Personnel Details:-
D.O.B:23/7/1986
Father Name:-S.Shakil
Ahmed
Address: B-
205,Block-
15,Gulistan-e-Joher
District East, Karachi.
Passport#:-
UW1155691
Cell:0345-3166846
Email:engrsyedowais
ahmed@yahoo.com
Skype:
engrsyedowaisahmed
CNIC:-42401-
5722569-5
Area of Work:-
Construction of Gas
Processing Facilities.
Building Projects,
Resort, Bank, office
Earth Works Projects.
Construction of Well
Site Projects.
Access Road &
Rig Camp
Cutting pit/water pit,
soak & Garbage pit.
Evaporation pond.
Plant Extension
Project.
Air Strip construction
Syed Owais Ahmed, Civil Engineer Graduated from NED UET’2009
(7th
Year in Exploration & Production Projects & Construction Industry.)
Professional Experience
 Working in “ P.P.L ” as a Project Engineer. (Sep -15 to Present).
 Worked in “ U.E.P ” as a Civil Engineer. (Nov-14 to Sep -15).
 Worked in “AMCORP” as a Construction Manager. (Dec-12 to Nov-14).
 Worked in “AMCORP” as a Project Engineer. (Nov-09 to Dec-12).
Construction of 50mmcfd GPF-II Plant at Gambat (as a Project Engineer)
 Ensuring the completion of various activities as per equipment schedule to
ensure the erection of different equipment directly on their respective
foundations.
 Construction of Civil foundation for various mechanical equipment like Vessel,
Skids, pipe support, pipe racks, E-House, Vents etc.
 Keeping a follow-up of Project deadlines & schedule for civil works.
 Issuing Quality Notices in case of any violation of Quality parameter and
ensuring its corrective action as per standard engineering practices.
 Conduction daily progress review meeting with client and 3rd
party.
 Issuing daily Minutes of meeting held with Contractors.
 Construction of Road, Evaporation Pond, Boundary wall , watch Tower , Pre
engineering structures, storm water channel ,HSE foundations etc.
 Verifying execution of works as per IFC Drawings & specifications.
 Ensuring implementation of Checklist/protocols by the contractors for all the
major activities carried out at site.
 Specifying Taking Over of the completed civil jobs to Mechanical Contractors.
 Ensuring Health & Safety protocols to be implemented at site.
 Verifying Project Dossier for all the Equipment Foundation as per Key plans.
 Verifying as built drawing for different structures.
Construction of 160mmcfd Gas Processing Plant at Sanghar (as C.E in U.E.P)
 Construction of Amine Tank, Fire Water Tank, Demin Tank & Raw Water
tank.Moreover Piling , E-Pond etc.
 Construction of Civil foundation for various mechanical equipment like Vessel,
Skids, pipe support, pipe racks, E-House, Vents etc.
 Verifying execution of works as per IFC Drawings & C.P.E specifications.
 Making Inspection & Test Plan for the works involved in construction of plant.
 Ensuring implementation of Checklist/protocols by the contractors for all the
major activities carried out at site.
 Verifying Contractor’s Invoices/Project Bills.
 Issuing Revised IFC Drawings to contractors.
 Verifying Release Notes of work Sites from various contractors.
 Specifying Taking Over of the completed civil jobs to Mechanical Contractors.
 Keeping a follow-up of Project deadlines & schedule for civil works.
 Ensuring Health & Safety protocols to be implemented at site.
 Daily progress reporting of the works carried out at site.
 Making Project Dossier for all the Equipment Foundation.
HSE & PTW system.
Professional Skills:-
Equipment Management
Bar Bending Schedule
& BOQs.
Material & Manpower
Management.
Quality Assurance/
Quality Control
Site Supervision
Procurement.
Daily Progress
Reporting.
Personnel Skills:-
Ability to understand
& present others
points of view.
Good communication
skills.
A team Leader.
A Hard working &
devoted person.
Can handle stress.
Always Proactive
Safety conscious.
Doer & Conformist
Computer Tools:-
AutoCAD
MS Office & Project
Outlook & Emails
Construction of Well Site & Access Road at Eni (as a C.M in AMCORP.)
 38280 Man Days & 459360 Man hours without L.T.I in 2013 & 32952 Man
Days & 395424 Man hours without L.T.I in 2014.
 Construction of K-32, K-33 ,K-34, K-35,K-35, K-37,K-38 Well Site & Access
Road along with Drilling camp & Repair of old camps & access Road.
 Construction of Rig Pad, Cellar Pad, polygon pad, dry & liquid chemical pad,
Diesel & Generator pad, Soak Pit, Garbage Pit, and Water pit for Well Sites.
 Construction of Skids, Foundation, Slippers, and Pipe racks & Pipe supports
for Extension of Plants.
 Making project invoices & C.T.R for different works.
 Independently managing assignments with team of Supervisors.
 Material, Manpower & Equipment Management.
 Dealing with contractors on account of different site issues.
 Technical drafting & Drawing included in a complete project.
 Ensuring Quality & Control Standard compliance.
 Making Risk assessment & Job safety Assessment.
R.T.O Karachi, A.B.L DHA, Air Strip & E-Pond at BHP & K-27,K-23 at ENI Axact Beach
Resort & Axact House Expansion(P.E in AMCORP)
 Checking contractor activities & given approval for critical activities.
 Preparing estimates of time and material costs.
 Making Daily Progress Reports.
 Making As built drawing for completed projects.
 Bid/Tender meetings in order to get new projects.
 Making Purchase order, letter of submittal, Bills & other relevant documents.
 Procurement of items for all the running projects.
 Site visits for ensuring Execution as per provided design.
 Dealing with Clients, Sub Contractor & Vendors.
 Ensuring project execution as per Specification.
 Making Quantity & Rates comparative for different project items.
 Verification of Bills/Invoices for releasing of payments.
 Making Scope of work, Tender Documents & Method Statements with P.M.
 Making Project Drawing & issuing revised drawing.
 Making rate analysis involving Civil, Plumbing, Electrical, HVAC & Network
based equipment & activities. Making Bill of Quantities for Civil works carried
out by Axact.
 Dealing with Contractor, subcontractors, Vendors & in House authorities for
smooth execution of activities.
 Routine site visits to ensure work complies with Architect & Consultant
specification. Ensuring works as per Company’s regulation & policies.
 Ensuring Quality & Control Standard.
 Payment management. (Subcontractor, labor, community, vendors.)
 Verification of invoices & on site Quantities.

Project Engineer Cv

  • 1.
    Personnel Details:- D.O.B:23/7/1986 Father Name:-S.Shakil Ahmed Address:B- 205,Block- 15,Gulistan-e-Joher District East, Karachi. Passport#:- UW1155691 Cell:0345-3166846 Email:engrsyedowais ahmed@yahoo.com Skype: engrsyedowaisahmed CNIC:-42401- 5722569-5 Area of Work:- Construction of Gas Processing Facilities. Building Projects, Resort, Bank, office Earth Works Projects. Construction of Well Site Projects. Access Road & Rig Camp Cutting pit/water pit, soak & Garbage pit. Evaporation pond. Plant Extension Project. Air Strip construction Syed Owais Ahmed, Civil Engineer Graduated from NED UET’2009 (7th Year in Exploration & Production Projects & Construction Industry.) Professional Experience  Working in “ P.P.L ” as a Project Engineer. (Sep -15 to Present).  Worked in “ U.E.P ” as a Civil Engineer. (Nov-14 to Sep -15).  Worked in “AMCORP” as a Construction Manager. (Dec-12 to Nov-14).  Worked in “AMCORP” as a Project Engineer. (Nov-09 to Dec-12). Construction of 50mmcfd GPF-II Plant at Gambat (as a Project Engineer)  Ensuring the completion of various activities as per equipment schedule to ensure the erection of different equipment directly on their respective foundations.  Construction of Civil foundation for various mechanical equipment like Vessel, Skids, pipe support, pipe racks, E-House, Vents etc.  Keeping a follow-up of Project deadlines & schedule for civil works.  Issuing Quality Notices in case of any violation of Quality parameter and ensuring its corrective action as per standard engineering practices.  Conduction daily progress review meeting with client and 3rd party.  Issuing daily Minutes of meeting held with Contractors.  Construction of Road, Evaporation Pond, Boundary wall , watch Tower , Pre engineering structures, storm water channel ,HSE foundations etc.  Verifying execution of works as per IFC Drawings & specifications.  Ensuring implementation of Checklist/protocols by the contractors for all the major activities carried out at site.  Specifying Taking Over of the completed civil jobs to Mechanical Contractors.  Ensuring Health & Safety protocols to be implemented at site.  Verifying Project Dossier for all the Equipment Foundation as per Key plans.  Verifying as built drawing for different structures. Construction of 160mmcfd Gas Processing Plant at Sanghar (as C.E in U.E.P)  Construction of Amine Tank, Fire Water Tank, Demin Tank & Raw Water tank.Moreover Piling , E-Pond etc.  Construction of Civil foundation for various mechanical equipment like Vessel, Skids, pipe support, pipe racks, E-House, Vents etc.  Verifying execution of works as per IFC Drawings & C.P.E specifications.  Making Inspection & Test Plan for the works involved in construction of plant.  Ensuring implementation of Checklist/protocols by the contractors for all the major activities carried out at site.  Verifying Contractor’s Invoices/Project Bills.  Issuing Revised IFC Drawings to contractors.  Verifying Release Notes of work Sites from various contractors.  Specifying Taking Over of the completed civil jobs to Mechanical Contractors.  Keeping a follow-up of Project deadlines & schedule for civil works.  Ensuring Health & Safety protocols to be implemented at site.  Daily progress reporting of the works carried out at site.  Making Project Dossier for all the Equipment Foundation.
  • 2.
    HSE & PTWsystem. Professional Skills:- Equipment Management Bar Bending Schedule & BOQs. Material & Manpower Management. Quality Assurance/ Quality Control Site Supervision Procurement. Daily Progress Reporting. Personnel Skills:- Ability to understand & present others points of view. Good communication skills. A team Leader. A Hard working & devoted person. Can handle stress. Always Proactive Safety conscious. Doer & Conformist Computer Tools:- AutoCAD MS Office & Project Outlook & Emails Construction of Well Site & Access Road at Eni (as a C.M in AMCORP.)  38280 Man Days & 459360 Man hours without L.T.I in 2013 & 32952 Man Days & 395424 Man hours without L.T.I in 2014.  Construction of K-32, K-33 ,K-34, K-35,K-35, K-37,K-38 Well Site & Access Road along with Drilling camp & Repair of old camps & access Road.  Construction of Rig Pad, Cellar Pad, polygon pad, dry & liquid chemical pad, Diesel & Generator pad, Soak Pit, Garbage Pit, and Water pit for Well Sites.  Construction of Skids, Foundation, Slippers, and Pipe racks & Pipe supports for Extension of Plants.  Making project invoices & C.T.R for different works.  Independently managing assignments with team of Supervisors.  Material, Manpower & Equipment Management.  Dealing with contractors on account of different site issues.  Technical drafting & Drawing included in a complete project.  Ensuring Quality & Control Standard compliance.  Making Risk assessment & Job safety Assessment. R.T.O Karachi, A.B.L DHA, Air Strip & E-Pond at BHP & K-27,K-23 at ENI Axact Beach Resort & Axact House Expansion(P.E in AMCORP)  Checking contractor activities & given approval for critical activities.  Preparing estimates of time and material costs.  Making Daily Progress Reports.  Making As built drawing for completed projects.  Bid/Tender meetings in order to get new projects.  Making Purchase order, letter of submittal, Bills & other relevant documents.  Procurement of items for all the running projects.  Site visits for ensuring Execution as per provided design.  Dealing with Clients, Sub Contractor & Vendors.  Ensuring project execution as per Specification.  Making Quantity & Rates comparative for different project items.  Verification of Bills/Invoices for releasing of payments.  Making Scope of work, Tender Documents & Method Statements with P.M.  Making Project Drawing & issuing revised drawing.  Making rate analysis involving Civil, Plumbing, Electrical, HVAC & Network based equipment & activities. Making Bill of Quantities for Civil works carried out by Axact.  Dealing with Contractor, subcontractors, Vendors & in House authorities for smooth execution of activities.  Routine site visits to ensure work complies with Architect & Consultant specification. Ensuring works as per Company’s regulation & policies.  Ensuring Quality & Control Standard.  Payment management. (Subcontractor, labor, community, vendors.)  Verification of invoices & on site Quantities.