Single Point of Accountability
Move Process Diagram
Revision 2.0 08/15/2001
Initial Request &
Documentation
Process 1.0
Service Provider
Work Order Initiation
Process 3.0
Space Readiness
Approval
Process 2.0
Schedule & Monitor
Move
Process 4.0
Closeout
Process 5.0
Issue
Resolution
Process 5.1
Process 0.0
IT Work Order
Initiation
Process 3.1
Voice MAC - Moves
Process 3.2
Non-GM or
Non-NAO
Funding
Process 1.2
Out of MSC
Scope
Process 1.3
Strategic Space
Planning &
Review
Process 1.1
INITIATION PREPARATION EXECUTION ASSURANCE
Voice-Only MAC
Process 1.4
Physical Move
Process 3.3
Project Management services provide a step-by-step process that will control cost and pro-actively
align the procurement and installation of the furniture with the clients desired occupancy schedule.
The services outlined below provide an overview of the process that we follow:
Scope of Work Analysis
! Determine project parameters.
! Define scope of work to be performed.
! Establish project documentation procedures.
Site Inspection
! Review job site conditions.
" Loading dock conditions.
" Determine freight elevator location and size.
" Review material handling and building protection.
! Assess construction progress.
" Verify field dimensions.
Site Observation
Dock Conditions
Observation
Installation Observation
PPPRRROOOJJJEEECCCTTT MMMAAANNNAAAGGGEEEMMMEEENNNTTT
Single Point of Accountability
Design and Product Application Consulting
! Review the furniture layout to assure:
" Proper product application.
" Fit and function.
Financial Planning
! Reconcile project specifications to budget.
! Document and communicate variances.
8th Floor
New Interior Partition to Ceiling - (3-5/8" @ 24" OC- 1/2" Drywall)
Material Labor
QTY U of M Amount Amount Total
454 LF $ 5,243.70 $ 10,646.30 $ 15,890.00
105 LF $ 1,212.75 $ 2,462.25 $ 3,675.00
134 LF $ 3,095.40 $ 6,284.60 $ 9,380.00
95 LF $ 2,194.50 $ 4,455.50 $ 6,650.00
3760 Sq Ft $ 564.00 $ 6,730.40 $ 7,294.40
Total $ 42,889.40
Application Guides
Furniture Specifications
Furniture Layout
Detail Project Budget
Professional Fees
Description of Work U of M QTY Unit Rate Total Comments
Interior Design SQ FT 47799 1.78$ 85,082.22$ FMG
Architectural SQ FT 47799 1.21$ 57,836.79$ DBI
Mechanical & Engineering SQ FT 47799 0.90$ 43,019.10$ EK Fox
General Contractor SQ FT 47799 -$ -$ Included in Construction $
Furniture Lease % 296,724.38$ 25% Of Furniture Budget
Legal Fees Lot -$
Insurance Lot
Sub-Total 185,938.11$
Construction
Description of Work U of M QTY Product Installation Total
8th Floor Lot *
9th Floor Lot
10th Floor Lot
Sub-Total 762,940.00$
ME&P 325,640.00$
Sub-Total 1,088,580.00$
FF&E
Description of Work U of M QTY Product Installation Total
8th Floor Lot 290,050.00$ 20,303.50$ 310,353.50$
9th Floor Lot 425,050.00$ 29,753.50$ 454,803.50$
10th Floor Lot 394,150.00$ 27,590.50$ 421,740.50$
Sub-Total 1,109,250.00$ 77,647.50$ 1,186,897.50$
Misc
Description of Work U of M QTY Product Installation Total
Move Management Lot 47,799.00$ 3,345.00$ 51,144.00$
AV Equipment Lot Incl. in Const. $ -$ -$ -$
Tele/Data Cabling Lot 95,598.00$ 6,691.86$ 102,289.86$
Security System Lot -$ -$ -$
Card Reader Lot -$ -$ -$
Artwork And Accessories Lot -$ -$ -$
Signage Lot 15,200.00$ 1,064.00$ 16,264.00$
Vending Machines Lot NIC -$ -$ -$
Kitchen Equipment Lot NIC -$ -$ -$
Coffee Equipment Lot NIC -$ -$ -$
Furniture Refurbishment Lot NIC -$ -$ -$
Sub-Total 158,597.00$ 11,100.86$ 118,553.86$
Estimated Project Budget 2,579,969.47$
Budget Summary
Summary Project Budget
Workstation Typical
PPPRRROOOJJJEEECCCTTT MMMAAANNNAAAGGGEEEMMMEEENNNTTT
Single Point of Accountability
Project Schedule
Project Scheduling
! Generate Critical Path Schedule to include:
" Occupancy Date.
" Construction schedule.
" Furniture specification, order entry and manufacturing lead-times.
Product Expediting
! Monitor and expedite production schedules.
! Generate weekly order status reports.
Change Order Management
! Process all change orders advised by the client or designer due to:
" Field changes.
" Layout revisions.
" Order modifications.
Change Order
A
Layout Revision
PPPRRROOOJJJEEECCCTTT MMMAAANNNAAAGGGEEEMMMEEENNNTTT
Single Point of Accountability
Site Inspection
Delivery Schedule
Pre-Installation Planning
! Secure necessary permits.
! Schedule loading docks, schedule elevators and
coordinate job site security.
! Finalize crew deployment and material handling
equipment.
! Schedule debris removal.
! Secure building protective material.
! Conduct a pre-installation punch list.
Job Site Visits
! A Project Manager shall be on site in order to:
" Evaluate the general progress and quality of work.
" Verify that work is proceeding according to documented
drawings.
Final Inspection
! A Project Manager together with the client shall
conduct an inspection of furniture, fabric and finish
installations for final client approval.
! Upon client approval that the phase or project is
substantially complete, a certificate of substantial
completion for such items shall be issued for written
acceptance.
As-Built Drawing
PPPRRROOOJJJEEECCCTTT MMMAAANNNAAAGGGEEEMMMEEENNNTTT
Single Point of Accountability
Post Installation Audit
! A detailed report will be created to include:
" Outstanding punch list items.
" A detail any backordered or other open items.
Employee Orientation
! A field-support team will organize and lead employee orientation sessions.
Punchlist Report
Project Manager: Scott Jarzynka Issue Date: 19-Jul-02
* The items identified herein shall be corrected by the General Contractor or by their sub-contractor(s) prior to final acceptance of the w ork by the tenant and/or tenant's landlord/ow ner. Any omission of items
fromthis punchlist does not w aiver the General Contractor's responsibilities for finish quality w orkmanship, materials, quarantees, etc.
* If any of the items or parts listed are to be considered additional w ork (i.e., not part of the contract) by the General Contractor or sub-contractor(s) , the landlord/ow ner and tenant must be notified in w riting no
later than 10 days after issue date, identifying costs for such, prior to proceeding w ith the w ork.
* All repair w ork shall be done in an expeditious manner w ith due respect to tenant's w ork schedule and personnel. If required by the landlord/tenant, a schedule for repairs shall be submitted for use in
coordinating the same w ith the landlord/tenant.
* The General Contractor shall notify the Architect and Landlord/Ow ner of his completion of repairs in order that final approval inspection may be provided
Location / Punchlist Punchlist Date Approval
Date Room # Dwg Code Item Yor N Description Resource Completed Signature Comments
7/19 G-33 A Y Scratched mobile pedestal FMS 7/25/2002
G-35 B Y Loose end panel base FMS 7/25/2002
G-39 B Y Loose end panel base FMS 7/25/2002
G-21 B Y Loose end panel base FMS 7/25/2002
G-24 B Y Loose end panel base FMS 7/25/2002
G-7 B Y Loose end panel base FMS 7/25/2002
Borg Warner
3800 Automation Dr
Auburn Hills, MI 48326
Project Punchlist - Ground Floor West Side
Product Instruction Guides
Product Information
Employee Orientation
Manual

Project Management Services

  • 1.
    PPPRRROOOJJJEEECCCTTT MMMAAANNNAAAGGGEEEMMMEEENNNTTT Single Pointof Accountability Move Process Diagram Revision 2.0 08/15/2001 Initial Request & Documentation Process 1.0 Service Provider Work Order Initiation Process 3.0 Space Readiness Approval Process 2.0 Schedule & Monitor Move Process 4.0 Closeout Process 5.0 Issue Resolution Process 5.1 Process 0.0 IT Work Order Initiation Process 3.1 Voice MAC - Moves Process 3.2 Non-GM or Non-NAO Funding Process 1.2 Out of MSC Scope Process 1.3 Strategic Space Planning & Review Process 1.1 INITIATION PREPARATION EXECUTION ASSURANCE Voice-Only MAC Process 1.4 Physical Move Process 3.3 Project Management services provide a step-by-step process that will control cost and pro-actively align the procurement and installation of the furniture with the clients desired occupancy schedule. The services outlined below provide an overview of the process that we follow: Scope of Work Analysis ! Determine project parameters. ! Define scope of work to be performed. ! Establish project documentation procedures. Site Inspection ! Review job site conditions. " Loading dock conditions. " Determine freight elevator location and size. " Review material handling and building protection. ! Assess construction progress. " Verify field dimensions. Site Observation Dock Conditions Observation Installation Observation
  • 2.
    PPPRRROOOJJJEEECCCTTT MMMAAANNNAAAGGGEEEMMMEEENNNTTT Single Pointof Accountability Design and Product Application Consulting ! Review the furniture layout to assure: " Proper product application. " Fit and function. Financial Planning ! Reconcile project specifications to budget. ! Document and communicate variances. 8th Floor New Interior Partition to Ceiling - (3-5/8" @ 24" OC- 1/2" Drywall) Material Labor QTY U of M Amount Amount Total 454 LF $ 5,243.70 $ 10,646.30 $ 15,890.00 105 LF $ 1,212.75 $ 2,462.25 $ 3,675.00 134 LF $ 3,095.40 $ 6,284.60 $ 9,380.00 95 LF $ 2,194.50 $ 4,455.50 $ 6,650.00 3760 Sq Ft $ 564.00 $ 6,730.40 $ 7,294.40 Total $ 42,889.40 Application Guides Furniture Specifications Furniture Layout Detail Project Budget Professional Fees Description of Work U of M QTY Unit Rate Total Comments Interior Design SQ FT 47799 1.78$ 85,082.22$ FMG Architectural SQ FT 47799 1.21$ 57,836.79$ DBI Mechanical & Engineering SQ FT 47799 0.90$ 43,019.10$ EK Fox General Contractor SQ FT 47799 -$ -$ Included in Construction $ Furniture Lease % 296,724.38$ 25% Of Furniture Budget Legal Fees Lot -$ Insurance Lot Sub-Total 185,938.11$ Construction Description of Work U of M QTY Product Installation Total 8th Floor Lot * 9th Floor Lot 10th Floor Lot Sub-Total 762,940.00$ ME&P 325,640.00$ Sub-Total 1,088,580.00$ FF&E Description of Work U of M QTY Product Installation Total 8th Floor Lot 290,050.00$ 20,303.50$ 310,353.50$ 9th Floor Lot 425,050.00$ 29,753.50$ 454,803.50$ 10th Floor Lot 394,150.00$ 27,590.50$ 421,740.50$ Sub-Total 1,109,250.00$ 77,647.50$ 1,186,897.50$ Misc Description of Work U of M QTY Product Installation Total Move Management Lot 47,799.00$ 3,345.00$ 51,144.00$ AV Equipment Lot Incl. in Const. $ -$ -$ -$ Tele/Data Cabling Lot 95,598.00$ 6,691.86$ 102,289.86$ Security System Lot -$ -$ -$ Card Reader Lot -$ -$ -$ Artwork And Accessories Lot -$ -$ -$ Signage Lot 15,200.00$ 1,064.00$ 16,264.00$ Vending Machines Lot NIC -$ -$ -$ Kitchen Equipment Lot NIC -$ -$ -$ Coffee Equipment Lot NIC -$ -$ -$ Furniture Refurbishment Lot NIC -$ -$ -$ Sub-Total 158,597.00$ 11,100.86$ 118,553.86$ Estimated Project Budget 2,579,969.47$ Budget Summary Summary Project Budget Workstation Typical
  • 3.
    PPPRRROOOJJJEEECCCTTT MMMAAANNNAAAGGGEEEMMMEEENNNTTT Single Pointof Accountability Project Schedule Project Scheduling ! Generate Critical Path Schedule to include: " Occupancy Date. " Construction schedule. " Furniture specification, order entry and manufacturing lead-times. Product Expediting ! Monitor and expedite production schedules. ! Generate weekly order status reports. Change Order Management ! Process all change orders advised by the client or designer due to: " Field changes. " Layout revisions. " Order modifications. Change Order A Layout Revision
  • 4.
    PPPRRROOOJJJEEECCCTTT MMMAAANNNAAAGGGEEEMMMEEENNNTTT Single Pointof Accountability Site Inspection Delivery Schedule Pre-Installation Planning ! Secure necessary permits. ! Schedule loading docks, schedule elevators and coordinate job site security. ! Finalize crew deployment and material handling equipment. ! Schedule debris removal. ! Secure building protective material. ! Conduct a pre-installation punch list. Job Site Visits ! A Project Manager shall be on site in order to: " Evaluate the general progress and quality of work. " Verify that work is proceeding according to documented drawings. Final Inspection ! A Project Manager together with the client shall conduct an inspection of furniture, fabric and finish installations for final client approval. ! Upon client approval that the phase or project is substantially complete, a certificate of substantial completion for such items shall be issued for written acceptance. As-Built Drawing
  • 5.
    PPPRRROOOJJJEEECCCTTT MMMAAANNNAAAGGGEEEMMMEEENNNTTT Single Pointof Accountability Post Installation Audit ! A detailed report will be created to include: " Outstanding punch list items. " A detail any backordered or other open items. Employee Orientation ! A field-support team will organize and lead employee orientation sessions. Punchlist Report Project Manager: Scott Jarzynka Issue Date: 19-Jul-02 * The items identified herein shall be corrected by the General Contractor or by their sub-contractor(s) prior to final acceptance of the w ork by the tenant and/or tenant's landlord/ow ner. Any omission of items fromthis punchlist does not w aiver the General Contractor's responsibilities for finish quality w orkmanship, materials, quarantees, etc. * If any of the items or parts listed are to be considered additional w ork (i.e., not part of the contract) by the General Contractor or sub-contractor(s) , the landlord/ow ner and tenant must be notified in w riting no later than 10 days after issue date, identifying costs for such, prior to proceeding w ith the w ork. * All repair w ork shall be done in an expeditious manner w ith due respect to tenant's w ork schedule and personnel. If required by the landlord/tenant, a schedule for repairs shall be submitted for use in coordinating the same w ith the landlord/tenant. * The General Contractor shall notify the Architect and Landlord/Ow ner of his completion of repairs in order that final approval inspection may be provided Location / Punchlist Punchlist Date Approval Date Room # Dwg Code Item Yor N Description Resource Completed Signature Comments 7/19 G-33 A Y Scratched mobile pedestal FMS 7/25/2002 G-35 B Y Loose end panel base FMS 7/25/2002 G-39 B Y Loose end panel base FMS 7/25/2002 G-21 B Y Loose end panel base FMS 7/25/2002 G-24 B Y Loose end panel base FMS 7/25/2002 G-7 B Y Loose end panel base FMS 7/25/2002 Borg Warner 3800 Automation Dr Auburn Hills, MI 48326 Project Punchlist - Ground Floor West Side Product Instruction Guides Product Information Employee Orientation Manual