RAJESH ROUSHAN
Email:roushan.raghu@gmail.com,roushanrajesh16@yahoo.com
Ph: (M) +91 9572904000, 9522221205
MECHANICAL ENGINEER (O&M)
(COAL HANDLING PLANT of capacity 1800TPH)
To work in a challenging environment that will help me to explore my skills in an efficient way, and
working towards achieving the goals of the organization with career growth and job satisfaction.
A competent professional with nearly +6 year experience in Coal handling plant & Coal Management.
 Established professional creditability in the areas of Site supervision, Technical Specifications,
Resource mobilization/deployment and monitoring to ensure execution within defined time/cost
parameters.
 Demonstrated excellence as Operation & Maintenance Engineer at various organizations.
 Proven track record in administering all the equipment of bulk material handling plant.
 Adroit in learning new technologies; Ability to work both in independent and collaborative milieu.
 Proactive approach in initializing and accomplishing the tasks.
CORE COMPETENCIES
 Quality Management
 Material Managements
 Requirement Analysis
 Client/Contractors Billing
 Fault root cause analysis
 Coal Yard Management
 Report Generation & Analysis
 Equipment Handling
 Hydraulic System
 Resource Mobilization & Management
 Safety Measures
CAREER CHRONICLE
CURRENT ORGANIZATION-
Since May’14 FEEDBACK POWER O&M SERVICE Pvt. Ltd. Raigarh, Chhattisgarh
Client:-Korba West Power Company Limited,
(An SBU of ADANI Power Limited)
Title : 600X1 MW Thermal Power Plants
Details : Coal handling plant of capacity 1800 TPH
Designation : Senior Engineer (FromMay 14toTillNow)
Responsibility: Commissioning, Operation & Maintenance of coal handling Plant.
Past Organizational Experience:
Jan'13 to Sept '13 INLAND POWER LIMITED Gola Ranchi as Assistant Manager
Project Handled:
Title: 63X2 MW Power Plant Project
Designation: Assistant Manager
Responsibility: Erection, Testing & Commissioning for CHP& Thermax ESP
May'11 to Jan '13 TECPRO ENGINEERS LIMITED Math ion Jharkhand as Engineer
Client:-Mathion Power Limited,
(Joint Venture of TATA Power & DVC)
Title : 525X2 MW Thermal Power Plants
Details : Coal handling plant of capacity 1600 TPH
Designation : Engineer Mechanical
Responsibility : Commissioning, Operation & Maintenance of coal handling Plant
Oct'10 to May '11 TRF LIMITED (A TATA ENTERPRISES) Cher Gujarat as Site Engineer
Aug'09 to Sep '10 UNIQUE INFRACON PVT. LIMITED Cher Gujarat as Site Engineer
Client: -Akri Mota Thermal Power Station, Cher Gujarat
(An SBU of Gujarat Mineral Development Corporation Limited)
Title : 125X2 MW Thermal Power Plants
Details : Coal handling plant of capacity 800 TPH
Designation : Site Engineer Mechanical
Responsibility: Operation & Maintenance of coal handling Plant
Key Deliverables:
 Planning, Scheduling & Ensuring proper execution of Operational & Maintenance plans and
ensuring maximum utilization and availability of the equipment for meeting the Generation
targets
 Adhering to Safety, Environment and Health standards in all functional areas and developed &
Implemented measures for enhancing safety levels
 Responsible for commissioning of Coal Handling Plant.
 Concerned with the operation & maintenance (O&M) of Mechanical Equipments like Paddle
Feeder, Ring Granulator, Grizzly Feeder, Stacker/Reclaimer, Conveyors (1800TPH), Apron
Feeder, Reversible Impactor, MMD Sizer, Crushers, Trippers, Pipe Conveyors, Flip-Flop
Screen, Belt Feeder, Ultra Flow feeder, Pollution Device such as Dry fog air Compressor
& it’s System, Dust Separation System.
 Concerned with maintenance of Gear Box, coupling and another belt accessories.
 Formulating daily, weekly and monthly progress reports, Plan reports, Plant reports, Manpower
reports MIS, SOP, SMP, HIRA, JSA etc. as per requirements.
 Accountable for Preventive, Routine & Breakdown Maintenance of Material handling Plant.
 Responsible for Maintenance scheduling, Planning & completion.
 Involvement in generation & analysis of hardware fault report like RCA & FIR.
 Planning of Material, Tools, Equipment and manpower for smooth operation.
 Synchronizing with clients for monitoring of working schedule as per target and modification as per
plant requirements.
 Administrating all the equipment of Bulk material handling plant.
 Formulating MOM, AMC, spares & Consumables requirement & procurement.
 Preparing letter of intent (LOI) for subcontractors and OEM/OES for supply of spares and servicing
of Equipments.
 Responsible for quality standards along with Housekeeping & Safety measures of sites.
ACADEMIC CREDENTIALS
B.Tech (Mechanical) From Synergy Institute of Engineering & Technology Orissa in 2009 with 6.3 CGPA
Intermediate Science from G.D College, Begusarai Bihar in 2001 with 57 %
Matriculation from B.P High school, Begusarai Bihar in 1999 with 67 %
PERSONEL DETAILS
Date of Birth: 29th January 1985
Nationality: Indian
Languase Known: Hindi & English
Mailing address: Kelo vihar, Raigarh CG.
Reference: Availiable upon request.

RAJESH ROUSHAN

  • 1.
    RAJESH ROUSHAN Email:roushan.raghu@gmail.com,roushanrajesh16@yahoo.com Ph: (M)+91 9572904000, 9522221205 MECHANICAL ENGINEER (O&M) (COAL HANDLING PLANT of capacity 1800TPH) To work in a challenging environment that will help me to explore my skills in an efficient way, and working towards achieving the goals of the organization with career growth and job satisfaction. A competent professional with nearly +6 year experience in Coal handling plant & Coal Management.  Established professional creditability in the areas of Site supervision, Technical Specifications, Resource mobilization/deployment and monitoring to ensure execution within defined time/cost parameters.  Demonstrated excellence as Operation & Maintenance Engineer at various organizations.  Proven track record in administering all the equipment of bulk material handling plant.  Adroit in learning new technologies; Ability to work both in independent and collaborative milieu.  Proactive approach in initializing and accomplishing the tasks. CORE COMPETENCIES  Quality Management  Material Managements  Requirement Analysis  Client/Contractors Billing  Fault root cause analysis  Coal Yard Management  Report Generation & Analysis  Equipment Handling  Hydraulic System  Resource Mobilization & Management  Safety Measures CAREER CHRONICLE CURRENT ORGANIZATION- Since May’14 FEEDBACK POWER O&M SERVICE Pvt. Ltd. Raigarh, Chhattisgarh Client:-Korba West Power Company Limited, (An SBU of ADANI Power Limited) Title : 600X1 MW Thermal Power Plants Details : Coal handling plant of capacity 1800 TPH Designation : Senior Engineer (FromMay 14toTillNow) Responsibility: Commissioning, Operation & Maintenance of coal handling Plant.
  • 2.
    Past Organizational Experience: Jan'13to Sept '13 INLAND POWER LIMITED Gola Ranchi as Assistant Manager Project Handled: Title: 63X2 MW Power Plant Project Designation: Assistant Manager Responsibility: Erection, Testing & Commissioning for CHP& Thermax ESP May'11 to Jan '13 TECPRO ENGINEERS LIMITED Math ion Jharkhand as Engineer Client:-Mathion Power Limited, (Joint Venture of TATA Power & DVC) Title : 525X2 MW Thermal Power Plants Details : Coal handling plant of capacity 1600 TPH Designation : Engineer Mechanical Responsibility : Commissioning, Operation & Maintenance of coal handling Plant Oct'10 to May '11 TRF LIMITED (A TATA ENTERPRISES) Cher Gujarat as Site Engineer Aug'09 to Sep '10 UNIQUE INFRACON PVT. LIMITED Cher Gujarat as Site Engineer Client: -Akri Mota Thermal Power Station, Cher Gujarat (An SBU of Gujarat Mineral Development Corporation Limited) Title : 125X2 MW Thermal Power Plants Details : Coal handling plant of capacity 800 TPH Designation : Site Engineer Mechanical Responsibility: Operation & Maintenance of coal handling Plant Key Deliverables:  Planning, Scheduling & Ensuring proper execution of Operational & Maintenance plans and ensuring maximum utilization and availability of the equipment for meeting the Generation targets  Adhering to Safety, Environment and Health standards in all functional areas and developed & Implemented measures for enhancing safety levels  Responsible for commissioning of Coal Handling Plant.  Concerned with the operation & maintenance (O&M) of Mechanical Equipments like Paddle Feeder, Ring Granulator, Grizzly Feeder, Stacker/Reclaimer, Conveyors (1800TPH), Apron Feeder, Reversible Impactor, MMD Sizer, Crushers, Trippers, Pipe Conveyors, Flip-Flop Screen, Belt Feeder, Ultra Flow feeder, Pollution Device such as Dry fog air Compressor & it’s System, Dust Separation System.  Concerned with maintenance of Gear Box, coupling and another belt accessories.
  • 3.
     Formulating daily,weekly and monthly progress reports, Plan reports, Plant reports, Manpower reports MIS, SOP, SMP, HIRA, JSA etc. as per requirements.  Accountable for Preventive, Routine & Breakdown Maintenance of Material handling Plant.  Responsible for Maintenance scheduling, Planning & completion.  Involvement in generation & analysis of hardware fault report like RCA & FIR.  Planning of Material, Tools, Equipment and manpower for smooth operation.  Synchronizing with clients for monitoring of working schedule as per target and modification as per plant requirements.  Administrating all the equipment of Bulk material handling plant.  Formulating MOM, AMC, spares & Consumables requirement & procurement.  Preparing letter of intent (LOI) for subcontractors and OEM/OES for supply of spares and servicing of Equipments.  Responsible for quality standards along with Housekeeping & Safety measures of sites. ACADEMIC CREDENTIALS B.Tech (Mechanical) From Synergy Institute of Engineering & Technology Orissa in 2009 with 6.3 CGPA Intermediate Science from G.D College, Begusarai Bihar in 2001 with 57 % Matriculation from B.P High school, Begusarai Bihar in 1999 with 67 % PERSONEL DETAILS Date of Birth: 29th January 1985 Nationality: Indian Languase Known: Hindi & English Mailing address: Kelo vihar, Raigarh CG. Reference: Availiable upon request.