Prepared By:
Mohammad Tomize
Ameed Hashem
Odai Assaf
Adnan Amer
 Introduction
 Definition & implementation
 Maintenance quality policies
 Maintenance quality objectives
 Required information
 Methodology (Seven Management tools)
 Notes & recommendations
 Conclusion & Results
 There is an important correlation between quality and
maintenance.
 maintenance management has become an essential
part of quality systems.
 It is an investment rather than cost.
 Improving the quality of maintenance will lead to
improved efficiency and effectiveness.
 Maintaining perfect equipment to maintain perfect
quality of products.
 focus on the expansion of maintenance perspective
through integrate it with other production programs.
Quality of maintenance is define by Japanese
Institute of Plant Maintenance ( JIPM) as: create
the conditions that prevent and control defects
in the processes and systems to get to the Zero
defects stage.
 Maintenance quality applied in two phases:
1) Phase I: Reactive reaction or Quality Control
phase.
2) Phase 2 : the initiative or quality assurance
stage.
 use of preventive, predictive and proactive
maintenance strategies.
 detecting potential failures before they occur.
 the equipment should be free from defects
and under quality control.
 focus on prevention of upstream.
 focus on the entrance of the errors
prevention.
 Divides the defects into main groups
 effective application of quality assurance
agent
 to preserve the value of the asset over time.
 to run the operation the longest possible
time without breakdowns.
 keep the equipment maintained and fully
functional at the time of customer request.
 Reducing costs of maintenance.
 First : information for product
1) number of the defects and their impact on
the product.
2) the amount of iterative combinatorial
algorithms of defects in each stage of the
measurement.
 Second: Special operations information
1) operating conditions for each sub-process.
2) prepared for the situation or conditions for
the implementation of sub-module & the
situation or the circumstances that accompanied
a defect.
 Some justification for the application of Total
quality management system, including
comprehensive :-
1) Link between quality & productivity.
2) Quality system is comprehensive in all areas.
3) Global quality system, which is a feature of
modern times.
4) The feasibility of some prevailing
administrative systems
5) The success of the application of the system
comprehensive quality in many educational
institutions.
 We found that there are many variables and
factors that affect the maintenance problem
in our university, but we select the most
common variables which are: doors, tables,
lighting ,windows, chairs ,projectors, fans,
central heating ,blackboard, internet,
curtains, water taps ,wall paint ,fire alarm,
computers in the labs ,and fire cabinets.
Finishing
1) the doors
2) the windows
3) wall paint
4) Central
heating
Furniture
1) The tables
2) The chairs
3) blackboard
4) The Curtains
Services
1) Internet
2) Water taps
3) Fire cabinets
4) Fire alarms
Electrical
1) The lighting
2) The Fans
3) The projectors
4) Computers in the
labs
Strategy
Objective
Category
Finishing
The doors
The windows
Wall paint
Repairing handles of the
doors
Buy doors that have a high
quality and suitable for use
Choosing appropriate site
for the windows
Continuous fixing for the
window’s frames
Chose the appropriate
color
Central
heating
Choosing long-lasting paint
Checking heating panels
Feeding the tank with fuel
Strategy
Objective
Category
Furniture
The chairs
Black board
Maintain the
cleanliness and safety
of the tables
Get rid of damaged
chairs
Buy the seats that do
not cause pain to the
back
Put the board in the
lighting place
The tables
The Curtains
Board renewal every
year
Choosing curtains that
has high quality and
wear resistance
Curtain’s Bridges
maintenance to make
sure that curtain is fixed
Buying enough tables
Strategy
Objective
Category
Electrical The fans
The projectors
Buy high-lighting lamps
and periodically checking
her work
Make sure to install the fans
well
Put more than one fan in
each room
Suitable place for the
projectors
The lighting
Put sufficient number of
lighting bulbs
Computers in
the labs
Get rid of obsolete
projectors
Improve the performance of
the computers and
download the latest
software
Strategy
Objective
Category
Services Water taps
Fire cabinets
Improve the speed and
quality of Internet
Ascertain the validity of the
water taps
Repairing of water taps that
have been damaged
Provide each department
with suitable fire cabinets
Internet
Increase the number of
modems
Fire alarms
Verify the existence of the
necessary materials and its
accessibility
Make sure of its work in a
timely manner
Tagging the gathering place
if the fire happens
Strategy contingency plan
Objective possible outcome
Category
Finishing
The doors
The windows
Wall paint
Repairing handles of the
doors
Buy doors that have a high
quality and suitable for use
Choosing appropriate site
for the windows
Continuous fixing for the
window’s frames
Chose the appropriate
color
Central
heating Choosing long-lasting paint
Checking heating panels
Feeding the tank with fuel
Expensive and
there is no
enough money
Contracting
with
workshops
that provide
cheap price
Reschedule
budget
Strategy
Objective
Category
Possible outcome
Furniture
The chairs
Black board
Maintain the
cleanliness and safety
of the tables
Get rid of damaged
chairs
Buy the seats that do
not cause pain to the
back
Put the board in the
lighting place
The tables
Buying enough tables
The Curtains
Board renewal every
year
Choosing curtains that
has high quality and
wear resistance
Curtain’s Bridges
maintenance to make
sure that curtain is fixed
The lighting place
is not suitable for
the board
Redesign the
room
Use artificial
lighting
Strategy
Objective
Category
Possible outcome
Electrical
The fans
The projectors
Buy high-lighting lamps and
periodically checking her
work
Make sure to install the fans
well
Put more than one fan in
each room
Suitable place for the
projectors
The lighting
Put sufficient number of
lighting bulbs
Computers in
the labs
Get rid of obsolete projectors
Improve the performance of
the computers and download
the latest software
There is no
enough space
Put a fan with
high efficiency
Make sure
there is
adequate
ventilation for
the room
Strategy
Objective
Category
Possible outcome
Services
Water taps
Fire cabinets
Improve the speed and
quality of Internet
Ascertain the validity of the
water taps
Repairing of water taps that
have been damaged
Provide each department
with suitable fire cabinets
Internet
Increase the number of
modems
Fire alarms
Verify the existence of the
necessary materials and its
accessibility
Make sure of its work in a
timely manner
Tagging the gathering place if
the fire happens
Hard to track
each tap
Hiring more
laborers
Build up
system for
tracking
Action
Objective
Improved workers skills Improved management
system
Improved controls
The doors
3 3 2
The windows
3 3 2
Wall paint
2 3 2
Central heating
3 2 2
KEY: 3 Strong relationship
2 Moderate relationship
1 Weak relationship
Action
Objective
Improved workers skills Improved management
system
Improved controls
The tables 3 2 2
The chairs 3 2 2
Black board 1 3 2
The curtains 3 1 2
KEY: 3 Strong relationship
2 Moderate relationship
1 Weak relationship
Action
Objective
Improved workers skills Improved management
system
Improved controls
The lighting
1 3 2
The Fans
1 3 2
The projectors
1 2 2
Computers in the labs
3 2
KEY: 3 Strong relationship
2 Moderate relationship
1 Weak relationship
Action
Objective
Improved workers skills Improved management
system
Improved controls
Internet
3 3
Water taps
3 2 2
Fire cabinets
1 3 3
Fire alarms
1 3 3
KEY: 3 Strong relationship
2 Moderate relationship
1 Weak relationship
Furniture
Finishing
Electrical
Services
Category Weight Al- Najah
university
Al- Najah
university
Another
university
Another
university
Difference
Raw score Wtd. score Raw score Wtd. score Wtd. score
Finishing 0.2 6 1.2 7 1.4 +0.2
Furniture 0.3 9 2.7 8 2.4 -0.3
Electrical 0.2 8 1.6 8 1.6 0
Services 0.3 7 2.1 9 2.7 +0.6
Total 1.00 7.6 8.1
 Running the university projects and
prepare the necessary reports.
 Manages the maintenance operations
projects and provide the requirements
of all faculties.
 Monitoring the quality control
department.
 Prepare annual plans for preventive
maintenance.
 Suggest ways to address some of the
operational errors that may appear after use.
 Mobilize the daily reports that prepared by
management department.
 Follow-up after maintenance problem and
send a message for maintenance department
to tell them that the problem has been
solved.
 Continuous check to make sure the presence
of the necessary tools for the maintenance
process.
 Receipt the maintenance requests and
do maintenance according to priorities.
 Implementation of periodic inspection
of all electrical equipment .
 Create a method in which the student
can submit Their complaints (zajel
icon).
They must Provide technical staff for maintenance
in every college, who are coached and ready to
deal with any operational or software problem,
and they must Coordinate between the
construction, maintenance and management of
security and safety to continue the work between
maintenance engineers and safety staff in order to
accelerate the reporting of any problems or
incidents within the university framework,
and The university administration should
pursue all complaints received through various
communication channels to listen to students
voted on the maintenance requirements.
The expected results from our project is:
 Optimized organization and management.
 Improved accessibility to information and
data.
 Data sustainability.
 Enhanced data updating.
 Equipment traceability.
Any Question
?
Maintaining Quality in University Facility Maintenance

More Related Content

What's hot

Auditing of microbiology laboratory
Auditing of microbiology laboratoryAuditing of microbiology laboratory
Auditing of microbiology laboratoryNikita Amane
 
Auditing of quality assurance and maintenance of engineering department
Auditing of quality assurance and   maintenance of engineering departmentAuditing of quality assurance and   maintenance of engineering department
Auditing of quality assurance and maintenance of engineering departmentPriyanka Kandhare
 
Audit Check List
Audit Check ListAudit Check List
Audit Check Listspschandel
 
Root cause analysis - tools and process
Root cause analysis - tools and processRoot cause analysis - tools and process
Root cause analysis - tools and processCharles Cotter, PhD
 
quality management system
quality management system quality management system
quality management system RiyaRai26
 
Auditing Manufacturing Process and Product and Process Information.pdf
Auditing Manufacturing Process and Product and Process Information.pdfAuditing Manufacturing Process and Product and Process Information.pdf
Auditing Manufacturing Process and Product and Process Information.pdfDr. Dinesh Mehta
 
Critical hazard management system hasm presentation
Critical hazard management system  hasm presentationCritical hazard management system  hasm presentation
Critical hazard management system hasm presentationAmruta Balekundri
 
Auditing of vendors and production department
Auditing of vendors and production departmentAuditing of vendors and production department
Auditing of vendors and production departmentArpitSuralkar
 
Introduction to validation
Introduction to validation Introduction to validation
Introduction to validation Ankush Sule
 
Ich guidelines on risk assessment and risk mangment
Ich guidelines on risk assessment and risk mangmentIch guidelines on risk assessment and risk mangment
Ich guidelines on risk assessment and risk mangmentAshvin Bhoge
 
Role of quality system and audits in pharmamaceutical
Role of quality system and audits in pharmamaceuticalRole of quality system and audits in pharmamaceutical
Role of quality system and audits in pharmamaceuticalganpat420
 
Non conformity and corrective action
Non conformity and corrective actionNon conformity and corrective action
Non conformity and corrective actionRaghu Malayanuru
 
Quality System and Audit.pptx
Quality System and Audit.pptxQuality System and Audit.pptx
Quality System and Audit.pptxDr. Dinesh Mehta
 
CAPA Training Presentation
CAPA Training PresentationCAPA Training Presentation
CAPA Training PresentationNancy Watts
 
Priliminary hazard analysis
Priliminary hazard analysisPriliminary hazard analysis
Priliminary hazard analysisAmansharma1378
 
Qualioty management system
Qualioty management systemQualioty management system
Qualioty management systemNamdeo Shinde
 
Corrective & Preventive actions (CAPA)
Corrective & Preventive actions (CAPA)Corrective & Preventive actions (CAPA)
Corrective & Preventive actions (CAPA)Yash Menghani
 
CHAPTER-1 DEFICIENCIES.pdf
CHAPTER-1 DEFICIENCIES.pdfCHAPTER-1 DEFICIENCIES.pdf
CHAPTER-1 DEFICIENCIES.pdfDr. Dinesh Mehta
 

What's hot (20)

Auditing of microbiology laboratory
Auditing of microbiology laboratoryAuditing of microbiology laboratory
Auditing of microbiology laboratory
 
Auditing of quality assurance and maintenance of engineering department
Auditing of quality assurance and   maintenance of engineering departmentAuditing of quality assurance and   maintenance of engineering department
Auditing of quality assurance and maintenance of engineering department
 
Audit Check List
Audit Check ListAudit Check List
Audit Check List
 
Auditing of etp
Auditing of etpAuditing of etp
Auditing of etp
 
Root cause analysis - tools and process
Root cause analysis - tools and processRoot cause analysis - tools and process
Root cause analysis - tools and process
 
quality management system
quality management system quality management system
quality management system
 
Auditing Manufacturing Process and Product and Process Information.pdf
Auditing Manufacturing Process and Product and Process Information.pdfAuditing Manufacturing Process and Product and Process Information.pdf
Auditing Manufacturing Process and Product and Process Information.pdf
 
Critical hazard management system hasm presentation
Critical hazard management system  hasm presentationCritical hazard management system  hasm presentation
Critical hazard management system hasm presentation
 
Auditing of vendors and production department
Auditing of vendors and production departmentAuditing of vendors and production department
Auditing of vendors and production department
 
Introduction to validation
Introduction to validation Introduction to validation
Introduction to validation
 
Ich guidelines on risk assessment and risk mangment
Ich guidelines on risk assessment and risk mangmentIch guidelines on risk assessment and risk mangment
Ich guidelines on risk assessment and risk mangment
 
Role of quality system and audits in pharmamaceutical
Role of quality system and audits in pharmamaceuticalRole of quality system and audits in pharmamaceutical
Role of quality system and audits in pharmamaceutical
 
Non conformity and corrective action
Non conformity and corrective actionNon conformity and corrective action
Non conformity and corrective action
 
Quality System and Audit.pptx
Quality System and Audit.pptxQuality System and Audit.pptx
Quality System and Audit.pptx
 
CAPA Training Presentation
CAPA Training PresentationCAPA Training Presentation
CAPA Training Presentation
 
CAPA
CAPACAPA
CAPA
 
Priliminary hazard analysis
Priliminary hazard analysisPriliminary hazard analysis
Priliminary hazard analysis
 
Qualioty management system
Qualioty management systemQualioty management system
Qualioty management system
 
Corrective & Preventive actions (CAPA)
Corrective & Preventive actions (CAPA)Corrective & Preventive actions (CAPA)
Corrective & Preventive actions (CAPA)
 
CHAPTER-1 DEFICIENCIES.pdf
CHAPTER-1 DEFICIENCIES.pdfCHAPTER-1 DEFICIENCIES.pdf
CHAPTER-1 DEFICIENCIES.pdf
 

Viewers also liked

Watch j. tsonga vs g. muller live streaming
Watch j. tsonga vs g. muller live streamingWatch j. tsonga vs g. muller live streaming
Watch j. tsonga vs g. muller live streamingjoleballew100
 
Funny safety signs from around the world
Funny safety signs from around the worldFunny safety signs from around the world
Funny safety signs from around the worldMarketingSignals
 
Wood pellet Conversion - Fuel storage and handling
Wood pellet Conversion - Fuel storage and handlingWood pellet Conversion - Fuel storage and handling
Wood pellet Conversion - Fuel storage and handlingPer Lysedal
 
Res epre 283-13
Res epre 283-13Res epre 283-13
Res epre 283-13EPRE
 
Internet technology and web engineering
Internet technology and web engineeringInternet technology and web engineering
Internet technology and web engineeringProfessor Lili Saghafi
 
Python Data Ecosystem: Thoughts on Building for the Future
Python Data Ecosystem: Thoughts on Building for the FuturePython Data Ecosystem: Thoughts on Building for the Future
Python Data Ecosystem: Thoughts on Building for the FutureWes McKinney
 
wish list redesign - uncommongoods
wish list redesign - uncommongoodswish list redesign - uncommongoods
wish list redesign - uncommongoodsZack Notes
 

Viewers also liked (9)

Watch j. tsonga vs g. muller live streaming
Watch j. tsonga vs g. muller live streamingWatch j. tsonga vs g. muller live streaming
Watch j. tsonga vs g. muller live streaming
 
PAREEK
PAREEKPAREEK
PAREEK
 
Funny safety signs from around the world
Funny safety signs from around the worldFunny safety signs from around the world
Funny safety signs from around the world
 
Zmi
ZmiZmi
Zmi
 
Wood pellet Conversion - Fuel storage and handling
Wood pellet Conversion - Fuel storage and handlingWood pellet Conversion - Fuel storage and handling
Wood pellet Conversion - Fuel storage and handling
 
Res epre 283-13
Res epre 283-13Res epre 283-13
Res epre 283-13
 
Internet technology and web engineering
Internet technology and web engineeringInternet technology and web engineering
Internet technology and web engineering
 
Python Data Ecosystem: Thoughts on Building for the Future
Python Data Ecosystem: Thoughts on Building for the FuturePython Data Ecosystem: Thoughts on Building for the Future
Python Data Ecosystem: Thoughts on Building for the Future
 
wish list redesign - uncommongoods
wish list redesign - uncommongoodswish list redesign - uncommongoods
wish list redesign - uncommongoods
 

Similar to Maintaining Quality in University Facility Maintenance

Online Exam Management System(OEMS)
Online Exam Management System(OEMS)Online Exam Management System(OEMS)
Online Exam Management System(OEMS)PUST
 
Joseph G Scott
Joseph G  ScottJoseph G  Scott
Joseph G ScottJoe Scott
 
Nilesh More_Project Manager
Nilesh More_Project ManagerNilesh More_Project Manager
Nilesh More_Project ManagerNilesh More
 
Software reliability & quality
Software reliability & qualitySoftware reliability & quality
Software reliability & qualityNur Islam
 
Online auction system srs riport
Online auction system srs  riportOnline auction system srs  riport
Online auction system srs riportDilip Prajapati
 
Quality Assurance in Modern Software Development
Quality Assurance in Modern Software DevelopmentQuality Assurance in Modern Software Development
Quality Assurance in Modern Software DevelopmentZahra Sadeghi
 
13 configuration management
13  configuration management13  configuration management
13 configuration managementrandhirlpu
 
How google-tests-software
How google-tests-softwareHow google-tests-software
How google-tests-softwareBhawna Tuteja
 
Hazenberg 20090527 Kennisdagen Presentatie Versie Final1 B
Hazenberg 20090527 Kennisdagen Presentatie Versie Final1 BHazenberg 20090527 Kennisdagen Presentatie Versie Final1 B
Hazenberg 20090527 Kennisdagen Presentatie Versie Final1 Bhazenbw
 
Making the Unstable Stable - An Intro To Testing
Making the Unstable Stable - An Intro To TestingMaking the Unstable Stable - An Intro To Testing
Making the Unstable Stable - An Intro To TestingCameron Presley
 
Next Step for Virtualization: Pre-production Testing
Next Step for Virtualization: Pre-production TestingNext Step for Virtualization: Pre-production Testing
Next Step for Virtualization: Pre-production Testingstacksafe
 
Online auction system srs riport
Online auction system srs  riportOnline auction system srs  riport
Online auction system srs riportDilip Prajapati
 
MODULE 3- Q4 - Copy MODULE IN CSS- Copy.pptx
MODULE 3- Q4 - Copy MODULE IN CSS- Copy.pptxMODULE 3- Q4 - Copy MODULE IN CSS- Copy.pptx
MODULE 3- Q4 - Copy MODULE IN CSS- Copy.pptxreynaldo glendro
 
Software maintenance
Software maintenanceSoftware maintenance
Software maintenanceAnsh Kapoor
 

Similar to Maintaining Quality in University Facility Maintenance (20)

Software Engineering by Pankaj Jalote
Software Engineering by Pankaj JaloteSoftware Engineering by Pankaj Jalote
Software Engineering by Pankaj Jalote
 
SECh123
SECh123SECh123
SECh123
 
Online Exam Management System(OEMS)
Online Exam Management System(OEMS)Online Exam Management System(OEMS)
Online Exam Management System(OEMS)
 
3. quality.ppt
3. quality.ppt3. quality.ppt
3. quality.ppt
 
Joseph G Scott
Joseph G  ScottJoseph G  Scott
Joseph G Scott
 
computer Unit 8
computer Unit 8computer Unit 8
computer Unit 8
 
Nilesh More_Project Manager
Nilesh More_Project ManagerNilesh More_Project Manager
Nilesh More_Project Manager
 
Software reliability & quality
Software reliability & qualitySoftware reliability & quality
Software reliability & quality
 
Online auction system srs riport
Online auction system srs  riportOnline auction system srs  riport
Online auction system srs riport
 
Quality Assurance in Modern Software Development
Quality Assurance in Modern Software DevelopmentQuality Assurance in Modern Software Development
Quality Assurance in Modern Software Development
 
13 configuration management
13  configuration management13  configuration management
13 configuration management
 
How google-tests-software
How google-tests-softwareHow google-tests-software
How google-tests-software
 
Hazenberg 20090527 Kennisdagen Presentatie Versie Final1 B
Hazenberg 20090527 Kennisdagen Presentatie Versie Final1 BHazenberg 20090527 Kennisdagen Presentatie Versie Final1 B
Hazenberg 20090527 Kennisdagen Presentatie Versie Final1 B
 
Making the Unstable Stable - An Intro To Testing
Making the Unstable Stable - An Intro To TestingMaking the Unstable Stable - An Intro To Testing
Making the Unstable Stable - An Intro To Testing
 
Review se
Review seReview se
Review se
 
Next Step for Virtualization: Pre-production Testing
Next Step for Virtualization: Pre-production TestingNext Step for Virtualization: Pre-production Testing
Next Step for Virtualization: Pre-production Testing
 
Online auction system srs riport
Online auction system srs  riportOnline auction system srs  riport
Online auction system srs riport
 
3
33
3
 
MODULE 3- Q4 - Copy MODULE IN CSS- Copy.pptx
MODULE 3- Q4 - Copy MODULE IN CSS- Copy.pptxMODULE 3- Q4 - Copy MODULE IN CSS- Copy.pptx
MODULE 3- Q4 - Copy MODULE IN CSS- Copy.pptx
 
Software maintenance
Software maintenanceSoftware maintenance
Software maintenance
 

Recently uploaded

Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 

Recently uploaded (20)

Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 

Maintaining Quality in University Facility Maintenance

  • 1. Prepared By: Mohammad Tomize Ameed Hashem Odai Assaf Adnan Amer
  • 2.  Introduction  Definition & implementation  Maintenance quality policies  Maintenance quality objectives  Required information  Methodology (Seven Management tools)  Notes & recommendations  Conclusion & Results
  • 3.  There is an important correlation between quality and maintenance.  maintenance management has become an essential part of quality systems.  It is an investment rather than cost.  Improving the quality of maintenance will lead to improved efficiency and effectiveness.  Maintaining perfect equipment to maintain perfect quality of products.  focus on the expansion of maintenance perspective through integrate it with other production programs.
  • 4. Quality of maintenance is define by Japanese Institute of Plant Maintenance ( JIPM) as: create the conditions that prevent and control defects in the processes and systems to get to the Zero defects stage.
  • 5.  Maintenance quality applied in two phases: 1) Phase I: Reactive reaction or Quality Control phase. 2) Phase 2 : the initiative or quality assurance stage.  use of preventive, predictive and proactive maintenance strategies.  detecting potential failures before they occur.
  • 6.  the equipment should be free from defects and under quality control.  focus on prevention of upstream.  focus on the entrance of the errors prevention.  Divides the defects into main groups  effective application of quality assurance agent
  • 7.  to preserve the value of the asset over time.  to run the operation the longest possible time without breakdowns.  keep the equipment maintained and fully functional at the time of customer request.  Reducing costs of maintenance.
  • 8.  First : information for product 1) number of the defects and their impact on the product. 2) the amount of iterative combinatorial algorithms of defects in each stage of the measurement.
  • 9.  Second: Special operations information 1) operating conditions for each sub-process. 2) prepared for the situation or conditions for the implementation of sub-module & the situation or the circumstances that accompanied a defect.
  • 10.  Some justification for the application of Total quality management system, including comprehensive :- 1) Link between quality & productivity. 2) Quality system is comprehensive in all areas. 3) Global quality system, which is a feature of modern times. 4) The feasibility of some prevailing administrative systems 5) The success of the application of the system comprehensive quality in many educational institutions.
  • 11.  We found that there are many variables and factors that affect the maintenance problem in our university, but we select the most common variables which are: doors, tables, lighting ,windows, chairs ,projectors, fans, central heating ,blackboard, internet, curtains, water taps ,wall paint ,fire alarm, computers in the labs ,and fire cabinets.
  • 12.
  • 13. Finishing 1) the doors 2) the windows 3) wall paint 4) Central heating Furniture 1) The tables 2) The chairs 3) blackboard 4) The Curtains Services 1) Internet 2) Water taps 3) Fire cabinets 4) Fire alarms Electrical 1) The lighting 2) The Fans 3) The projectors 4) Computers in the labs
  • 14. Strategy Objective Category Finishing The doors The windows Wall paint Repairing handles of the doors Buy doors that have a high quality and suitable for use Choosing appropriate site for the windows Continuous fixing for the window’s frames Chose the appropriate color Central heating Choosing long-lasting paint Checking heating panels Feeding the tank with fuel
  • 15. Strategy Objective Category Furniture The chairs Black board Maintain the cleanliness and safety of the tables Get rid of damaged chairs Buy the seats that do not cause pain to the back Put the board in the lighting place The tables The Curtains Board renewal every year Choosing curtains that has high quality and wear resistance Curtain’s Bridges maintenance to make sure that curtain is fixed Buying enough tables
  • 16. Strategy Objective Category Electrical The fans The projectors Buy high-lighting lamps and periodically checking her work Make sure to install the fans well Put more than one fan in each room Suitable place for the projectors The lighting Put sufficient number of lighting bulbs Computers in the labs Get rid of obsolete projectors Improve the performance of the computers and download the latest software
  • 17. Strategy Objective Category Services Water taps Fire cabinets Improve the speed and quality of Internet Ascertain the validity of the water taps Repairing of water taps that have been damaged Provide each department with suitable fire cabinets Internet Increase the number of modems Fire alarms Verify the existence of the necessary materials and its accessibility Make sure of its work in a timely manner Tagging the gathering place if the fire happens
  • 18. Strategy contingency plan Objective possible outcome Category Finishing The doors The windows Wall paint Repairing handles of the doors Buy doors that have a high quality and suitable for use Choosing appropriate site for the windows Continuous fixing for the window’s frames Chose the appropriate color Central heating Choosing long-lasting paint Checking heating panels Feeding the tank with fuel Expensive and there is no enough money Contracting with workshops that provide cheap price Reschedule budget
  • 19. Strategy Objective Category Possible outcome Furniture The chairs Black board Maintain the cleanliness and safety of the tables Get rid of damaged chairs Buy the seats that do not cause pain to the back Put the board in the lighting place The tables Buying enough tables The Curtains Board renewal every year Choosing curtains that has high quality and wear resistance Curtain’s Bridges maintenance to make sure that curtain is fixed The lighting place is not suitable for the board Redesign the room Use artificial lighting
  • 20. Strategy Objective Category Possible outcome Electrical The fans The projectors Buy high-lighting lamps and periodically checking her work Make sure to install the fans well Put more than one fan in each room Suitable place for the projectors The lighting Put sufficient number of lighting bulbs Computers in the labs Get rid of obsolete projectors Improve the performance of the computers and download the latest software There is no enough space Put a fan with high efficiency Make sure there is adequate ventilation for the room
  • 21. Strategy Objective Category Possible outcome Services Water taps Fire cabinets Improve the speed and quality of Internet Ascertain the validity of the water taps Repairing of water taps that have been damaged Provide each department with suitable fire cabinets Internet Increase the number of modems Fire alarms Verify the existence of the necessary materials and its accessibility Make sure of its work in a timely manner Tagging the gathering place if the fire happens Hard to track each tap Hiring more laborers Build up system for tracking
  • 22. Action Objective Improved workers skills Improved management system Improved controls The doors 3 3 2 The windows 3 3 2 Wall paint 2 3 2 Central heating 3 2 2 KEY: 3 Strong relationship 2 Moderate relationship 1 Weak relationship
  • 23. Action Objective Improved workers skills Improved management system Improved controls The tables 3 2 2 The chairs 3 2 2 Black board 1 3 2 The curtains 3 1 2 KEY: 3 Strong relationship 2 Moderate relationship 1 Weak relationship
  • 24. Action Objective Improved workers skills Improved management system Improved controls The lighting 1 3 2 The Fans 1 3 2 The projectors 1 2 2 Computers in the labs 3 2 KEY: 3 Strong relationship 2 Moderate relationship 1 Weak relationship
  • 25. Action Objective Improved workers skills Improved management system Improved controls Internet 3 3 Water taps 3 2 2 Fire cabinets 1 3 3 Fire alarms 1 3 3 KEY: 3 Strong relationship 2 Moderate relationship 1 Weak relationship
  • 27. Category Weight Al- Najah university Al- Najah university Another university Another university Difference Raw score Wtd. score Raw score Wtd. score Wtd. score Finishing 0.2 6 1.2 7 1.4 +0.2 Furniture 0.3 9 2.7 8 2.4 -0.3 Electrical 0.2 8 1.6 8 1.6 0 Services 0.3 7 2.1 9 2.7 +0.6 Total 1.00 7.6 8.1
  • 28.
  • 29.  Running the university projects and prepare the necessary reports.  Manages the maintenance operations projects and provide the requirements of all faculties.  Monitoring the quality control department.  Prepare annual plans for preventive maintenance.
  • 30.  Suggest ways to address some of the operational errors that may appear after use.  Mobilize the daily reports that prepared by management department.  Follow-up after maintenance problem and send a message for maintenance department to tell them that the problem has been solved.  Continuous check to make sure the presence of the necessary tools for the maintenance process.
  • 31.  Receipt the maintenance requests and do maintenance according to priorities.  Implementation of periodic inspection of all electrical equipment .  Create a method in which the student can submit Their complaints (zajel icon).
  • 32. They must Provide technical staff for maintenance in every college, who are coached and ready to deal with any operational or software problem, and they must Coordinate between the construction, maintenance and management of security and safety to continue the work between maintenance engineers and safety staff in order to accelerate the reporting of any problems or incidents within the university framework,
  • 33. and The university administration should pursue all complaints received through various communication channels to listen to students voted on the maintenance requirements.
  • 34. The expected results from our project is:  Optimized organization and management.  Improved accessibility to information and data.  Data sustainability.  Enhanced data updating.  Equipment traceability.