1. GANGARAJU ALLU
PROFILE SYNOPSIS
Current Organization : Abhijeet Ferrotech Limited (Abhijeet Group)
Current Designation : Asst. Manager – Maintenance & Project
Current Location : Visakhapatnam
Total Experience : +10 years post qualification
Current CTC : 4.2 Lacks / Annum
Expected CTC : Negotiable
Notice Period : Negotiable
Highest Qualification : Diploma in Mechanical Engineering
Date of Birth : 15th
June 1985
Phone : 09550161811, 08297558911
Email : allu_gangaraju@yahoo.co.in
Address of Communication : House No: 20-191, Durga Nagar, Near: Sub-Station, H.B.Colony,
Dist - Visakhapatnam, Andhra Pradesh – 530022.
Aim to pursue challenging assignment with a high growth oriented organization which fosters modern
management & Technical practices.
Current Job Profile
Abhijeet Ferrotech Limited, Visakhapatnam, Andhra Pradesh
1. Duration: Sep’10 to till date
2. Designation: Asst. Manager
3. Responsibilities: Maintenance of Furnace, CCM and Material handling Equipments.
Construction of 48 Sq. M Sinter Plant.
A) Maintenance Responsibilities
- Responsible for Furnace, CCM and Material handling Maintenance activities.
- Preparation of Preventive Maintenance Plans & Schedules.
- Established planned approach system to increase Equipments Life.
- Initiating Action plans for minimizing down time of Equipments
- Managing Staff, Contract workmen & Consultants deployed at area.
- Indigenous manufacturing of equipment spares & tools at work place.
- Indenting the material / service required and tracking the status to ensure timely availability.
- Preparation of Maintenance – Monthly Score card for review & analysis.
- Conducting regular Safety tests & inspections to ensure protective environment.
- Certifying and processing the bills with reference to the Quality and Quantity executed.
2. B) Projects Responsibilities
- To render planning, scheduling & monitoring services to the assigned projects.
- To prepare deliverables, issue progress reports and work progress analysis.
- Develop, approve and maintain various package /area / contractors works schedules.
- Successfully completed Fabrication, Quality inspections and Supervision activities in china with M/s.
Hennan Winner for 2x0.4 MTA Linear Sinter plant Equipment for delivery of equipment.
- Responsible for coordinating with Sub vendors of M/s. Hennan Winner, china for Equipment
manufacturing status and updating the same to the corporate office.
- Responsible for coordination with Design consultant (MMT & Siri Consultants) for preparation of
detailed drawings of Civil & Mechanical.
- Responsible for inspection of all detailed engineering drawings with basic engineering drawings received
from M/s. Hennan Winner, China.
- Execution of Project Construction activities as scheduled.
- Interfacing of construction activities with Material & Equipment availability.
- Implementing cost efficient methods for construction; tracking designs, materials, services, delay in site.
- Keeping close watch on various activities and updating on any Risk foreseen for project completion.
- Certifying and processing the bills with reference to the Quality and Quantity executed.
Previous Job Profile
Atibir Industries Limited, Giridhi, Jharkhand
1. Duration: Jan’10 to Aug”10
2. Designation: Sr. Engineer
3. Responsibilities: Maintenance of 0.4 MTPA Pallet Plant Equipment.
A) Maintenance Responsibilities
- Understanding of Pallet making process, technology & equipment.
- Conducted cold trail of Ball mill, Travelling grate(TG), Balling discs, Hot drier, Rotary kiln, Annual
cooler, Belt Conveyors, Roll feeders, HT Centrifugal Blowers, Ceramic filters, Bucket elevators,
Hydraulic Power packs, Centrifugal pumps etc.
- Responsible for preparation of preventive maintenance check lists, work instructions & procedures.
- Responsible for preparation of Annual spares list and ensuring the spares available in time.
- Attended for preventive, breakdown and shutdown maintenance activities of Mechanical Equipment.
- Responsible for handling shift activities with coordination with other shift in charges.
- Coordinating with commercial department for PO's & Work orders for smooth operations of
Maintenance activities.
3. Anna Consultancy, Srikakulam, Andhra Pradesh
1. Project Site: Concast Ferro Inc.,
a. Duration: Jun’04 to Oct”07
b. Designation: Site Engineer
c. Responsibilities: Commissioning & Maintenance of 215Cu-M Blast Furnace.
A) Maintenance Responsibilities
- Understanding of Pig Iron making process, Technology & Mechanical equipment.
- Attended for preventive maintenance activities of Mechanical Equipment.
- Drawings preparation as per site requirement & modification structures in Auto CAD.
- Responsible for Shift Activities along with Breakdown and scheduled shutdown.
- Responsible for conducting acceptance test of Mechanical equipment after maintenance along with
Hand over.
- Technical comparatives and Technical Calculations.
- Responsible for Inter Department, Consultant and Vendor’s follow up.
- Installation and Commissioning of Pumps, Blowers, Conveyors, Vibrating equipment, Top charging
equipment, Mud gun, Drill-M/c, EOT Cranes, PCM, Gear Boxes etc.
2. Project Site: SBQ Steels Ltd.,
a. Duration: Nov’07 to Dec”09
b. Designation: Site In-Charge
c. Responsibilities: Project of 250Cu-M Blast Furnace & 30 Sq. Meter Carousal
Batch type Sinter Plant.
A) Project Responsibilities
- Responsible for study and review of drawings related to 250 Cu-m Blast Furnace received from TRF
design consultant.
- Prepare the Project schedules, Drawings and Equipment lists.
- Responsible to coordinate, Day to day activities with inter department for smooth execution of project
activities.
- Responsible of handling the project execution works like Structural fabrication & erection, Ducting,
Equipment erection & alignment and commissioning.
- Responsible of executing all project works by following all safety standards.
- Responsible for conducting physical inspection of Quality parameters and preparation of protocols
& NCR’s.
- Vendor’s bill verification and processing as per work done at site.
- As per the requirements DP, UT & RT tests conducting for Structure & Ducts.
- Drawings development done as per site material availability (like Cones, miter bends etc.).
4. ACHIEVEMENTS
1) Successfully completed the Quality Inspections and Supervision activities of 48 Sq. M Sinter Plant
Equipments for delivery at M/s. Hennan Winner, china.
2) Productively designed and established the Crushing Plant, Tabling machine & Screening systems.
3) Successfully completed erection of 250 Cu. M Blast Furnace in 28 days.
CONSTRUCTION PROJECTS UNDERTAKEN
1) 22.5 * 8 MVA - FERRO Alloy Project, (Completed).
2) 48 Sq. M – Mn Ore Sinter Plant, (0.4MTPA) (In Progress).
3) 0.4 MTPA Pallet Plant (Completed).
4) 250 Cu-M Blast Furnace (Completed).
5) 215 Cu-M Blast Furnace (Completed).
SOFT SKILLS
MS Projects 2010 & Auto Cad 2007.
Microsoft Excel, Power Point, Word & Outlook.
EDUCATIONAL BACKGROUND
1. Diploma In Mechanical Engineering (2004)
M.R.A.G.R Govt. Polytechnic Collage, Vizianagaram.
REFERENCES
T. A. NAIDU (Sr. General Manager – Maintenance & Projects) – 08297550099.
DECLARATION
I hereby declare that the statements and information furnished above are correct and true to the best of my
knowledge.
Date:
Place: Visakhapatnam Gangaraju Allu