CURRICLUM VITAE
SARFARAZ ALI
MECHANICAL ENGINEER (B.TECH)
MOBILE NO. : +919730017860, +918581824900
EMAIL: - sali.bsz@gmail.com , sarfarazanas@hotmail.com
CAREER OBJECTIVE
Want to be a part of an organization, which enables me to contribute to its advancement &
growth, by utilization my abilities & experiences in power plant, sugar plant & oil refinery
projects.
PROFESSIONAL EXPERINCE
1. Work in M/S L&TECC AS A SITE ENGINEER PIPE LINE &
MAINTANTANCE ENGINEER M/S RELINCE INDUSTRIAL
LIMITED. OIL & GASS PLANT Village. Gadimoga , Near Kakinada, Distt.
Godavari (East) Andhra Pradesh (01APRIL 2015 TO 30 SEPT 2015. )
JOB RESPONSIBILITY
• All Material for Erection.
• All pump and motor maintenance and pipe line modification and erection.
• Piping spool Fabrication and spool Erection.
• Mechanical clearance for utility and process loops and built preparation & documentation punch
preparation, loop preparation.
• Development All Structure and Piping general arrangement drawing.
• Preparing Isometric Drawing & MTO Preparation.
• Responsibility for monitoring the daily work activity of the as erection of above ground field
Fabrication / installation of large bore and small bore.
2. WORKED IN M/S BSZ ENGINEERING SERVICES CLIENT M/S
TENDAHO SUGAR FACTORY PROJECT AS PROJECT ENGINEER /
STRUCTURE ENGINEER AND WELDING QUALITY ASSATA,
ADDIS ABABA ETHIOPA (AFRICA) FROM 01 JAN 2012 TO 28 FEB
2015
JOB RESPONSIBILITY
• Steel structure erection and fabrication and welding.
• All structure, column and Piping fabrication and spools Erection.Diffusar and Mill House Erection.
• Responsibility for monitoring the daily work activity of the as erection of above ground field
Fabrication / installation of large bore and small bore.
• Involved in Pre – Commissioning activities.
• Material requisition preparation.
• Managing Mechanical Project activities involving working out various requirement with respect to
utilities. Machine, Manpower & monitoring overall Project Operation for ensuring timely
completion.
• Review of Vander documents and preparation of interface documents.
• Preparing bill of material.
• Monitoring of equipment site work progress and prepare weekly report of the status of each
assignment.
• Ability to perform inspection testing of hydro test and pneumatic test operation,
• Involved in the NDT technique like radiographic testing, Magnetic particle testing Liquid penetrate
test.
• Preparation of as All Structure and Piping Drawings.
• Any Modification as per thsite condition.
• Fabrication of the supports.
• Co –ordinate with project and procurement personals to achieve Organization goals.
3. WORKE IN M/S INDIAN RAILWAY ELECTRICITY
COMPANY(Subsidiary company NTPC) NABINAGAR THERMAR
POWER PROJECT (4X250 MW) SITE ENGINEER / STRUCTURE
MACHANICAL )FROM 01 Feb 2011 TO 30 JAN 2012
JOB RESPONSIBILITY
• All structure, column and Piping fabrication and spools Erection Diffuser and Mill House Erection.
• All Material for Chain less Diffuser Erection.
• Piping spool Fabrication and spool Erection.
• Mechanical clearance for utilty and process loops and built preparation & documentation punch
preparation, loop preparation.
• Development All Structure and Piping general arrangement drawing.
• Preparing Isometric Drawing & MTO Preparation.
• Responsibility for monitoring the daily work activity of the as erection of above ground field
Fabrication / installation of large bore and small bore.
• Involved in Pre – Commissioning activities.
• Document work related to Quality Dept.( Line history sheet loop files ,RT,DPT, generation of PMI
reports, maintain record of RT)
• Preparation of Inspection Test plan, Incoming Material Inspection Report , Quality Procedure
(Rediography,PWHT,PMI,DPT Weld Visual ,Material inspection)
• Checking of Isometric and P &ID as per line and preparation of as built drawing.
4. WORKE IN M/S BHAU SHAHEB BIRJDAR S.S.K LTD 1250 TCD New
Sugar Plant Erection & Commissioning istt . Osmanabad (MH) (Sugar
Plant Erection) SITE ENGINEER FROM 11 Aug 2010 TO 16 Jan 2011
JOB RESPONSIBILITY
• Steel structure erection and fabrication and welding.
• Piping spool Fabrication and spool Erection.
• Mechanical clearance for utility and process loops and built preparation & documentation
punch preparation, loop preparation.
• Development All Structure and Piping general arrangement drawing.
• Preparing Isometric Drawing & MTO Preparation.
• Responsibility for monitoring the daily work activity of the as erection of above ground field
Fabrication / installation of large bore and small bore.
• Involved in Pre – Commissioning activities.
• Document work related to Quality Dept.( Line history sheet loop files ,RT,DPT, generation
of PMI reports, maintain record of RT)
• Preparation of Inspection Test plan, Incoming Material Inspection Report , Quality
Procedure (Rediography,PWHT,PMI,DPT Weld Visual ,Material inspection)
• Checking of Isometric and P &ID as per line and preparation of as built drawing.
TECHNICALQUALIFICATION
• B.TECH in Mechanical Engineer from Jawaharlal Nehru Technical University
(Hyderabad) in 2010
ACADEMIA
• H.S.C (Bihar Board, Patna) in 2006
• S.S.C (Bihar Board, Patna) IN 2003
TECHNICAL SKILLS
• Quality Control and Engineering Inspection from ATI, Hyderabad.
• Project Management (PRIMA VERA Software) From ATI, Hyderabad.
• Knowledge of P & ID Equipment drawing, structure drawing, Plot plan & line list.
• Review structure erection and Fabrication and piping layout Plan.
IT SKILLS
Application Software : MS Office 2007
PERSONAL DETAIL
Father’s Name : Mr. SHAMSHAD ALI
Date of Birth : 16/07/1987
Sex : Male
Nationality : Indian
Marital Status : Married
Languages known : English, Hindi& Urdu
Passport Number : J6292032
Place of issue : Patna
Issue of Date : 11/02/2011
Date of Expiry : 10/02/2021
Permanent Address
Village : Indrawn Abdullah
PO : Thawe
Distt : Gopalganj
State : Bihar 841440
PRESENT ADDDRES
FLATE NO : B4/102 LIlavati green opp – Indian petrol pump
Old Mumbai Pune Highway
Talegaon Dabhade 410507
Pune(M.H)
DECLARATION
I hereby declare that all the information presented above are true to the best of my knowledge and belief and
any discrepancies arising out in future, I shall be responsible for it.
Yours faithfully,
SARFARAZ ALI
I hereby declare that all the information presented above are true to the best of my knowledge and belief and
any discrepancies arising out in future, I shall be responsible for it.
Yours faithfully,
SARFARAZ ALI

qt cv

  • 1.
    CURRICLUM VITAE SARFARAZ ALI MECHANICALENGINEER (B.TECH) MOBILE NO. : +919730017860, +918581824900 EMAIL: - sali.bsz@gmail.com , sarfarazanas@hotmail.com CAREER OBJECTIVE Want to be a part of an organization, which enables me to contribute to its advancement & growth, by utilization my abilities & experiences in power plant, sugar plant & oil refinery projects. PROFESSIONAL EXPERINCE 1. Work in M/S L&TECC AS A SITE ENGINEER PIPE LINE & MAINTANTANCE ENGINEER M/S RELINCE INDUSTRIAL LIMITED. OIL & GASS PLANT Village. Gadimoga , Near Kakinada, Distt. Godavari (East) Andhra Pradesh (01APRIL 2015 TO 30 SEPT 2015. ) JOB RESPONSIBILITY • All Material for Erection. • All pump and motor maintenance and pipe line modification and erection. • Piping spool Fabrication and spool Erection. • Mechanical clearance for utility and process loops and built preparation & documentation punch preparation, loop preparation. • Development All Structure and Piping general arrangement drawing. • Preparing Isometric Drawing & MTO Preparation. • Responsibility for monitoring the daily work activity of the as erection of above ground field Fabrication / installation of large bore and small bore. 2. WORKED IN M/S BSZ ENGINEERING SERVICES CLIENT M/S TENDAHO SUGAR FACTORY PROJECT AS PROJECT ENGINEER / STRUCTURE ENGINEER AND WELDING QUALITY ASSATA, ADDIS ABABA ETHIOPA (AFRICA) FROM 01 JAN 2012 TO 28 FEB 2015 JOB RESPONSIBILITY
  • 2.
    • Steel structureerection and fabrication and welding. • All structure, column and Piping fabrication and spools Erection.Diffusar and Mill House Erection. • Responsibility for monitoring the daily work activity of the as erection of above ground field Fabrication / installation of large bore and small bore. • Involved in Pre – Commissioning activities. • Material requisition preparation. • Managing Mechanical Project activities involving working out various requirement with respect to utilities. Machine, Manpower & monitoring overall Project Operation for ensuring timely completion. • Review of Vander documents and preparation of interface documents. • Preparing bill of material. • Monitoring of equipment site work progress and prepare weekly report of the status of each assignment. • Ability to perform inspection testing of hydro test and pneumatic test operation, • Involved in the NDT technique like radiographic testing, Magnetic particle testing Liquid penetrate test. • Preparation of as All Structure and Piping Drawings. • Any Modification as per thsite condition. • Fabrication of the supports. • Co –ordinate with project and procurement personals to achieve Organization goals. 3. WORKE IN M/S INDIAN RAILWAY ELECTRICITY COMPANY(Subsidiary company NTPC) NABINAGAR THERMAR POWER PROJECT (4X250 MW) SITE ENGINEER / STRUCTURE MACHANICAL )FROM 01 Feb 2011 TO 30 JAN 2012 JOB RESPONSIBILITY • All structure, column and Piping fabrication and spools Erection Diffuser and Mill House Erection. • All Material for Chain less Diffuser Erection. • Piping spool Fabrication and spool Erection. • Mechanical clearance for utilty and process loops and built preparation & documentation punch preparation, loop preparation. • Development All Structure and Piping general arrangement drawing.
  • 3.
    • Preparing IsometricDrawing & MTO Preparation. • Responsibility for monitoring the daily work activity of the as erection of above ground field Fabrication / installation of large bore and small bore. • Involved in Pre – Commissioning activities. • Document work related to Quality Dept.( Line history sheet loop files ,RT,DPT, generation of PMI reports, maintain record of RT) • Preparation of Inspection Test plan, Incoming Material Inspection Report , Quality Procedure (Rediography,PWHT,PMI,DPT Weld Visual ,Material inspection) • Checking of Isometric and P &ID as per line and preparation of as built drawing. 4. WORKE IN M/S BHAU SHAHEB BIRJDAR S.S.K LTD 1250 TCD New Sugar Plant Erection & Commissioning istt . Osmanabad (MH) (Sugar Plant Erection) SITE ENGINEER FROM 11 Aug 2010 TO 16 Jan 2011 JOB RESPONSIBILITY • Steel structure erection and fabrication and welding. • Piping spool Fabrication and spool Erection. • Mechanical clearance for utility and process loops and built preparation & documentation punch preparation, loop preparation. • Development All Structure and Piping general arrangement drawing. • Preparing Isometric Drawing & MTO Preparation. • Responsibility for monitoring the daily work activity of the as erection of above ground field Fabrication / installation of large bore and small bore. • Involved in Pre – Commissioning activities. • Document work related to Quality Dept.( Line history sheet loop files ,RT,DPT, generation of PMI reports, maintain record of RT) • Preparation of Inspection Test plan, Incoming Material Inspection Report , Quality Procedure (Rediography,PWHT,PMI,DPT Weld Visual ,Material inspection) • Checking of Isometric and P &ID as per line and preparation of as built drawing.
  • 4.
    TECHNICALQUALIFICATION • B.TECH inMechanical Engineer from Jawaharlal Nehru Technical University (Hyderabad) in 2010 ACADEMIA • H.S.C (Bihar Board, Patna) in 2006 • S.S.C (Bihar Board, Patna) IN 2003 TECHNICAL SKILLS • Quality Control and Engineering Inspection from ATI, Hyderabad. • Project Management (PRIMA VERA Software) From ATI, Hyderabad. • Knowledge of P & ID Equipment drawing, structure drawing, Plot plan & line list. • Review structure erection and Fabrication and piping layout Plan. IT SKILLS Application Software : MS Office 2007 PERSONAL DETAIL Father’s Name : Mr. SHAMSHAD ALI Date of Birth : 16/07/1987 Sex : Male Nationality : Indian Marital Status : Married Languages known : English, Hindi& Urdu Passport Number : J6292032 Place of issue : Patna Issue of Date : 11/02/2011 Date of Expiry : 10/02/2021 Permanent Address Village : Indrawn Abdullah PO : Thawe Distt : Gopalganj State : Bihar 841440 PRESENT ADDDRES FLATE NO : B4/102 LIlavati green opp – Indian petrol pump Old Mumbai Pune Highway Talegaon Dabhade 410507 Pune(M.H) DECLARATION
  • 5.
    I hereby declarethat all the information presented above are true to the best of my knowledge and belief and any discrepancies arising out in future, I shall be responsible for it. Yours faithfully, SARFARAZ ALI
  • 6.
    I hereby declarethat all the information presented above are true to the best of my knowledge and belief and any discrepancies arising out in future, I shall be responsible for it. Yours faithfully, SARFARAZ ALI