SlideShare a Scribd company logo
Project   on  Replacement Presented By: Abhishek Singh KshitizSrivastava
Content ,[object Object]
Company Profile
Objective of the Project
Methodology
Data collection and Analysis
Conclusion
References,[object Object]
ACCMAN INSTITUTE OF MANAGEMENT  	Founded in the Year 2003 by BALIBHADRA FOUNDATION - a New Delhi based educational trust, promoted by a group of visionary and leading practicing professionals with a mission of providing high quality, relevant, career-oriented, Industry focused tailor-made business programmes at an affordable cost.  F O U N D A T I O N
ACCMAN INSTITUTE OF MANAGEMENT Situated at -  46A/2, Knowledge Park – III, Greater Noida, G B Nagar, PIN  - 201308 (U.P.) Contact details -  Telephone: 0120 – 2323800 - 02 Fax: 0120-2323805 E-Mail: accmanschool@hotmail.com , info@accman.co.in
ACCMAN INSTITUTE OF MANAGEMENT Construction work in Progress. In January 2005.
ACCMAN INSTITUTE OF MANAGEMENT Construction  work at completion stage,  June 2006.
ACCMAN INSTITUTE OF MANAGEMENT Opening  year          2006   Front Office
ACCMAN INSTITUTE OF MANAGEMENT
(Hon’ble Chairman)
Dr. K B L Mathur Former Chief Economic Advisor, Govt. of India.
Prof. B D SINGH Ex. Chairman NALCO, Sr. Prof at IMT Ghaziabad.
ShriJaspalRana,   Arjuna& Padam- Shree Awardees and Gold Medalist in Asian & Common wealth Games
Prof. Rajiv Singh FCA , Senior faculty and Member, Board of Governors, ACCMAN Institute, praising the anchor of the programme
ShriAseemChawla, Partner Amarchand & Mangal Das & Suresh Shroff & Co. Member Executive Committee of Income Tax Appellate Tribunal
Achievement of the Institute on the Scale of Time Period: ,[object Object]
2008: Institute increases the seats of PGDM from 60 to 120.
2009: Institute got the permission of running PGDM-Marketing course from the All India Council of Technical Education merely 4 years after their establishment.
2010: Institute ranked 7th position in NCR region and 1st position in Greater Noida in a survey conducted by a prestigious magazine Business Chronicle.,[object Object]
Replace the computer System, If needed.
Replacement due to :-,[object Object]
To Find the Best Replacement Age (Time) of a Machine   When   ,[object Object]
  Its scrap value is constant and
  The Money value is not considered. Let 	C = Cost of Machine S = Scrap value of the machine at time t. and,            Cm(t) = Maintenance cost of machine at time t,                        [Cm(t) increases with t].   Case 1 : When time ‘t’ is a continuous variable.
Case 2 :When time ‘t’ is a discrete variable. we conclude that-   ,[object Object]
Replace if the next years maintenance cost is greater than the previous years average total cost.,[object Object]

More Related Content

What's hot

OR 14 15-unit_3
OR 14 15-unit_3OR 14 15-unit_3
OR 14 15-unit_3
Nageswara Rao Thots
 
Unit 5 or
Unit 5 orUnit 5 or
What is replacement theory
What is replacement theoryWhat is replacement theory
What is replacement theory
krishna kumar
 
Replacement theory
Replacement theoryReplacement theory
Replacement theory
Suaj
 
Replacement model
Replacement modelReplacement model
Replacement model
Devan P.D
 
Replacement analysis
Replacement analysisReplacement analysis
Replacement analysis
Mallikarjun Vastrad
 
Replacement models in plant and operations
Replacement models in plant and operationsReplacement models in plant and operations
Replacement models in plant and operations
Abu Bashar
 
Replacement Theory
Replacement TheoryReplacement Theory
Replacement Theory
Nilam Kabra
 
Replacement
ReplacementReplacement
Replacement
Sonali Srivastava
 
Equipment Replacement Model1 modi
Equipment Replacement Model1 modiEquipment Replacement Model1 modi
Equipment Replacement Model1 modi
Anil Kulkarni, [PMP®, M-Tech Civil, CE]
 
Prsentation 2 htibl bt case study uploaded
Prsentation 2 htibl bt case study uploadedPrsentation 2 htibl bt case study uploaded
Prsentation 2 htibl bt case study uploaded
Prashant Ratnaparkhi
 
Replacement theory
Replacement theoryReplacement theory
Replacement theory
SAI SANTHOSH
 
Recent development of automation in vehicle manufacturing industries 1
Recent development of automation in vehicle manufacturing industries 1Recent development of automation in vehicle manufacturing industries 1
Recent development of automation in vehicle manufacturing industries 1
ZAID SHARIFF
 
facility location ( operations and quality management)
facility location ( operations and quality management)facility location ( operations and quality management)
facility location ( operations and quality management)
saumyah Singh
 
Depreciation
DepreciationDepreciation
Depreciation
AnilRajput39
 
Facility location
Facility location Facility location
Facility location
mintubutani2212
 
Plant Location models in Food Industry
Plant Location models in Food IndustryPlant Location models in Food Industry
Plant Location models in Food Industry
Abhishek Thakur
 
Facility location and case study
Facility location and case studyFacility location and case study
Facility location and case study
HemantJoshi110
 
171130 Progress Update WP2 (Bram Westerweel)
171130 Progress Update WP2 (Bram Westerweel)171130 Progress Update WP2 (Bram Westerweel)
171130 Progress Update WP2 (Bram Westerweel)
SINTAS
 

What's hot (19)

OR 14 15-unit_3
OR 14 15-unit_3OR 14 15-unit_3
OR 14 15-unit_3
 
Unit 5 or
Unit 5 orUnit 5 or
Unit 5 or
 
What is replacement theory
What is replacement theoryWhat is replacement theory
What is replacement theory
 
Replacement theory
Replacement theoryReplacement theory
Replacement theory
 
Replacement model
Replacement modelReplacement model
Replacement model
 
Replacement analysis
Replacement analysisReplacement analysis
Replacement analysis
 
Replacement models in plant and operations
Replacement models in plant and operationsReplacement models in plant and operations
Replacement models in plant and operations
 
Replacement Theory
Replacement TheoryReplacement Theory
Replacement Theory
 
Replacement
ReplacementReplacement
Replacement
 
Equipment Replacement Model1 modi
Equipment Replacement Model1 modiEquipment Replacement Model1 modi
Equipment Replacement Model1 modi
 
Prsentation 2 htibl bt case study uploaded
Prsentation 2 htibl bt case study uploadedPrsentation 2 htibl bt case study uploaded
Prsentation 2 htibl bt case study uploaded
 
Replacement theory
Replacement theoryReplacement theory
Replacement theory
 
Recent development of automation in vehicle manufacturing industries 1
Recent development of automation in vehicle manufacturing industries 1Recent development of automation in vehicle manufacturing industries 1
Recent development of automation in vehicle manufacturing industries 1
 
facility location ( operations and quality management)
facility location ( operations and quality management)facility location ( operations and quality management)
facility location ( operations and quality management)
 
Depreciation
DepreciationDepreciation
Depreciation
 
Facility location
Facility location Facility location
Facility location
 
Plant Location models in Food Industry
Plant Location models in Food IndustryPlant Location models in Food Industry
Plant Location models in Food Industry
 
Facility location and case study
Facility location and case studyFacility location and case study
Facility location and case study
 
171130 Progress Update WP2 (Bram Westerweel)
171130 Progress Update WP2 (Bram Westerweel)171130 Progress Update WP2 (Bram Westerweel)
171130 Progress Update WP2 (Bram Westerweel)
 

Similar to Project presentation on Replcement

Swayam assignment
Swayam assignmentSwayam assignment
Swayam assignment
SIDDAVATAM NARENDRA REDDY
 
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET Journal
 
Mechanical Engineering project
Mechanical Engineering projectMechanical Engineering project
Mechanical Engineering project
Manpreet Singh
 
Replacement Problem - Dr. Bhupender SOM - JIMS Rohini Faculty Presentation
Replacement Problem - Dr. Bhupender SOM - JIMS Rohini Faculty PresentationReplacement Problem - Dr. Bhupender SOM - JIMS Rohini Faculty Presentation
Replacement Problem - Dr. Bhupender SOM - JIMS Rohini Faculty Presentation
JIMS Rohini Sector 5
 
jay new resume
jay new  resumejay new  resume
jay new resume
jay singh bhadaoria
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
Mudit M. Saxena
 
Automation Enhanced Green Campus Initiative
Automation Enhanced Green Campus InitiativeAutomation Enhanced Green Campus Initiative
Automation Enhanced Green Campus Initiative
IRJET Journal
 
Page 28-30_32_Round-Table-Dec-Jan15
Page 28-30_32_Round-Table-Dec-Jan15Page 28-30_32_Round-Table-Dec-Jan15
Page 28-30_32_Round-Table-Dec-Jan15
Megha Roy
 
IRJET- Enhance the Capacity of Outer Tube Machining Cell
IRJET-  	  Enhance the Capacity of Outer Tube Machining CellIRJET-  	  Enhance the Capacity of Outer Tube Machining Cell
IRJET- Enhance the Capacity of Outer Tube Machining Cell
IRJET Journal
 
KIRAN ATPADKAR33333333
KIRAN ATPADKAR33333333KIRAN ATPADKAR33333333
KIRAN ATPADKAR33333333
KIRAN ATPADKAR
 
Methodsofcosting.pptx
Methodsofcosting.pptxMethodsofcosting.pptx
Methodsofcosting.pptx
JitenBendle
 
IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...
IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...
IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...
IRJET Journal
 
Ganesh - CSSBB
Ganesh - CSSBBGanesh - CSSBB
Ganesh - CSSBB
Ganesh Thambidorai
 
IRJET- Optimization of Machining Facility Layout by using Simulation: Cas...
IRJET-  	  Optimization of Machining Facility Layout by using Simulation: Cas...IRJET-  	  Optimization of Machining Facility Layout by using Simulation: Cas...
IRJET- Optimization of Machining Facility Layout by using Simulation: Cas...
IRJET Journal
 
Microsoft Word - Santhosh Resume2
Microsoft Word - Santhosh Resume2Microsoft Word - Santhosh Resume2
Microsoft Word - Santhosh Resume2
caadadada vxvxv
 
Pratap resume trw
Pratap resume trwPratap resume trw
Pratap resume trw
Pratap Sankar
 
IRJET- Distribution Selection for Pump Manufacturing Companies
IRJET- Distribution Selection for Pump Manufacturing CompaniesIRJET- Distribution Selection for Pump Manufacturing Companies
IRJET- Distribution Selection for Pump Manufacturing Companies
IRJET Journal
 
Arvind singh mahor -summer project report
Arvind singh mahor -summer project reportArvind singh mahor -summer project report
Arvind singh mahor -summer project report
Arvind Mahor
 
RESUME_J K Saraff
RESUME_J K SaraffRESUME_J K Saraff
RESUME_J K Saraff
Jay Kishan Saraff
 
IRJET- Plant Evaluation using OEE & ORE
IRJET-  	  Plant Evaluation using OEE & OREIRJET-  	  Plant Evaluation using OEE & ORE
IRJET- Plant Evaluation using OEE & ORE
IRJET Journal
 

Similar to Project presentation on Replcement (20)

Swayam assignment
Swayam assignmentSwayam assignment
Swayam assignment
 
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
 
Mechanical Engineering project
Mechanical Engineering projectMechanical Engineering project
Mechanical Engineering project
 
Replacement Problem - Dr. Bhupender SOM - JIMS Rohini Faculty Presentation
Replacement Problem - Dr. Bhupender SOM - JIMS Rohini Faculty PresentationReplacement Problem - Dr. Bhupender SOM - JIMS Rohini Faculty Presentation
Replacement Problem - Dr. Bhupender SOM - JIMS Rohini Faculty Presentation
 
jay new resume
jay new  resumejay new  resume
jay new resume
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
Automation Enhanced Green Campus Initiative
Automation Enhanced Green Campus InitiativeAutomation Enhanced Green Campus Initiative
Automation Enhanced Green Campus Initiative
 
Page 28-30_32_Round-Table-Dec-Jan15
Page 28-30_32_Round-Table-Dec-Jan15Page 28-30_32_Round-Table-Dec-Jan15
Page 28-30_32_Round-Table-Dec-Jan15
 
IRJET- Enhance the Capacity of Outer Tube Machining Cell
IRJET-  	  Enhance the Capacity of Outer Tube Machining CellIRJET-  	  Enhance the Capacity of Outer Tube Machining Cell
IRJET- Enhance the Capacity of Outer Tube Machining Cell
 
KIRAN ATPADKAR33333333
KIRAN ATPADKAR33333333KIRAN ATPADKAR33333333
KIRAN ATPADKAR33333333
 
Methodsofcosting.pptx
Methodsofcosting.pptxMethodsofcosting.pptx
Methodsofcosting.pptx
 
IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...
IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...
IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...
 
Ganesh - CSSBB
Ganesh - CSSBBGanesh - CSSBB
Ganesh - CSSBB
 
IRJET- Optimization of Machining Facility Layout by using Simulation: Cas...
IRJET-  	  Optimization of Machining Facility Layout by using Simulation: Cas...IRJET-  	  Optimization of Machining Facility Layout by using Simulation: Cas...
IRJET- Optimization of Machining Facility Layout by using Simulation: Cas...
 
Microsoft Word - Santhosh Resume2
Microsoft Word - Santhosh Resume2Microsoft Word - Santhosh Resume2
Microsoft Word - Santhosh Resume2
 
Pratap resume trw
Pratap resume trwPratap resume trw
Pratap resume trw
 
IRJET- Distribution Selection for Pump Manufacturing Companies
IRJET- Distribution Selection for Pump Manufacturing CompaniesIRJET- Distribution Selection for Pump Manufacturing Companies
IRJET- Distribution Selection for Pump Manufacturing Companies
 
Arvind singh mahor -summer project report
Arvind singh mahor -summer project reportArvind singh mahor -summer project report
Arvind singh mahor -summer project report
 
RESUME_J K Saraff
RESUME_J K SaraffRESUME_J K Saraff
RESUME_J K Saraff
 
IRJET- Plant Evaluation using OEE & ORE
IRJET-  	  Plant Evaluation using OEE & OREIRJET-  	  Plant Evaluation using OEE & ORE
IRJET- Plant Evaluation using OEE & ORE
 

Project presentation on Replcement