This document is a commissioning stage compliance certificate that must be signed off on by representatives of the sub-contractor, construction, commissioning, and owner before functional testing can begin. It verifies that installation activities, pre-functional checkouts, and operational checkouts are complete. It includes a checklist of items that must be reviewed like quality assurance notices, non-conformance reports, and commissioning issue log items. Signatures are required from the sub-contractor, construction, commissioning, and owner to verify readiness for the next stage of testing.