The document outlines several quality initiatives implemented by a project to improve project quality for offshore gas facilities. The key initiatives included developing a quality management dashboard to provide real-time status of major activities, implementing a schedule Q compliance matrix to map requirements and identify gaps, and developing a readiness matrix program to monitor pre-requisites for upcoming activities. Additional quality assurance assessments and weekly walkthroughs were also conducted to verify compliance. The initiatives helped ensure all activities started on schedule with full readiness, identified potential issues early to prevent delays, and aimed to deliver the facilities with zero punch points before sail away.
How Implementing an effective Change Control process can have a positive impact on a project. This presentation will bring you through a step by step guide to accomplish this goal.
How Implementing an effective Change Control process can have a positive impact on a project. This presentation will bring you through a step by step guide to accomplish this goal.
The topic was delivered by Mr. S. Shanmugasundaram, General Manager – Engineering Quality, Renault-Nissan Technology & Business Centre India Pvt. Ltd., Chennai.
Marval Release Management - the political processMarval Software
Release Management is the final hurdle to overcome. If not done properly, it will invalidate everyone’s hard work and result in nothing more than delivering a poor customer experience.
A brief description about second eddition of C&Q Volume 5.
"V" module of validation system obsoluted and risk based aproach described as per cGMP requiremnet.
SQF Code Edition 9: What's New Since 8.1 & Tips for Your Conversion PlanSafetyChain Software
To prepare you for a May 2021 implementation deadline, LeAnn Chuboff from SQFI explains what's changed in SQF Edition 9.0 and how to make your transition smooth.
Promotion Flow for Mission Critical Enterprise SWGlen Alleman
The release code to production for a mission critical enterprise application, we don't just "push to production" and see what the customer thinks. There is a stewardship governance process, even while the development of the software is done with Scrum.
One fault and 10's of 1,000's of users are impacted.
5 project commissioning best practices for you to considerOlivia Wilson
During the commissioning phase, functional testing procedures are performed, interoperability problems are resolved, and energy usage is optimised for enhanced performance and efficiency. Here are five project commissioning best practices for you to consider, including planning, factory acceptance testing (FAT), mechanical completions, construction quality and schedule management. Click to know more: https://www.global-cxm.com/commissioning/
Introduction to software quality assurance by QuontraSolutionsQUONTRASOLUTIONS
Quontra Solutions provides QA training by Real time Industry experts. QA is having good demand in the market. Our QA online training Instructors are very much experienced and highly qualified and dedicated.
Our QA online training program is job oriented. After completion of QA training with us you should be able to work on any kind of project. After completion of QA online training our dedicated team will be supporting you.
The topic was delivered by Mr. S. Shanmugasundaram, General Manager – Engineering Quality, Renault-Nissan Technology & Business Centre India Pvt. Ltd., Chennai.
Marval Release Management - the political processMarval Software
Release Management is the final hurdle to overcome. If not done properly, it will invalidate everyone’s hard work and result in nothing more than delivering a poor customer experience.
A brief description about second eddition of C&Q Volume 5.
"V" module of validation system obsoluted and risk based aproach described as per cGMP requiremnet.
SQF Code Edition 9: What's New Since 8.1 & Tips for Your Conversion PlanSafetyChain Software
To prepare you for a May 2021 implementation deadline, LeAnn Chuboff from SQFI explains what's changed in SQF Edition 9.0 and how to make your transition smooth.
Promotion Flow for Mission Critical Enterprise SWGlen Alleman
The release code to production for a mission critical enterprise application, we don't just "push to production" and see what the customer thinks. There is a stewardship governance process, even while the development of the software is done with Scrum.
One fault and 10's of 1,000's of users are impacted.
5 project commissioning best practices for you to considerOlivia Wilson
During the commissioning phase, functional testing procedures are performed, interoperability problems are resolved, and energy usage is optimised for enhanced performance and efficiency. Here are five project commissioning best practices for you to consider, including planning, factory acceptance testing (FAT), mechanical completions, construction quality and schedule management. Click to know more: https://www.global-cxm.com/commissioning/
Introduction to software quality assurance by QuontraSolutionsQUONTRASOLUTIONS
Quontra Solutions provides QA training by Real time Industry experts. QA is having good demand in the market. Our QA online training Instructors are very much experienced and highly qualified and dedicated.
Our QA online training program is job oriented. After completion of QA training with us you should be able to work on any kind of project. After completion of QA online training our dedicated team will be supporting you.
Global Commissioning is a client focused international company providing Commissioning Agent, Commissioning Management, MEP Validation & Specialist Electrical Management Services to the construction industry Globally.
Global Commissioning is a client focused international company providing Commissioning Agent, Commissioning Management, MEP Validation & Specialist Electrical Management Services to the construction industry Globally.
Promo_Epc project rule of credit and progress measurement ignitetribes
Project progress monitoring and control is one of the most important tasks of construction project management. Many times planner or project manager not able.The hardest part of project controls is accurate performance measurement of work accomplished.
Taking time out to establish repeatable rules of credit can literally remove 75% of the performance measurement "guessing game" out of the equation.
In this book we don't just explain on what is rule of credit but we also provide tonnes of examples on how to establish the weighted milestone. It's a ready to be plug and plan in your project control measurement.
Log in to ignitetribes.com to purchase the book.
In this technique, test cases are developed using the use cases of the system. A use case encompass the various actors and their interactions with the system. Use cases cover the complete transactions from start to finish. These test cases depict the actual use of software by the end user.
Test Automation Strategies in a Continuous Delivery EcosystemCognizant
Testing organizations (QA) striving to attain continuous integration (CI) and continuous delivery (CD) in a Lean or Agile environment can choose among and make use of the intelligent automation tools and techniques presented here.
5 Great Tips for Improving Your Project QAQCNico Cottone
Poor quality assurance and quality control (QAQC) can lead to schedule delays, increased costs, and safety risks in a construction project. Improving QAQC starts with putting in place a quality management system (QMS) that is specifically tailored to your construction project and you can learn more about brass PVD coating.
SurfTech INC is capable of selecting and Great Tips for Improving Your Project QAQC, and we provide Assisted PVD coating, thin film coating, and ceramic coating facility in the United States. For a quote or to learn more about our process, please contact us at +1–440–275–3356 or ncotton@ercsurftech.com.
Visit At: www.ercsurftech.com
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
2. List of quality initiatives shared and its benefits:
Developmentand Implementation of Quality ManagementDashboard:
Quality Management Dashboard is a status dashboard where the data of all Major Processes
and quality deliverables as per schedule Q and SAEP 1160 requirements are captured at one
place with graphical presentation for easy understanding which is being updated on weekly
basis.
Benefits:
It gives the real time status of all major activities which are as follows:
Welding Procedure qualification
Readiness and approval of Quality Procedures
Status of Receipt Material
Status of Manpower compliance
Status of Quality Notification
PQI trend
Status of Project Weekly Repair Rate
Status of Quality Assurance Activities like Focus assessments, Audits, training and KOM
Status of RFIs
Quality Deliverables as per Schedule Q.
Implementation of Schedule Q Compliance Check Matrix.
All Schedule Q requirements were mapped Clause by Clause to identify the Gaps between
Schedule Q requirements and existing Yard Quality System. Accordingly, the applicable
System Procedures, Project Procedures, Check sheets and Controls were defined, modified
and implemented. Total of 219 clausal requirements of Schedule Q were identified as
applicable to yard scope which are being complied and monitored on weekly basis.
Benefits:
It helped to meet the requirements of Schedule Q and eliminate the chances of violations
which might cause impact on Project PQI, progress and schedule.
3. Implementation and developmentof program for readinessmatrixfor each
new activity starting in 30 days.
Readiness matrix is a program which identifies the pre-requisites (Procedure, ITP, WPS,
Skilled Manpower etc...) along with the startup dates against each planned activity. Each
activity is monitored against the day left for the start-up with respect to readiness of all the
pre-requisites. Each approval in any requirement contributes for increment in readiness
score. An alert system is made for the readiness score of each activity vs the days left for
activity startup. This program gives alert in advance about area of concerns which might
cause delay in start of the upcoming activity so that required action can be taken on timely
manner to avoid interruption in the start-up of activity.
Benefits:
As of now, all the activities in the project were started as per the planned schedule with
100% readiness which helped to eliminate major issues in the project. KOM were conducted
on time prior to start of the activities with the help of this quality tool.
Zero punch pointdrive to deliver the facilities with zero punch pointbefore sail
away
Zero punch point drive is a program developed with the aim to deliver the facilities with
zero punch point. ZERO punch point drive will be achieved by Advance reporting & closing of
Punch Points by the project quality team prior to final official walkthroughs, categorizing the
punch points by time limits to accelerate the closeout on timely manners and weekly review
of open punch items. Preliminary walkthroughs for each modules have been planned level
wise on weekly basis. Assurance of program implementation, planning of walkthroughs and
tracking and follow up of punch points will be monitored by Contractor QA Manager and
supervised by Company Inspection representative.
Benefits:
It will help to identify the potential punch points at advance stage and to minimize the work
at offshore.
4. Implementation of additionalQuality assurance focusassessment:
Apart from the weekly focus assessments, additional QA assessments are being conducted
by Company inspection for ongoing critical activities. Total 57 numbers of QA assessments
are planned during the project construction phase out of which 31 have been conducted so
far.
Benefits:
It helps to verify the compliance to Project quality requirements at activity level and
effectiveness of the Contractor’s Quality System.
Weekly walkthroughsfor verification of equipment’spreservation
requirements:
Company inspection along with contractor conduct weekly walkthroughs dedicated for
verification of equipment preservation. Procedural requirement along with the manufacture
recommendation are mapped in the preservation matrix which is monitored regularly
during the walkthroughs.
Benefits:
It helps to verify the compliance to preservation requirement as per SAMMS &
Manufacturer’s recommendations. As of now, there is no any major violations identified
with respect to preservation of materials. Senior Management from vendor (M/S Lewa) had
appreciated the implementation of preservation system at yard.
In addition to above, following Initiatives were also shared with the Hazira
Team:
Readiness Verification of Equipment storage facility as per storage area classification like
Enclosed & Climatic, Enclosed Non Climatic Controlled and Open storage.
Implementation of Dimensional Check sheet for received materials during receiving
inspection.
Established proactive approach by initiating more number of proactive notification to
avoid violation LBEs