The project manager effectively delivered the AllenSolly store project on time and under budget through strong project management skills and leadership. Key factors in the project manager's effectiveness included knowledge of design, construction, cost management and scheduling. The project manager took responsibility and ownership for the project, involved stakeholders in decision-making, and motivated the team through leadership. As a result, the project was completed in 35 days compared to the usual 50 days, came in under the 80 lakh budget at 76 lakhs, and the store design met the client's objectives of a distinctive, high-quality space for the high street location.
PHEL, India (Psyche Hospitality Enterprises Ltd.), is a Hospitality Consultancy Company specialising in the areas of project consultancy, project and operations management, financial consultancy etc. for our clients who range from a small restaurant to a international 5 star hotel chain.
PHEL, India (Psyche Hospitality Enterprises Ltd.), is a Hospitality Consultancy Company specialising in the areas of project consultancy, project and operations management, financial consultancy etc. for our clients who range from a small restaurant to a international 5 star hotel chain.
Aeronautic manufacturing industry is facing huge challenge : production ramp up, new launch, etc
Increase use of suppliers has complexified programs management and
DfSS Webinar Part 1: An Introduction to DFSSmjames1
Participants will gain an introduction to the methodology DFSS (Design for Six Sigma) and how to apply it within your business. Waldemar Wasiuk a principal at BMGI Europe Waldemar Wasiuk a principal at BMGI Europe will walk you through the DFSS basics, how to get started, select DFSS projects and deliver meaningful business results.
Assure the best possible return on your investment with assistance in developing your IT Governance strategy with the experienced professionals at Checkpoint Partners
Aeronautic manufacturing industry is facing huge challenge : production ramp up, new launch, etc
Increase use of suppliers has complexified programs management and
DfSS Webinar Part 1: An Introduction to DFSSmjames1
Participants will gain an introduction to the methodology DFSS (Design for Six Sigma) and how to apply it within your business. Waldemar Wasiuk a principal at BMGI Europe Waldemar Wasiuk a principal at BMGI Europe will walk you through the DFSS basics, how to get started, select DFSS projects and deliver meaningful business results.
Assure the best possible return on your investment with assistance in developing your IT Governance strategy with the experienced professionals at Checkpoint Partners
George Jucan: Using PMCDF to Advance One's CareerPMI SWOC
George Jucan
George Jucan is a well known in the project management community as a successful IT project management consultant, speaker at public events, trainer and author of high-impact project management articles.
George is an experienced Project Manager Professional (PMP) with 20 years of technical and management experience in complex environments, both in public and private sector. He provides consulting services in methodology definition and capability assessment, business reengineering and organizational restructuring, projects audit and recovery, as well as hands-on management of projects.
George Jucan is currently a member of the Core Team for the upcoming PMBOK® Guide 5th Edition.
Moreover, George is currently the Vice-Chair of the Canadian Advisory Committee for the upcoming ISO 21500 project management standard. He is also the Chair of PMI Information Systems SIG, as well as a Board member of PMI Southern Ontario Chapter.
WQD2011 - Breakthrough Process Improvement - Mashreq Bank - Improving Sales, ...Dubai Quality Group
Breakthrough Process Improvement case study submitted by Mashreq Bank during 3rd Continual Improvement & Innovation Symposium organized by Dubai Quality Group's Continual Improvement Subgroup to celebrate World Quality Day 2011.
Flevy.com - Pricing a Consulting ProjectDavid Tracy
This is a partial preview of the document found here:
https://flevy.com/browse/business-document/pricing-a-consulting-project-94
Description:
This presentation discusses the basic principles behind designing and pricing a management consulting type project.
Project Management in an Agency Environment Jeff Thaler
An overview of Project Management core areas of focus. Includes project management process, tools, and collaboration with other parties - includes roles and responsibilities in comparison to Account Management.
The world of search engine optimization (SEO) is buzzing with discussions after Google confirmed that around 2,500 leaked internal documents related to its Search feature are indeed authentic. The revelation has sparked significant concerns within the SEO community. The leaked documents were initially reported by SEO experts Rand Fishkin and Mike King, igniting widespread analysis and discourse. For More Info:- https://news.arihantwebtech.com/search-disrupted-googles-leaked-documents-rock-the-seo-world/
Buy Verified PayPal Account | Buy Google 5 Star Reviewsusawebmarket
Buy Verified PayPal Account
Looking to buy verified PayPal accounts? Discover 7 expert tips for safely purchasing a verified PayPal account in 2024. Ensure security and reliability for your transactions.
PayPal Services Features-
🟢 Email Access
🟢 Bank Added
🟢 Card Verified
🟢 Full SSN Provided
🟢 Phone Number Access
🟢 Driving License Copy
🟢 Fasted Delivery
Client Satisfaction is Our First priority. Our services is very appropriate to buy. We assume that the first-rate way to purchase our offerings is to order on the website. If you have any worry in our cooperation usually You can order us on Skype or Telegram.
24/7 Hours Reply/Please Contact
usawebmarketEmail: support@usawebmarket.com
Skype: usawebmarket
Telegram: @usawebmarket
WhatsApp: +1(218) 203-5951
USA WEB MARKET is the Best Verified PayPal, Payoneer, Cash App, Skrill, Neteller, Stripe Account and SEO, SMM Service provider.100%Satisfection granted.100% replacement Granted.
[Note: This is a partial preview. To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations]
Sustainability has become an increasingly critical topic as the world recognizes the need to protect our planet and its resources for future generations. Sustainability means meeting our current needs without compromising the ability of future generations to meet theirs. It involves long-term planning and consideration of the consequences of our actions. The goal is to create strategies that ensure the long-term viability of People, Planet, and Profit.
Leading companies such as Nike, Toyota, and Siemens are prioritizing sustainable innovation in their business models, setting an example for others to follow. In this Sustainability training presentation, you will learn key concepts, principles, and practices of sustainability applicable across industries. This training aims to create awareness and educate employees, senior executives, consultants, and other key stakeholders, including investors, policymakers, and supply chain partners, on the importance and implementation of sustainability.
LEARNING OBJECTIVES
1. Develop a comprehensive understanding of the fundamental principles and concepts that form the foundation of sustainability within corporate environments.
2. Explore the sustainability implementation model, focusing on effective measures and reporting strategies to track and communicate sustainability efforts.
3. Identify and define best practices and critical success factors essential for achieving sustainability goals within organizations.
CONTENTS
1. Introduction and Key Concepts of Sustainability
2. Principles and Practices of Sustainability
3. Measures and Reporting in Sustainability
4. Sustainability Implementation & Best Practices
To download the complete presentation, visit: https://www.oeconsulting.com.sg/training-presentations
Premium MEAN Stack Development Solutions for Modern BusinessesSynapseIndia
Stay ahead of the curve with our premium MEAN Stack Development Solutions. Our expert developers utilize MongoDB, Express.js, AngularJS, and Node.js to create modern and responsive web applications. Trust us for cutting-edge solutions that drive your business growth and success.
Know more: https://www.synapseindia.com/technology/mean-stack-development-company.html
Discover the innovative and creative projects that highlight my journey throu...dylandmeas
Discover the innovative and creative projects that highlight my journey through Full Sail University. Below, you’ll find a collection of my work showcasing my skills and expertise in digital marketing, event planning, and media production.
3.0 Project 2_ Developing My Brand Identity Kit.pptxtanyjahb
A personal brand exploration presentation summarizes an individual's unique qualities and goals, covering strengths, values, passions, and target audience. It helps individuals understand what makes them stand out, their desired image, and how they aim to achieve it.
Improving profitability for small businessBen Wann
In this comprehensive presentation, we will explore strategies and practical tips for enhancing profitability in small businesses. Tailored to meet the unique challenges faced by small enterprises, this session covers various aspects that directly impact the bottom line. Attendees will learn how to optimize operational efficiency, manage expenses, and increase revenue through innovative marketing and customer engagement techniques.
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...Kumar Satyam
According to TechSci Research report, “India Orthopedic Devices Market -Industry Size, Share, Trends, Competition Forecast & Opportunities, 2030”, the India Orthopedic Devices Market stood at USD 1,280.54 Million in 2024 and is anticipated to grow with a CAGR of 7.84% in the forecast period, 2026-2030F. The India Orthopedic Devices Market is being driven by several factors. The most prominent ones include an increase in the elderly population, who are more prone to orthopedic conditions such as osteoporosis and arthritis. Moreover, the rise in sports injuries and road accidents are also contributing to the demand for orthopedic devices. Advances in technology and the introduction of innovative implants and prosthetics have further propelled the market growth. Additionally, government initiatives aimed at improving healthcare infrastructure and the increasing prevalence of lifestyle diseases have led to an upward trend in orthopedic surgeries, thereby fueling the market demand for these devices.
Putting the SPARK into Virtual Training.pptxCynthia Clay
This 60-minute webinar, sponsored by Adobe, was delivered for the Training Mag Network. It explored the five elements of SPARK: Storytelling, Purpose, Action, Relationships, and Kudos. Knowing how to tell a well-structured story is key to building long-term memory. Stating a clear purpose that doesn't take away from the discovery learning process is critical. Ensuring that people move from theory to practical application is imperative. Creating strong social learning is the key to commitment and engagement. Validating and affirming participants' comments is the way to create a positive learning environment.
Cracking the Workplace Discipline Code Main.pptxWorkforce Group
Cultivating and maintaining discipline within teams is a critical differentiator for successful organisations.
Forward-thinking leaders and business managers understand the impact that discipline has on organisational success. A disciplined workforce operates with clarity, focus, and a shared understanding of expectations, ultimately driving better results, optimising productivity, and facilitating seamless collaboration.
Although discipline is not a one-size-fits-all approach, it can help create a work environment that encourages personal growth and accountability rather than solely relying on punitive measures.
In this deck, you will learn the significance of workplace discipline for organisational success. You’ll also learn
• Four (4) workplace discipline methods you should consider
• The best and most practical approach to implementing workplace discipline.
• Three (3) key tips to maintain a disciplined workplace.
Exploring Patterns of Connection with Social Dreaming
Project manager delivering project success
1. January 19, 2012
Project Manager Delivering Project Success Assignment by Prof. Prbhakaran
Bipin Barma
Project : AllenSolly Store, Commercial Street, Bangalore
Project Manager : Bipin Barma
Area of the store : 2000sft
Budget Approved : 80 Lakhs
Execution Period : 35 days
Location : High Street , in one of the costliest area of Bangalore.
Project Objectives :
• To execute the project in a span of 35 days in comparision to the regular project duration of 50 days to save the dead
rent and to start the business as early as possible.(within the specified budget & Quality Standards)
• It should be one of the best store in the high street with ACP cladded Facade and back lit LED Signages, best interiors
for superior customer shopping experience
QN-1 : Describe what made the project manager for the project effective or ineffective.
Effectiveness is defined as being “a measure of the quality of attainment in meeting objectives; to be distinguished
from efficiency which is measured by the volume of output achieved for the input used”
Here in this case effective project management means whether or not the project met its stated goals and whether
the project Manager managed the project effectively.
The following Qualities and deliveries made the Project Manager effective in the process of executing the project .
References : Class Materials ,Google, Wiki & Blogs 1
2. January 19, 2012
Project Manager Delivering Project Success Assignment by Prof. Prbhakaran
Bipin Barma
Knowledge & Sense of Participative in Leadership &
Skills responsibility decision-making Ownership
1. Time : Execution should
Meeting
complete in 35 days
Success Criteria
2. Cost : Capex Spent to be
Effective Project Manager within the approved budget of
80 Lakhs
3. Scope : Design to meet the
guidelines of New identity -
Delivering Value High Street
4. Quality : To be the best in
standards ( in comparison to
the competitors)
5. Visual Merchandising &
Facade : has to be distinctive
(standing out)
Team Work Delegation of Managing Managing Risks
Power Relationship & Conflicts
(In the following pages ,each of the above heads are been described how it helped the project manager during the execution
process and the improvements that could have been stressed upon.)
References : Class Materials ,Google, Wiki & Blogs 2
3. January 19, 2012
Project Manager Delivering Project Success Assignment by Prof. Prbhakaran
Bipin Barma
Knowledge & Skills (project manager is an Architect with formal project management credentials)
To execute a retail store following basic skills are must
1. Understanding of design ,capability of customising minor details as per site conditions
2. Drawing reading (Auto Cad files) and making the Contractor understand what exactly to be done
3. Making Drawings –the main mode of communication
4. MS Project – execution Plan developement & tracking
5. MS office- for detail calculations and financial spread sheet presentations
6. Knowledge of materials, cost & availibility- procurement best practices
7. Leadership skill, team work culture, conflict handling capabilities and negotiation skills – helped the project
manager making the best use of all resources to achieve the project Goals.
Area of improvement :
o Political skills – ability to build a power base and establish the right connections with upper management.
Sense of responsibility (Lead from the front)
Project Manager was influential and one point of contact to all external and internal stakeholders for
information transfer and decision making,
This created a transperent environment where accuracy of all data (whether it is the target dates of mile
stones, Cash flow requirements ,cost differntial values ,risk assesment etc.) remain stable.
If there is an scope change ,design change or cost over run - every department (visual merchandising,
Opertaion, Vendors) could communicate to him for change requests having an faith it will be processed as
per organisational best practise.
A well defined RAM (Responsibility Allocation Matrix) was prepared and followed so that each
stakeholder understands his accountibility and deliverables in accomplishing the project.
References : Class Materials ,Google, Wiki & Blogs 3
4. January 19, 2012
Project Manager Delivering Project Success Assignment by Prof. Prbhakaran
Bipin Barma
Participative in decision making
All designs and cost related planning exercises used to go through the project manager ,he used to be the formal signoff
authority of every action that is going to be implemented .
Being participative he could logically analyse every dimensions of actions before being getting executed ,this helped
eliminating the prevailing errors and risks
Leadership & Ownership
Through Leadership The project manager had to provide direction to all stake holders, energize others, and obtainin their
voluntary commitment to the over all vision of the project .
The mjor areas where Leadership is driven by the project manager :
Motivating Others
Managing Change
Developing People
Building Power Bases
Understanding Behavioural styles
Managing the Team
Providing Project Leadership
Managing Project Politics
Developing Personal Effectiveness
Managing Project Conflicts
References : Class Materials ,Google, Wiki & Blogs 4
5. January 19, 2012
Project Manager Delivering Project Success Assignment by Prof. Prbhakaran
Bipin Barma
Meeting Sucess Criteria:
Following objectives were set and achieved :
Time : Execution completed in 35 days ,handed over to operation on time for opening
Cost : Capex Spent was within the approved budget of 80 Lakhs (76 lakhs)
Scope : Design was made as per the guidelines of New identity - High Street , (store came out very well and
got awarded by the President )
Quality : Over all execution quality was up to the standards in comparision to the other competitors.
Visual Merchandising & Facade : New glazing with spider fittings ,Facade -ACP cladded, signage - 3D back
lit,Fore court newly paved, Interiors –new visuals been put, Luxurious Lounge been created , The Store came
out very well and opened with increased footfall.
References : Class Materials ,Google, Wiki & Blogs 5
6. January 19, 2012
Project Manager Delivering Project Success Assignment by Prof. Prbhakaran
Bipin Barma
Delivering Values : “Professionalism ,Integrity ,Corporate Values and problem solving” were the three major areas which
demanded value addition.The project manager could extract all these values from all the stakeholders throughout the project
life cycle.
Project Managerial effectiveness through Value addition
Critical
E Zone
F
F
E
C
T
I
V
E
N
E
S
S
0 1 2 3 4 5 6
Mean Values
References : Class Materials ,Google, Wiki & Blogs 6
7. January 19, 2012
Project Manager Delivering Project Success Assignment by Prof. Prbhakaran
Bipin Barma
Managing Risks and Conflicts :
Following were the major risks handled carefully by the project manager.
1. Scope Creep : Initiation of change request form to tap time and cost impact due to changes and approval of the same
before /during execution.
a. Facade implementation cost increased twice than that was planned earlier
b. Gnerator Space re designed due to increase in size of the Machine
2. Police and Traffic issues :
a. Bribing of more than 3 Lakhs to police to move raw materials to the site during day time and to continue fit out
work in the day time.(Contingencies cap increased to 10% of the total Capex)
3. Conflicts between Contractors & departments : (difference of opinion)
a. Reduction of execution time, resulted conflicts between the contractors -through discussion & re evaluating the
dependencies every week the PM could reduce the friction for smoother execution.
Conflict management is a critical activity which requires in depth evaluation of the Cause and require delicate handling to
keep the motivation up of all stakeholders.Most of the times it generates high level of negative energy in the project
environment. Not all who involved in the process express their desire and emotion openly and becomes difficult to
understand the issue at grass root level.
The following is one of the frame work that could help resolving the conflicts by ( FORCING ,COLLBORATING,COPROMISING
,AVOIDING AND ACCOMODATING )- various issues.
References : Class Materials ,Google, Wiki & Blogs 7
8. January 19, 2012
Project Manager Delivering Project Success Assignment by Prof. Prbhakaran
Bipin Barma
Conflict handling Frame Work
References : Class Materials ,Google, Wiki & Blogs 8
9. January 19, 2012
Project Manager Delivering Project Success Assignment by Prof. Prbhakaran
Bipin Barma
Managing relationship, delegation of Power and Team Work
Relationship Management through TO & RO bifurcation
In this project environment ,relationship with vendors, external consultants,local authorities (external
stakeholders )- is mostly Task Oriented (TO) and the relationship with departments ,Team members
,management (internal stake holders) is Relationship Oriented (RO)
Relationships:
Integrated Present Case
Related
( high- TO 1. Relationship with
(high -RO)
& RO) external stakeholders t
handled through proper
Planning ,Organising
Relationship and Control
2. Relationship with
Orientation Separated Internal Stake holders
Dedicated
(RO) (Low- TO handled through
(High -RO)
& RO) mutual trust
Feelings, development
,encouragement and
mutual- trust, &
caring the feelings
encouragement
Task Orientation (TO) – Plan, Organise & Control
References : Class Materials ,Google, Wiki & Blogs 9
10. January 19, 2012
Project Manager Delivering Project Success Assignment by Prof. Prbhakaran
Bipin Barma
Delegation of Power or Authority: (through various levels)
Creating Six levels of authority and delegating Power :
Levels Results
Level 1: Seek Approval for
look into the problem; report all; decide what to do. Authority
Level 2: Justify the logic and be
look into the problem; let the PM know alternative actions including pros and cons of each; authorised to implement
recommend one for his approval.
Level 3: Seek Approval for
look into the problem; let the PM know what is to be done ; don’t take action until PM approves. Authority
Level 4: You are authorised no
look into the problem; let the PM know what is intended to be done ; do it unless PM says “No.” further approval required
Level 5: Authorised ,but keep
take action; let the PM know what you did. reporting
Level 6: You are empowered to
take action; no further contact with PM is required do so
The Project Manager always remained as a power house of all authorities, with his due approval unless mentioned in the
Responsibility allocation Matrix the power or authority to take a decision can be shifted from one person to other.
References : Class Materials ,Google, Wiki & Blogs 10
11. January 19, 2012
Project Manager Delivering Project Success Assignment by Prof. Prbhakaran
Bipin Barma
Team Work :
Undestanding the importance of team work, following guidelines were followed throughout the Project Life Cycle.
Seeking out other’s opinions and involvement in matters that concern them before making decisions or plans final.
Trusting the team to develop a consensus on an issue, even if it takes a little more time.
Voluntarily offering your own relevant experiences, ideas and findings to colleagues who could use them.
Acknowledging a colleague’s contribution sharing the credit
Being non defensive and receptive to the suggestions, ideas opinions and needs of colleagues. Making the effort to
understand before criticising.
Considering impact of your plans on others.
Being unwilling to criticise a third party who isn’t present, not gossiping.
Coming prepared to present or participate when you have a role in meetings.
Expressing appreciation for teamwork extended to you that was helpful.
Identifying and helping pick up loose ends even though they may not be your responsibility.
Keeping people advised of changes, developments and new information on a task or project.
Being supportive of the team’s objectives once they are set.
References : Class Materials ,Google, Wiki & Blogs 11
12. January 19, 2012
Project Manager Delivering Project Success Assignment by Prof. Prbhakaran
Bipin Barma
Summary :
With thorough evaluation of all steps we can conclude that the effectiveness of the Project Manager or any stakeholder who is
involved in the Project delivery need to have the following Values :
1. Integrated
2. Dedicated
3. Developer
4. Executive
5. Benevolent Autocrat
Developer Executive
Benevolent
Autocrat
RO – Bureaucrat
Integrated
Relationship
Oriented Related
Dedicated
Missionary TO – Task MORE
Compro - Separated Oriented
miser EFFECTIVE (ME)
Developer Autocrat
LESS EFFECTIVE
(LE)
References : Class Materials ,Google, Wiki & Blogs 12
13. January 19, 2012
Project Manager Delivering Project Success Assignment by Prof. Prbhakaran
Bipin Barma
THE OUTCOME :
AllenSolly Store
Commercial
Street, Bangalore
References : Class Materials ,Google, Wiki & Blogs 13