GANGARAJU ALLU
PROFILE SYNOPSIS
Current Organization : Abhijeet Ferrotech Limited (Abhijeet Group)
Current Designation : Asst. Manager – Maintenance & Project
Current Location : Visakhapatnam
Total Experience : +10 years post qualification
Current CTC : 4.2 Lacks / Annum
Expected CTC : Negotiable
Notice Period : Negotiable
Highest Qualification : Diploma in Mechanical Engineering
Date of Birth : 15th
June 1985
Phone : 09550161811, 08297558911
Email : allu_gangaraju@yahoo.co.in
Address of Communication : House No: 20-191, Durga Nagar, Near: Sub-Station, H.B.Colony,
Dist - Visakhapatnam, Andhra Pradesh – 530022.
Aim to pursue challenging assignment with a high growth oriented organization which fosters modern
management & Technical practices.
Current Job Profile
Abhijeet Ferrotech Limited, Visakhapatnam, Andhra Pradesh
1. Duration: Sep’10 to till date
2. Designation: Asst. Manager
3. Responsibilities: Maintenance of Furnace, CCM and Material handling Equipments.
Construction of 48 Sq. M Sinter Plant.
A) Maintenance Responsibilities
- Responsible for Furnace, CCM and Material handling Maintenance activities.
- Preparation of Preventive Maintenance Plans & Schedules.
- Established planned approach system to increase Equipments Life.
- Initiating Action plans for minimizing down time of Equipments
- Managing Staff, Contract workmen & Consultants deployed at area.
- Indigenous manufacturing of equipment spares & tools at work place.
- Indenting the material / service required and tracking the status to ensure timely availability.
- Preparation of Maintenance – Monthly Score card for review & analysis.
- Conducting regular Safety tests & inspections to ensure protective environment.
- Certifying and processing the bills with reference to the Quality and Quantity executed.
B) Projects Responsibilities
- To render planning, scheduling & monitoring services to the assigned projects.
- To prepare deliverables, issue progress reports and work progress analysis.
- Develop, approve and maintain various package /area / contractors works schedules.
- Successfully completed Fabrication, Quality inspections and Supervision activities in china with M/s.
Hennan Winner for 2x0.4 MTA Linear Sinter plant Equipment for delivery of equipment.
- Responsible for coordinating with Sub vendors of M/s. Hennan Winner, china for Equipment
manufacturing status and updating the same to the corporate office.
- Responsible for coordination with Design consultant (MMT & Siri Consultants) for preparation of
detailed drawings of Civil & Mechanical.
- Responsible for inspection of all detailed engineering drawings with basic engineering drawings received
from M/s. Hennan Winner, China.
- Execution of Project Construction activities as scheduled.
- Interfacing of construction activities with Material & Equipment availability.
- Implementing cost efficient methods for construction; tracking designs, materials, services, delay in site.
- Keeping close watch on various activities and updating on any Risk foreseen for project completion.
- Certifying and processing the bills with reference to the Quality and Quantity executed.
Previous Job Profile
Atibir Industries Limited, Giridhi, Jharkhand
1. Duration: Jan’10 to Aug”10
2. Designation: Sr. Engineer
3. Responsibilities: Maintenance of 0.4 MTPA Pallet Plant Equipment.
A) Maintenance Responsibilities
- Understanding of Pallet making process, technology & equipment.
- Conducted cold trail of Ball mill, Travelling grate(TG), Balling discs, Hot drier, Rotary kiln, Annual
cooler, Belt Conveyors, Roll feeders, HT Centrifugal Blowers, Ceramic filters, Bucket elevators,
Hydraulic Power packs, Centrifugal pumps etc.
- Responsible for preparation of preventive maintenance check lists, work instructions & procedures.
- Responsible for preparation of Annual spares list and ensuring the spares available in time.
- Attended for preventive, breakdown and shutdown maintenance activities of Mechanical Equipment.
- Responsible for handling shift activities with coordination with other shift in charges.
- Coordinating with commercial department for PO's & Work orders for smooth operations of
Maintenance activities.
Anna Consultancy, Srikakulam, Andhra Pradesh
1. Project Site: Concast Ferro Inc.,
a. Duration: Jun’04 to Oct”07
b. Designation: Site Engineer
c. Responsibilities: Commissioning & Maintenance of 215Cu-M Blast Furnace.
A) Maintenance Responsibilities
- Understanding of Pig Iron making process, Technology & Mechanical equipment.
- Attended for preventive maintenance activities of Mechanical Equipment.
- Drawings preparation as per site requirement & modification structures in Auto CAD.
- Responsible for Shift Activities along with Breakdown and scheduled shutdown.
- Responsible for conducting acceptance test of Mechanical equipment after maintenance along with
Hand over.
- Technical comparatives and Technical Calculations.
- Responsible for Inter Department, Consultant and Vendor’s follow up.
- Installation and Commissioning of Pumps, Blowers, Conveyors, Vibrating equipment, Top charging
equipment, Mud gun, Drill-M/c, EOT Cranes, PCM, Gear Boxes etc.
2. Project Site: SBQ Steels Ltd.,
a. Duration: Nov’07 to Dec”09
b. Designation: Site In-Charge
c. Responsibilities: Project of 250Cu-M Blast Furnace & 30 Sq. Meter Carousal
Batch type Sinter Plant.
A) Project Responsibilities
- Responsible for study and review of drawings related to 250 Cu-m Blast Furnace received from TRF
design consultant.
- Prepare the Project schedules, Drawings and Equipment lists.
- Responsible to coordinate, Day to day activities with inter department for smooth execution of project
activities.
- Responsible of handling the project execution works like Structural fabrication & erection, Ducting,
Equipment erection & alignment and commissioning.
- Responsible of executing all project works by following all safety standards.
- Responsible for conducting physical inspection of Quality parameters and preparation of protocols
& NCR’s.
- Vendor’s bill verification and processing as per work done at site.
- As per the requirements DP, UT & RT tests conducting for Structure & Ducts.
- Drawings development done as per site material availability (like Cones, miter bends etc.).
ACHIEVEMENTS
1) Successfully completed the Quality Inspections and Supervision activities of 48 Sq. M Sinter Plant
Equipments for delivery at M/s. Hennan Winner, china.
2) Productively designed and established the Crushing Plant, Tabling machine & Screening systems.
3) Successfully completed erection of 250 Cu. M Blast Furnace in 28 days.
CONSTRUCTION PROJECTS UNDERTAKEN
1) 22.5 * 8 MVA - FERRO Alloy Project, (Completed).
2) 48 Sq. M – Mn Ore Sinter Plant, (0.4MTPA) (In Progress).
3) 0.4 MTPA Pallet Plant (Completed).
4) 250 Cu-M Blast Furnace (Completed).
5) 215 Cu-M Blast Furnace (Completed).
SOFT SKILLS
 MS Projects 2010 & Auto Cad 2007.
 Microsoft Excel, Power Point, Word & Outlook.
EDUCATIONAL BACKGROUND
1. Diploma In Mechanical Engineering (2004)
M.R.A.G.R Govt. Polytechnic Collage, Vizianagaram.
REFERENCES
 T. A. NAIDU (Sr. General Manager – Maintenance & Projects) – 08297550099.
DECLARATION
I hereby declare that the statements and information furnished above are correct and true to the best of my
knowledge.
Date:
Place: Visakhapatnam Gangaraju Allu

More Related Content

What's hot

What's hot (20)

En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
 
Updated CV
Updated CVUpdated CV
Updated CV
 
JAGDEO JADHAV -BIO DATA -1
JAGDEO JADHAV  -BIO DATA  -1JAGDEO JADHAV  -BIO DATA  -1
JAGDEO JADHAV -BIO DATA -1
 
Abhishek Resume
Abhishek ResumeAbhishek Resume
Abhishek Resume
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
RESUME-1
RESUME-1RESUME-1
RESUME-1
 
paramasivam resume
paramasivam resume paramasivam resume
paramasivam resume
 
Resume-up-Aug-16
Resume-up-Aug-16Resume-up-Aug-16
Resume-up-Aug-16
 
Arun_Mangal_cv Feb 2015
Arun_Mangal_cv Feb 2015Arun_Mangal_cv Feb 2015
Arun_Mangal_cv Feb 2015
 
Prasad_Naik__International 1
Prasad_Naik__International 1Prasad_Naik__International 1
Prasad_Naik__International 1
 
Resume
ResumeResume
Resume
 
ASIM CV
ASIM CVASIM CV
ASIM CV
 
CV 25-12-15 M.K.Narayana _ Seaport Technology & Engineering
CV 25-12-15 M.K.Narayana _ Seaport Technology & EngineeringCV 25-12-15 M.K.Narayana _ Seaport Technology & Engineering
CV 25-12-15 M.K.Narayana _ Seaport Technology & Engineering
 
Bilal updated cv
Bilal updated cvBilal updated cv
Bilal updated cv
 
rcallueng resume
rcallueng resumercallueng resume
rcallueng resume
 
Christopher Kinnon Resume
Christopher Kinnon ResumeChristopher Kinnon Resume
Christopher Kinnon Resume
 
Hairi Mohd Noor_Resume
Hairi Mohd Noor_ResumeHairi Mohd Noor_Resume
Hairi Mohd Noor_Resume
 
Peter L. Cabbab.
Peter L. Cabbab.Peter L. Cabbab.
Peter L. Cabbab.
 
Sanjay's C.V
Sanjay's C.VSanjay's C.V
Sanjay's C.V
 
Cirriculum vitae pelis2
Cirriculum vitae  pelis2Cirriculum vitae  pelis2
Cirriculum vitae pelis2
 

Similar to Ganga Raju Resume

Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq Ahmad
 
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY AROKIAM
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016sathish kumar
 
ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011Iyad Hassan
 
Cv civil engineer ahmed mansour
Cv civil engineer ahmed mansourCv civil engineer ahmed mansour
Cv civil engineer ahmed mansourahmed mansour
 
Cv civil ahmed mansour
Cv civil ahmed mansourCv civil ahmed mansour
Cv civil ahmed mansourahmed mansour
 
Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager Islam Elshoura
 
Venkata Chandra Sekhar Sure
Venkata Chandra Sekhar SureVenkata Chandra Sekhar Sure
Venkata Chandra Sekhar Surechandu52
 
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)Project Engineer- (Design, Engineering, Planning & Coordination - Projects)
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)Aniket Dalvi
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant
 
Curriculum Vitae Dermawan LG - Project Manager
Curriculum Vitae Dermawan LG - Project ManagerCurriculum Vitae Dermawan LG - Project Manager
Curriculum Vitae Dermawan LG - Project ManagerDermawan Lumban Gaol
 

Similar to Ganga Raju Resume (20)

Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)
 
Aftab CV.
Aftab CV.Aftab CV.
Aftab CV.
 
V. SRINIVASA RAO CV
V. SRINIVASA RAO CVV. SRINIVASA RAO CV
V. SRINIVASA RAO CV
 
CV hmsnegi
CV hmsnegiCV hmsnegi
CV hmsnegi
 
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABD
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011
 
Cv civil engineer ahmed mansour
Cv civil engineer ahmed mansourCv civil engineer ahmed mansour
Cv civil engineer ahmed mansour
 
Cv civil ahmed mansour
Cv civil ahmed mansourCv civil ahmed mansour
Cv civil ahmed mansour
 
Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager
 
Sr.Mech.Design Engr. 30.03.15
Sr.Mech.Design Engr. 30.03.15Sr.Mech.Design Engr. 30.03.15
Sr.Mech.Design Engr. 30.03.15
 
Venkata Chandra Sekhar Sure
Venkata Chandra Sekhar SureVenkata Chandra Sekhar Sure
Venkata Chandra Sekhar Sure
 
Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
 
Koti (assistant manager mech)
Koti (assistant manager mech)Koti (assistant manager mech)
Koti (assistant manager mech)
 
Assistant Manager - Mechanical
Assistant Manager - MechanicalAssistant Manager - Mechanical
Assistant Manager - Mechanical
 
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)Project Engineer- (Design, Engineering, Planning & Coordination - Projects)
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
 
CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05
 
Curriculum Vitae Dermawan LG - Project Manager
Curriculum Vitae Dermawan LG - Project ManagerCurriculum Vitae Dermawan LG - Project Manager
Curriculum Vitae Dermawan LG - Project Manager
 
DILKASH(resume)
DILKASH(resume)DILKASH(resume)
DILKASH(resume)
 

Ganga Raju Resume

  • 1. GANGARAJU ALLU PROFILE SYNOPSIS Current Organization : Abhijeet Ferrotech Limited (Abhijeet Group) Current Designation : Asst. Manager – Maintenance & Project Current Location : Visakhapatnam Total Experience : +10 years post qualification Current CTC : 4.2 Lacks / Annum Expected CTC : Negotiable Notice Period : Negotiable Highest Qualification : Diploma in Mechanical Engineering Date of Birth : 15th June 1985 Phone : 09550161811, 08297558911 Email : allu_gangaraju@yahoo.co.in Address of Communication : House No: 20-191, Durga Nagar, Near: Sub-Station, H.B.Colony, Dist - Visakhapatnam, Andhra Pradesh – 530022. Aim to pursue challenging assignment with a high growth oriented organization which fosters modern management & Technical practices. Current Job Profile Abhijeet Ferrotech Limited, Visakhapatnam, Andhra Pradesh 1. Duration: Sep’10 to till date 2. Designation: Asst. Manager 3. Responsibilities: Maintenance of Furnace, CCM and Material handling Equipments. Construction of 48 Sq. M Sinter Plant. A) Maintenance Responsibilities - Responsible for Furnace, CCM and Material handling Maintenance activities. - Preparation of Preventive Maintenance Plans & Schedules. - Established planned approach system to increase Equipments Life. - Initiating Action plans for minimizing down time of Equipments - Managing Staff, Contract workmen & Consultants deployed at area. - Indigenous manufacturing of equipment spares & tools at work place. - Indenting the material / service required and tracking the status to ensure timely availability. - Preparation of Maintenance – Monthly Score card for review & analysis. - Conducting regular Safety tests & inspections to ensure protective environment. - Certifying and processing the bills with reference to the Quality and Quantity executed.
  • 2. B) Projects Responsibilities - To render planning, scheduling & monitoring services to the assigned projects. - To prepare deliverables, issue progress reports and work progress analysis. - Develop, approve and maintain various package /area / contractors works schedules. - Successfully completed Fabrication, Quality inspections and Supervision activities in china with M/s. Hennan Winner for 2x0.4 MTA Linear Sinter plant Equipment for delivery of equipment. - Responsible for coordinating with Sub vendors of M/s. Hennan Winner, china for Equipment manufacturing status and updating the same to the corporate office. - Responsible for coordination with Design consultant (MMT & Siri Consultants) for preparation of detailed drawings of Civil & Mechanical. - Responsible for inspection of all detailed engineering drawings with basic engineering drawings received from M/s. Hennan Winner, China. - Execution of Project Construction activities as scheduled. - Interfacing of construction activities with Material & Equipment availability. - Implementing cost efficient methods for construction; tracking designs, materials, services, delay in site. - Keeping close watch on various activities and updating on any Risk foreseen for project completion. - Certifying and processing the bills with reference to the Quality and Quantity executed. Previous Job Profile Atibir Industries Limited, Giridhi, Jharkhand 1. Duration: Jan’10 to Aug”10 2. Designation: Sr. Engineer 3. Responsibilities: Maintenance of 0.4 MTPA Pallet Plant Equipment. A) Maintenance Responsibilities - Understanding of Pallet making process, technology & equipment. - Conducted cold trail of Ball mill, Travelling grate(TG), Balling discs, Hot drier, Rotary kiln, Annual cooler, Belt Conveyors, Roll feeders, HT Centrifugal Blowers, Ceramic filters, Bucket elevators, Hydraulic Power packs, Centrifugal pumps etc. - Responsible for preparation of preventive maintenance check lists, work instructions & procedures. - Responsible for preparation of Annual spares list and ensuring the spares available in time. - Attended for preventive, breakdown and shutdown maintenance activities of Mechanical Equipment. - Responsible for handling shift activities with coordination with other shift in charges. - Coordinating with commercial department for PO's & Work orders for smooth operations of Maintenance activities.
  • 3. Anna Consultancy, Srikakulam, Andhra Pradesh 1. Project Site: Concast Ferro Inc., a. Duration: Jun’04 to Oct”07 b. Designation: Site Engineer c. Responsibilities: Commissioning & Maintenance of 215Cu-M Blast Furnace. A) Maintenance Responsibilities - Understanding of Pig Iron making process, Technology & Mechanical equipment. - Attended for preventive maintenance activities of Mechanical Equipment. - Drawings preparation as per site requirement & modification structures in Auto CAD. - Responsible for Shift Activities along with Breakdown and scheduled shutdown. - Responsible for conducting acceptance test of Mechanical equipment after maintenance along with Hand over. - Technical comparatives and Technical Calculations. - Responsible for Inter Department, Consultant and Vendor’s follow up. - Installation and Commissioning of Pumps, Blowers, Conveyors, Vibrating equipment, Top charging equipment, Mud gun, Drill-M/c, EOT Cranes, PCM, Gear Boxes etc. 2. Project Site: SBQ Steels Ltd., a. Duration: Nov’07 to Dec”09 b. Designation: Site In-Charge c. Responsibilities: Project of 250Cu-M Blast Furnace & 30 Sq. Meter Carousal Batch type Sinter Plant. A) Project Responsibilities - Responsible for study and review of drawings related to 250 Cu-m Blast Furnace received from TRF design consultant. - Prepare the Project schedules, Drawings and Equipment lists. - Responsible to coordinate, Day to day activities with inter department for smooth execution of project activities. - Responsible of handling the project execution works like Structural fabrication & erection, Ducting, Equipment erection & alignment and commissioning. - Responsible of executing all project works by following all safety standards. - Responsible for conducting physical inspection of Quality parameters and preparation of protocols & NCR’s. - Vendor’s bill verification and processing as per work done at site. - As per the requirements DP, UT & RT tests conducting for Structure & Ducts. - Drawings development done as per site material availability (like Cones, miter bends etc.).
  • 4. ACHIEVEMENTS 1) Successfully completed the Quality Inspections and Supervision activities of 48 Sq. M Sinter Plant Equipments for delivery at M/s. Hennan Winner, china. 2) Productively designed and established the Crushing Plant, Tabling machine & Screening systems. 3) Successfully completed erection of 250 Cu. M Blast Furnace in 28 days. CONSTRUCTION PROJECTS UNDERTAKEN 1) 22.5 * 8 MVA - FERRO Alloy Project, (Completed). 2) 48 Sq. M – Mn Ore Sinter Plant, (0.4MTPA) (In Progress). 3) 0.4 MTPA Pallet Plant (Completed). 4) 250 Cu-M Blast Furnace (Completed). 5) 215 Cu-M Blast Furnace (Completed). SOFT SKILLS  MS Projects 2010 & Auto Cad 2007.  Microsoft Excel, Power Point, Word & Outlook. EDUCATIONAL BACKGROUND 1. Diploma In Mechanical Engineering (2004) M.R.A.G.R Govt. Polytechnic Collage, Vizianagaram. REFERENCES  T. A. NAIDU (Sr. General Manager – Maintenance & Projects) – 08297550099. DECLARATION I hereby declare that the statements and information furnished above are correct and true to the best of my knowledge. Date: Place: Visakhapatnam Gangaraju Allu