT IN SMALL SCALE INDUSTRIES: A VITAL TOOL FOR SUSTAINABLE DEV...
ENERGY-MANAGEMENT IN SMALL SCALE INDUSTRIES: A VITAL TOOL FOR SUSTAINABLE DEV...ENERGY-MANAGEMENT IN SMALL SCALE INDUSTRIES: A VITAL TOOL FOR SUSTAINABLE DEV...
ENERGY-MANAGEMENT IN SMALL SCALE INDUSTRIES: A VITAL TOOL FOR SUSTAINABLE DEV...
IAEME Publication
 
Sap isu tcodes
Sap isu tcodesSap isu tcodes
Sap isu tcodes
RAJESH YALLABANDI
 
GST_Configuration Document_GANESH_SAPSD
GST_Configuration Document_GANESH_SAPSD GST_Configuration Document_GANESH_SAPSD
GST_Configuration Document_GANESH_SAPSD
Ganesh Tarlana
 
Rate Category Period End Billing
Rate Category Period End BillingRate Category Period End Billing
Rate Category Period End Billing
Rakesh Dasgupta
 
Installation Groups
Installation GroupsInstallation Groups
Installation Groups
Rakesh Dasgupta
 
At&c losses and remedies
At&c losses and remediesAt&c losses and remedies
At&c losses and remedies
Sushant Kumar Sinha
 
ISU Assess Workflow to Re Estimate Previous Billed Meter Readings
ISU Assess Workflow to Re Estimate Previous Billed Meter ReadingsISU Assess Workflow to Re Estimate Previous Billed Meter Readings
ISU Assess Workflow to Re Estimate Previous Billed Meter Readings
Rakesh Dasgupta
 
What is DERMS ? Distributed Energy Resources Management System
What is DERMS ? Distributed  Energy  Resources  Management SystemWhat is DERMS ? Distributed  Energy  Resources  Management System
What is DERMS ? Distributed Energy Resources Management System
Power System Operation
 
Abt meter
Abt meterAbt meter
Abt meter
Jay Ranvir
 
Roadmap for distribution loss reduction.. a step by step approach
Roadmap  for distribution loss reduction.. a step by step approachRoadmap  for distribution loss reduction.. a step by step approach
Roadmap for distribution loss reduction.. a step by step approach
D.Pawan Kumar
 
Linear Consumption Pattern
Linear Consumption PatternLinear Consumption Pattern
Linear Consumption Pattern
Rakesh Dasgupta
 
Unit commitment
Unit commitmentUnit commitment
Unit commitment
Mohammad Abdullah
 
Inter Company Billing in SAP -Basics
Inter Company Billing in SAP -BasicsInter Company Billing in SAP -Basics
Inter Company Billing in SAP -Basics
Mangesh Ambardekar
 
SAP ISU Validation Class : Comparison of n periods
SAP ISU Validation Class : Comparison of n periodsSAP ISU Validation Class : Comparison of n periods
SAP ISU Validation Class : Comparison of n periods
Rakesh Dasgupta
 

What's hot (20)

What is load management
What is load managementWhat is load management
What is load management
 
SAP IS-U Tables
SAP IS-U TablesSAP IS-U Tables
SAP IS-U Tables
 
Sap tr um_dm_meter reading order creation, assignment and meter reading sheet...
Sap tr um_dm_meter reading order creation, assignment and meter reading sheet...Sap tr um_dm_meter reading order creation, assignment and meter reading sheet...
Sap tr um_dm_meter reading order creation, assignment and meter reading sheet...
 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boiler
 
Thermal power plant efficiency
Thermal power plant efficiencyThermal power plant efficiency
Thermal power plant efficiency
 
DM Serial Switching
DM Serial SwitchingDM Serial Switching
DM Serial Switching
 
ENERGY-MANAGEMENT IN SMALL SCALE INDUSTRIES: A VITAL TOOL FOR SUSTAINABLE DEV...
ENERGY-MANAGEMENT IN SMALL SCALE INDUSTRIES: A VITAL TOOL FOR SUSTAINABLE DEV...ENERGY-MANAGEMENT IN SMALL SCALE INDUSTRIES: A VITAL TOOL FOR SUSTAINABLE DEV...
ENERGY-MANAGEMENT IN SMALL SCALE INDUSTRIES: A VITAL TOOL FOR SUSTAINABLE DEV...
 
Sap isu tcodes
Sap isu tcodesSap isu tcodes
Sap isu tcodes
 
GST_Configuration Document_GANESH_SAPSD
GST_Configuration Document_GANESH_SAPSD GST_Configuration Document_GANESH_SAPSD
GST_Configuration Document_GANESH_SAPSD
 
Rate Category Period End Billing
Rate Category Period End BillingRate Category Period End Billing
Rate Category Period End Billing
 
Installation Groups
Installation GroupsInstallation Groups
Installation Groups
 
At&c losses and remedies
At&c losses and remediesAt&c losses and remedies
At&c losses and remedies
 
ISU Assess Workflow to Re Estimate Previous Billed Meter Readings
ISU Assess Workflow to Re Estimate Previous Billed Meter ReadingsISU Assess Workflow to Re Estimate Previous Billed Meter Readings
ISU Assess Workflow to Re Estimate Previous Billed Meter Readings
 
What is DERMS ? Distributed Energy Resources Management System
What is DERMS ? Distributed  Energy  Resources  Management SystemWhat is DERMS ? Distributed  Energy  Resources  Management System
What is DERMS ? Distributed Energy Resources Management System
 
Abt meter
Abt meterAbt meter
Abt meter
 
Roadmap for distribution loss reduction.. a step by step approach
Roadmap  for distribution loss reduction.. a step by step approachRoadmap  for distribution loss reduction.. a step by step approach
Roadmap for distribution loss reduction.. a step by step approach
 
Linear Consumption Pattern
Linear Consumption PatternLinear Consumption Pattern
Linear Consumption Pattern
 
Unit commitment
Unit commitmentUnit commitment
Unit commitment
 
Inter Company Billing in SAP -Basics
Inter Company Billing in SAP -BasicsInter Company Billing in SAP -Basics
Inter Company Billing in SAP -Basics
 
SAP ISU Validation Class : Comparison of n periods
SAP ISU Validation Class : Comparison of n periodsSAP ISU Validation Class : Comparison of n periods
SAP ISU Validation Class : Comparison of n periods
 

Similar to AT&C LOSSES In RAPDRP

Intelligent mcc Siemens
Intelligent mcc Siemens Intelligent mcc Siemens
Intelligent mcc Siemens
Praveen Patil
 
Intelligent mcc
Intelligent mccIntelligent mcc
Intelligent mcc
Praveen Patil
 
Automatic meter reading nnb ppt
Automatic meter reading  nnb pptAutomatic meter reading  nnb ppt
Automatic meter reading nnb ppt
NagendraEEE
 
water level monitor using gsm
water level monitor using gsmwater level monitor using gsm
water level monitor using gsm
Aditya Kumar
 
Smart_Grid_Tanzania_bsd.pptx
Smart_Grid_Tanzania_bsd.pptxSmart_Grid_Tanzania_bsd.pptx
Smart_Grid_Tanzania_bsd.pptx
LawrenceMutinda1
 
Pre paid energy meter
Pre paid energy meterPre paid energy meter
Pre paid energy meter
Suman Padhy
 
AVR_GENERAL KOSTI.ppt
AVR_GENERAL KOSTI.pptAVR_GENERAL KOSTI.ppt
AVR_GENERAL KOSTI.ppt
prasadkappala
 
Microprocessor based autonomous control system
Microprocessor based autonomous control systemMicroprocessor based autonomous control system
Microprocessor based autonomous control systemDr. Rajesh P Barnwal
 
Industrial Billing Presentation
Industrial Billing PresentationIndustrial Billing Presentation
Industrial Billing PresentationSALEEM KHAN
 
Instruction manual
Instruction manualInstruction manual
Instruction manual
rohit singh
 
Power Factor Control at ABA Control 33/11kV Injection Substation Using Auto T...
Power Factor Control at ABA Control 33/11kV Injection Substation Using Auto T...Power Factor Control at ABA Control 33/11kV Injection Substation Using Auto T...
Power Factor Control at ABA Control 33/11kV Injection Substation Using Auto T...
IRJET Journal
 
Smart street light management systems for street light energy conservation, a...
Smart street light management systems for street light energy conservation, a...Smart street light management systems for street light energy conservation, a...
Smart street light management systems for street light energy conservation, a...
Instruments Universal
 
04 ret670 test report
04 ret670 test report04 ret670 test report
04 ret670 test report
niranjan131
 
NTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportNTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship report
Aneel-k Suthar
 
Solar Energy Generation Potential on National Highways
Solar Energy Generation Potential on National HighwaysSolar Energy Generation Potential on National Highways
Solar Energy Generation Potential on National Highways
IRJET Journal
 
Solar Power Plant Design and PV Syst
Solar Power Plant Design and PV SystSolar Power Plant Design and PV Syst
Solar Power Plant Design and PV Syst
Sunrator Technologies LLP
 
Agricultural machinery telematics
Agricultural machinery telematicsAgricultural machinery telematics
Agricultural machinery telematics
Mik Kaplunski
 
Low power low voltage operation of operational amplifier
Low power low voltage operation of operational amplifierLow power low voltage operation of operational amplifier
Low power low voltage operation of operational amplifier
eSAT Journals
 

Similar to AT&C LOSSES In RAPDRP (20)

Intelligent mcc Siemens
Intelligent mcc Siemens Intelligent mcc Siemens
Intelligent mcc Siemens
 
Intelligent mcc
Intelligent mccIntelligent mcc
Intelligent mcc
 
Automatic meter reading nnb ppt
Automatic meter reading  nnb pptAutomatic meter reading  nnb ppt
Automatic meter reading nnb ppt
 
water level monitor using gsm
water level monitor using gsmwater level monitor using gsm
water level monitor using gsm
 
Smart_Grid_Tanzania_bsd.pptx
Smart_Grid_Tanzania_bsd.pptxSmart_Grid_Tanzania_bsd.pptx
Smart_Grid_Tanzania_bsd.pptx
 
Pre paid energy meter
Pre paid energy meterPre paid energy meter
Pre paid energy meter
 
AVR_GENERAL KOSTI.ppt
AVR_GENERAL KOSTI.pptAVR_GENERAL KOSTI.ppt
AVR_GENERAL KOSTI.ppt
 
Microprocessor based autonomous control system
Microprocessor based autonomous control systemMicroprocessor based autonomous control system
Microprocessor based autonomous control system
 
Industrial Billing Presentation
Industrial Billing PresentationIndustrial Billing Presentation
Industrial Billing Presentation
 
Power sector mis
Power sector misPower sector mis
Power sector mis
 
Instruction manual
Instruction manualInstruction manual
Instruction manual
 
Power Factor Control at ABA Control 33/11kV Injection Substation Using Auto T...
Power Factor Control at ABA Control 33/11kV Injection Substation Using Auto T...Power Factor Control at ABA Control 33/11kV Injection Substation Using Auto T...
Power Factor Control at ABA Control 33/11kV Injection Substation Using Auto T...
 
Smart street light management systems for street light energy conservation, a...
Smart street light management systems for street light energy conservation, a...Smart street light management systems for street light energy conservation, a...
Smart street light management systems for street light energy conservation, a...
 
CESC Limited
CESC LimitedCESC Limited
CESC Limited
 
04 ret670 test report
04 ret670 test report04 ret670 test report
04 ret670 test report
 
NTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportNTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship report
 
Solar Energy Generation Potential on National Highways
Solar Energy Generation Potential on National HighwaysSolar Energy Generation Potential on National Highways
Solar Energy Generation Potential on National Highways
 
Solar Power Plant Design and PV Syst
Solar Power Plant Design and PV SystSolar Power Plant Design and PV Syst
Solar Power Plant Design and PV Syst
 
Agricultural machinery telematics
Agricultural machinery telematicsAgricultural machinery telematics
Agricultural machinery telematics
 
Low power low voltage operation of operational amplifier
Low power low voltage operation of operational amplifierLow power low voltage operation of operational amplifier
Low power low voltage operation of operational amplifier
 

Recently uploaded

FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
Jemma Hussein Allen
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
Frank van Harmelen
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
Sri Ambati
 
Leading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdfLeading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdf
OnBoard
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
Thijs Feryn
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
DianaGray10
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
DianaGray10
 
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Tobias Schneck
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Product School
 
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
Product School
 
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
James Anderson
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
91mobiles
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
Alan Dix
 
PCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase TeamPCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase Team
ControlCase
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
Product School
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
Laura Byrne
 
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Thierry Lestable
 

Recently uploaded (20)

FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
 
Leading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdfLeading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdf
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
 
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
 
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
 
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
 
PCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase TeamPCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase Team
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
 
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
 

AT&C LOSSES In RAPDRP

  • 1. Presentation on ELECTRICITY DISTRIBUTION LOSSES & ITS PREVENTION Presented By:- Abhishek Kumar, Geo Spatial Division, HCL 1
  • 2. CONTENTS 1. Drivers of AT&C LOSSES 2. GIS MAP SAMPLE HAMIRPUR 3. AT&C Calculation of DISTRIBUTION TRANSFORMER 4. Pre-requisites for obtaining baseline AT&C LOSSES 5. Ring Fencing Diagram 2
  • 3. Drivers for AT&C Losses TECHNICAL LOSSES COMMERCIAL LOSSES  Overloading of system elements like Feeders, Transformers & Conductors  Absence of up gradation of Old Lines and Equipment's  Non Installation of Capacitors  Low Metering/Billing/Collection Efficiency  Theft, Pilferage and tampering of meters  Inadequate Revenue Collection  Faulty Meter Reading
  • 4. GIS MAP SMAPLE (HAMIRPUR) 4 33/11 KV SUBSTATION
  • 5. REPRESENTATION OF SUSPECETED THEFT CASES 5 BILL NOT SHOWN/DOOR LOCK NO CONNECTIONS VALID CONNECTIONS
  • 6. AT&C LOSS CALCULATION AT DTR LEVEL 6 DTR DTR, 25KVA DTR, 25 KVA (13 CONSUMERS CONNECTED) DT INPUT ENERGY: 3020 KWH BILLED UNIT: 3020 DT INPUT ENERGY: 3020 KWH TOTAL ASSESMENT: 15793.77 REALISATION: 11843 INR BILLED UNIT : 2868 KWH AT&C LOSS : 28.79% ASSESMENT: 15793.77 INR REALISATION : 11843 INR AT&C LOSS : 28.71%
  • 7. CALCULATION of AT&C LOSS : BILLING EFFICIENCY 7 SI No. DT INPUT ENERGY (KWH) ACCOUNT ID METER STATUS BILL_BASIS CONSUMPTION 1 6368004000 FAULTY ASSESMENT (METER DEFECTIVE) 80 2 4485004000 ACTIVE METERED UNIT 400 3 7884004000 ACTIVE METERED UNIT 740 4 3872893000 FAULTY ASSESMENT (METER DEFECTIVE) 160 5 4414004000 FAULTY ASSESMENT (METER DEFECTIVE) 160 6 6492993000 ACTIVE METERED UNIT 291 7 872893000 ACTIVE METERED UNIT 160 8 7712004000 FAULTY ASSESMENT (METER DEFECTIVE) 245 9 2046993000 FAULTY ASSESMENT (METER DEFECTIVE) 80 10 942893000 FAULTY ASSESMENT (METER DEFECTIVE) 160 11 5797004000 ACTIVE METERED UNIT 157 12 2125993000 ACTIVE PROVISIONAL (HOUSE LOCKED) 104 13 5715893000 ACTIVE METERED UNIT 131 Total 2868 3020 Billing Efficiency= (Billed Unit/DT Energy) x 100 = 2868/3020 x 100 = 94.96 %
  • 8. CALCULATION of AT&C LOSS : COLLECTION EFFICIENCY SI No. ACCOUNT ID CURRENT_ASSESSMENT LAST_PAY_AMT LAST_PAY_DATE 1 6368004000 239.06 239 25-Aug-14 2 4485004000 2156.8 2157 25-Aug-14 3 7884004000 4042.76 4043 26-Aug-14 4 3872893000 862.4 0 26-Jul-14 5 4414004000 1421.71 0 30-Mar-85 6 6492993000 1540.7 1541 25-Aug-14 7 872893000 867 0 12-Apr-14 8 7712004000 1161.98 1161 26-Aug-14 9 2046993000 218.95 219 19-Aug-14 10 942893000 853.59 854 19-Aug-14 11 5797004000 828.37 829 25-Aug-14 12 2125993000 1221.36 0 1-Jan-11 13 5715893000 379.09 800 20-Aug-14 TOTAL 15793.77 11843 8  Collection Efficiency: (Collected Payment/Billed Amount) x 100 = 11843/15793.77 x 100= 74.98%
  • 9. CONCEPT OF AT&C LOSS COMMERCIAL LOSSES Factors causing Commercial Losses:  Meter tampering  Bypassing of meters  Usage of MAGNETS to slow down the meters  Tampering of PT circuits  CT/PT ratios (In case of HT meters) 9
  • 10. CONCEPT OF AT&C LOSS COMMERCIAL LOSSES :- COLLECTION EFFICIENCY  Utility is not being able to collect the complete amount billed by it.  Absence of Energy Accounting & Auditing  In case of unavailability of arrear figures, the collection efficiency figures can be more than 100%.  Revenue collected shall exclude the arrears.  In above cases efficiency needs to be restricted to 100% and shall be used for computation of AT&C losses. 10
  • 11. PRE-REQUISITES FOR OBTAINING BASELINE AT&C LOSSES  Metering of Energy Input Points of Project Area  On incoming lines of 33/11 kV sub-stations located within project area.  On 33 KV, 11 KV feeders emanating from sub-station located outside project area but supplying power to HT/LT consumers located within project area. 11
  • 12. PRE-REQUISITES FOR OBTAINING BASELINE AT&C LOSSES  Ring-fencing of Project area Electrical Network  Import/Export meters at the boundary of those lines that are feeding outside as well as inside project area so that import and export of energy can be measured for project area. These lines may emanate from the sub-stations located within or outside project area.  Import/Export meters on the dedicated feeder emanating from sub-stations located within project area but feeding outside project area.  Import/Export meters on 33/11 KV Sub-Stations 12