This weekly progress report provides an update on the Dynamic Reactive Power Compensation project at the Hail-2 and Al-Jouf-2 380kV substations in Saudi Arabia. The project involves installing +/-450MVAr Static VAR Compensators (SVCs) to improve voltage support. The report summarizes that commissioning is 99.2% complete at the Al-Jouf-2 site, with energization expected by October 15th. It also provides an overview of the contract details and timelines.
Tal Mizrahi
Technion
Israel Institute of Technology
Research Track Session Part 1
ONS2015: http://bit.ly/ons2015sd
ONS Inspire! Webinars: http://bit.ly/oiw-sd
Watch the talk (video) on ONS Content Archives: http://bit.ly/ons-archives-sd
Tal Mizrahi
Technion
Israel Institute of Technology
Research Track Session Part 1
ONS2015: http://bit.ly/ons2015sd
ONS Inspire! Webinars: http://bit.ly/oiw-sd
Watch the talk (video) on ONS Content Archives: http://bit.ly/ons-archives-sd
The presentation contain an example for project planning using the Primavera P6. It starts from the contract wiring, tendering and management. Then a planning process is followed.
The presentation contain an example for project planning using the Primavera P6. It starts from the contract wiring, tendering and management. Then a planning process is followed.
Dhaka South City Corporation: Structure, Finance and Personal ManagementAhasan Uddin Bhuiyan
Dhaka Municipality was established on the 1st August, 1864. Prior to the establishment of the Municipality, a Committee of Improvement existed in the city as early as 1823. The next significant milestone was the Bengal Municipal Act of 1922. This Act extended franchise to women also who had so far been denied this right. The Municipal Administration Ordinance of 1960 repealed all previous municipal laws and provided that the chairmen would be an official member appointed by and holding office during the pleasure of the Govt. Dhaka became the capital of Bangladesh with the independence in the year 1971. City area was divided into 50 wards and election of Ward Commissioners was held in 1977 with the introduction of "Pourashava Ordinance, 1977". The corporation was statuted with the introduction of the Dhaka Municipal Corporation Ordinance, 1983, repealing the application of Pourashava Ordinance, 1977. In 1990, Dhaka Municipal Corporation was renamed as Dhaka City Corporation and was divided in to zones to fulfill the objectives of decentralization. The election of the Corporation was held on January, 1994 and Mr. Mohammad Hanif became the first elected Mayor.
The Local Govt. (City Corporation) Amendment Act (2011), Dhaka City Corporation has divided as Dhaka South City Corporation (DSCC) and Dhaka North City Corporation (DNCC) on 04.12.2011.
Need and Importance of ICT Based Library Services in ODL: With Special Refere...Anupama Chetia
Need and Importance of ICT Based Library Services in ODL: With Special Reference to Krishna Kanta Handiqui State Open University &Gauhati University Institute of Distance and Open Learning
Perché è importante espandere il nostro network su LinkedIn; quali sono le strategie da adottare per richiedere o accettare un invito. Le logiche del permesso e della fiducia su LinkedIn. #LinkedIn #Networking
Make india = make in india presentation by cs electric (2 files merged)Mahesh Chandra Manav
Presentation Make In India ,Green India,Smart India by C S Electric use full for DHI/EESL/ARAI/CEA/BIS/NTPC/Niti Aayog/Power Grid/REC/Urban Infra Div, Indian Railways, Metro Rail Project ,State Road Transportation Authorities, Municipal Corporation , Industrial Infra Development Corporation , Power T&D,Solar EPC Companies ,Electrical Engineering Project Companies,Mega Housing Board, Building and Shopping Mall,Airports and Infra, Industries in Large Size
Similar to Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... dated 26.10.2016 (20)
2. Weekly Progress Report # 70
SVC
JOUF
PREPARED BY:
2016
AJAZ UL KABIR
Project Manager- Qassim Group
SEC ‐ EHVPD , COA , SVC Al-Jouf-2
Mobile : 054 112 2637 , Email : absheikh@se.com.sa
REVIEWED BY:
ABDULRAHMAN AL-KADI
Group Leader- Qassim
Extra High Voltage Projects Department- COA
Mobile : 050 489 6906 , Email : EVPRC-QPGL@se.com.sa
26
October
Dynamic Reactive Power Compensation at Hail-2
(9031) & Al-Jouf-2 380kV Substations
SEC CONTRACT NO. 4400003963/00
3. AIM/ OBJECTIVE: CONTRACT DETAILS:
SEC intends to improve rapid voltage
support at Hail-2 (9031) and Al-Jouf-2
380kV Substations of SEC network by
providing Conventional or Hybrid Static
VAR Compensator Systems (SVC).
The SVCs at Hail-2 (9031) shall be
connected to spare 380kV Breaker. CB
position for SVC at Al-Jouf-2 .380kV
Substation will be provided by Al-Jouf-2
380kV Substation Contractor.
• Project Name ……………………….. DYNAMIC REACTIVE POWER
COMPENSATION AT HAIL-2 (9031)
& AL-JOUF-2 380KV SUBSTATIONS
• Contract No ………………………… 4400003963/00
• Owner ………………………………. SAUDI ELECTRIC COMPANY - COA
• SEC Project Manager ……………… ENGR. AJAZ UL KABIR
• Contractor ………………………...... SIEMENS LTD.
• Address ……………………………... SIEMENS COMPANY LIMITED,
P.O.BOX 9510, RIYADH 11423, KSA
• Contractor Project Manager ………. ENGR. REHAN ULHAQUE
• Contract Effective Date ……………. 03-JUNE-2014
• Contract Value ……………………... SAR 463,840,000.00
PROJECT DESCRIPTION & CONTRACT INFO
SVC ALJOUF-2
5. SVS set up
2x SVC PLUS
2x TSC
32kV
380 kV
15% at 450 MVA +/-5%
Q at 32 kV (1.0 pu)
2 x (0+143.1 Mvar) cap 2 x (-75+81.9 Mvar)
Ik=63kA
SVC PLUSSVC PLUS
TSC TSC
Installation of +450MVAr (Capacitive) & -150MVAr (Indutive) 380kV SVC System
SVC CONNECTION DIAGRAM
SVC ALJOUF-2
6. PROJECT SIGN BOARD
• Contract Signing : June 03, 2014
• Kick off Meeting : June 24, 2014
• Site Handover : June 26, 2014
• TCC: June 02, 2016
• PAC: August 02, 2016
• FAC: November 02, 2016
SVC ALJOUF-2
7. CONTROL ROOM
Protection & Control System / SAS / Alarms / Metering (SIEMENS)
Electrical:
Witnessing with CSD Engineer completed except the
following:
• SAS Close Loop Test 83% completed (remaining 17%
for which data entry update will be completed by
25/10/2016 in CRCC; SCADA Closed Loop Test will be
resumed on Wednesday 26/10/2016).
• Final Trip Test for Protection & Control is completed
• Interlock test completed
• Snag Clearance in progress
• Post Energization Test (to be done after Energization of
SVC Transformer & 13.8kV Auxiliary System after
receiving Energization Permit) : Need 10 Working Days
to put SVC in service
SVC ALJOUF-2
8. SVC ALJOUF-2
HVAC & FPS
Electro-Mechanical:
• HVAC installation – 100% completed ; Air-
Balancing and DDC Panel in progress
• Fire Alarm/Fighting Test: All walk through
requirements/comments from ISD (East
Division) – 100% completed ; request
already send to ISD / S&EPD-East to
confirm the date of Final Inspection or
issue Energization Clearance based on the
submitted Test results.
• Internal Testing of Fire alarm, Firefighting
and Hydrant system Completed.
9. Dynamic & Static Reactive Power Compensator at Al Jouf-2, 380kV Substation
Contractor Date of award 02/06/2016 TCC Handed Over
SIEMENS 03.06.2014
15/10/2016 Expected
Energization
26.06.2014
COMMISSIONING
STATUS
(99.2 % completed)
EQUIPMENT
REMARKS
(Delivery status –
100 % completed)
EXPECTED BUILDING
READINESS
BUILDINGEXP. DELIVERYSUPPLIEREQUIPMENTS/N
Witnessing with CSD – 100%
completed
OLT – 100% completed
CLT – 83% completed
Capacitor, Reactor, Resister,
Thyristor, IGBT, Cooling
System delivered
Foundations completedOutdoor Foundations30-12-2015SIEMENSSVC Equipment's1
Witnessing with CSD – 100%
completed
Delivered and InstalledFoundations completedTransformer Foundation15-12-2015SIEMENS450MVA Power Transformer's2
Witnessing with CSD – 99%
completed
Delivered and Installed
Building and foundation are
ready
Control Building15-12-2015
ALFANAR, KSA &
SIEMENS
13.8kV Switchgear & RMU3
Witnessing with CSD – 100%
completed
Delivered and InstalledFoundation readyTransformer Foundation15-02-2016UTEC, KSA
Auxiliary Transformer /
Grounding Transformer
4
Witnessing with CSD – 100%
completed
Delivered and Installed
Building ReadyControl Building
15-01-2016TBDProtection System5
Witnessing with CSD – 100%
completed
Delivered and Installed15-12-2015
HEPOCKEE &
BENNING
Battery & Battery Charger6
Witnessing with CSD – 100%
completed
Delivered and Installed30-12-2015TBDAC / DC Panel7
HV Cable termination
completed
Delivered and InstalledSteel structure installed
Trench and duct bank
ready
25-10-2015TBD & LS Cable
Steel Structures, Cables and Earthing
Materials
8