SlideShare a Scribd company logo
RANJAN KUMAR ROYRANJAN KUMAR ROY
Flat No. - B/204, B-Wing, Eknath Park, Morewadi-Ajmeera Road, Pimpri, Pune (Maharashtra)Flat No. - B/204, B-Wing, Eknath Park, Morewadi-Ajmeera Road, Pimpri, Pune (Maharashtra)
Contact: +91 20 4072 5721, +91 99 7000 6493, +91 88 3035 8582Contact: +91 20 4072 5721, +91 99 7000 6493, +91 88 3035 8582
E-mail:E-mail: ranjanroy_123@yahoo.comranjanroy_123@yahoo.com,, rkroy_123@yahoo.co.inrkroy_123@yahoo.co.in
SR. PROFESSIONALSR. PROFESSIONAL – ELECTRICAL AND C&I (ENGINEERING & PROCUREMENT)– ELECTRICAL AND C&I (ENGINEERING & PROCUREMENT)
Experiences in Elect. Engineering, Erection & Commissioning and Procurement activities etc.Experiences in Elect. Engineering, Erection & Commissioning and Procurement activities etc.
in different Thermal Power Plant Projects.in different Thermal Power Plant Projects.
CAREER OBJECTIVECAREER OBJECTIVE
Nearly 24.5 years of experience in Electrical and C&I - Engineering, procurement andNearly 24.5 years of experience in Electrical and C&I - Engineering, procurement and
construction works etc. of various Thermal Power Project in different capacities. Looking aconstruction works etc. of various Thermal Power Project in different capacities. Looking a
reputed organization as areputed organization as a Sr. Professional –Electrical Engineering /PurchaseSr. Professional –Electrical Engineering /Purchase to achieveto achieve
management’s goalmanagement’s goal in stipulated timein stipulated time frame.frame.
PROFESSIONAL SYNOPSISPROFESSIONAL SYNOPSIS
 Core strengths in Electrical Design, Erection & Commissioning of Ash Handling Plants,Core strengths in Electrical Design, Erection & Commissioning of Ash Handling Plants,
illumination works in multi-storied building and procurement activities of different boughtillumination works in multi-storied building and procurement activities of different bought
out electrical items.out electrical items.
 Hands on experience in defining scope of project and awarding work contracts toHands on experience in defining scope of project and awarding work contracts to
qualified professionals/contractors.qualified professionals/contractors.
 Meticulous and structured approach with super planning & implementation skills.Meticulous and structured approach with super planning & implementation skills.
 Participating in tendering jobsParticipating in tendering jobs
BASKET OF KEY COMPETENCIESBASKET OF KEY COMPETENCIES
Electrical EngineeringElectrical Engineering C&I EngineeringC&I Engineering Procurement activitiesProcurement activities
Erection & CommissioningErection & Commissioning TenderingTendering Customer correspondenceCustomer correspondence
Training & DevelopmentTraining & Development Finalization of offersFinalization of offers Vendor correspondenceVendor correspondence
PROFESSIONAL EXPERIENCESPROFESSIONAL EXPERIENCES
TECPRO SYSTEMS LTD. (Ashtech Division)TECPRO SYSTEMS LTD. (Ashtech Division) MARCH 2010 TO TILL DATEMARCH 2010 TO TILL DATE
DEPUTY GENERAL MANAGER (Electrical)DEPUTY GENERAL MANAGER (Electrical)
Overall responsible for preparation & customer’s approval of detail Electrical EngineeringOverall responsible for preparation & customer’s approval of detail Electrical Engineering
drawing/ documents for following Projects. Also taking care procurement activities ofdrawing/ documents for following Projects. Also taking care procurement activities of
electrical items.electrical items.
 VUNG ANG-1 Project (Vietnam-2X600MWVUNG ANG-1 Project (Vietnam-2X600MW)-Ash Handling Plant & Clarified water System)-Ash Handling Plant & Clarified water System
 TANJUNG TABALONG(2x30MW) Coal fired Power Plant, IndonesiaTANJUNG TABALONG(2x30MW) Coal fired Power Plant, Indonesia
 KAKATIYA (APGENCO, 1x600MW, Stage-II) - Ash Handling Plant & Mill rejected SystemKAKATIYA (APGENCO, 1x600MW, Stage-II) - Ash Handling Plant & Mill rejected System
 RAYALASEEMA (APGENCO, 1x600MW) - Ash Handling PlantRAYALASEEMA (APGENCO, 1x600MW) - Ash Handling Plant
 VTPS(APGENCO, 1x500MW), Vijayawada – Wet Ash Handling SystemVTPS(APGENCO, 1x500MW), Vijayawada – Wet Ash Handling System
 NTPC/Solapur (2x660MW) Ash handling & Ash water recirculation systemNTPC/Solapur (2x660MW) Ash handling & Ash water recirculation system
 NTPC/Meja (2x660MW) - Ash Handling PlantNTPC/Meja (2x660MW) - Ash Handling Plant
 NTPC/Muzaffarpur (2x195MW) - Ash Handling PlantNTPC/Muzaffarpur (2x195MW) - Ash Handling Plant
 IOTL-Korba –(1x300MW) -Fly Ash Handling SystemIOTL-Korba –(1x300MW) -Fly Ash Handling System
 BINA Thermal Power Station (M.P-2x250MW)- Ash Handling PlantBINA Thermal Power Station (M.P-2x250MW)- Ash Handling Plant
 KORBA (Chhatisgargh-1x500MW, Ext.-III) - Ash Handling PlantKORBA (Chhatisgargh-1x500MW, Ext.-III) - Ash Handling Plant
 VIZAG Thermal Power Project -(2x500MW) –TWS PackageVIZAG Thermal Power Project -(2x500MW) –TWS Package
 LANCO Amarakantak Power Ltd.-(2x660MW) –TWS PackageLANCO Amarakantak Power Ltd.-(2x660MW) –TWS Package
PagePage 11 ofof 55
Electrical Engineering worksElectrical Engineering works ––
 Preparation/checking of SLD, feeder list, transformer sizing, bus-duct sizingPreparation/checking of SLD, feeder list, transformer sizing, bus-duct sizing
calculation.calculation.
 Preparation/checking of HT&LT Power cable schedule & voltage drop calculations.Preparation/checking of HT&LT Power cable schedule & voltage drop calculations.
 Preparation/checking of documents for 33kV HT Transmission line & substation.Preparation/checking of documents for 33kV HT Transmission line & substation.
 Preparation/checking of electrical equipment layout dgs.Preparation/checking of electrical equipment layout dgs.
 Preparation/checking of illumination calculation and layout dgs.Preparation/checking of illumination calculation and layout dgs.
 Preparation/checking of earthing calculation and layout dgs.Preparation/checking of earthing calculation and layout dgs.
 Preparation/checking of lightning calculation and layout dgs.Preparation/checking of lightning calculation and layout dgs.
 Preparation/checking tech data sheet of HT&LT Motors, transformers, all type cablesPreparation/checking tech data sheet of HT&LT Motors, transformers, all type cables
 Overhead transmission line conductor sizing calculation.Overhead transmission line conductor sizing calculation.
 UPS & battery sizing calculation.UPS & battery sizing calculation.
 Charger & battery sizing calculation.Charger & battery sizing calculation.
 Tech. data sheet of cable trays.Tech. data sheet of cable trays.
 Checking vendorsChecking vendors drg/documents of HT& LT MCC, Battery charger, UPS, MLDB,drg/documents of HT& LT MCC, Battery charger, UPS, MLDB,
Lighting panels, Bus-duct, Transformers, HT/LT cables, Control, MLDB/DBs/LPs & Inst.Lighting panels, Bus-duct, Transformers, HT/LT cables, Control, MLDB/DBs/LPs & Inst.
cablescables
Procurement activitiesProcurement activities ––
 Floating enquiries to different vendors/manufactures for electrical items.Floating enquiries to different vendors/manufactures for electrical items.
 Tech discussions with different vendors and preparation of tech/commercialTech discussions with different vendors and preparation of tech/commercial
comparativescomparatives
 Preparation of Routine slip for managements approvalPreparation of Routine slip for managements approval
 Day to day follow up with vendor/manufacturer for readiness of material &Day to day follow up with vendor/manufacturer for readiness of material &
drgs/documentsdrgs/documents
Other activitiesOther activities ––
 Co-ordination to Project/vendor/customerCo-ordination to Project/vendor/customer electrical works.electrical works.
 Review month wise Sales target with Management on regular basis.Review month wise Sales target with Management on regular basis.
 Lead & guidedLead & guided the teamthe team members.members.
 Participation in Tendering worksParticipation in Tendering works
 Erection & commissioning activitiesErection & commissioning activities of AH System of Raichur-TP Plant (1x250MW)of AH System of Raichur-TP Plant (1x250MW)
NMSEZ PVT. LTD. (Reliance Industries Ltd.)NMSEZ PVT. LTD. (Reliance Industries Ltd.) FEB 2008– MAR 2010FEB 2008– MAR 2010
SR. MANAGERSR. MANAGER
Electrical Engineering worksElectrical Engineering works --
 Power distribution (HT & LT) to different nodes.Power distribution (HT & LT) to different nodes.
 Finalization of transformer & DG ratings for SEZ Project.Finalization of transformer & DG ratings for SEZ Project.
 Earthing sizing & layout drawings of 400kV switchyard & commercial complex,Earthing sizing & layout drawings of 400kV switchyard & commercial complex,
 Lighting calculation & illumination layout drgs.Lighting calculation & illumination layout drgs.
 HT & LT cable sizing and preparation of cable schedule.HT & LT cable sizing and preparation of cable schedule.
 Preparation of electrical purchase requisition for procurement action.Preparation of electrical purchase requisition for procurement action.
 Preparation of technical comparative.Preparation of technical comparative.
 Review vendor’s document for Firefighting, smoke detector and CCTV systemReview vendor’s document for Firefighting, smoke detector and CCTV system
 Electrical drg/documents for Dhirubhai Ambani DAV International School, Koperkherein.Electrical drg/documents for Dhirubhai Ambani DAV International School, Koperkherein.
Project worksProject works --
 Supervising project works like Earthing, cable trench & cable tray.Supervising project works like Earthing, cable trench & cable tray.
MAHINDRA ASHTECH LIMITEDMAHINDRA ASHTECH LIMITED JAN 2006 – FEB 2008JAN 2006 – FEB 2008
MANAGER (ELECTRICAL)MANAGER (ELECTRICAL)
PagePage 22 ofof 55
Electrical design worksElectrical design works ––
 Preparation/checking of SLD, load/drive list, transformer & bus-duct sizing calculationPreparation/checking of SLD, load/drive list, transformer & bus-duct sizing calculation
 Preparation/checking of HT & LT Power cable schedule & voltage drop calculations.Preparation/checking of HT & LT Power cable schedule & voltage drop calculations.
 Preparation/checking of illumination calculation and layout dgsPreparation/checking of illumination calculation and layout dgs
 Preparation/checking of earthing calculation and layout dgsPreparation/checking of earthing calculation and layout dgs
 Preparation/checking of lightning layout dgsPreparation/checking of lightning layout dgs
 Preparation/checking tech data sheet of HT&LT Motors, transformers, all type cablesPreparation/checking tech data sheet of HT&LT Motors, transformers, all type cables
 Checking vendors GA & wiring drgs of HT&LT MCC, Battery charger, UPS, MLDB &Checking vendors GA & wiring drgs of HT&LT MCC, Battery charger, UPS, MLDB &
LPs.LPs.
 Preparation of PLC related jobs like I/O list, Control write-up, hardware configurationPreparation of PLC related jobs like I/O list, Control write-up, hardware configuration
& protection & interlocks, control/power cable schedule and block logic diagrams etc.& protection & interlocks, control/power cable schedule and block logic diagrams etc.
 Preparation of purchase requisition and sending enquiries to different vendors.Preparation of purchase requisition and sending enquiries to different vendors.
 Tech. discussions with different vendors before finalizationTech. discussions with different vendors before finalization
 Preparation of tech. comparativesPreparation of tech. comparatives
 Estimation & preparations of tender documents.Estimation & preparations of tender documents.
 Inspection during manufacturing and before dispatch.Inspection during manufacturing and before dispatch.
 Organised various training sessions for the team to enhance their performance.Organised various training sessions for the team to enhance their performance.
 Led & guided the team.Led & guided the team.
Project handledProject handled ––
 MSEB-Paras Project, Stage-II(1x250MW) –Ash Handling ProjectMSEB-Paras Project, Stage-II(1x250MW) –Ash Handling Project
 NTPC-Sipat Project, Stage-I(3x660MW) - Ash Handling ProjectNTPC-Sipat Project, Stage-I(3x660MW) - Ash Handling Project
 NTPC-Talcher R&M Project, (2x90 & 2x110MW)NTPC-Talcher R&M Project, (2x90 & 2x110MW) - Ash Handling Project- Ash Handling Project
 NTPC-Badarpur R&M Project, (2x210MW)NTPC-Badarpur R&M Project, (2x210MW) - Ash Handling Project- Ash Handling Project
 APGENCO-Vijayawada, Stage-4, U#7(1x500MW)APGENCO-Vijayawada, Stage-4, U#7(1x500MW) - Fly Ash Handling Project- Fly Ash Handling Project
 NLC-Barsinghsar, (2x125MW)NLC-Barsinghsar, (2x125MW) - Ash Handling Project- Ash Handling Project
DESEIN & INDURE GROUP OF COMPANIESDESEIN & INDURE GROUP OF COMPANIES JAN 1998 - JAN 2006JAN 1998 - JAN 2006
SENIOR ELECTRICAL ENGINEERSENIOR ELECTRICAL ENGINEER
Electrical and C&I design worksElectrical and C&I design works --
 Preparation of load/drive list, transformer sizing, bus-duct sizing calculationPreparation of load/drive list, transformer sizing, bus-duct sizing calculation
 Preparation of HT&LT Power cable schedule & voltage drop calculations.Preparation of HT&LT Power cable schedule & voltage drop calculations.
 Preparation of illumination calculation and layout dgsPreparation of illumination calculation and layout dgs
 Preparation of earthing calculation and layout dgsPreparation of earthing calculation and layout dgs
 Preparation of lightning calculation and layout dgsPreparation of lightning calculation and layout dgs
 Preparation/checking tech data sheet of HT&LT Motors, transformers, all type cablesPreparation/checking tech data sheet of HT&LT Motors, transformers, all type cables
 checking vendors drgs of HT&LT MCC, Battery charger, UPS, MLDB & LPschecking vendors drgs of HT&LT MCC, Battery charger, UPS, MLDB & LPs
 Preparation of PLC related jobs like I/O list, Control write-up, hardware configurationPreparation of PLC related jobs like I/O list, Control write-up, hardware configuration
& protection & interlocks.& protection & interlocks.
 Preparation of purchase requisitionPreparation of purchase requisition
 Review & approval of vendor drgs and technical evaluation of different offersReview & approval of vendor drgs and technical evaluation of different offers
 Attend inspection during manufacturing or before dispatchAttend inspection during manufacturing or before dispatch
 Customer & vendor correspondences for proper work flowCustomer & vendor correspondences for proper work flow
 Project site correspondences and tech. support & problems troubleshooting.Project site correspondences and tech. support & problems troubleshooting.
 Played pivotal role in erection, testing & commissioning of various electricalPlayed pivotal role in erection, testing & commissioning of various electrical
equipments/instruments for Surathgarh Thermal Power Station & Vindhyanchal Superequipments/instruments for Surathgarh Thermal Power Station & Vindhyanchal Super
Thermal Power Station.Thermal Power Station.
 Proactively contributed in preparation of Bills for customers and checking bills of theProactively contributed in preparation of Bills for customers and checking bills of the
Contractors.Contractors.
Project handledProject handled ––
 NTPC-Kahalgaon Project, (3x500MW) –Ash Handling ProjectNTPC-Kahalgaon Project, (3x500MW) –Ash Handling Project
 NTPC-Sipat Project,Stage-II (2x500MW) –Ash Handling ProjectNTPC-Sipat Project,Stage-II (2x500MW) –Ash Handling Project
 NTPC-Unchahar Project, (1x210MW) –Ash Handling ProjectNTPC-Unchahar Project, (1x210MW) –Ash Handling Project
 Jindal Power Ltd. Project, Raigarh(4x250MW) –Ash Handling ProjectJindal Power Ltd. Project, Raigarh(4x250MW) –Ash Handling Project
 Orient Cement, Bhusawal TPP(2x125MW)Orient Cement, Bhusawal TPP(2x125MW) –Ash Handling Project–Ash Handling Project
PagePage 33 ofof 55
 Neepaz Metallic Ltd, Rourkela –Fly Ash Handling SystemNeepaz Metallic Ltd, Rourkela –Fly Ash Handling System
 Bhusan Steel Ltd, Meramandali, Orissa –Fly Ash Handling SystemBhusan Steel Ltd, Meramandali, Orissa –Fly Ash Handling System
 RRVUNL-Suratgarh TPS(2x250MW), Stage-II, Rajasthan –Ash Handling SystemRRVUNL-Suratgarh TPS(2x250MW), Stage-II, Rajasthan –Ash Handling System
 NTPC-Vindhyanchal STPS(2x500MW), Stage-III, MP –Ash Handling SystemNTPC-Vindhyanchal STPS(2x500MW), Stage-III, MP –Ash Handling System
Erection & commissioning activitiesErection & commissioning activities
 RRVUNL-Suratgarh TPS(2x250MW), Stage-II, Rajasthan –Ash Handling SystemRRVUNL-Suratgarh TPS(2x250MW), Stage-II, Rajasthan –Ash Handling System
 NTPC-Vindhyanchal STPS(2x500MW), Stage-III, MP –Ash Handling SystemNTPC-Vindhyanchal STPS(2x500MW), Stage-III, MP –Ash Handling System
ELECTRICAL ENGINEERELECTRICAL ENGINEER
IB Valley Thermal Power Station (2x210MW, Unit –1&2), IB Valley, Jharsuguda, OrissaIB Valley Thermal Power Station (2x210MW, Unit –1&2), IB Valley, Jharsuguda, Orissa
Description: Ash Water Recycling ProjectDescription: Ash Water Recycling Project
Position: Project Engineer (Electrical)Position: Project Engineer (Electrical)
Nature of jobNature of job::
 Erection, Testing & Commissioning activities in 33KV HT Transmission line with 2-Erection, Testing & Commissioning activities in 33KV HT Transmission line with 2-
pole, 4-pole and towers.pole, 4-pole and towers.
 Erection, Testing & commissioning activities in 33KV Switchyard with 33KV Breaker,Erection, Testing & commissioning activities in 33KV Switchyard with 33KV Breaker,
Isolator, CT, PT and Power Transformers of 33KV/6.6KV.Isolator, CT, PT and Power Transformers of 33KV/6.6KV.
 Earthing works of Switchyard and control room area.Earthing works of Switchyard and control room area.
 Tray erection, Control & Power cable laying & terminations.Tray erection, Control & Power cable laying & terminations.
 Erection, Testing & commissioning activities of Electrical control panel, RTCC panel,Erection, Testing & commissioning activities of Electrical control panel, RTCC panel,
LT Switchgear, HT Switchgear, 1000KVA transformers, Battery systems with charger,LT Switchgear, HT Switchgear, 1000KVA transformers, Battery systems with charger,
DCDB, LT & HT motors and motorized valve.DCDB, LT & HT motors and motorized valve.
 Liasoning with Govt. authorities for charging of transmission line.Liasoning with Govt. authorities for charging of transmission line.
D.D. BUILDERS, ORISSAD.D. BUILDERS, ORISSA JUN 1992 - DECJUN 1992 - DEC
19971997
ELECTRICAL ENGINEER-PROJECTELECTRICAL ENGINEER-PROJECT
Indrawati Hydel Power Plant (4x40MW), Mukhiguda, Kalahandi, OrissaIndrawati Hydel Power Plant (4x40MW), Mukhiguda, Kalahandi, Orissa
Description: Tailrace Channel packageDescription: Tailrace Channel package
Position: Electrical Engineer -ProjectPosition: Electrical Engineer -Project
Nature of jobNature of job::
•• Maintenance activities in 11KV HT Transmission line with 2-pole and 4-poleMaintenance activities in 11KV HT Transmission line with 2-pole and 4-pole
structures.structures.
•• Power distribution and its maintenance in different construction sites.Power distribution and its maintenance in different construction sites.
•• Maintenance of Construction Power LT Switch Board.Maintenance of Construction Power LT Switch Board.
•• Maintenance of area lighting at the time of erection and office building.Maintenance of area lighting at the time of erection and office building.
•• Operation & Maintenance of distribution transformers.Operation & Maintenance of distribution transformers.
ACADEMICACADEMIC
 A.M.I.E (Electrical Engineering) from “The Institution of Engineers, India” - 1992A.M.I.E (Electrical Engineering) from “The Institution of Engineers, India” - 1992
MEMBERSHIPMEMBERSHIP
 Associate Member of The Institution of Engineers, India.Associate Member of The Institution of Engineers, India.
COMPUTER LITERACYCOMPUTER LITERACY
Basic, Microsoft Office, Dos, Windows 95, 2000, and the Internet.Basic, Microsoft Office, Dos, Windows 95, 2000, and the Internet.
Date of BirthDate of Birth : 21: 21stst
Jul 1970Jul 1970 GenderGender: Male: Male
Nationality : IndianNationality : Indian Marital Status: MarriedMarital Status: Married
Skype IDSkype ID : ranjan.rkroy1: ranjan.rkroy1 PassportPassport : H7069188: H7069188
PagePage 44 ofof 55
Languages Known : English, Oriya & HindiLanguages Known : English, Oriya & Hindi ValidityValidity : 18/11/2019: 18/11/2019
Salary expectation – NegotiableSalary expectation – Negotiable
Permanent Address –Permanent Address –
S/o- Rabindra Kumar RoyS/o- Rabindra Kumar Roy
Flat No. - B/204, B-Wing, Eknath Park,Flat No. - B/204, B-Wing, Eknath Park,
Morewadi-Ajmeera Road, Pimpri, Pune (Maharashtra)Morewadi-Ajmeera Road, Pimpri, Pune (Maharashtra)
References and verifying documentation furnished upon request.References and verifying documentation furnished upon request.
Signature of candidateSignature of candidate
12/12/201612/12/2016
PagePage 55 ofof 55
Languages Known : English, Oriya & HindiLanguages Known : English, Oriya & Hindi ValidityValidity : 18/11/2019: 18/11/2019
Salary expectation – NegotiableSalary expectation – Negotiable
Permanent Address –Permanent Address –
S/o- Rabindra Kumar RoyS/o- Rabindra Kumar Roy
Flat No. - B/204, B-Wing, Eknath Park,Flat No. - B/204, B-Wing, Eknath Park,
Morewadi-Ajmeera Road, Pimpri, Pune (Maharashtra)Morewadi-Ajmeera Road, Pimpri, Pune (Maharashtra)
References and verifying documentation furnished upon request.References and verifying documentation furnished upon request.
Signature of candidateSignature of candidate
12/12/201612/12/2016
PagePage 55 ofof 55

More Related Content

What's hot

Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resume
VEERABHARATHI MUNI
 
Mohammed Ibrahim CV ( Electrical Engineer)
Mohammed Ibrahim CV ( Electrical Engineer)Mohammed Ibrahim CV ( Electrical Engineer)
Mohammed Ibrahim CV ( Electrical Engineer)Mohamed ibrahim
 
Enaia electrical design. engineer cv
Enaia electrical design. engineer  cvEnaia electrical design. engineer  cv
Enaia electrical design. engineer cv
Enaia Kamel
 
The Power Behind The Power
The Power Behind The PowerThe Power Behind The Power
The Power Behind The Power
Vinay Pravidhi
 
RESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPLRESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPLBISWAJYOTI SWAIN
 
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDINSenior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDINHossam Fattah
 
Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017Nicolae Vasiliu
 
1 update resume for electrical engineer
1  update resume for electrical engineer1  update resume for electrical engineer
1 update resume for electrical engineer
Iram shahzad khan
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Upendra Kumar Yadav
 
Eng Samer Ali CV
Eng Samer Ali CVEng Samer Ali CV
Eng Samer Ali CVSamer Ali
 
Director Power Projects Resume
Director Power Projects ResumeDirector Power Projects Resume
Director Power Projects Resumeprasunkishoreroy
 
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERINGRESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERINGpappu kumar
 

What's hot (20)

Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resume
 
CV8thApril 2015
CV8thApril 2015CV8thApril 2015
CV8thApril 2015
 
CV-Electrical-Engineer (1)
CV-Electrical-Engineer (1)CV-Electrical-Engineer (1)
CV-Electrical-Engineer (1)
 
SIP PRESENTATION
SIP PRESENTATIONSIP PRESENTATION
SIP PRESENTATION
 
Mohammed Ibrahim CV ( Electrical Engineer)
Mohammed Ibrahim CV ( Electrical Engineer)Mohammed Ibrahim CV ( Electrical Engineer)
Mohammed Ibrahim CV ( Electrical Engineer)
 
Enaia electrical design. engineer cv
Enaia electrical design. engineer  cvEnaia electrical design. engineer  cv
Enaia electrical design. engineer cv
 
The Power Behind The Power
The Power Behind The PowerThe Power Behind The Power
The Power Behind The Power
 
RESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPLRESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPL
 
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDINSenior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
 
Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017
 
Jose_Transmission_Engineer
Jose_Transmission_EngineerJose_Transmission_Engineer
Jose_Transmission_Engineer
 
Update CV
Update CVUpdate CV
Update CV
 
JOVIN RESUME
JOVIN RESUMEJOVIN RESUME
JOVIN RESUME
 
1 update resume for electrical engineer
1  update resume for electrical engineer1  update resume for electrical engineer
1 update resume for electrical engineer
 
Resume of Dileep K 2017
Resume of Dileep K 2017Resume of Dileep K 2017
Resume of Dileep K 2017
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
 
Ashish Resume
Ashish ResumeAshish Resume
Ashish Resume
 
Eng Samer Ali CV
Eng Samer Ali CVEng Samer Ali CV
Eng Samer Ali CV
 
Director Power Projects Resume
Director Power Projects ResumeDirector Power Projects Resume
Director Power Projects Resume
 
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERINGRESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
 

Similar to Ranjan Roy- 12.12.16

VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEVIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEvijayabaskar v
 
Resume for Electrical design engineer
Resume for Electrical design engineerResume for Electrical design engineer
Resume for Electrical design engineer
NISHITKUMAR JOSHI
 
Sr.Electrical Engineer_13years of Experinece
Sr.Electrical Engineer_13years of ExperineceSr.Electrical Engineer_13years of Experinece
Sr.Electrical Engineer_13years of ExperineceNagaraj Maradi
 
Amol bakane update rockstar
Amol bakane    update rockstarAmol bakane    update rockstar
Amol bakane update rockstar
amol bakane
 
HARTEK POWER - POWER SYSTEM PROFILE
HARTEK POWER - POWER SYSTEM PROFILEHARTEK POWER - POWER SYSTEM PROFILE
HARTEK POWER - POWER SYSTEM PROFILE
HARTEK POWER
 
Resume- Rahul Bhardwaj
Resume- Rahul BhardwajResume- Rahul Bhardwaj
Resume- Rahul BhardwajRahul Bhardwaj
 
Rajesh CV -E & I
Rajesh CV -E & IRajesh CV -E & I
Rajesh CV -E & I
RAJESH LANDE
 
Resume of Kaptan Singh new
Resume of Kaptan Singh newResume of Kaptan Singh new
Resume of Kaptan Singh newkaptan singh
 
CV_ susovan
CV_ susovanCV_ susovan
CV_ susovan
Susovan Biswas
 
CV-Sandeep Kumar Updated
CV-Sandeep Kumar UpdatedCV-Sandeep Kumar Updated
CV-Sandeep Kumar UpdatedSANDEEP KUMAR
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Akhtar
 

Similar to Ranjan Roy- 12.12.16 (20)

MEGA ENGINEERING CO. PAKISTAN Profile
MEGA ENGINEERING CO. PAKISTAN ProfileMEGA ENGINEERING CO. PAKISTAN Profile
MEGA ENGINEERING CO. PAKISTAN Profile
 
Amarjeet Copy
Amarjeet   CopyAmarjeet   Copy
Amarjeet Copy
 
Resume mohan
Resume mohanResume mohan
Resume mohan
 
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEVIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
 
Resume for Electrical design engineer
Resume for Electrical design engineerResume for Electrical design engineer
Resume for Electrical design engineer
 
Sr.Electrical Engineer_13years of Experinece
Sr.Electrical Engineer_13years of ExperineceSr.Electrical Engineer_13years of Experinece
Sr.Electrical Engineer_13years of Experinece
 
NAVNATH UPDATED CV
NAVNATH UPDATED CVNAVNATH UPDATED CV
NAVNATH UPDATED CV
 
Amol bakane update rockstar
Amol bakane    update rockstarAmol bakane    update rockstar
Amol bakane update rockstar
 
HARTEK POWER - POWER SYSTEM PROFILE
HARTEK POWER - POWER SYSTEM PROFILEHARTEK POWER - POWER SYSTEM PROFILE
HARTEK POWER - POWER SYSTEM PROFILE
 
Electrical engineer
Electrical engineerElectrical engineer
Electrical engineer
 
Resume- Rahul Bhardwaj
Resume- Rahul BhardwajResume- Rahul Bhardwaj
Resume- Rahul Bhardwaj
 
Rajesh CV -E & I
Rajesh CV -E & IRajesh CV -E & I
Rajesh CV -E & I
 
Ravi_ElectricalEngineer
Ravi_ElectricalEngineerRavi_ElectricalEngineer
Ravi_ElectricalEngineer
 
Deepak Resume
Deepak ResumeDeepak Resume
Deepak Resume
 
Krunal bhatt
Krunal bhattKrunal bhatt
Krunal bhatt
 
Resume of Kaptan Singh new
Resume of Kaptan Singh newResume of Kaptan Singh new
Resume of Kaptan Singh new
 
CV_ susovan
CV_ susovanCV_ susovan
CV_ susovan
 
CV_Susovan
CV_SusovanCV_Susovan
CV_Susovan
 
CV-Sandeep Kumar Updated
CV-Sandeep Kumar UpdatedCV-Sandeep Kumar Updated
CV-Sandeep Kumar Updated
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2
 

Ranjan Roy- 12.12.16

  • 1. RANJAN KUMAR ROYRANJAN KUMAR ROY Flat No. - B/204, B-Wing, Eknath Park, Morewadi-Ajmeera Road, Pimpri, Pune (Maharashtra)Flat No. - B/204, B-Wing, Eknath Park, Morewadi-Ajmeera Road, Pimpri, Pune (Maharashtra) Contact: +91 20 4072 5721, +91 99 7000 6493, +91 88 3035 8582Contact: +91 20 4072 5721, +91 99 7000 6493, +91 88 3035 8582 E-mail:E-mail: ranjanroy_123@yahoo.comranjanroy_123@yahoo.com,, rkroy_123@yahoo.co.inrkroy_123@yahoo.co.in SR. PROFESSIONALSR. PROFESSIONAL – ELECTRICAL AND C&I (ENGINEERING & PROCUREMENT)– ELECTRICAL AND C&I (ENGINEERING & PROCUREMENT) Experiences in Elect. Engineering, Erection & Commissioning and Procurement activities etc.Experiences in Elect. Engineering, Erection & Commissioning and Procurement activities etc. in different Thermal Power Plant Projects.in different Thermal Power Plant Projects. CAREER OBJECTIVECAREER OBJECTIVE Nearly 24.5 years of experience in Electrical and C&I - Engineering, procurement andNearly 24.5 years of experience in Electrical and C&I - Engineering, procurement and construction works etc. of various Thermal Power Project in different capacities. Looking aconstruction works etc. of various Thermal Power Project in different capacities. Looking a reputed organization as areputed organization as a Sr. Professional –Electrical Engineering /PurchaseSr. Professional –Electrical Engineering /Purchase to achieveto achieve management’s goalmanagement’s goal in stipulated timein stipulated time frame.frame. PROFESSIONAL SYNOPSISPROFESSIONAL SYNOPSIS  Core strengths in Electrical Design, Erection & Commissioning of Ash Handling Plants,Core strengths in Electrical Design, Erection & Commissioning of Ash Handling Plants, illumination works in multi-storied building and procurement activities of different boughtillumination works in multi-storied building and procurement activities of different bought out electrical items.out electrical items.  Hands on experience in defining scope of project and awarding work contracts toHands on experience in defining scope of project and awarding work contracts to qualified professionals/contractors.qualified professionals/contractors.  Meticulous and structured approach with super planning & implementation skills.Meticulous and structured approach with super planning & implementation skills.  Participating in tendering jobsParticipating in tendering jobs BASKET OF KEY COMPETENCIESBASKET OF KEY COMPETENCIES Electrical EngineeringElectrical Engineering C&I EngineeringC&I Engineering Procurement activitiesProcurement activities Erection & CommissioningErection & Commissioning TenderingTendering Customer correspondenceCustomer correspondence Training & DevelopmentTraining & Development Finalization of offersFinalization of offers Vendor correspondenceVendor correspondence PROFESSIONAL EXPERIENCESPROFESSIONAL EXPERIENCES TECPRO SYSTEMS LTD. (Ashtech Division)TECPRO SYSTEMS LTD. (Ashtech Division) MARCH 2010 TO TILL DATEMARCH 2010 TO TILL DATE DEPUTY GENERAL MANAGER (Electrical)DEPUTY GENERAL MANAGER (Electrical) Overall responsible for preparation & customer’s approval of detail Electrical EngineeringOverall responsible for preparation & customer’s approval of detail Electrical Engineering drawing/ documents for following Projects. Also taking care procurement activities ofdrawing/ documents for following Projects. Also taking care procurement activities of electrical items.electrical items.  VUNG ANG-1 Project (Vietnam-2X600MWVUNG ANG-1 Project (Vietnam-2X600MW)-Ash Handling Plant & Clarified water System)-Ash Handling Plant & Clarified water System  TANJUNG TABALONG(2x30MW) Coal fired Power Plant, IndonesiaTANJUNG TABALONG(2x30MW) Coal fired Power Plant, Indonesia  KAKATIYA (APGENCO, 1x600MW, Stage-II) - Ash Handling Plant & Mill rejected SystemKAKATIYA (APGENCO, 1x600MW, Stage-II) - Ash Handling Plant & Mill rejected System  RAYALASEEMA (APGENCO, 1x600MW) - Ash Handling PlantRAYALASEEMA (APGENCO, 1x600MW) - Ash Handling Plant  VTPS(APGENCO, 1x500MW), Vijayawada – Wet Ash Handling SystemVTPS(APGENCO, 1x500MW), Vijayawada – Wet Ash Handling System  NTPC/Solapur (2x660MW) Ash handling & Ash water recirculation systemNTPC/Solapur (2x660MW) Ash handling & Ash water recirculation system  NTPC/Meja (2x660MW) - Ash Handling PlantNTPC/Meja (2x660MW) - Ash Handling Plant  NTPC/Muzaffarpur (2x195MW) - Ash Handling PlantNTPC/Muzaffarpur (2x195MW) - Ash Handling Plant  IOTL-Korba –(1x300MW) -Fly Ash Handling SystemIOTL-Korba –(1x300MW) -Fly Ash Handling System  BINA Thermal Power Station (M.P-2x250MW)- Ash Handling PlantBINA Thermal Power Station (M.P-2x250MW)- Ash Handling Plant  KORBA (Chhatisgargh-1x500MW, Ext.-III) - Ash Handling PlantKORBA (Chhatisgargh-1x500MW, Ext.-III) - Ash Handling Plant  VIZAG Thermal Power Project -(2x500MW) –TWS PackageVIZAG Thermal Power Project -(2x500MW) –TWS Package  LANCO Amarakantak Power Ltd.-(2x660MW) –TWS PackageLANCO Amarakantak Power Ltd.-(2x660MW) –TWS Package PagePage 11 ofof 55
  • 2. Electrical Engineering worksElectrical Engineering works ––  Preparation/checking of SLD, feeder list, transformer sizing, bus-duct sizingPreparation/checking of SLD, feeder list, transformer sizing, bus-duct sizing calculation.calculation.  Preparation/checking of HT&LT Power cable schedule & voltage drop calculations.Preparation/checking of HT&LT Power cable schedule & voltage drop calculations.  Preparation/checking of documents for 33kV HT Transmission line & substation.Preparation/checking of documents for 33kV HT Transmission line & substation.  Preparation/checking of electrical equipment layout dgs.Preparation/checking of electrical equipment layout dgs.  Preparation/checking of illumination calculation and layout dgs.Preparation/checking of illumination calculation and layout dgs.  Preparation/checking of earthing calculation and layout dgs.Preparation/checking of earthing calculation and layout dgs.  Preparation/checking of lightning calculation and layout dgs.Preparation/checking of lightning calculation and layout dgs.  Preparation/checking tech data sheet of HT&LT Motors, transformers, all type cablesPreparation/checking tech data sheet of HT&LT Motors, transformers, all type cables  Overhead transmission line conductor sizing calculation.Overhead transmission line conductor sizing calculation.  UPS & battery sizing calculation.UPS & battery sizing calculation.  Charger & battery sizing calculation.Charger & battery sizing calculation.  Tech. data sheet of cable trays.Tech. data sheet of cable trays.  Checking vendorsChecking vendors drg/documents of HT& LT MCC, Battery charger, UPS, MLDB,drg/documents of HT& LT MCC, Battery charger, UPS, MLDB, Lighting panels, Bus-duct, Transformers, HT/LT cables, Control, MLDB/DBs/LPs & Inst.Lighting panels, Bus-duct, Transformers, HT/LT cables, Control, MLDB/DBs/LPs & Inst. cablescables Procurement activitiesProcurement activities ––  Floating enquiries to different vendors/manufactures for electrical items.Floating enquiries to different vendors/manufactures for electrical items.  Tech discussions with different vendors and preparation of tech/commercialTech discussions with different vendors and preparation of tech/commercial comparativescomparatives  Preparation of Routine slip for managements approvalPreparation of Routine slip for managements approval  Day to day follow up with vendor/manufacturer for readiness of material &Day to day follow up with vendor/manufacturer for readiness of material & drgs/documentsdrgs/documents Other activitiesOther activities ––  Co-ordination to Project/vendor/customerCo-ordination to Project/vendor/customer electrical works.electrical works.  Review month wise Sales target with Management on regular basis.Review month wise Sales target with Management on regular basis.  Lead & guidedLead & guided the teamthe team members.members.  Participation in Tendering worksParticipation in Tendering works  Erection & commissioning activitiesErection & commissioning activities of AH System of Raichur-TP Plant (1x250MW)of AH System of Raichur-TP Plant (1x250MW) NMSEZ PVT. LTD. (Reliance Industries Ltd.)NMSEZ PVT. LTD. (Reliance Industries Ltd.) FEB 2008– MAR 2010FEB 2008– MAR 2010 SR. MANAGERSR. MANAGER Electrical Engineering worksElectrical Engineering works --  Power distribution (HT & LT) to different nodes.Power distribution (HT & LT) to different nodes.  Finalization of transformer & DG ratings for SEZ Project.Finalization of transformer & DG ratings for SEZ Project.  Earthing sizing & layout drawings of 400kV switchyard & commercial complex,Earthing sizing & layout drawings of 400kV switchyard & commercial complex,  Lighting calculation & illumination layout drgs.Lighting calculation & illumination layout drgs.  HT & LT cable sizing and preparation of cable schedule.HT & LT cable sizing and preparation of cable schedule.  Preparation of electrical purchase requisition for procurement action.Preparation of electrical purchase requisition for procurement action.  Preparation of technical comparative.Preparation of technical comparative.  Review vendor’s document for Firefighting, smoke detector and CCTV systemReview vendor’s document for Firefighting, smoke detector and CCTV system  Electrical drg/documents for Dhirubhai Ambani DAV International School, Koperkherein.Electrical drg/documents for Dhirubhai Ambani DAV International School, Koperkherein. Project worksProject works --  Supervising project works like Earthing, cable trench & cable tray.Supervising project works like Earthing, cable trench & cable tray. MAHINDRA ASHTECH LIMITEDMAHINDRA ASHTECH LIMITED JAN 2006 – FEB 2008JAN 2006 – FEB 2008 MANAGER (ELECTRICAL)MANAGER (ELECTRICAL) PagePage 22 ofof 55
  • 3. Electrical design worksElectrical design works ––  Preparation/checking of SLD, load/drive list, transformer & bus-duct sizing calculationPreparation/checking of SLD, load/drive list, transformer & bus-duct sizing calculation  Preparation/checking of HT & LT Power cable schedule & voltage drop calculations.Preparation/checking of HT & LT Power cable schedule & voltage drop calculations.  Preparation/checking of illumination calculation and layout dgsPreparation/checking of illumination calculation and layout dgs  Preparation/checking of earthing calculation and layout dgsPreparation/checking of earthing calculation and layout dgs  Preparation/checking of lightning layout dgsPreparation/checking of lightning layout dgs  Preparation/checking tech data sheet of HT&LT Motors, transformers, all type cablesPreparation/checking tech data sheet of HT&LT Motors, transformers, all type cables  Checking vendors GA & wiring drgs of HT&LT MCC, Battery charger, UPS, MLDB &Checking vendors GA & wiring drgs of HT&LT MCC, Battery charger, UPS, MLDB & LPs.LPs.  Preparation of PLC related jobs like I/O list, Control write-up, hardware configurationPreparation of PLC related jobs like I/O list, Control write-up, hardware configuration & protection & interlocks, control/power cable schedule and block logic diagrams etc.& protection & interlocks, control/power cable schedule and block logic diagrams etc.  Preparation of purchase requisition and sending enquiries to different vendors.Preparation of purchase requisition and sending enquiries to different vendors.  Tech. discussions with different vendors before finalizationTech. discussions with different vendors before finalization  Preparation of tech. comparativesPreparation of tech. comparatives  Estimation & preparations of tender documents.Estimation & preparations of tender documents.  Inspection during manufacturing and before dispatch.Inspection during manufacturing and before dispatch.  Organised various training sessions for the team to enhance their performance.Organised various training sessions for the team to enhance their performance.  Led & guided the team.Led & guided the team. Project handledProject handled ––  MSEB-Paras Project, Stage-II(1x250MW) –Ash Handling ProjectMSEB-Paras Project, Stage-II(1x250MW) –Ash Handling Project  NTPC-Sipat Project, Stage-I(3x660MW) - Ash Handling ProjectNTPC-Sipat Project, Stage-I(3x660MW) - Ash Handling Project  NTPC-Talcher R&M Project, (2x90 & 2x110MW)NTPC-Talcher R&M Project, (2x90 & 2x110MW) - Ash Handling Project- Ash Handling Project  NTPC-Badarpur R&M Project, (2x210MW)NTPC-Badarpur R&M Project, (2x210MW) - Ash Handling Project- Ash Handling Project  APGENCO-Vijayawada, Stage-4, U#7(1x500MW)APGENCO-Vijayawada, Stage-4, U#7(1x500MW) - Fly Ash Handling Project- Fly Ash Handling Project  NLC-Barsinghsar, (2x125MW)NLC-Barsinghsar, (2x125MW) - Ash Handling Project- Ash Handling Project DESEIN & INDURE GROUP OF COMPANIESDESEIN & INDURE GROUP OF COMPANIES JAN 1998 - JAN 2006JAN 1998 - JAN 2006 SENIOR ELECTRICAL ENGINEERSENIOR ELECTRICAL ENGINEER Electrical and C&I design worksElectrical and C&I design works --  Preparation of load/drive list, transformer sizing, bus-duct sizing calculationPreparation of load/drive list, transformer sizing, bus-duct sizing calculation  Preparation of HT&LT Power cable schedule & voltage drop calculations.Preparation of HT&LT Power cable schedule & voltage drop calculations.  Preparation of illumination calculation and layout dgsPreparation of illumination calculation and layout dgs  Preparation of earthing calculation and layout dgsPreparation of earthing calculation and layout dgs  Preparation of lightning calculation and layout dgsPreparation of lightning calculation and layout dgs  Preparation/checking tech data sheet of HT&LT Motors, transformers, all type cablesPreparation/checking tech data sheet of HT&LT Motors, transformers, all type cables  checking vendors drgs of HT&LT MCC, Battery charger, UPS, MLDB & LPschecking vendors drgs of HT&LT MCC, Battery charger, UPS, MLDB & LPs  Preparation of PLC related jobs like I/O list, Control write-up, hardware configurationPreparation of PLC related jobs like I/O list, Control write-up, hardware configuration & protection & interlocks.& protection & interlocks.  Preparation of purchase requisitionPreparation of purchase requisition  Review & approval of vendor drgs and technical evaluation of different offersReview & approval of vendor drgs and technical evaluation of different offers  Attend inspection during manufacturing or before dispatchAttend inspection during manufacturing or before dispatch  Customer & vendor correspondences for proper work flowCustomer & vendor correspondences for proper work flow  Project site correspondences and tech. support & problems troubleshooting.Project site correspondences and tech. support & problems troubleshooting.  Played pivotal role in erection, testing & commissioning of various electricalPlayed pivotal role in erection, testing & commissioning of various electrical equipments/instruments for Surathgarh Thermal Power Station & Vindhyanchal Superequipments/instruments for Surathgarh Thermal Power Station & Vindhyanchal Super Thermal Power Station.Thermal Power Station.  Proactively contributed in preparation of Bills for customers and checking bills of theProactively contributed in preparation of Bills for customers and checking bills of the Contractors.Contractors. Project handledProject handled ––  NTPC-Kahalgaon Project, (3x500MW) –Ash Handling ProjectNTPC-Kahalgaon Project, (3x500MW) –Ash Handling Project  NTPC-Sipat Project,Stage-II (2x500MW) –Ash Handling ProjectNTPC-Sipat Project,Stage-II (2x500MW) –Ash Handling Project  NTPC-Unchahar Project, (1x210MW) –Ash Handling ProjectNTPC-Unchahar Project, (1x210MW) –Ash Handling Project  Jindal Power Ltd. Project, Raigarh(4x250MW) –Ash Handling ProjectJindal Power Ltd. Project, Raigarh(4x250MW) –Ash Handling Project  Orient Cement, Bhusawal TPP(2x125MW)Orient Cement, Bhusawal TPP(2x125MW) –Ash Handling Project–Ash Handling Project PagePage 33 ofof 55
  • 4.  Neepaz Metallic Ltd, Rourkela –Fly Ash Handling SystemNeepaz Metallic Ltd, Rourkela –Fly Ash Handling System  Bhusan Steel Ltd, Meramandali, Orissa –Fly Ash Handling SystemBhusan Steel Ltd, Meramandali, Orissa –Fly Ash Handling System  RRVUNL-Suratgarh TPS(2x250MW), Stage-II, Rajasthan –Ash Handling SystemRRVUNL-Suratgarh TPS(2x250MW), Stage-II, Rajasthan –Ash Handling System  NTPC-Vindhyanchal STPS(2x500MW), Stage-III, MP –Ash Handling SystemNTPC-Vindhyanchal STPS(2x500MW), Stage-III, MP –Ash Handling System Erection & commissioning activitiesErection & commissioning activities  RRVUNL-Suratgarh TPS(2x250MW), Stage-II, Rajasthan –Ash Handling SystemRRVUNL-Suratgarh TPS(2x250MW), Stage-II, Rajasthan –Ash Handling System  NTPC-Vindhyanchal STPS(2x500MW), Stage-III, MP –Ash Handling SystemNTPC-Vindhyanchal STPS(2x500MW), Stage-III, MP –Ash Handling System ELECTRICAL ENGINEERELECTRICAL ENGINEER IB Valley Thermal Power Station (2x210MW, Unit –1&2), IB Valley, Jharsuguda, OrissaIB Valley Thermal Power Station (2x210MW, Unit –1&2), IB Valley, Jharsuguda, Orissa Description: Ash Water Recycling ProjectDescription: Ash Water Recycling Project Position: Project Engineer (Electrical)Position: Project Engineer (Electrical) Nature of jobNature of job::  Erection, Testing & Commissioning activities in 33KV HT Transmission line with 2-Erection, Testing & Commissioning activities in 33KV HT Transmission line with 2- pole, 4-pole and towers.pole, 4-pole and towers.  Erection, Testing & commissioning activities in 33KV Switchyard with 33KV Breaker,Erection, Testing & commissioning activities in 33KV Switchyard with 33KV Breaker, Isolator, CT, PT and Power Transformers of 33KV/6.6KV.Isolator, CT, PT and Power Transformers of 33KV/6.6KV.  Earthing works of Switchyard and control room area.Earthing works of Switchyard and control room area.  Tray erection, Control & Power cable laying & terminations.Tray erection, Control & Power cable laying & terminations.  Erection, Testing & commissioning activities of Electrical control panel, RTCC panel,Erection, Testing & commissioning activities of Electrical control panel, RTCC panel, LT Switchgear, HT Switchgear, 1000KVA transformers, Battery systems with charger,LT Switchgear, HT Switchgear, 1000KVA transformers, Battery systems with charger, DCDB, LT & HT motors and motorized valve.DCDB, LT & HT motors and motorized valve.  Liasoning with Govt. authorities for charging of transmission line.Liasoning with Govt. authorities for charging of transmission line. D.D. BUILDERS, ORISSAD.D. BUILDERS, ORISSA JUN 1992 - DECJUN 1992 - DEC 19971997 ELECTRICAL ENGINEER-PROJECTELECTRICAL ENGINEER-PROJECT Indrawati Hydel Power Plant (4x40MW), Mukhiguda, Kalahandi, OrissaIndrawati Hydel Power Plant (4x40MW), Mukhiguda, Kalahandi, Orissa Description: Tailrace Channel packageDescription: Tailrace Channel package Position: Electrical Engineer -ProjectPosition: Electrical Engineer -Project Nature of jobNature of job:: •• Maintenance activities in 11KV HT Transmission line with 2-pole and 4-poleMaintenance activities in 11KV HT Transmission line with 2-pole and 4-pole structures.structures. •• Power distribution and its maintenance in different construction sites.Power distribution and its maintenance in different construction sites. •• Maintenance of Construction Power LT Switch Board.Maintenance of Construction Power LT Switch Board. •• Maintenance of area lighting at the time of erection and office building.Maintenance of area lighting at the time of erection and office building. •• Operation & Maintenance of distribution transformers.Operation & Maintenance of distribution transformers. ACADEMICACADEMIC  A.M.I.E (Electrical Engineering) from “The Institution of Engineers, India” - 1992A.M.I.E (Electrical Engineering) from “The Institution of Engineers, India” - 1992 MEMBERSHIPMEMBERSHIP  Associate Member of The Institution of Engineers, India.Associate Member of The Institution of Engineers, India. COMPUTER LITERACYCOMPUTER LITERACY Basic, Microsoft Office, Dos, Windows 95, 2000, and the Internet.Basic, Microsoft Office, Dos, Windows 95, 2000, and the Internet. Date of BirthDate of Birth : 21: 21stst Jul 1970Jul 1970 GenderGender: Male: Male Nationality : IndianNationality : Indian Marital Status: MarriedMarital Status: Married Skype IDSkype ID : ranjan.rkroy1: ranjan.rkroy1 PassportPassport : H7069188: H7069188 PagePage 44 ofof 55
  • 5. Languages Known : English, Oriya & HindiLanguages Known : English, Oriya & Hindi ValidityValidity : 18/11/2019: 18/11/2019 Salary expectation – NegotiableSalary expectation – Negotiable Permanent Address –Permanent Address – S/o- Rabindra Kumar RoyS/o- Rabindra Kumar Roy Flat No. - B/204, B-Wing, Eknath Park,Flat No. - B/204, B-Wing, Eknath Park, Morewadi-Ajmeera Road, Pimpri, Pune (Maharashtra)Morewadi-Ajmeera Road, Pimpri, Pune (Maharashtra) References and verifying documentation furnished upon request.References and verifying documentation furnished upon request. Signature of candidateSignature of candidate 12/12/201612/12/2016 PagePage 55 ofof 55
  • 6. Languages Known : English, Oriya & HindiLanguages Known : English, Oriya & Hindi ValidityValidity : 18/11/2019: 18/11/2019 Salary expectation – NegotiableSalary expectation – Negotiable Permanent Address –Permanent Address – S/o- Rabindra Kumar RoyS/o- Rabindra Kumar Roy Flat No. - B/204, B-Wing, Eknath Park,Flat No. - B/204, B-Wing, Eknath Park, Morewadi-Ajmeera Road, Pimpri, Pune (Maharashtra)Morewadi-Ajmeera Road, Pimpri, Pune (Maharashtra) References and verifying documentation furnished upon request.References and verifying documentation furnished upon request. Signature of candidateSignature of candidate 12/12/201612/12/2016 PagePage 55 ofof 55