Project Management-
Gatekeepers of Process
   Structure and Workflow




                            1
Team Structure at GlobalHue
Account, Creatives and Project Managers
   Assigned per client and product
       Account Supervisors
       Account Executives
       Project Managers
       Copywriters
       Art Directors
       Print Producers
       Editorial (Translator and Proofreader)
   Work as an integrated team
   Information shared from initiation to completion
   Whole team integration for the lifecycle of the project
   From CIR to Final Release


                                                             2
The role of the Project Manager
Project Managers assigned to each client/product team
    Facilitate the internal meetings
    Distributes the information
         Action Items
         Schedules Status meetings
    Gathers information for the creation of timelines
    Provides a recap of the CRI Meetings
    Tracks job through status reports
    Informs departments of work flow
    Maintains status of active jobs
    Enters Production estimates and purchase orders into the system
    Responsible for routing the actual pieces of
    a job (manuscripts, Art Director’s layouts,
    mechanicals, etc) through the Agency for signature approvals and/or corrections




                                                                                      3
Project Manager’s role
Liaison to all Agency departments, working specifically within
client/product team to provide information on each job to:
    Account Management
    Creative (Art Directors and Copy Writers)
    Editorial
    Studio Imprint
    Production




                                                                 4
All job requests concerning agency projects must be communicated through the assigned
Project Manager. Any requests that are made between departments without a Project
Manager’s knowledge should be rejected.




                                      Account Management




                  Production                                     Art Directors




                                        Project Manager




                                                                 Copy Writers
             Editorial/Proofreading




                                         Studio Imprint




                                                                                    5
Project Manager’s role

Sets up Job Jackets for each assigned project

Schedules work for other key support service
departments of the Agency
(Studio, Editorial, and Production)
on the basis of advance warning.

Priority jobs must be noted by Project Manager and group sign-off meetings
arranged to expedite the approval process when necessary

Enters estimates into Advantage

Enters Purchase Orders into Advantage



                                                                         6
Tracking the job
Project Manager creates an initial schedule/timeline for the job based on
input from account, production and media.

Project Managers file paperwork in the job jacket for the tracking of the job’s
history.

Work with Account on the daily progress of their assigned projects.

Provides daily action lists to the team.

Provides Editorial EOD job listing that requires their services.

Runs the weekly team status meetings.

Provides input on the current state of a job during the daily PM meetings.

                                                                              7
Workflow
-Begin at the beginning:
     Communicate the client’s need




                                     8
Account Team: Defines the assignment


 Provides the client’s input.
 Plots the path of the assignment.
 Is aware of the client budget contingencies.
 Determines the approximate timeframe for the project
 deliverables based on Agency as well as Client
 feedback.
 Communicates the client direction to the team.



                                                        9
The CIR
The CIR is the starting point for all creative executions. It provides the team with the key
information for the proper execution of the job.

 The CIR contains the following information:


     Billable/Non-billable:
     Purpose:
     Target Audience:
     Communication Objective:
     Promise:
     Delivery Vehicle:
     Format/Initial Specs:
     Mandatories:
     Considerations/Additional Client instruction:




                                                                                           10
CIR Meeting
 Account, Creatives and Project Manager, Studio Imprint, Editorial’, Print Production
must attend all CIR Meetings
   Distribute the preliminary information and discuss the Creative Brief/project with
   the team
   Account to ensure that Project Management has the proper guidelines to
   distribute to all assigned departments
   Schedule follow up meetings to discuss direction and concept
   Review hours for each discipline for the project
   Determine need for support (freelance help)
   Project Management to provide a recap of the CIR for all team member




                                                                                    11
Stages of the Process
Timeline: A timeline is created and approved by all involved departments
prior to submission to the client

Concept Review : Initialion and submission of concepts and copy to client

Layout Revisions: Review/revise layout and submit to Client

Mechanical Review: Create production-ready files and prep artwork for final
release

File Release: After client approvals/ revisions- load and release of final files




                                                                                   12
Editorial Functions:
        Involvement from the concept stage to proof review.

If the job is out of scope it must have estimate on file
    If not, process is halted and Account Team notified

Responsibilities
  Translation
  Proofreading
   • Initial Concepts
   • Copy decks
   • Production-ready mechanicals
   • Story Boards and Scripts
   • Vendor/Printer Proofs


                                                              13
Concept Review
Account issues a CIR to discuss the scope and parameters of the project.
Files are either provided from the general market agency or created
internally if an original piece.
1. Editorial’: Translates provided general market creative or, if original,
      proofreads document.
2. Copy: Reviews From A to Si’ translation and/or comments- Signs off on
      document.
3. Art: Updates/Creates layout with current copy deck- signs off on the
      document.
4. Account: Reviews layouts/concepts- signs off on the document.
5. Editorial’: Proofreads layouts and reviews and comments made by the team.
Repeat Steps 1-5 until the document is clean.
7. Account & Creative: Presents layouts/concepts to the client.




                                                                           14
Layout Revisions
1. Account: Notes and marks layouts with client comments.
2. Creative: Reviews client comments.
3. Editorial: Reviews comments to check for consistency and current guidelines- signs off
       on the layout.
4. Creative: Revise layouts and/or Copy decks to reflect client comments- signs off on the
       document
5. Account: Reviews revised layouts and notes makes comments if necessary- signs off
       on the document.
6. Editorial: Proofreads revised layouts and makes comments if necessary- signs off on
       the document.
Repeat Steps 4-6 until clean
7. Account: Submits for client approval
If there are additional client comments repeat process until approval is received.




                                                                                        15
Studio Functions:
   Involvement from the mechanical stage to the file release

Job must have estimate on file
   If not, process is halted and Account Team notified
Production specs, die strikes, comps and printer’s
dummies prepared at this point
QC checks layout against spec sheet
Discrepancies are followed up with Production or AD




                                                               16
Retouching

Job must have estimate on file
   If not, process is halted and Account Team notified
Preparation of final high res artwork occurs
simultaneously with layout and copy revisions to speed
process




                                                         17
Preparing for Production/ Mechanical Stage
This is the stage where the files are transferred from Creative to Studio Imprint for the creation of the
mechanicals. The job folder for studio must contain the Studio Ticket as well as the proper reference
materials. Studio will not begin a job unless they have all the information they require.
1.Production: Creates studio ticket for submission to Studio Imprint
2. Studio : Creates mechanical based on layout and specs provided-Studio operator and
    QC signs off on the mechanical.
3. Art: Double checks mechanical and notes and changes if necessary-signs off on the
    mechanical.
4. Editorial: Proofreads mechanical- signs off on the mechanical
5. Copy/ Art/ Account: Reviews proofreaders comments and makes any necessary
    changes- Creatives and Account must sign off on the mechanical.
6. Studio Imprint: Incorporates any comments on mechanical
Repeat Steps 2-6 until Clean
7. Account: Submits mechanical to client for approval
8. Account: Marks client changes on mechanical
9. Art/Copy: Reviews client comments- marks any additional changes, and signs
    mechanical.
10. Editorial: Reviews client comments- marks any additional changes and signs
    mechanical.
11. Studio Imprint: Incorporates comments into mechanical
Repeat Steps 7-11 until clean


                                                                                                            18
Print Production Overview and
            Functions
Digital and traditional delivery of all final production files to vendors and clients

Works with Client, Account, Art Department, Studio Imprint,
and printers on cost, timing, and specs

Checks file integrity and construction of files at the beginning and prior to the release
of the job

Works with Studio Imprint, as final high-resolution artwork is prepared
Checks specs during internal routing (at the beginning and at time of release)

Requests Estimates and Purchase Orders from Project Management

Reviews vendor proofs




                                                                                        19
Production: Pre-Release
Pre-File Release
   Estimate Request must specify:
       Job Number
       Description: Should include size, colors, quantities, delivery/run
       dates
   Vendor bids
       Written estimate
   Estimate request to Project Management

   Approval of Studio rounds
   File Release to Vendor/Publication/Printer



                                                                            20
Production: Post Release
Post-File Release Process
  File received by vendor
  Approval proof to Agency
  Revision/approval of proof
  Revised proof
  Final approval
  Printing/letter shop/manufacturing
  Delivery of job
  Keeps job history on file for future reference



                                                   21
Mechanical Release
1. Account: Receives final client approval on the mechanical, gives the
      mechanical a final read and signs off on the checklist
2. Studio Imprint: Gives the mechanical a final read and signs off on the
      checklist
3. Editorial: Final Read- signs checklist
4. Account/Copy/ Creative/Production: Final Read- signs checklist
5. Production: Signs checklist-Releases files to publication/print vendor
Vendor Proofs Received
6. Production: Provides PM with vendor proofs as well as back up from
      final read.
7. Editorial: Proofreads proofs against backup
8. Account/Art/Copy: Reviews proofs and makes comments if
      necessary
9.Production: Gives corrected proofs to the vendor.
Repeat steps 6-9 until clean
                                                                       22
How Revisions Impact Costs
On a timeline: earlier in the process = less $
Changes can be made at any point
Near the end of the process = more $
Overtime and rush charges become prohibitive
Changes at the printer are the most costly




                                                 23
Rising Cost of Change Over the
           Life of a Job

$$$$
 JOB COST




       $
            Concept   Layout   Art Selection   Mechanical   Disk Release   Printer   24
The Routing System for
       approvals/revisons
The Routing System is in place to ensure that anyone can
look at the job jacket and:
   Determine a job’s current state and the next appropriate
   steps
   See the history of the job
   Track down errors




                                                              25
The Transition Meeting
The purpose of the transition meeting is to ensure that the proper information is shared
    between the project managers incase a job has to be temporarily handed off.




  The PM assigned to the project calls for a transition meeting if the EOD
  deliverables need to be covered by a 2nd PM.

  The PM’s supervisor as well as Account Management must be invited to the
  meeting.

  The PM assigned to the project must fill out the transition form which the
  covering PM will refer to for the EDO deliverables.

  The covering PM will provide a recap of the meeting to all team members
  involved in the project.




                                                                                       26

More Related Content

What's hot

Apqp+english+version[1]
Apqp+english+version[1]Apqp+english+version[1]
Apqp+english+version[1]Murat Terzi
 
Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012REDceo.net
 
Pre-opening interior snagging services for luxury hotels
Pre-opening interior snagging services for luxury hotelsPre-opening interior snagging services for luxury hotels
Pre-opening interior snagging services for luxury hotelsSamir Khosla
 
CMGT 410 Become Exceptional--cmgt410.com
CMGT 410 Become Exceptional--cmgt410.comCMGT 410 Become Exceptional--cmgt410.com
CMGT 410 Become Exceptional--cmgt410.comclaric132
 
CMGT 410 HOMEWORK Redefined Education--cmgt410homework.com
CMGT 410 HOMEWORK Redefined Education--cmgt410homework.comCMGT 410 HOMEWORK Redefined Education--cmgt410homework.com
CMGT 410 HOMEWORK Redefined Education--cmgt410homework.comclaric238
 
CMGT 410 AID Achievement Education--cmgt410aid.com
CMGT 410 AID Achievement Education--cmgt410aid.comCMGT 410 AID Achievement Education--cmgt410aid.com
CMGT 410 AID Achievement Education--cmgt410aid.comagathachristie182
 
CMGT 410 AID Inspiring Innovation--cmgt410aid.com
CMGT 410 AID Inspiring Innovation--cmgt410aid.comCMGT 410 AID Inspiring Innovation--cmgt410aid.com
CMGT 410 AID Inspiring Innovation--cmgt410aid.comwilliamwordsworth35
 
Togaf 9 template architecture vision
Togaf 9 template   architecture visionTogaf 9 template   architecture vision
Togaf 9 template architecture visionKris Manzera
 
Jessica D Anson 2009
Jessica D Anson 2009Jessica D Anson 2009
Jessica D Anson 2009maejam
 
Agility : a Velvet Glove in an Iron FIst
Agility : a Velvet Glove in an Iron FIstAgility : a Velvet Glove in an Iron FIst
Agility : a Velvet Glove in an Iron FIstHSBC Private Bank
 
SOFTWARE PROJECT MANAGEMENT TOOL PPT
SOFTWARE PROJECT MANAGEMENT TOOL PPTSOFTWARE PROJECT MANAGEMENT TOOL PPT
SOFTWARE PROJECT MANAGEMENT TOOL PPTSai Charan
 
CMGT 410 AID Introduction Education--cmgt410aid.com
CMGT 410 AID Introduction Education--cmgt410aid.comCMGT 410 AID Introduction Education--cmgt410aid.com
CMGT 410 AID Introduction Education--cmgt410aid.comkopiko203
 
Spm ksp
Spm kspSpm ksp
Spm kspktosri
 
CMGT 410 AID Become Exceptional--cmgt410aid.com
CMGT 410 AID Become Exceptional--cmgt410aid.comCMGT 410 AID Become Exceptional--cmgt410aid.com
CMGT 410 AID Become Exceptional--cmgt410aid.comkopiko125
 
CMGT 410 AID Redefined Education--cmgt410aid.com
CMGT 410 AID Redefined Education--cmgt410aid.comCMGT 410 AID Redefined Education--cmgt410aid.com
CMGT 410 AID Redefined Education--cmgt410aid.comkopiko172
 

What's hot (20)

Software Project Management
Software Project ManagementSoftware Project Management
Software Project Management
 
Software project management 3
Software project management 3Software project management 3
Software project management 3
 
Apqp+english+version[1]
Apqp+english+version[1]Apqp+english+version[1]
Apqp+english+version[1]
 
Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012
 
Pre-opening interior snagging services for luxury hotels
Pre-opening interior snagging services for luxury hotelsPre-opening interior snagging services for luxury hotels
Pre-opening interior snagging services for luxury hotels
 
Symbioun's Agile Capabilities
Symbioun's Agile CapabilitiesSymbioun's Agile Capabilities
Symbioun's Agile Capabilities
 
CMGT 410 Become Exceptional--cmgt410.com
CMGT 410 Become Exceptional--cmgt410.comCMGT 410 Become Exceptional--cmgt410.com
CMGT 410 Become Exceptional--cmgt410.com
 
CMGT 410 HOMEWORK Redefined Education--cmgt410homework.com
CMGT 410 HOMEWORK Redefined Education--cmgt410homework.comCMGT 410 HOMEWORK Redefined Education--cmgt410homework.com
CMGT 410 HOMEWORK Redefined Education--cmgt410homework.com
 
CMGT 410 AID Achievement Education--cmgt410aid.com
CMGT 410 AID Achievement Education--cmgt410aid.comCMGT 410 AID Achievement Education--cmgt410aid.com
CMGT 410 AID Achievement Education--cmgt410aid.com
 
CMGT 410 AID Inspiring Innovation--cmgt410aid.com
CMGT 410 AID Inspiring Innovation--cmgt410aid.comCMGT 410 AID Inspiring Innovation--cmgt410aid.com
CMGT 410 AID Inspiring Innovation--cmgt410aid.com
 
Togaf 9 template architecture vision
Togaf 9 template   architecture visionTogaf 9 template   architecture vision
Togaf 9 template architecture vision
 
Product dossier touchbase automation
Product dossier touchbase automationProduct dossier touchbase automation
Product dossier touchbase automation
 
20130411 velvet gloveagile
20130411 velvet gloveagile20130411 velvet gloveagile
20130411 velvet gloveagile
 
Jessica D Anson 2009
Jessica D Anson 2009Jessica D Anson 2009
Jessica D Anson 2009
 
Agility : a Velvet Glove in an Iron FIst
Agility : a Velvet Glove in an Iron FIstAgility : a Velvet Glove in an Iron FIst
Agility : a Velvet Glove in an Iron FIst
 
SOFTWARE PROJECT MANAGEMENT TOOL PPT
SOFTWARE PROJECT MANAGEMENT TOOL PPTSOFTWARE PROJECT MANAGEMENT TOOL PPT
SOFTWARE PROJECT MANAGEMENT TOOL PPT
 
CMGT 410 AID Introduction Education--cmgt410aid.com
CMGT 410 AID Introduction Education--cmgt410aid.comCMGT 410 AID Introduction Education--cmgt410aid.com
CMGT 410 AID Introduction Education--cmgt410aid.com
 
Spm ksp
Spm kspSpm ksp
Spm ksp
 
CMGT 410 AID Become Exceptional--cmgt410aid.com
CMGT 410 AID Become Exceptional--cmgt410aid.comCMGT 410 AID Become Exceptional--cmgt410aid.com
CMGT 410 AID Become Exceptional--cmgt410aid.com
 
CMGT 410 AID Redefined Education--cmgt410aid.com
CMGT 410 AID Redefined Education--cmgt410aid.comCMGT 410 AID Redefined Education--cmgt410aid.com
CMGT 410 AID Redefined Education--cmgt410aid.com
 

Similar to Project Management Overview

Completeguidetomanualtestinguma 120608233901-phpapp01
Completeguidetomanualtestinguma 120608233901-phpapp01Completeguidetomanualtestinguma 120608233901-phpapp01
Completeguidetomanualtestinguma 120608233901-phpapp01bdivyadeepu
 
Completeguidetomanualtestinguma 120608233901-phpapp01
Completeguidetomanualtestinguma 120608233901-phpapp01Completeguidetomanualtestinguma 120608233901-phpapp01
Completeguidetomanualtestinguma 120608233901-phpapp01bdivyadeepu
 
Working Agile with Scrum and TFS 2013
Working Agile with Scrum and TFS 2013Working Agile with Scrum and TFS 2013
Working Agile with Scrum and TFS 2013Moataz Nabil
 
Complete testing@uma
Complete testing@umaComplete testing@uma
Complete testing@umaUma Sapireddy
 
Complete guide to manual testing@uma
Complete guide to manual  testing@umaComplete guide to manual  testing@uma
Complete guide to manual testing@umaUma Sapireddy
 
Integrating agile into sdlc presentation pmi v2
Integrating agile into sdlc presentation   pmi v2Integrating agile into sdlc presentation   pmi v2
Integrating agile into sdlc presentation pmi v2pmimkecomm
 
Construction process
Construction processConstruction process
Construction processMazen Al-Qadi
 
Raistec business solutions company profile
Raistec business solutions   company profileRaistec business solutions   company profile
Raistec business solutions company profileRajesh Rai
 
Manual testing good notes
Manual testing good notesManual testing good notes
Manual testing good notesdkns0906
 
Tuli e services_development_process
Tuli e services_development_processTuli e services_development_process
Tuli e services_development_processTULI eServices Inc.
 
ACCENTURE - PERIOD OF EMPLOYMENT
ACCENTURE - PERIOD OF EMPLOYMENTACCENTURE - PERIOD OF EMPLOYMENT
ACCENTURE - PERIOD OF EMPLOYMENTglicell palmaria
 
Assignment Instructions  The case study is a project manag.docx
Assignment Instructions  The case study is a project manag.docxAssignment Instructions  The case study is a project manag.docx
Assignment Instructions  The case study is a project manag.docxssuser562afc1
 
Software industry 101
Software industry 101Software industry 101
Software industry 101Iman Tunggono
 

Similar to Project Management Overview (20)

Completeguidetomanualtestinguma 120608233901-phpapp01
Completeguidetomanualtestinguma 120608233901-phpapp01Completeguidetomanualtestinguma 120608233901-phpapp01
Completeguidetomanualtestinguma 120608233901-phpapp01
 
Completeguidetomanualtestinguma 120608233901-phpapp01
Completeguidetomanualtestinguma 120608233901-phpapp01Completeguidetomanualtestinguma 120608233901-phpapp01
Completeguidetomanualtestinguma 120608233901-phpapp01
 
Working Agile with Scrum and TFS 2013
Working Agile with Scrum and TFS 2013Working Agile with Scrum and TFS 2013
Working Agile with Scrum and TFS 2013
 
Complete testing@uma
Complete testing@umaComplete testing@uma
Complete testing@uma
 
Complete guide to manual testing@uma
Complete guide to manual  testing@umaComplete guide to manual  testing@uma
Complete guide to manual testing@uma
 
Integrating agile into sdlc presentation pmi v2
Integrating agile into sdlc presentation   pmi v2Integrating agile into sdlc presentation   pmi v2
Integrating agile into sdlc presentation pmi v2
 
Pepnad final
Pepnad finalPepnad final
Pepnad final
 
Balcroft dmwb flyer
Balcroft dmwb flyerBalcroft dmwb flyer
Balcroft dmwb flyer
 
Balcroft DMWB Flyer
Balcroft DMWB FlyerBalcroft DMWB Flyer
Balcroft DMWB Flyer
 
MOM on BA
MOM on BAMOM on BA
MOM on BA
 
Construction process
Construction processConstruction process
Construction process
 
JD Design Engineer
JD Design EngineerJD Design Engineer
JD Design Engineer
 
Raistec business solutions company profile
Raistec business solutions   company profileRaistec business solutions   company profile
Raistec business solutions company profile
 
Manual testing
Manual testing Manual testing
Manual testing
 
Manual testing good notes
Manual testing good notesManual testing good notes
Manual testing good notes
 
Tuli e services_development_process
Tuli e services_development_processTuli e services_development_process
Tuli e services_development_process
 
ACCENTURE - PERIOD OF EMPLOYMENT
ACCENTURE - PERIOD OF EMPLOYMENTACCENTURE - PERIOD OF EMPLOYMENT
ACCENTURE - PERIOD OF EMPLOYMENT
 
Assignment Instructions  The case study is a project manag.docx
Assignment Instructions  The case study is a project manag.docxAssignment Instructions  The case study is a project manag.docx
Assignment Instructions  The case study is a project manag.docx
 
Software industry 101
Software industry 101Software industry 101
Software industry 101
 
abhi resume
abhi resumeabhi resume
abhi resume
 

Recently uploaded

Event Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybridEvent Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybridHolger Mueller
 
USA classified ads posting – best classified sites in usa.pdf
USA classified ads posting – best classified sites in usa.pdfUSA classified ads posting – best classified sites in usa.pdf
USA classified ads posting – best classified sites in usa.pdfsuperbizness1227
 
How to Maintain Healthy Life style.pptx
How to Maintain  Healthy Life style.pptxHow to Maintain  Healthy Life style.pptx
How to Maintain Healthy Life style.pptxrdishurana
 
Evolution and Growth of Supply chain.pdf
Evolution and Growth of Supply chain.pdfEvolution and Growth of Supply chain.pdf
Evolution and Growth of Supply chain.pdfGutaMengesha1
 
Understanding UAE Labour Law: Key Points for Employers and Employees
Understanding UAE Labour Law: Key Points for Employers and EmployeesUnderstanding UAE Labour Law: Key Points for Employers and Employees
Understanding UAE Labour Law: Key Points for Employers and EmployeesDragon Dream Bar
 
sales plan presentation by mckinsey alum
sales plan presentation by mckinsey alumsales plan presentation by mckinsey alum
sales plan presentation by mckinsey alumzyqmx62fgm
 
LinkedIn Masterclass Techweek 2024 v4.1.pptx
LinkedIn Masterclass Techweek 2024 v4.1.pptxLinkedIn Masterclass Techweek 2024 v4.1.pptx
LinkedIn Masterclass Techweek 2024 v4.1.pptxSymbio Agency Ltd
 
HR and Employment law update: May 2024.
HR and Employment law update:  May 2024.HR and Employment law update:  May 2024.
HR and Employment law update: May 2024.FelixPerez547899
 
Transforming Max Life Insurance with PMaps Job-Fit Assessments- Case Study
Transforming Max Life Insurance with PMaps Job-Fit Assessments- Case StudyTransforming Max Life Insurance with PMaps Job-Fit Assessments- Case Study
Transforming Max Life Insurance with PMaps Job-Fit Assessments- Case StudyPMaps Assessments
 
TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024Adnet Communications
 
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...Björn Rohles
 
Cracking the Change Management Code Main New.pptx
Cracking the Change Management Code Main New.pptxCracking the Change Management Code Main New.pptx
Cracking the Change Management Code Main New.pptxWorkforce Group
 
12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdf
12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdf12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdf
12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdfSOFTTECHHUB
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanasabutalha2013
 
Unlock Your TikTok Potential: Free TikTok Likes with InstBlast
Unlock Your TikTok Potential: Free TikTok Likes with InstBlastUnlock Your TikTok Potential: Free TikTok Likes with InstBlast
Unlock Your TikTok Potential: Free TikTok Likes with InstBlastInstBlast Marketing
 
The Inspiring Personality To Watch In 2024.pdf
The Inspiring Personality To Watch In 2024.pdfThe Inspiring Personality To Watch In 2024.pdf
The Inspiring Personality To Watch In 2024.pdfinsightssuccess2
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback AnalysisSafe PaaS
 
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
8 Questions B2B Commercial Teams Can Ask To Help Product DiscoveryDesmond Leo
 
Luxury Artificial Plants Dubai | Plants in KSA, UAE | Shajara
Luxury Artificial Plants Dubai | Plants in KSA, UAE | ShajaraLuxury Artificial Plants Dubai | Plants in KSA, UAE | Shajara
Luxury Artificial Plants Dubai | Plants in KSA, UAE | ShajaraShajara Artificial Plants
 
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckPitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckHajeJanKamps
 

Recently uploaded (20)

Event Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybridEvent Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybrid
 
USA classified ads posting – best classified sites in usa.pdf
USA classified ads posting – best classified sites in usa.pdfUSA classified ads posting – best classified sites in usa.pdf
USA classified ads posting – best classified sites in usa.pdf
 
How to Maintain Healthy Life style.pptx
How to Maintain  Healthy Life style.pptxHow to Maintain  Healthy Life style.pptx
How to Maintain Healthy Life style.pptx
 
Evolution and Growth of Supply chain.pdf
Evolution and Growth of Supply chain.pdfEvolution and Growth of Supply chain.pdf
Evolution and Growth of Supply chain.pdf
 
Understanding UAE Labour Law: Key Points for Employers and Employees
Understanding UAE Labour Law: Key Points for Employers and EmployeesUnderstanding UAE Labour Law: Key Points for Employers and Employees
Understanding UAE Labour Law: Key Points for Employers and Employees
 
sales plan presentation by mckinsey alum
sales plan presentation by mckinsey alumsales plan presentation by mckinsey alum
sales plan presentation by mckinsey alum
 
LinkedIn Masterclass Techweek 2024 v4.1.pptx
LinkedIn Masterclass Techweek 2024 v4.1.pptxLinkedIn Masterclass Techweek 2024 v4.1.pptx
LinkedIn Masterclass Techweek 2024 v4.1.pptx
 
HR and Employment law update: May 2024.
HR and Employment law update:  May 2024.HR and Employment law update:  May 2024.
HR and Employment law update: May 2024.
 
Transforming Max Life Insurance with PMaps Job-Fit Assessments- Case Study
Transforming Max Life Insurance with PMaps Job-Fit Assessments- Case StudyTransforming Max Life Insurance with PMaps Job-Fit Assessments- Case Study
Transforming Max Life Insurance with PMaps Job-Fit Assessments- Case Study
 
TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024
 
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
 
Cracking the Change Management Code Main New.pptx
Cracking the Change Management Code Main New.pptxCracking the Change Management Code Main New.pptx
Cracking the Change Management Code Main New.pptx
 
12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdf
12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdf12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdf
12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdf
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
Unlock Your TikTok Potential: Free TikTok Likes with InstBlast
Unlock Your TikTok Potential: Free TikTok Likes with InstBlastUnlock Your TikTok Potential: Free TikTok Likes with InstBlast
Unlock Your TikTok Potential: Free TikTok Likes with InstBlast
 
The Inspiring Personality To Watch In 2024.pdf
The Inspiring Personality To Watch In 2024.pdfThe Inspiring Personality To Watch In 2024.pdf
The Inspiring Personality To Watch In 2024.pdf
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback Analysis
 
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
 
Luxury Artificial Plants Dubai | Plants in KSA, UAE | Shajara
Luxury Artificial Plants Dubai | Plants in KSA, UAE | ShajaraLuxury Artificial Plants Dubai | Plants in KSA, UAE | Shajara
Luxury Artificial Plants Dubai | Plants in KSA, UAE | Shajara
 
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckPitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
 

Project Management Overview

  • 1. Project Management- Gatekeepers of Process Structure and Workflow 1
  • 2. Team Structure at GlobalHue Account, Creatives and Project Managers Assigned per client and product Account Supervisors Account Executives Project Managers Copywriters Art Directors Print Producers Editorial (Translator and Proofreader) Work as an integrated team Information shared from initiation to completion Whole team integration for the lifecycle of the project From CIR to Final Release 2
  • 3. The role of the Project Manager Project Managers assigned to each client/product team Facilitate the internal meetings Distributes the information Action Items Schedules Status meetings Gathers information for the creation of timelines Provides a recap of the CRI Meetings Tracks job through status reports Informs departments of work flow Maintains status of active jobs Enters Production estimates and purchase orders into the system Responsible for routing the actual pieces of a job (manuscripts, Art Director’s layouts, mechanicals, etc) through the Agency for signature approvals and/or corrections 3
  • 4. Project Manager’s role Liaison to all Agency departments, working specifically within client/product team to provide information on each job to: Account Management Creative (Art Directors and Copy Writers) Editorial Studio Imprint Production 4
  • 5. All job requests concerning agency projects must be communicated through the assigned Project Manager. Any requests that are made between departments without a Project Manager’s knowledge should be rejected. Account Management Production Art Directors Project Manager Copy Writers Editorial/Proofreading Studio Imprint 5
  • 6. Project Manager’s role Sets up Job Jackets for each assigned project Schedules work for other key support service departments of the Agency (Studio, Editorial, and Production) on the basis of advance warning. Priority jobs must be noted by Project Manager and group sign-off meetings arranged to expedite the approval process when necessary Enters estimates into Advantage Enters Purchase Orders into Advantage 6
  • 7. Tracking the job Project Manager creates an initial schedule/timeline for the job based on input from account, production and media. Project Managers file paperwork in the job jacket for the tracking of the job’s history. Work with Account on the daily progress of their assigned projects. Provides daily action lists to the team. Provides Editorial EOD job listing that requires their services. Runs the weekly team status meetings. Provides input on the current state of a job during the daily PM meetings. 7
  • 8. Workflow -Begin at the beginning: Communicate the client’s need 8
  • 9. Account Team: Defines the assignment Provides the client’s input. Plots the path of the assignment. Is aware of the client budget contingencies. Determines the approximate timeframe for the project deliverables based on Agency as well as Client feedback. Communicates the client direction to the team. 9
  • 10. The CIR The CIR is the starting point for all creative executions. It provides the team with the key information for the proper execution of the job. The CIR contains the following information: Billable/Non-billable: Purpose: Target Audience: Communication Objective: Promise: Delivery Vehicle: Format/Initial Specs: Mandatories: Considerations/Additional Client instruction: 10
  • 11. CIR Meeting Account, Creatives and Project Manager, Studio Imprint, Editorial’, Print Production must attend all CIR Meetings Distribute the preliminary information and discuss the Creative Brief/project with the team Account to ensure that Project Management has the proper guidelines to distribute to all assigned departments Schedule follow up meetings to discuss direction and concept Review hours for each discipline for the project Determine need for support (freelance help) Project Management to provide a recap of the CIR for all team member 11
  • 12. Stages of the Process Timeline: A timeline is created and approved by all involved departments prior to submission to the client Concept Review : Initialion and submission of concepts and copy to client Layout Revisions: Review/revise layout and submit to Client Mechanical Review: Create production-ready files and prep artwork for final release File Release: After client approvals/ revisions- load and release of final files 12
  • 13. Editorial Functions: Involvement from the concept stage to proof review. If the job is out of scope it must have estimate on file If not, process is halted and Account Team notified Responsibilities Translation Proofreading • Initial Concepts • Copy decks • Production-ready mechanicals • Story Boards and Scripts • Vendor/Printer Proofs 13
  • 14. Concept Review Account issues a CIR to discuss the scope and parameters of the project. Files are either provided from the general market agency or created internally if an original piece. 1. Editorial’: Translates provided general market creative or, if original, proofreads document. 2. Copy: Reviews From A to Si’ translation and/or comments- Signs off on document. 3. Art: Updates/Creates layout with current copy deck- signs off on the document. 4. Account: Reviews layouts/concepts- signs off on the document. 5. Editorial’: Proofreads layouts and reviews and comments made by the team. Repeat Steps 1-5 until the document is clean. 7. Account & Creative: Presents layouts/concepts to the client. 14
  • 15. Layout Revisions 1. Account: Notes and marks layouts with client comments. 2. Creative: Reviews client comments. 3. Editorial: Reviews comments to check for consistency and current guidelines- signs off on the layout. 4. Creative: Revise layouts and/or Copy decks to reflect client comments- signs off on the document 5. Account: Reviews revised layouts and notes makes comments if necessary- signs off on the document. 6. Editorial: Proofreads revised layouts and makes comments if necessary- signs off on the document. Repeat Steps 4-6 until clean 7. Account: Submits for client approval If there are additional client comments repeat process until approval is received. 15
  • 16. Studio Functions: Involvement from the mechanical stage to the file release Job must have estimate on file If not, process is halted and Account Team notified Production specs, die strikes, comps and printer’s dummies prepared at this point QC checks layout against spec sheet Discrepancies are followed up with Production or AD 16
  • 17. Retouching Job must have estimate on file If not, process is halted and Account Team notified Preparation of final high res artwork occurs simultaneously with layout and copy revisions to speed process 17
  • 18. Preparing for Production/ Mechanical Stage This is the stage where the files are transferred from Creative to Studio Imprint for the creation of the mechanicals. The job folder for studio must contain the Studio Ticket as well as the proper reference materials. Studio will not begin a job unless they have all the information they require. 1.Production: Creates studio ticket for submission to Studio Imprint 2. Studio : Creates mechanical based on layout and specs provided-Studio operator and QC signs off on the mechanical. 3. Art: Double checks mechanical and notes and changes if necessary-signs off on the mechanical. 4. Editorial: Proofreads mechanical- signs off on the mechanical 5. Copy/ Art/ Account: Reviews proofreaders comments and makes any necessary changes- Creatives and Account must sign off on the mechanical. 6. Studio Imprint: Incorporates any comments on mechanical Repeat Steps 2-6 until Clean 7. Account: Submits mechanical to client for approval 8. Account: Marks client changes on mechanical 9. Art/Copy: Reviews client comments- marks any additional changes, and signs mechanical. 10. Editorial: Reviews client comments- marks any additional changes and signs mechanical. 11. Studio Imprint: Incorporates comments into mechanical Repeat Steps 7-11 until clean 18
  • 19. Print Production Overview and Functions Digital and traditional delivery of all final production files to vendors and clients Works with Client, Account, Art Department, Studio Imprint, and printers on cost, timing, and specs Checks file integrity and construction of files at the beginning and prior to the release of the job Works with Studio Imprint, as final high-resolution artwork is prepared Checks specs during internal routing (at the beginning and at time of release) Requests Estimates and Purchase Orders from Project Management Reviews vendor proofs 19
  • 20. Production: Pre-Release Pre-File Release Estimate Request must specify: Job Number Description: Should include size, colors, quantities, delivery/run dates Vendor bids Written estimate Estimate request to Project Management Approval of Studio rounds File Release to Vendor/Publication/Printer 20
  • 21. Production: Post Release Post-File Release Process File received by vendor Approval proof to Agency Revision/approval of proof Revised proof Final approval Printing/letter shop/manufacturing Delivery of job Keeps job history on file for future reference 21
  • 22. Mechanical Release 1. Account: Receives final client approval on the mechanical, gives the mechanical a final read and signs off on the checklist 2. Studio Imprint: Gives the mechanical a final read and signs off on the checklist 3. Editorial: Final Read- signs checklist 4. Account/Copy/ Creative/Production: Final Read- signs checklist 5. Production: Signs checklist-Releases files to publication/print vendor Vendor Proofs Received 6. Production: Provides PM with vendor proofs as well as back up from final read. 7. Editorial: Proofreads proofs against backup 8. Account/Art/Copy: Reviews proofs and makes comments if necessary 9.Production: Gives corrected proofs to the vendor. Repeat steps 6-9 until clean 22
  • 23. How Revisions Impact Costs On a timeline: earlier in the process = less $ Changes can be made at any point Near the end of the process = more $ Overtime and rush charges become prohibitive Changes at the printer are the most costly 23
  • 24. Rising Cost of Change Over the Life of a Job $$$$ JOB COST $ Concept Layout Art Selection Mechanical Disk Release Printer 24
  • 25. The Routing System for approvals/revisons The Routing System is in place to ensure that anyone can look at the job jacket and: Determine a job’s current state and the next appropriate steps See the history of the job Track down errors 25
  • 26. The Transition Meeting The purpose of the transition meeting is to ensure that the proper information is shared between the project managers incase a job has to be temporarily handed off. The PM assigned to the project calls for a transition meeting if the EOD deliverables need to be covered by a 2nd PM. The PM’s supervisor as well as Account Management must be invited to the meeting. The PM assigned to the project must fill out the transition form which the covering PM will refer to for the EDO deliverables. The covering PM will provide a recap of the meeting to all team members involved in the project. 26