Kazi Ferdousul Karim has over 3 years of experience in power plant operation. He holds a PG Diploma in Thermal Power Plant Engineering and a B.Tech in Electrical Engineering. He is currently working as an Engineer - Operation at Simhapuri Energy Limited in Nellore, Andhra Pradesh, where he is responsible for the operation of boilers and turbines across 3 x 150 MW units. Prior to this, he has undergone simulator training and on-job training at various thermal power plants across 210 MW and 330 MW combined cycle units.
Training Report Of 2x600MW, Kalishindh Super Thermal Power Project Jhalawar(Rajasthan)
Under
Asst. Prof. Neeraj Kumar Garg
Dept. of Electrical Engineering
Radhey Shyam Meena
B.Tech. In Electrical Engineering
Govt. Engineering College Jhalawar
Rajasthan Technical University Kota
I am Rajapaul from India. I have 10 years experience as a Mechanical Technician in oil & gas field. I have good experience on Pr - commissioning,commissioning, maintaining rotating equipment and static equipment.Herewith i have attached my resume for your reference.
Thanks & Regards,
Rajapaul.P
+91-9600435455(India)
+965-66775329 (Kuwait)
With an experience in the field of Testing and Commissioning of power system products, I look forward for an opportunity to display my skills in the field of Testing & commissioning ,Operation & Maintenance and Execution of projects related to power systems.
A thermal power station is a power station in which heat energy is converted to electric power. In most of the places in the world the turbine is steam-driven. Water is heated, turns into steam and spins a steam turbine which drives an electrical generator.
Operational description of 400kv switchyard NTPC Ramagundam RSTPSPradeep Avanigadda
400 KV Switchyard of Ramagundam Super Thermal Power Station is the most vital switching station in the southern Grid. 2600 MW of Bulk Power generated by three 200 MW Units and four 500 MW Units of NTPC Ramagundam is evacuated for supplying to the southern states.
Switchyard consists of four 400 KV busbars fed by 7 Nos. of generators, 10 Nos. of 400 KV feeders, 3 Nos of 220 KV feeders and two nos. of 132 Kv feeders as shown in the single line diagram of 400 Kv switch yard.
In addition to the above, four nos. of Tie Transformers, five nos. of Auto transformers, two nos. of Shunt Reactors and one Bus reactor are provided.
Training Report Of 2x600MW, Kalishindh Super Thermal Power Project Jhalawar(Rajasthan)
Under
Asst. Prof. Neeraj Kumar Garg
Dept. of Electrical Engineering
Radhey Shyam Meena
B.Tech. In Electrical Engineering
Govt. Engineering College Jhalawar
Rajasthan Technical University Kota
I am Rajapaul from India. I have 10 years experience as a Mechanical Technician in oil & gas field. I have good experience on Pr - commissioning,commissioning, maintaining rotating equipment and static equipment.Herewith i have attached my resume for your reference.
Thanks & Regards,
Rajapaul.P
+91-9600435455(India)
+965-66775329 (Kuwait)
With an experience in the field of Testing and Commissioning of power system products, I look forward for an opportunity to display my skills in the field of Testing & commissioning ,Operation & Maintenance and Execution of projects related to power systems.
A thermal power station is a power station in which heat energy is converted to electric power. In most of the places in the world the turbine is steam-driven. Water is heated, turns into steam and spins a steam turbine which drives an electrical generator.
Operational description of 400kv switchyard NTPC Ramagundam RSTPSPradeep Avanigadda
400 KV Switchyard of Ramagundam Super Thermal Power Station is the most vital switching station in the southern Grid. 2600 MW of Bulk Power generated by three 200 MW Units and four 500 MW Units of NTPC Ramagundam is evacuated for supplying to the southern states.
Switchyard consists of four 400 KV busbars fed by 7 Nos. of generators, 10 Nos. of 400 KV feeders, 3 Nos of 220 KV feeders and two nos. of 132 Kv feeders as shown in the single line diagram of 400 Kv switch yard.
In addition to the above, four nos. of Tie Transformers, five nos. of Auto transformers, two nos. of Shunt Reactors and one Bus reactor are provided.
About this Training Course
To provide attendees with a detailed understanding of the calculations required to evaluate the performance of a
Combined Cycle Gas Turbine (CCGT) Power Plant. Provide an understanding of the requirements as regards implementing a successful performance evaluation strategy for a Combined Cycle Gas Turbine Power Plant
Key Learning Outcome
Performance Test Calculations
Power Output/Heat Rate Calculations
Correction Factors
Performance Monitoring
Performance Diagnostics
Performance Improvements
Combined Cycle GT Plant Overview
Performance Terms and Definitions
Brayton Cycle
Rankine Cycle
Combined Cycle
Performance Test Objectives
Uncertainty Analysis
Who Should Attend
This course would be ideal for any engineer requiring an understanding of the thermodynamic calculations required to assess the performance of a CCGT Power Plant. Attendees would be encouraged to bring their own plant data for discussion during the course.
Gas Turbine , CCPP, Operation& Maintenance, spare part supply, Manpower service for Power Plant, GE LM6000 ,GE LM2500, GE FRAME 6,... P&W, MAN, RR, Turbine commisioning and start up,......
Ensures operation of machinery and mechanical equipment by completing preventive maintenance requirements on engines, Having relevant experience in maintenance in all types of pump, Compressor such as centrifugal, reciprocating and rotary, Turbine, Fin fan.
Heat exchanger (fixed type, U type, and floating type) Bundle removing, hydro testing, servicing jobs.
Water or Steam flushing, Blinding, Open the man ways, Exhaust fan or Air mover fitting, Safety Inspection (H2S), Internal Scaffolding, Light arrangement, Inter-casting cleaning (column, vessel).
OTPC-Palatana 726.6MW combined cycle power generationJoydeep Paul
This slide shows the generation process and a detail of 726.6MW Combined Cycle Power Plant located in North-Eastern state Tripura of India (palatana project site) under ONGC-Tripura Power Company
industrial training during the bachelor of engineering in electrical. and know how to produce electricity from the coal using different equipment. after we know ho to transmit and distribute electric power supply nearest area and provide electricity.
1. KAZI FERDOUSUL KARIMKAZI FERDOUSUL KARIM
PG Diploma in Thermal Power Plant Engineering (NPTI Course) and B.TECH
(Electrical Engineering)
E-mail:E-mail: ferdouskarimkazi@gmail.com / ferdous.kazi@rediffmail.com
Mobile:Mobile: +91-8096256648/+91-8096256648/++91-892747924391-8927479243
PG Diploma in Thermal Power Plant Engg. (NPTI Course) and B.TECH (Electrical Engg) with 3 Year 3
months experience (continuing) in Power Plant Operation
ApercuApercu
Presently working in Simhapuri Energy Limited (Madhucon Projects), Nellore, Andhra
Pradesh and looking after Operation of Boiler, Turbine of 600 MW(4*150MW).
Successfully completed training at Pragati Power having 330 MW Combined Cycle Gas
Turbine Plant of GE make Turbine (2 x 104 MW Frame 9-E Gas Turbine and 1 x 122 MW STG Unit).
Having Knowledge of Rankine cycle, Brayton cycle Reheat cycle, Sub critical and Super critical boiler, PF
boiler, Regeneration cycle, Turbine, Pump, Fan, Condenser and cooling tower etc.
Successfully completed Simulator Training Programme (210 MW).
Having full-fledged knowledge of large scale Thermal Power Plant and Combined Cycle Power
Plant.
Ability to analyse and interpret unique problems, with a combination of training experience and logical
thinking to find the right solutions.
Acquired knowledge and understanding of subjects like; Electrical Machines, Power System, Power plant
Engineering etc.
Excellent relationship management, analytical and negotiation skills.
Job RecordJob Record
1. Company :- Simhapuri Energy Limited (Madhucon Group)
Address :- Thamminapatnam, Nellore, Andhra Pradesh
Duration :- October, 2012 to Present
Designation :- Engineer-Operation
2. Company :- Super Smelters Ltd (SAI Group)
Address :- Asansol, Jamuria, West Bengal
Duration :- June, 2011 to September, 2011
Designation :- GET-Power Plant Operation
Present Job ProfilePresent Job Profile
Now, I am working in Simhapuri Energy Limited, Nellore, Andhra Pradesh having 600 MW
(4*150MW) CFBC Unit as Engineer- Operation from October, 2012.
Boiler maker: Wuxi Huaguang Boiler Co., Ltd
Boiler type: High pressures with intermediate reheat single drum natural circulation CFBC.
Steam Generation Capacity (MCR): 487 TPH.
Working pressure & Temperature: 137 Kg/cm2
& 540+5 o
c.
Turbine make: Harbine Turbine Company
Turbine type: subcritical with super high pressure, single reheat, double casing double flow
2. condensing turbine.
Generator: Shandong Jinan Power Equipments (air cooled)
DCS: Zhejiang Supcon Technology co ltd
Job Profile:
Associated with Boiler and Turbine Operation of 3X150 MW & commissioning of 1 x150 MW
Safe start- up, shut down of boiler and turbine from both hot and cold conditions
Smooth and Efficient Operation of Unit and it’s auxiliaries by producing steam and power as
per the budget.
To operate the units by operating the recommended parameters within the designed values.
To reduce the downtime of unit and its auxiliaries by avoiding tripping.
Handling of normal and emergency condition of the Boiler/Turbine operation.
Ensuring smooth running of boiler feed pumps and its auxiliaries.
Efficiency Monitoring of Boiler & Turbine and its auxiliary are for routine daily basis
Following changeover schedules of equipment’s as per manufacturer’s standard.
Load Control Monitoring.
Preparation and carrying out of Hydro test as per IBR norms during annual shutdown.
Preparation of Daily log Sheets and daily report.
Communication with field operator.
Actively participated in commissioning activities like refractory dry out, chemical cleaning,
alkali blow out, steam blowing etc of 150 MW (Unit-4).
Academic CredentialsAcademic Credentials
Examination
Passed
University/Board College/Institute College/Institute
recognised by
Marks & Year
of Passing
PG Diploma in
Thermal Power
Plant Engineering
Central Board of
Irrigation & Power
(CBIP)
Central Board of
Irrigation & Power
(CBIP)
Ministry of Power &
Central Electricity
Authority(CEA)
74.20%
(2012)
B.TECH in Electrical
Engineering
West Bengal
University of
Technology
Guru Nanak
Institute of
Technology
All India Council for
Technical Education
(AICTE)
7.94(CGPA)
(2011)
12th
West Bengal Council
of Higher Secondary
Examination
Chaltakhali RGBC
Institution(Al
Ameen Mission)
Government of West
Bengal
80.00%
(2007)
10th
West Bengal Board of
Secondary
Examination
Akuni B G Biharilal
Institution
Government of West
Bengal
80.75%
(2005)
Academic Project DetailsAcademic Project Details
Title :- Optimization of Auxiliary Power Consumption (APC) in Thermal Power Plant.
Title :- New simplified inverter topology for DC to AC conversion using a H Bridge stage with an
Auxiliary
Bidirectional switch.
3. Industrial TrainingIndustrial Training
SL No. Name of Training Name of Industry Duration
1 Simulator Training
(210 MW)
West Bengal Power Development Corporation Ltd,
(Govt. of West Bengal)
1 week
2 Scheme Tracing(210 MW) NTPC, Badarpur (Govt. of India) 1 month
3 Rotational on job operation
(210 MW)
NTPC, Badarpur (Govt. of India) 1 month
4 Rotational on job operation &
maintenance(330 MW)
Pragati Power (Gas Power Plant Frame 9-E )
(Govt. of NCR, Delhi)
3 month
5 Vocational Training SAIL,Durgapur (Govt. of India) 2 weeks
6 Vocational Training West Bengal State Electricity Transmission
Company Ltd. (Govt. of West Bengal)
2 weeks
Other DetailsOther Details
Achievement : Played football in Zonal Level (Under Srerampore Subdivision)
Strength : Hard working, Energetic, Fixed determined
Hobbies : Socialising with people, recreational fishing
Personal DossierPersonal Dossier
Address : S/O-KAZI HAFIZUL KARIM
VILL & P.O- Akuni
Police Station- Chanditala
District- Hooghly
State- West Bengal
Pin-712701, India
Date of Birth : 03-05-1990
Sex : Male
Nationality : Indian
Languages Known : English, Bengali & Hindi
Passport No : J1001275 Valid till 2020
PAN No. : BSDPK7094Q
DeclarationDeclaration
I am confident of my ability and ready to work in a team. I hereby declare that the information furnished
above is true to the best of my knowledge.
Date : -------------------------------
Place: (KAZI FERDOUSUL KARIM)