The document requests expressions of interest for an EPC contract to design and construct industrial hazardous waste and general solid waste treatment facilities. The key objectives are to comply with landfill diversion targets, enable reuse and recycling where possible before energy recovery or landfilling, and design "best in class" modular facilities that minimize costs and number of technologies while ensuring regulatory compliance, sustainability, and safety. The facilities will treat 150,000-284,000 tons/year of industrial hazardous waste and general municipal solid waste from a population of 50,000 located on an industrial reservation accessible by road.