SlideShare a Scribd company logo
Computer Simulation Methods
“Reducing Queue Time” at
using Arena
located at
Wayne State University Campus
Abhishek Anand
Parag Kapile
Flow chart for Restaurant
Objective
• To minimize the total lead time, wait time of
customers and number of customers waiting
at Subway food services located at the Wayne
State University campus.
• Scheduling additional employees and cashier
and comparing the proposed model with
current model.
Motivations and why you want to
work on this problem?
• We work as student worker at Subway food
services at Wayne State University.
• We have noticed that during peak hours the
wait time for customers in queue is large
which delay the order processing time and
delay in service thus leading to unsatisfied
customer.
Model Description
• Customer here is an entity and arrival rate is defined
by Normal distribution curve.
• We have nine employees working according to the
schedule.
• There 4 stations:
1. Bread and Meat selection station.
2. Toaster
3. Salad and Dressing station.
4. Paying and wrapping station.
Model Description
Model in Arena
Input data analysis
• Using Input Analyzer, we found the best fit
curve for the data.
• The distribution for arrival was found to be
Beta distribution.
Input Analyzer
Station and Route
• As the customer arrives they take 25 seconds
to reach at the Bread and Meat selection
Station.
• And it takes 6 seconds for transfer between
other stations.
Schedule
• We are using the real time schedule of
subway.
Resources
• Resources are created using the real time
schedule.
Bread and Meat Selection Process
• We are using Set.
• Set is usually a set of resources which can hold
multiple elements.
• Resources here are employees.
• Prep A set is the set name for bread and meat
selection process.
Toasting Process
• One toaster unit is present.
• 80% people want their sub to be toasted.
• Toaster takes constant time.
Salad and Dressing Process
• Similar like bread and meat selection process
we are using Prep B set for salad and dressing
process.
• And we are using Prep C set for paying and
wrapping process.
Animation Model
Output Statistical Analysis
CURRENT MODEL:
• Abhishek is schedule for both Station 1 (BMS)
and Station 3 (SDS).
• According to current model the wait time in
the Queue is 18.26 minutes and number of
customers waiting in the Queue is 7.6 for
Salad and Dressing Selection Process.
• The bottle neck for the current model is Salad
and Dressing Selection Process.
Current Model : Queue
Proposed Model
• Abhishek and Rohan are schedule for Station 1
(BMS) and Pratik and Arpit are schedule for
Station 3 (SDS).
• According to proposed model the wait time in
the Queue is 0.035 minutes which has been
reduced from 18.26 minutes and number of
customers waiting in the Queue is 0.014 which
has been reduced from 7.6 for Salad and
Dressing Selection Process
Proposed Model Queue
Recommendation
For First Shift:
• Schedule Abhishek and Rohan for Station 1 (BMS)
instead of scheduling only Abhishek.
• Schedule Pratik and Arpit for the Station 3 (SDS)
instead of scheduling only Abhishek.
For Second Shift:
• Schedule Cook and Akshay for Station 1 (BMS)
instead of scheduling only Cook.
• Schedule Nara and Dejia for the Station 3 (SDS)
instead of scheduling only Nara.
Conclusion
• There is significant change in the current
model and the proposed model.
• We recommend to use the proposed schedule
for decreasing the wait time in the Queue and
also increasing the utilization of employees.
• We can further reduce the average wait time
and number of people in queue by adding
another line comprising of all the 4 stations.
Project Presentation_fx7378_fy6055

More Related Content

What's hot

Arena Model for Coffe Shop
Arena Model for Coffe ShopArena Model for Coffe Shop
Arena Model for Coffe Shop
Ebru Özmüş
 
Habanero Restaurant - Simulation Project
Habanero Restaurant - Simulation ProjectHabanero Restaurant - Simulation Project
Habanero Restaurant - Simulation Project
Jatin Saini
 
Shrivastava Shalvi project_report
Shrivastava Shalvi project_reportShrivastava Shalvi project_report
Shrivastava Shalvi project_report
Shalvi Shrivastava
 
Gupta ayank project_report
Gupta ayank project_reportGupta ayank project_report
Gupta ayank project_report
Ayank Gupta
 
Simulation Project Report
Simulation Project ReportSimulation Project Report
Simulation Project Report
Jasmine Sachdeva
 
Burger King Simulation
Burger King SimulationBurger King Simulation
Burger King Simulation
Rohit Jain
 
Simulation with Arena (Dental Clinic project)
Simulation with Arena (Dental Clinic project)Simulation with Arena (Dental Clinic project)
Simulation with Arena (Dental Clinic project)
Kimseng Sok
 
Simulation project on Burger King
Simulation project on Burger KingSimulation project on Burger King
Simulation project on Burger King
Kartik Sagar
 
Simulation Project in ARENA
Simulation Project in ARENASimulation Project in ARENA
Simulation Project in ARENAAditya Nakate
 
Kroger Store Simulation Using Arena
Kroger Store Simulation Using ArenaKroger Store Simulation Using Arena
Kroger Store Simulation Using Arena
Dhivya Rajprasad
 
Process simulation study of order processing at Starbucks, University of Cinc...
Process simulation study of order processing at Starbucks, University of Cinc...Process simulation study of order processing at Starbucks, University of Cinc...
Process simulation study of order processing at Starbucks, University of Cinc...
Piyush Verma
 
Arena Simulation of Chipotle Restaurant
Arena Simulation of Chipotle RestaurantArena Simulation of Chipotle Restaurant
Arena Simulation of Chipotle Restaurant
Rohit Bhaya
 
Deone pranilfinalreport
Deone pranilfinalreportDeone pranilfinalreport
Deone pranilfinalreport
Pranil Deone
 
Simulation of food serving system of EWU canteen using Arena software
Simulation of food serving system of EWU canteen using Arena softwareSimulation of food serving system of EWU canteen using Arena software
Simulation of food serving system of EWU canteen using Arena software
East West University
 
Super 8 gas station model - Arena Simulation
Super 8 gas station model - Arena SimulationSuper 8 gas station model - Arena Simulation
Super 8 gas station model - Arena Simulation
Arunkumar Jagadeesan
 
Simulation study of Gas Station
Simulation study of Gas StationSimulation study of Gas Station
Simulation study of Gas Station
Akul Mahajan
 
Barber Shop Simulation
Barber Shop SimulationBarber Shop Simulation
Barber Shop Simulation
Ravish Kalra
 
Bakery Production Using Arena Simulation
Bakery Production Using Arena SimulationBakery Production Using Arena Simulation
Bakery Production Using Arena Simulation
Socheat Veng
 
Simulation with ARENA - SM Paints
Simulation with ARENA - SM PaintsSimulation with ARENA - SM Paints
Simulation with ARENA - SM Paints
hrishik26
 
Bakery Production Using Arena Simulation
Bakery Production Using Arena SimulationBakery Production Using Arena Simulation
Bakery Production Using Arena Simulation
Socheat Veng
 

What's hot (20)

Arena Model for Coffe Shop
Arena Model for Coffe ShopArena Model for Coffe Shop
Arena Model for Coffe Shop
 
Habanero Restaurant - Simulation Project
Habanero Restaurant - Simulation ProjectHabanero Restaurant - Simulation Project
Habanero Restaurant - Simulation Project
 
Shrivastava Shalvi project_report
Shrivastava Shalvi project_reportShrivastava Shalvi project_report
Shrivastava Shalvi project_report
 
Gupta ayank project_report
Gupta ayank project_reportGupta ayank project_report
Gupta ayank project_report
 
Simulation Project Report
Simulation Project ReportSimulation Project Report
Simulation Project Report
 
Burger King Simulation
Burger King SimulationBurger King Simulation
Burger King Simulation
 
Simulation with Arena (Dental Clinic project)
Simulation with Arena (Dental Clinic project)Simulation with Arena (Dental Clinic project)
Simulation with Arena (Dental Clinic project)
 
Simulation project on Burger King
Simulation project on Burger KingSimulation project on Burger King
Simulation project on Burger King
 
Simulation Project in ARENA
Simulation Project in ARENASimulation Project in ARENA
Simulation Project in ARENA
 
Kroger Store Simulation Using Arena
Kroger Store Simulation Using ArenaKroger Store Simulation Using Arena
Kroger Store Simulation Using Arena
 
Process simulation study of order processing at Starbucks, University of Cinc...
Process simulation study of order processing at Starbucks, University of Cinc...Process simulation study of order processing at Starbucks, University of Cinc...
Process simulation study of order processing at Starbucks, University of Cinc...
 
Arena Simulation of Chipotle Restaurant
Arena Simulation of Chipotle RestaurantArena Simulation of Chipotle Restaurant
Arena Simulation of Chipotle Restaurant
 
Deone pranilfinalreport
Deone pranilfinalreportDeone pranilfinalreport
Deone pranilfinalreport
 
Simulation of food serving system of EWU canteen using Arena software
Simulation of food serving system of EWU canteen using Arena softwareSimulation of food serving system of EWU canteen using Arena software
Simulation of food serving system of EWU canteen using Arena software
 
Super 8 gas station model - Arena Simulation
Super 8 gas station model - Arena SimulationSuper 8 gas station model - Arena Simulation
Super 8 gas station model - Arena Simulation
 
Simulation study of Gas Station
Simulation study of Gas StationSimulation study of Gas Station
Simulation study of Gas Station
 
Barber Shop Simulation
Barber Shop SimulationBarber Shop Simulation
Barber Shop Simulation
 
Bakery Production Using Arena Simulation
Bakery Production Using Arena SimulationBakery Production Using Arena Simulation
Bakery Production Using Arena Simulation
 
Simulation with ARENA - SM Paints
Simulation with ARENA - SM PaintsSimulation with ARENA - SM Paints
Simulation with ARENA - SM Paints
 
Bakery Production Using Arena Simulation
Bakery Production Using Arena SimulationBakery Production Using Arena Simulation
Bakery Production Using Arena Simulation
 

Similar to Project Presentation_fx7378_fy6055

Case Study using Simulation
Case Study using Simulation Case Study using Simulation
Case Study using Simulation
Sanjay Santhakumar
 
Process planning SMED and VSM: Single minute exchange of die and Value stream...
Process planning SMED and VSM: Single minute exchange of die and Value stream...Process planning SMED and VSM: Single minute exchange of die and Value stream...
Process planning SMED and VSM: Single minute exchange of die and Value stream...
Yatinkumar Patel
 
Fast food restaurant
Fast food restaurantFast food restaurant
Fast food restaurant
Rishav Sircar
 
The Capacity Requirement Planning
The Capacity Requirement Planning The Capacity Requirement Planning
The Capacity Requirement Planning
BagishMishra3
 
Modeling and Simulation_Optimization Research
Modeling and Simulation_Optimization ResearchModeling and Simulation_Optimization Research
Modeling and Simulation_Optimization Research
Brian Doyle
 
Six Sigma Chipotle
Six Sigma ChipotleSix Sigma Chipotle
Six Sigma ChipotleMusa Ellison
 
Production planing & control
Production planing & controlProduction planing & control
Production planing & control
PRIYABAMBALE
 
130135794-Training-Outline-for-Management-Trainee.pptx
130135794-Training-Outline-for-Management-Trainee.pptx130135794-Training-Outline-for-Management-Trainee.pptx
130135794-Training-Outline-for-Management-Trainee.pptx
Nittamallik216
 
Chick fil-a Solutions for Staffing
Chick fil-a Solutions for StaffingChick fil-a Solutions for Staffing
Chick fil-a Solutions for Staffing
Erin Graham
 
Unit iv-1-qt
Unit iv-1-qtUnit iv-1-qt
Unit iv-1-qt
Anurag Srivastava
 
Lean Manufacturign Simulator
Lean Manufacturign SimulatorLean Manufacturign Simulator
Lean Manufacturign Simulator
Edgar Cardenas Sanchez
 
Chick fil-a
Chick fil-aChick fil-a
Chick fil-a
Erin Graham
 
Final Senior Design (12-09-15)
Final Senior Design (12-09-15)Final Senior Design (12-09-15)
Final Senior Design (12-09-15)Gabriel Zimeri
 
Lean and Process Improvement Implementation at Subway Restaurant
Lean and Process Improvement Implementation at Subway RestaurantLean and Process Improvement Implementation at Subway Restaurant
Lean and Process Improvement Implementation at Subway Restaurant
SIDHARTH JAYANTH KINI , CLSSGB
 
Operation management
Operation managementOperation management
Operation management
assignmenthelpp
 

Similar to Project Presentation_fx7378_fy6055 (20)

Case Study using Simulation
Case Study using Simulation Case Study using Simulation
Case Study using Simulation
 
Process planning SMED and VSM: Single minute exchange of die and Value stream...
Process planning SMED and VSM: Single minute exchange of die and Value stream...Process planning SMED and VSM: Single minute exchange of die and Value stream...
Process planning SMED and VSM: Single minute exchange of die and Value stream...
 
EEMT 5120 project
EEMT 5120 projectEEMT 5120 project
EEMT 5120 project
 
Fast food restaurant
Fast food restaurantFast food restaurant
Fast food restaurant
 
The Capacity Requirement Planning
The Capacity Requirement Planning The Capacity Requirement Planning
The Capacity Requirement Planning
 
Beejmantra 1
Beejmantra 1Beejmantra 1
Beejmantra 1
 
Modeling and Simulation_Optimization Research
Modeling and Simulation_Optimization ResearchModeling and Simulation_Optimization Research
Modeling and Simulation_Optimization Research
 
Six Sigma Chipotle
Six Sigma ChipotleSix Sigma Chipotle
Six Sigma Chipotle
 
Production planing & control
Production planing & controlProduction planing & control
Production planing & control
 
130135794-Training-Outline-for-Management-Trainee.pptx
130135794-Training-Outline-for-Management-Trainee.pptx130135794-Training-Outline-for-Management-Trainee.pptx
130135794-Training-Outline-for-Management-Trainee.pptx
 
Chick fil-a Solutions for Staffing
Chick fil-a Solutions for StaffingChick fil-a Solutions for Staffing
Chick fil-a Solutions for Staffing
 
Unit iv-1-qt
Unit iv-1-qtUnit iv-1-qt
Unit iv-1-qt
 
Lean Manufacturign Simulator
Lean Manufacturign SimulatorLean Manufacturign Simulator
Lean Manufacturign Simulator
 
FINAL PROJECT
FINAL PROJECTFINAL PROJECT
FINAL PROJECT
 
Chick fil-a
Chick fil-aChick fil-a
Chick fil-a
 
Final Senior Design (12-09-15)
Final Senior Design (12-09-15)Final Senior Design (12-09-15)
Final Senior Design (12-09-15)
 
Lean and Process Improvement Implementation at Subway Restaurant
Lean and Process Improvement Implementation at Subway RestaurantLean and Process Improvement Implementation at Subway Restaurant
Lean and Process Improvement Implementation at Subway Restaurant
 
MCS
MCS MCS
MCS
 
Session 4
Session 4Session 4
Session 4
 
Operation management
Operation managementOperation management
Operation management
 

More from Parag Kapile

IE7610_REPORT_GROUP_8
IE7610_REPORT_GROUP_8IE7610_REPORT_GROUP_8
IE7610_REPORT_GROUP_8Parag Kapile
 
report kapile_fx7378
report kapile_fx7378report kapile_fx7378
report kapile_fx7378Parag Kapile
 
Lean Back Offices Project
Lean Back Offices ProjectLean Back Offices Project
Lean Back Offices ProjectParag Kapile
 
GROUP PROJECT REPORT_FY6055_FX7378
GROUP PROJECT REPORT_FY6055_FX7378GROUP PROJECT REPORT_FY6055_FX7378
GROUP PROJECT REPORT_FY6055_FX7378Parag Kapile
 
Individual Project
Individual ProjectIndividual Project
Individual ProjectParag Kapile
 
Optimization of International student expenses at Wayne state ppt
Optimization of International student expenses at Wayne state pptOptimization of International student expenses at Wayne state ppt
Optimization of International student expenses at Wayne state pptParag Kapile
 
design n testing of tool used in press shop
design n testing of tool used in press shopdesign n testing of tool used in press shop
design n testing of tool used in press shopParag Kapile
 

More from Parag Kapile (7)

IE7610_REPORT_GROUP_8
IE7610_REPORT_GROUP_8IE7610_REPORT_GROUP_8
IE7610_REPORT_GROUP_8
 
report kapile_fx7378
report kapile_fx7378report kapile_fx7378
report kapile_fx7378
 
Lean Back Offices Project
Lean Back Offices ProjectLean Back Offices Project
Lean Back Offices Project
 
GROUP PROJECT REPORT_FY6055_FX7378
GROUP PROJECT REPORT_FY6055_FX7378GROUP PROJECT REPORT_FY6055_FX7378
GROUP PROJECT REPORT_FY6055_FX7378
 
Individual Project
Individual ProjectIndividual Project
Individual Project
 
Optimization of International student expenses at Wayne state ppt
Optimization of International student expenses at Wayne state pptOptimization of International student expenses at Wayne state ppt
Optimization of International student expenses at Wayne state ppt
 
design n testing of tool used in press shop
design n testing of tool used in press shopdesign n testing of tool used in press shop
design n testing of tool used in press shop
 

Project Presentation_fx7378_fy6055

  • 1. Computer Simulation Methods “Reducing Queue Time” at using Arena located at Wayne State University Campus Abhishek Anand Parag Kapile
  • 2. Flow chart for Restaurant
  • 3. Objective • To minimize the total lead time, wait time of customers and number of customers waiting at Subway food services located at the Wayne State University campus. • Scheduling additional employees and cashier and comparing the proposed model with current model.
  • 4. Motivations and why you want to work on this problem? • We work as student worker at Subway food services at Wayne State University. • We have noticed that during peak hours the wait time for customers in queue is large which delay the order processing time and delay in service thus leading to unsatisfied customer.
  • 5. Model Description • Customer here is an entity and arrival rate is defined by Normal distribution curve. • We have nine employees working according to the schedule. • There 4 stations: 1. Bread and Meat selection station. 2. Toaster 3. Salad and Dressing station. 4. Paying and wrapping station.
  • 7. Input data analysis • Using Input Analyzer, we found the best fit curve for the data. • The distribution for arrival was found to be Beta distribution.
  • 9. Station and Route • As the customer arrives they take 25 seconds to reach at the Bread and Meat selection Station. • And it takes 6 seconds for transfer between other stations.
  • 10. Schedule • We are using the real time schedule of subway.
  • 11. Resources • Resources are created using the real time schedule.
  • 12. Bread and Meat Selection Process • We are using Set. • Set is usually a set of resources which can hold multiple elements. • Resources here are employees. • Prep A set is the set name for bread and meat selection process.
  • 13. Toasting Process • One toaster unit is present. • 80% people want their sub to be toasted. • Toaster takes constant time.
  • 14. Salad and Dressing Process • Similar like bread and meat selection process we are using Prep B set for salad and dressing process. • And we are using Prep C set for paying and wrapping process.
  • 16. Output Statistical Analysis CURRENT MODEL: • Abhishek is schedule for both Station 1 (BMS) and Station 3 (SDS). • According to current model the wait time in the Queue is 18.26 minutes and number of customers waiting in the Queue is 7.6 for Salad and Dressing Selection Process. • The bottle neck for the current model is Salad and Dressing Selection Process.
  • 18. Proposed Model • Abhishek and Rohan are schedule for Station 1 (BMS) and Pratik and Arpit are schedule for Station 3 (SDS). • According to proposed model the wait time in the Queue is 0.035 minutes which has been reduced from 18.26 minutes and number of customers waiting in the Queue is 0.014 which has been reduced from 7.6 for Salad and Dressing Selection Process
  • 20. Recommendation For First Shift: • Schedule Abhishek and Rohan for Station 1 (BMS) instead of scheduling only Abhishek. • Schedule Pratik and Arpit for the Station 3 (SDS) instead of scheduling only Abhishek. For Second Shift: • Schedule Cook and Akshay for Station 1 (BMS) instead of scheduling only Cook. • Schedule Nara and Dejia for the Station 3 (SDS) instead of scheduling only Nara.
  • 21. Conclusion • There is significant change in the current model and the proposed model. • We recommend to use the proposed schedule for decreasing the wait time in the Queue and also increasing the utilization of employees. • We can further reduce the average wait time and number of people in queue by adding another line comprising of all the 4 stations.