To analyze & improve discharging time of Aqueous FG Products
using SPC Tool
2016
Target (Discharging Time)
2
Target >>>> 30 min. from 35 min./ batch
List of FG Products analyzed for discharging time using SPC tool
3
List of FG- Aqueous Plant
S.NO SAP CODE OLD CODE DESCRIPTION BATCH SIZE (Kg)
1 10-603778-1.1350 11006393L
W/B OP INK HIGH GLOSS
ANTIBLOCKING 3000
2 10-603780-7.2660 11006391L WB OP INK NEUTRAL FINISH 3000
3 10-603785-6.2660 11006374Y WATER BASED PRIMER INK - TA 2800
4 10-603787-2.2660 11006386L WB OP INK- HIGH GLOSS HIGH SLIP 3120
5 10-603788-0.2660 11006385L WATER BASED OP INK - HIGH GLOSS 3120
6 10-603789-8.2660 11006378L
WATER BASED OP INK - INLINE
PRIMER 3000
7 10-603868-0.2660 894275L WATER BASED OP INK - HIGH SCUFF 3120
8 10-603871-4.2660 894390Y PRIME FIX OP INK - PRIMER 3120
9 10-006541-6.2660 W987502 UNI PAPER TRANS WHITE HV 3120
10 10-615417-2.2660 10-615417-2/1 WB TOB ST OPL 3000
11 10-007024-2.1350 21271268B WB TOB HR CLEAR 3000
12 10-604870-5.1350 BEW00033 AQUAKOTE GLOSS 18 3120
13 10-603870-6.2660 894201Y Heat sealable WB blister coating 3000
14 10-603867-2.2660 894371X WATER BASED OP INK MATT 3000
15 10-007296-6.2660 BEW00018 WB TECH MEDIUM LCB 1653 3000
4
Data Collection from 16.03.2016 to 02.04.2016 – Daily monitoring
Sr. No.
Total Discharging
Time in min.
Mean Product Mean USL LSL
1
39
34.9
11006385L
#DIV/0! 30 0
2
37
34.9
894390Y
#DIV/0! 30 0
3
33
34.9
894371X
#DIV/0! 30 0
4
35
34.9
11006385L
#DIV/0! 30 0
5
35
34.9
11006378L
#DIV/0! 30 0
6
35
34.9
W987502
#DIV/0! 30 0
7
34
34.9 BEW00033 #DIV/0! 30 0
8
37
34.9
11006386L
#DIV/0! 30 0
9
34
34.9
894390Y
#DIV/0! 30 0
10
35
34.9
11006385L
#DIV/0! 30 0
11 34 34.9
BEW00033
#DIV/0! 30 0
12
37
34.9
11006385L
#DIV/0! 30 0
13
33
34.9
10-615417-2/1
#DIV/0! 30 0
14
32
34.9
11006374Y
#DIV/0! 30 0
15
34
34.9
BEW00033
#DIV/0! 30 0
Run Chart of the data from 16.03.2016 to 02.04.2016
5
6
Key Factors for Analysis
• Power Tripping Problem
• Discharge line
• Pump Capacity
• Batch Viscosity
• Air Pressure
• Batch Size
Action Plan Identification
7
1. We have taken Power tripping Problem with maintenance team .
2. We identified that pump is having long suction, which slow down the
discharge process.
Product/
Shade
Power
Tripping
No. of times Total time
loss due to
power
tripping
Action
Identified to
reduce
power
tripping
Problem
W987502 Yes 3 12 min 01 Person
must be
available at
electric sub
station to
reset.
894390Y Yes 2 08 min
Action Plan Implemented
8
1. Shifting of discharge pump from mezzanine floor to ground floor.
Before After
2. Power Tripping was arrested by deploying one person/shift at electric sub
station to reset the tripping issue at the earliest.
Power tripping time reduced from 04 min. to 02 min.
Pump Location
(Earlier)
Pump Present
9
Data Collection after Action implementation from 30.05.2016 to 10.06.2016
Sr. No.
Total Discharging
Time in min.
Mean Product Mean USL LSL
1 28 24.4
11006385L
#DIV/0! 30 0
2 28 24.4
894390Y
#DIV/0! 30 0
3 24 24.4
894371X
#DIV/0! 30 0
4 24 24.4
11006385L
#DIV/0! 30 0
5 24 24.4
11006378L
#DIV/0! 30 0
6 24 24.4
W987502
#DIV/0! 30 0
7 24 24.4 BEW00033 #DIV/0! 30 0
8 23 24.4
11006386L
#DIV/0! 30 0
9 21 24.4
894390Y
#DIV/0! 30 0
10 25 24.4
11006385L
#DIV/0! 30 0
11 24 24.4
BEW00033
#DIV/0! 30 0
12 24 24.4
11006385L
#DIV/0! 30 0
13 26 24.4
10-615417-2/1
#DIV/0! 30 0
14 25 24.4
11006374Y
#DIV/0! 30 0
15 25 24.4
BEW00033
#DIV/0! 30 0
10
Run Chart after action implementation (30.05.2016 to 10.06.2016 )
Benefits
11
• Discharging time reduced from 35
min. to 27 min. average resulting in
saving of 08 min. per batch.
• Total saving per day = 30 min.
• Due to this saving we are able to
manage our daily Production
effectively & can utilize this half an
hour in other Production related
activities.
• Savings
12
THANK YOU

More Related Content

What's hot

ExLon VacTech Solutions
ExLon VacTech SolutionsExLon VacTech Solutions
ExLon VacTech SolutionsAamer Pathan
 
Specification totaln kjeldahl
Specification totaln kjeldahlSpecification totaln kjeldahl
Specification totaln kjeldahlhydrologyproject0
 
Brea Mafa & NCPC-SA
Brea Mafa & NCPC-SABrea Mafa & NCPC-SA
Brea Mafa & NCPC-SA7391456
 
Heatpulse 8108 rapid thermal processor
Heatpulse 8108 rapid thermal processorHeatpulse 8108 rapid thermal processor
Heatpulse 8108 rapid thermal processorEmily Tan
 
Fall 2014 Co-op Rotation Summary
Fall 2014 Co-op Rotation SummaryFall 2014 Co-op Rotation Summary
Fall 2014 Co-op Rotation SummaryAsh Abel
 
Genie gr pressure regulator datasheet
Genie gr pressure regulator datasheetGenie gr pressure regulator datasheet
Genie gr pressure regulator datasheeta1-cbiss
 
Máy lạnh Daikin âm trần
Máy lạnh Daikin âm trầnMáy lạnh Daikin âm trần
Máy lạnh Daikin âm trầnMyLnhGiGc
 
20627 Utica Finished Assemblies Tugger
20627 Utica Finished Assemblies Tugger20627 Utica Finished Assemblies Tugger
20627 Utica Finished Assemblies Tuggeramscott2
 
Nb, nbg, nk, nkg (data booklet)
Nb, nbg, nk, nkg (data booklet)Nb, nbg, nk, nkg (data booklet)
Nb, nbg, nk, nkg (data booklet)Preeda Pawarana
 
Inlet Air Cooling system from Ikeuchi Improve gas Turbine efficiency
Inlet Air Cooling system from Ikeuchi Improve gas Turbine efficiencyInlet Air Cooling system from Ikeuchi Improve gas Turbine efficiency
Inlet Air Cooling system from Ikeuchi Improve gas Turbine efficiencyH.Ikeuchi & Co.,Ltd
 
Training materials for students final r1-rwp
Training materials for students final r1-rwpTraining materials for students final r1-rwp
Training materials for students final r1-rwpsembcorpwatertechprize
 
Quartzdyne 0.5 quartz pressure transducer
Quartzdyne 0.5 quartz pressure transducerQuartzdyne 0.5 quartz pressure transducer
Quartzdyne 0.5 quartz pressure transducerJason Blackburn
 
Non-Destructive Testing: Using the Maturity Method & Alternatives to Coring
Non-Destructive Testing: Using the Maturity Method & Alternatives to CoringNon-Destructive Testing: Using the Maturity Method & Alternatives to Coring
Non-Destructive Testing: Using the Maturity Method & Alternatives to CoringJill Reeves
 

What's hot (18)

ExLon VacTech Solutions
ExLon VacTech SolutionsExLon VacTech Solutions
ExLon VacTech Solutions
 
Specification totaln kjeldahl
Specification totaln kjeldahlSpecification totaln kjeldahl
Specification totaln kjeldahl
 
Brea Mafa & NCPC-SA
Brea Mafa & NCPC-SABrea Mafa & NCPC-SA
Brea Mafa & NCPC-SA
 
Upstock v whip_stock
Upstock v whip_stockUpstock v whip_stock
Upstock v whip_stock
 
Heatpulse 8108 rapid thermal processor
Heatpulse 8108 rapid thermal processorHeatpulse 8108 rapid thermal processor
Heatpulse 8108 rapid thermal processor
 
540 Term Paper
540 Term Paper540 Term Paper
540 Term Paper
 
Fall 2014 Co-op Rotation Summary
Fall 2014 Co-op Rotation SummaryFall 2014 Co-op Rotation Summary
Fall 2014 Co-op Rotation Summary
 
Genie gr pressure regulator datasheet
Genie gr pressure regulator datasheetGenie gr pressure regulator datasheet
Genie gr pressure regulator datasheet
 
Máy lạnh Daikin âm trần
Máy lạnh Daikin âm trầnMáy lạnh Daikin âm trần
Máy lạnh Daikin âm trần
 
20627 Utica Finished Assemblies Tugger
20627 Utica Finished Assemblies Tugger20627 Utica Finished Assemblies Tugger
20627 Utica Finished Assemblies Tugger
 
Nb, nbg, nk, nkg (data booklet)
Nb, nbg, nk, nkg (data booklet)Nb, nbg, nk, nkg (data booklet)
Nb, nbg, nk, nkg (data booklet)
 
Inlet Air Cooling system from Ikeuchi Improve gas Turbine efficiency
Inlet Air Cooling system from Ikeuchi Improve gas Turbine efficiencyInlet Air Cooling system from Ikeuchi Improve gas Turbine efficiency
Inlet Air Cooling system from Ikeuchi Improve gas Turbine efficiency
 
Training materials for students final r1-rwp
Training materials for students final r1-rwpTraining materials for students final r1-rwp
Training materials for students final r1-rwp
 
Cooling tower Inspection Guide
Cooling tower Inspection GuideCooling tower Inspection Guide
Cooling tower Inspection Guide
 
Quartzdyne 0.5 quartz pressure transducer
Quartzdyne 0.5 quartz pressure transducerQuartzdyne 0.5 quartz pressure transducer
Quartzdyne 0.5 quartz pressure transducer
 
Boiler Operation and Maintenance Experiences
Boiler Operation and Maintenance ExperiencesBoiler Operation and Maintenance Experiences
Boiler Operation and Maintenance Experiences
 
Non-Destructive Testing: Using the Maturity Method & Alternatives to Coring
Non-Destructive Testing: Using the Maturity Method & Alternatives to CoringNon-Destructive Testing: Using the Maturity Method & Alternatives to Coring
Non-Destructive Testing: Using the Maturity Method & Alternatives to Coring
 
Norton Bevel System - Brochure
Norton Bevel System - BrochureNorton Bevel System - Brochure
Norton Bevel System - Brochure
 

Similar to Analyzing and Improving Discharging Times of Aqueous Printing Products Using SPC

SPD12 Pipeline Dynamic Simulation
SPD12 Pipeline Dynamic SimulationSPD12 Pipeline Dynamic Simulation
SPD12 Pipeline Dynamic SimulationSaleh Lari Mojarrad
 
Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Emeka Ngwobia
 
Erectn n commisioning
Erectn n commisioningErectn n commisioning
Erectn n commisioningnileshgiri
 
Indian scenario of super critical power plants issues and challenges by ntpc...
Indian scenario of super critical power plants  issues and challenges by ntpc...Indian scenario of super critical power plants  issues and challenges by ntpc...
Indian scenario of super critical power plants issues and challenges by ntpc...Ajay Singhal
 
COOP training-Bokhari
COOP training-BokhariCOOP training-Bokhari
COOP training-BokhariAssad Bokhari
 
MINI STEAM GENERATOR
MINI STEAM GENERATORMINI STEAM GENERATOR
MINI STEAM GENERATORIRJET Journal
 
Proposal Wide Blower No.1 & 2 with inverter
Proposal Wide Blower No.1 & 2  with inverterProposal Wide Blower No.1 & 2  with inverter
Proposal Wide Blower No.1 & 2 with inverterRidhoIrawan12
 
POX O2 Spargers- Report Summary2 Next STEP
POX O2 Spargers- Report Summary2 Next STEPPOX O2 Spargers- Report Summary2 Next STEP
POX O2 Spargers- Report Summary2 Next STEPChris Galeotti
 
FIRE WATER PUMP HOUSE EQUIPMENT CAPACITY AND OPERATION AT POWER PLANT
FIRE WATER PUMP HOUSE EQUIPMENT CAPACITY AND OPERATION AT POWER PLANTFIRE WATER PUMP HOUSE EQUIPMENT CAPACITY AND OPERATION AT POWER PLANT
FIRE WATER PUMP HOUSE EQUIPMENT CAPACITY AND OPERATION AT POWER PLANTDEEPAK GORAI
 
Lot 04 - AL SAAD Brackish water and reverse osmosis plant
Lot 04 - AL SAAD Brackish water and reverse osmosis plantLot 04 - AL SAAD Brackish water and reverse osmosis plant
Lot 04 - AL SAAD Brackish water and reverse osmosis plantMohammed Abdelkawy
 
Experimental Analysis of Refrigeration system using Microchannel condenser & ...
Experimental Analysis of Refrigeration system using Microchannel condenser & ...Experimental Analysis of Refrigeration system using Microchannel condenser & ...
Experimental Analysis of Refrigeration system using Microchannel condenser & ...AM Publications
 
Industrial training report on NHPC TLD-III
Industrial training report on NHPC TLD-IIIIndustrial training report on NHPC TLD-III
Industrial training report on NHPC TLD-IIIPrashant Raj
 
Ammonia plant GSFC by Vishal Tapiawala
Ammonia plant GSFC by Vishal TapiawalaAmmonia plant GSFC by Vishal Tapiawala
Ammonia plant GSFC by Vishal TapiawalaVishal Tapiawala
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)hepemod733
 
Catálogo Williams _ V series
Catálogo Williams _ V series Catálogo Williams _ V series
Catálogo Williams _ V series Vibropac
 
Reliable-Sponge-Pvt-Ltd-Unit-lll
Reliable-Sponge-Pvt-Ltd-Unit-lllReliable-Sponge-Pvt-Ltd-Unit-lll
Reliable-Sponge-Pvt-Ltd-Unit-lllReliable India
 

Similar to Analyzing and Improving Discharging Times of Aqueous Printing Products Using SPC (20)

SPD12 Pipeline Dynamic Simulation
SPD12 Pipeline Dynamic SimulationSPD12 Pipeline Dynamic Simulation
SPD12 Pipeline Dynamic Simulation
 
Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.
 
Erectn n commisioning
Erectn n commisioningErectn n commisioning
Erectn n commisioning
 
Indian scenario of super critical power plants issues and challenges by ntpc...
Indian scenario of super critical power plants  issues and challenges by ntpc...Indian scenario of super critical power plants  issues and challenges by ntpc...
Indian scenario of super critical power plants issues and challenges by ntpc...
 
COOP training-Bokhari
COOP training-BokhariCOOP training-Bokhari
COOP training-Bokhari
 
MINI STEAM GENERATOR
MINI STEAM GENERATORMINI STEAM GENERATOR
MINI STEAM GENERATOR
 
Due Diligence TEM 220201.pptx
Due Diligence TEM 220201.pptxDue Diligence TEM 220201.pptx
Due Diligence TEM 220201.pptx
 
Pres 001
Pres 001Pres 001
Pres 001
 
Proposal Wide Blower No.1 & 2 with inverter
Proposal Wide Blower No.1 & 2  with inverterProposal Wide Blower No.1 & 2  with inverter
Proposal Wide Blower No.1 & 2 with inverter
 
POX O2 Spargers- Report Summary2 Next STEP
POX O2 Spargers- Report Summary2 Next STEPPOX O2 Spargers- Report Summary2 Next STEP
POX O2 Spargers- Report Summary2 Next STEP
 
Aset BPTP 2019
Aset BPTP 2019Aset BPTP 2019
Aset BPTP 2019
 
FIRE WATER PUMP HOUSE EQUIPMENT CAPACITY AND OPERATION AT POWER PLANT
FIRE WATER PUMP HOUSE EQUIPMENT CAPACITY AND OPERATION AT POWER PLANTFIRE WATER PUMP HOUSE EQUIPMENT CAPACITY AND OPERATION AT POWER PLANT
FIRE WATER PUMP HOUSE EQUIPMENT CAPACITY AND OPERATION AT POWER PLANT
 
Lot 04 - AL SAAD Brackish water and reverse osmosis plant
Lot 04 - AL SAAD Brackish water and reverse osmosis plantLot 04 - AL SAAD Brackish water and reverse osmosis plant
Lot 04 - AL SAAD Brackish water and reverse osmosis plant
 
Experimental Analysis of Refrigeration system using Microchannel condenser & ...
Experimental Analysis of Refrigeration system using Microchannel condenser & ...Experimental Analysis of Refrigeration system using Microchannel condenser & ...
Experimental Analysis of Refrigeration system using Microchannel condenser & ...
 
Industrial training report on NHPC TLD-III
Industrial training report on NHPC TLD-IIIIndustrial training report on NHPC TLD-III
Industrial training report on NHPC TLD-III
 
Ammonia plant GSFC by Vishal Tapiawala
Ammonia plant GSFC by Vishal TapiawalaAmmonia plant GSFC by Vishal Tapiawala
Ammonia plant GSFC by Vishal Tapiawala
 
Ere
EreEre
Ere
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
 
Catálogo Williams _ V series
Catálogo Williams _ V series Catálogo Williams _ V series
Catálogo Williams _ V series
 
Reliable-Sponge-Pvt-Ltd-Unit-lll
Reliable-Sponge-Pvt-Ltd-Unit-lllReliable-Sponge-Pvt-Ltd-Unit-lll
Reliable-Sponge-Pvt-Ltd-Unit-lll
 

Analyzing and Improving Discharging Times of Aqueous Printing Products Using SPC

  • 1. To analyze & improve discharging time of Aqueous FG Products using SPC Tool 2016
  • 2. Target (Discharging Time) 2 Target >>>> 30 min. from 35 min./ batch
  • 3. List of FG Products analyzed for discharging time using SPC tool 3 List of FG- Aqueous Plant S.NO SAP CODE OLD CODE DESCRIPTION BATCH SIZE (Kg) 1 10-603778-1.1350 11006393L W/B OP INK HIGH GLOSS ANTIBLOCKING 3000 2 10-603780-7.2660 11006391L WB OP INK NEUTRAL FINISH 3000 3 10-603785-6.2660 11006374Y WATER BASED PRIMER INK - TA 2800 4 10-603787-2.2660 11006386L WB OP INK- HIGH GLOSS HIGH SLIP 3120 5 10-603788-0.2660 11006385L WATER BASED OP INK - HIGH GLOSS 3120 6 10-603789-8.2660 11006378L WATER BASED OP INK - INLINE PRIMER 3000 7 10-603868-0.2660 894275L WATER BASED OP INK - HIGH SCUFF 3120 8 10-603871-4.2660 894390Y PRIME FIX OP INK - PRIMER 3120 9 10-006541-6.2660 W987502 UNI PAPER TRANS WHITE HV 3120 10 10-615417-2.2660 10-615417-2/1 WB TOB ST OPL 3000 11 10-007024-2.1350 21271268B WB TOB HR CLEAR 3000 12 10-604870-5.1350 BEW00033 AQUAKOTE GLOSS 18 3120 13 10-603870-6.2660 894201Y Heat sealable WB blister coating 3000 14 10-603867-2.2660 894371X WATER BASED OP INK MATT 3000 15 10-007296-6.2660 BEW00018 WB TECH MEDIUM LCB 1653 3000
  • 4. 4 Data Collection from 16.03.2016 to 02.04.2016 – Daily monitoring Sr. No. Total Discharging Time in min. Mean Product Mean USL LSL 1 39 34.9 11006385L #DIV/0! 30 0 2 37 34.9 894390Y #DIV/0! 30 0 3 33 34.9 894371X #DIV/0! 30 0 4 35 34.9 11006385L #DIV/0! 30 0 5 35 34.9 11006378L #DIV/0! 30 0 6 35 34.9 W987502 #DIV/0! 30 0 7 34 34.9 BEW00033 #DIV/0! 30 0 8 37 34.9 11006386L #DIV/0! 30 0 9 34 34.9 894390Y #DIV/0! 30 0 10 35 34.9 11006385L #DIV/0! 30 0 11 34 34.9 BEW00033 #DIV/0! 30 0 12 37 34.9 11006385L #DIV/0! 30 0 13 33 34.9 10-615417-2/1 #DIV/0! 30 0 14 32 34.9 11006374Y #DIV/0! 30 0 15 34 34.9 BEW00033 #DIV/0! 30 0
  • 5. Run Chart of the data from 16.03.2016 to 02.04.2016 5
  • 6. 6 Key Factors for Analysis • Power Tripping Problem • Discharge line • Pump Capacity • Batch Viscosity • Air Pressure • Batch Size
  • 7. Action Plan Identification 7 1. We have taken Power tripping Problem with maintenance team . 2. We identified that pump is having long suction, which slow down the discharge process. Product/ Shade Power Tripping No. of times Total time loss due to power tripping Action Identified to reduce power tripping Problem W987502 Yes 3 12 min 01 Person must be available at electric sub station to reset. 894390Y Yes 2 08 min
  • 8. Action Plan Implemented 8 1. Shifting of discharge pump from mezzanine floor to ground floor. Before After 2. Power Tripping was arrested by deploying one person/shift at electric sub station to reset the tripping issue at the earliest. Power tripping time reduced from 04 min. to 02 min. Pump Location (Earlier) Pump Present
  • 9. 9 Data Collection after Action implementation from 30.05.2016 to 10.06.2016 Sr. No. Total Discharging Time in min. Mean Product Mean USL LSL 1 28 24.4 11006385L #DIV/0! 30 0 2 28 24.4 894390Y #DIV/0! 30 0 3 24 24.4 894371X #DIV/0! 30 0 4 24 24.4 11006385L #DIV/0! 30 0 5 24 24.4 11006378L #DIV/0! 30 0 6 24 24.4 W987502 #DIV/0! 30 0 7 24 24.4 BEW00033 #DIV/0! 30 0 8 23 24.4 11006386L #DIV/0! 30 0 9 21 24.4 894390Y #DIV/0! 30 0 10 25 24.4 11006385L #DIV/0! 30 0 11 24 24.4 BEW00033 #DIV/0! 30 0 12 24 24.4 11006385L #DIV/0! 30 0 13 26 24.4 10-615417-2/1 #DIV/0! 30 0 14 25 24.4 11006374Y #DIV/0! 30 0 15 25 24.4 BEW00033 #DIV/0! 30 0
  • 10. 10 Run Chart after action implementation (30.05.2016 to 10.06.2016 )
  • 11. Benefits 11 • Discharging time reduced from 35 min. to 27 min. average resulting in saving of 08 min. per batch. • Total saving per day = 30 min. • Due to this saving we are able to manage our daily Production effectively & can utilize this half an hour in other Production related activities. • Savings