SlideShare a Scribd company logo
1 of 2
GOPAL PRASAD YADAV
S/O – Kunal ray
Village- Saray Saho
Post- Parsa
District- Saran
State- Bihar (841219)
Contact No. – 9981008119, 9716287211
E-mail:- gopalyadav.mech@gmail.com
CAREER SUMMARY:
Overall Industry Experience:-3 Years’+ experience Operation & Maintenance of AshHandlingSystem
in Thermal PowerPlant.
1. Lalitpur PowerGeneration Company Limited (3X660MW) , Lalitpur, U.P
2. Satpura Thermal PowerStation (2x250MW) , Sarni, M.P
3. Parichha Thermal PowerStation (2x250 & 2x210MW), Parichha,Jhansi, U.P
CAREER OBJECTIVE:
Seeking a challenging carrier in the field of Engineering, where my combined experience are fully utilized
& developed to uphold your company quality standards, policies & procedures, in addition that, it shall be
my wholehearted Endeavour to meet the company expectations and contribute myself qualitatively
towards achieving the organizational objective by integral part of the company.
CAREER PROFILE:
CURRENT EMPLOYER: MELCOINDIA Pvt.Ltd.
Duration: (From 15th March 2016 to till date)
Designation: Engineer. (AHP)
 Operation shift incharge of Ash Handling System in 3x660MW, Lalitpur, U.P
 PLC(Desk)Engineer of Ash Handling System in 2x250MW, Sarni, M.P
PREVIOUS EMPLOYER:GARG ENGINEERINGANDSONS. Jhansi, U.P.
Duration: (From July 2013 to February 2016)
Designation: Engineer. (AHP)
 Maintenance engineer of Ash Handling System in 2x250 MW, Parichha,Jhansi, U.P
 Operation & Maintenance of Ash Handling System in 2x210 MW, Parichha, Jhansi,
U.P
Job Profile:
 Operation & Maintenance of All ash handling system in 3x660MW, 2X250MW and
2X210MW of coal based thermal power plant.
 Working as Field engineer, Desk engineer (PLC&DCS), and Shift Engineer & AHP Shift In-
charge.
Summary of Skills & Experience:
 Wet ash system: Bottom ash (W-Type& 3V-Type hopper), High concentration slurry disposal
system, and ash slurry series.
 Wet ash unloading & slurry disposal system (silo to ash pond).
 Fly ash system: ESP/APH/DUCT(Wet& Dry system) & Buffer hopper ash conveying
(Dense/Lean phase) D-pump, Nova & Air lock vessel.
 Silo unloading system: ash conditioner & Unloading spout.
 Planning & Co-ordination of all activities for Operation & maintenance of ash handling plant.
 Developing of SOP & SME to increase efficiency of ash handling system.
 Running trail, loop testing, problem rectification& Modification.
 Looking after every kind of breakdown, corrective,preventive maintenance & modification work
of complete Ash Handling System.
 Proper process of PTW(Permitto Work) system, Safe isolation & normalization, Man power &
Equipment Safety.
 Daily maintain the DPR, Equipment log book, defect logbook,permit logbook & JSA.
 Man powerhandling and proper utilization.
 To create & review the scope of workby coordinating with maintenance & operation teams.
 To make sure the work quality and safety.
 Coordination the different department and working people.
 Maintain the weekly presentation & Training schedule.
Computer Proficiency:
OperatingSystem: Windows XP, Windows 7 & 8, M-S Office, Internet Knowledge.
Professional & Academic Record:
 Matriculation from BSEB Patna in 2005
 Intermediate from BSEB Patna in 2007
 B.E. in Mechanical engineering from RGPV, BHOPAL in 2013 with 70% marks
Internship/ Training attended:
 Done one month of industrial training in BHEL, BHOPAL (M.P.)
Personal Information:
Date of birth: - 16/05/1989
Marital Status: - Single
Mother's Name: - Gayanti Devi
Father's name: - Kunal Ray
Languages Known: - English, Hindi
Hobbies: - Reading News Paper, Walking Outdoor and Playing Cricket.
Current CTC: - 2.8 lacks
Expected Salary: - More than 3 lacks
Declaration
I hereby declare that above given information is true to the best of my knowledge and I understand that
my candidature is liable to be rejected if any part of the information is found to be false.
Date:
Place: Lalitpur (GOPALPRASAD YADAV)

More Related Content

What's hot

Top 8 power plant engineer resume samples
Top 8 power plant engineer resume samplesTop 8 power plant engineer resume samples
Top 8 power plant engineer resume samplestonychoper2305
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 
Cseb (chhattisgarh state electricity board) korba east vocational training pr...
Cseb (chhattisgarh state electricity board) korba east vocational training pr...Cseb (chhattisgarh state electricity board) korba east vocational training pr...
Cseb (chhattisgarh state electricity board) korba east vocational training pr...haxxo24
 
COAL HANDLING DIVISION/PLANT, ANPARA
COAL HANDLING DIVISION/PLANT, ANPARACOAL HANDLING DIVISION/PLANT, ANPARA
COAL HANDLING DIVISION/PLANT, ANPARARajat Verma
 
Indian scenario of super critical power plants issues and challenges by ntpc...
Indian scenario of super critical power plants  issues and challenges by ntpc...Indian scenario of super critical power plants  issues and challenges by ntpc...
Indian scenario of super critical power plants issues and challenges by ntpc...Ajay Singhal
 
Ash Handling System of a Thermal Power Plant
Ash Handling System of a Thermal Power PlantAsh Handling System of a Thermal Power Plant
Ash Handling System of a Thermal Power PlantAmay Jain
 
Coal Handling Plant
Coal Handling PlantCoal Handling Plant
Coal Handling PlantVIVEK TOMAR
 
SANJAY KUMAR RESUME
SANJAY KUMAR RESUMESANJAY KUMAR RESUME
SANJAY KUMAR RESUMESanjay Kumar
 
Standard erection manual (pressure parts)
Standard erection manual (pressure parts)Standard erection manual (pressure parts)
Standard erection manual (pressure parts)Ashutosh Sachan
 
Resume- Rotating Equipment supervisor
Resume- Rotating Equipment supervisorResume- Rotating Equipment supervisor
Resume- Rotating Equipment supervisornitin mokal
 
Summer Training Report on thermal power plant
Summer Training Report on thermal power plantSummer Training Report on thermal power plant
Summer Training Report on thermal power plantMohdAreebQureshi
 
COAL HANDLING PLANT
COAL  HANDLING PLANTCOAL  HANDLING PLANT
COAL HANDLING PLANTpulak126
 
CV - Mechanical Engineer with 4 years and 9 Months Exp NEW ATC
CV - Mechanical Engineer with 4 years and 9 Months Exp NEW ATCCV - Mechanical Engineer with 4 years and 9 Months Exp NEW ATC
CV - Mechanical Engineer with 4 years and 9 Months Exp NEW ATCMidhun Raj
 
MECHANICAL MAINTENANCE ENGINEER (1)
MECHANICAL MAINTENANCE ENGINEER (1)MECHANICAL MAINTENANCE ENGINEER (1)
MECHANICAL MAINTENANCE ENGINEER (1)Pramodbhai More
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)abdul mohammad
 

What's hot (20)

RESUME
RESUMERESUME
RESUME
 
coal handling plant
coal handling plantcoal handling plant
coal handling plant
 
Top 8 power plant engineer resume samples
Top 8 power plant engineer resume samplesTop 8 power plant engineer resume samples
Top 8 power plant engineer resume samples
 
hari_new resume
hari_new resumehari_new resume
hari_new resume
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Cseb (chhattisgarh state electricity board) korba east vocational training pr...
Cseb (chhattisgarh state electricity board) korba east vocational training pr...Cseb (chhattisgarh state electricity board) korba east vocational training pr...
Cseb (chhattisgarh state electricity board) korba east vocational training pr...
 
COAL HANDLING DIVISION/PLANT, ANPARA
COAL HANDLING DIVISION/PLANT, ANPARACOAL HANDLING DIVISION/PLANT, ANPARA
COAL HANDLING DIVISION/PLANT, ANPARA
 
Updated CV
Updated CVUpdated CV
Updated CV
 
Indian scenario of super critical power plants issues and challenges by ntpc...
Indian scenario of super critical power plants  issues and challenges by ntpc...Indian scenario of super critical power plants  issues and challenges by ntpc...
Indian scenario of super critical power plants issues and challenges by ntpc...
 
Ash Handling System of a Thermal Power Plant
Ash Handling System of a Thermal Power PlantAsh Handling System of a Thermal Power Plant
Ash Handling System of a Thermal Power Plant
 
Coal Handling Plant
Coal Handling PlantCoal Handling Plant
Coal Handling Plant
 
SANJAY KUMAR RESUME
SANJAY KUMAR RESUMESANJAY KUMAR RESUME
SANJAY KUMAR RESUME
 
Standard erection manual (pressure parts)
Standard erection manual (pressure parts)Standard erection manual (pressure parts)
Standard erection manual (pressure parts)
 
Resume- Rotating Equipment supervisor
Resume- Rotating Equipment supervisorResume- Rotating Equipment supervisor
Resume- Rotating Equipment supervisor
 
Summer Training Report on thermal power plant
Summer Training Report on thermal power plantSummer Training Report on thermal power plant
Summer Training Report on thermal power plant
 
COAL HANDLING PLANT
COAL  HANDLING PLANTCOAL  HANDLING PLANT
COAL HANDLING PLANT
 
Engr,imran cv.cement.
Engr,imran cv.cement.Engr,imran cv.cement.
Engr,imran cv.cement.
 
CV - Mechanical Engineer with 4 years and 9 Months Exp NEW ATC
CV - Mechanical Engineer with 4 years and 9 Months Exp NEW ATCCV - Mechanical Engineer with 4 years and 9 Months Exp NEW ATC
CV - Mechanical Engineer with 4 years and 9 Months Exp NEW ATC
 
MECHANICAL MAINTENANCE ENGINEER (1)
MECHANICAL MAINTENANCE ENGINEER (1)MECHANICAL MAINTENANCE ENGINEER (1)
MECHANICAL MAINTENANCE ENGINEER (1)
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)
 

Similar to gopal_mech (AHP) RESUME-1 (20)

E&I Resume
E&I ResumeE&I Resume
E&I Resume
 
new resume for dubeyjee
new resume for dubeyjeenew resume for dubeyjee
new resume for dubeyjee
 
CV_prateek diffrnt
CV_prateek diffrntCV_prateek diffrnt
CV_prateek diffrnt
 
Asik Ali Battery Production and Maintenance
Asik Ali Battery Production and MaintenanceAsik Ali Battery Production and Maintenance
Asik Ali Battery Production and Maintenance
 
Resume
ResumeResume
Resume
 
Resume dipen 10-2015
Resume dipen 10-2015Resume dipen 10-2015
Resume dipen 10-2015
 
Resume
ResumeResume
Resume
 
Pawan CV
Pawan CVPawan CV
Pawan CV
 
Shoyeb resume 30.7
Shoyeb resume 30.7Shoyeb resume 30.7
Shoyeb resume 30.7
 
Shoyeb resume 30.7
Shoyeb resume 30.7Shoyeb resume 30.7
Shoyeb resume 30.7
 
shoyeb resume 30.7
shoyeb resume 30.7shoyeb resume 30.7
shoyeb resume 30.7
 
Resume
ResumeResume
Resume
 
A sattar
A sattarA sattar
A sattar
 
Resume(1)
Resume(1)Resume(1)
Resume(1)
 
Resume
ResumeResume
Resume
 
achal cv2
achal cv2achal cv2
achal cv2
 
kuldep document biodata.. jan17
kuldep document biodata.. jan17kuldep document biodata.. jan17
kuldep document biodata.. jan17
 
Sai linkin
Sai linkinSai linkin
Sai linkin
 
CURRICULUM VITAE RAHUL SHARMA (1) (1)
CURRICULUM VITAE RAHUL SHARMA (1) (1)CURRICULUM VITAE RAHUL SHARMA (1) (1)
CURRICULUM VITAE RAHUL SHARMA (1) (1)
 
shambhu_122596239
shambhu_122596239shambhu_122596239
shambhu_122596239
 

gopal_mech (AHP) RESUME-1

  • 1. GOPAL PRASAD YADAV S/O – Kunal ray Village- Saray Saho Post- Parsa District- Saran State- Bihar (841219) Contact No. – 9981008119, 9716287211 E-mail:- gopalyadav.mech@gmail.com CAREER SUMMARY: Overall Industry Experience:-3 Years’+ experience Operation & Maintenance of AshHandlingSystem in Thermal PowerPlant. 1. Lalitpur PowerGeneration Company Limited (3X660MW) , Lalitpur, U.P 2. Satpura Thermal PowerStation (2x250MW) , Sarni, M.P 3. Parichha Thermal PowerStation (2x250 & 2x210MW), Parichha,Jhansi, U.P CAREER OBJECTIVE: Seeking a challenging carrier in the field of Engineering, where my combined experience are fully utilized & developed to uphold your company quality standards, policies & procedures, in addition that, it shall be my wholehearted Endeavour to meet the company expectations and contribute myself qualitatively towards achieving the organizational objective by integral part of the company. CAREER PROFILE: CURRENT EMPLOYER: MELCOINDIA Pvt.Ltd. Duration: (From 15th March 2016 to till date) Designation: Engineer. (AHP)  Operation shift incharge of Ash Handling System in 3x660MW, Lalitpur, U.P  PLC(Desk)Engineer of Ash Handling System in 2x250MW, Sarni, M.P PREVIOUS EMPLOYER:GARG ENGINEERINGANDSONS. Jhansi, U.P. Duration: (From July 2013 to February 2016) Designation: Engineer. (AHP)  Maintenance engineer of Ash Handling System in 2x250 MW, Parichha,Jhansi, U.P  Operation & Maintenance of Ash Handling System in 2x210 MW, Parichha, Jhansi, U.P Job Profile:  Operation & Maintenance of All ash handling system in 3x660MW, 2X250MW and 2X210MW of coal based thermal power plant.  Working as Field engineer, Desk engineer (PLC&DCS), and Shift Engineer & AHP Shift In- charge.
  • 2. Summary of Skills & Experience:  Wet ash system: Bottom ash (W-Type& 3V-Type hopper), High concentration slurry disposal system, and ash slurry series.  Wet ash unloading & slurry disposal system (silo to ash pond).  Fly ash system: ESP/APH/DUCT(Wet& Dry system) & Buffer hopper ash conveying (Dense/Lean phase) D-pump, Nova & Air lock vessel.  Silo unloading system: ash conditioner & Unloading spout.  Planning & Co-ordination of all activities for Operation & maintenance of ash handling plant.  Developing of SOP & SME to increase efficiency of ash handling system.  Running trail, loop testing, problem rectification& Modification.  Looking after every kind of breakdown, corrective,preventive maintenance & modification work of complete Ash Handling System.  Proper process of PTW(Permitto Work) system, Safe isolation & normalization, Man power & Equipment Safety.  Daily maintain the DPR, Equipment log book, defect logbook,permit logbook & JSA.  Man powerhandling and proper utilization.  To create & review the scope of workby coordinating with maintenance & operation teams.  To make sure the work quality and safety.  Coordination the different department and working people.  Maintain the weekly presentation & Training schedule. Computer Proficiency: OperatingSystem: Windows XP, Windows 7 & 8, M-S Office, Internet Knowledge. Professional & Academic Record:  Matriculation from BSEB Patna in 2005  Intermediate from BSEB Patna in 2007  B.E. in Mechanical engineering from RGPV, BHOPAL in 2013 with 70% marks Internship/ Training attended:  Done one month of industrial training in BHEL, BHOPAL (M.P.) Personal Information: Date of birth: - 16/05/1989 Marital Status: - Single Mother's Name: - Gayanti Devi Father's name: - Kunal Ray Languages Known: - English, Hindi Hobbies: - Reading News Paper, Walking Outdoor and Playing Cricket. Current CTC: - 2.8 lacks Expected Salary: - More than 3 lacks Declaration I hereby declare that above given information is true to the best of my knowledge and I understand that my candidature is liable to be rejected if any part of the information is found to be false. Date: Place: Lalitpur (GOPALPRASAD YADAV)