PPPRRROOOJJJEEECCCTTT MMMAAANNNAAAGGGEEEMMMEEENNNTTT
Single Point of Accountability
Move Process Diagram
Revision 2.0 08/15/2001
Initial Request &
Documentation
Process 1.0
Service Provider
Work Order Initiation
Process 3.0
Space Readiness
Approval
Process 2.0
Schedule & Monitor
Move
Process 4.0
Closeout
Process 5.0
Issue
Resolution
Process 5.1
Process 0.0
IT Work Order
Initiation
Process 3.1
Voice MAC - Moves
Process 3.2
Non-GM or
Non-NAO
Funding
Process 1.2
Out of MSC
Scope
Process 1.3
Strategic Space
Planning &
Review
Process 1.1
INITIATION PREPARATION EXECUTION ASSURANCE
Voice-Only MAC
Process 1.4
Physical Move
Process 3.3
Project Management services provide a step-by-step process that will control cost and pro-actively
align the procurement and installation of the furniture with the clients desired occupancy schedule.
The services outlined below provide an overview of the process that we follow:
Scope of Work Analysis
! Determine project parameters.
! Define scope of work to be performed.
! Establish project documentation procedures.
Site Inspection
! Review job site conditions.
" Loading dock conditions.
" Determine freight elevator location and size.
" Review material handling and building protection.
! Assess construction progress.
" Verify field dimensions.
Site Observation
Dock Conditions
Observation
Installation Observation
PPPRRROOOJJJEEECCCTTT MMMAAANNNAAAGGGEEEMMMEEENNNTTT
Single Point of Accountability
Design and Product Application Consulting
! Review the furniture layout to assure:
" Proper product application.
" Fit and function.
Financial Planning
! Reconcile project specifications to budget.
! Document and communicate variances.
8th Floor
New Interior Partition to Ceiling - (3-5/8" @ 24" OC- 1/2" Drywall)
Material Labor
QTY U of M Amount Amount Total
454 LF $ 5,243.70 $ 10,646.30 $ 15,890.00
105 LF $ 1,212.75 $ 2,462.25 $ 3,675.00
134 LF $ 3,095.40 $ 6,284.60 $ 9,380.00
95 LF $ 2,194.50 $ 4,455.50 $ 6,650.00
3760 Sq Ft $ 564.00 $ 6,730.40 $ 7,294.40
Total $ 42,889.40
Application Guides
Furniture Specifications
Furniture Layout
Detail Project Budget
Professional Fees
Description of Work U of M QTY Unit Rate Total Comments
Interior Design SQ FT 47799 1.78$ 85,082.22$ FMG
Architectural SQ FT 47799 1.21$ 57,836.79$ DBI
Mechanical & Engineering SQ FT 47799 0.90$ 43,019.10$ EK Fox
General Contractor SQ FT 47799 -$ -$ Included in Construction $
Furniture Lease % 296,724.38$ 25% Of Furniture Budget
Legal Fees Lot -$
Insurance Lot
Sub-Total 185,938.11$
Construction
Description of Work U of M QTY Product Installation Total
8th Floor Lot *
9th Floor Lot
10th Floor Lot
Sub-Total 762,940.00$
ME&P 325,640.00$
Sub-Total 1,088,580.00$
FF&E
Description of Work U of M QTY Product Installation Total
8th Floor Lot 290,050.00$ 20,303.50$ 310,353.50$
9th Floor Lot 425,050.00$ 29,753.50$ 454,803.50$
10th Floor Lot 394,150.00$ 27,590.50$ 421,740.50$
Sub-Total 1,109,250.00$ 77,647.50$ 1,186,897.50$
Misc
Description of Work U of M QTY Product Installation Total
Move Management Lot 47,799.00$ 3,345.00$ 51,144.00$
AV Equipment Lot Incl. in Const. $ -$ -$ -$
Tele/Data Cabling Lot 95,598.00$ 6,691.86$ 102,289.86$
Security System Lot -$ -$ -$
Card Reader Lot -$ -$ -$
Artwork And Accessories Lot -$ -$ -$
Signage Lot 15,200.00$ 1,064.00$ 16,264.00$
Vending Machines Lot NIC -$ -$ -$
Kitchen Equipment Lot NIC -$ -$ -$
Coffee Equipment Lot NIC -$ -$ -$
Furniture Refurbishment Lot NIC -$ -$ -$
Sub-Total 158,597.00$ 11,100.86$ 118,553.86$
Estimated Project Budget 2,579,969.47$
Budget Summary
Summary Project Budget
Workstation Typical
PPPRRROOOJJJEEECCCTTT MMMAAANNNAAAGGGEEEMMMEEENNNTTT
Single Point of Accountability
Project Schedule
Project Scheduling
! Generate Critical Path Schedule to include:
" Occupancy Date.
" Construction schedule.
" Furniture specification, order entry and manufacturing lead-times.
Product Expediting
! Monitor and expedite production schedules.
! Generate weekly order status reports.
Change Order Management
! Process all change orders advised by the client or designer due to:
" Field changes.
" Layout revisions.
" Order modifications.
Change Order
A
Layout Revision
PPPRRROOOJJJEEECCCTTT MMMAAANNNAAAGGGEEEMMMEEENNNTTT
Single Point of Accountability
Site Inspection
Delivery Schedule
Pre-Installation Planning
! Secure necessary permits.
! Schedule loading docks, schedule elevators and
coordinate job site security.
! Finalize crew deployment and material handling
equipment.
! Schedule debris removal.
! Secure building protective material.
! Conduct a pre-installation punch list.
Job Site Visits
! A Project Manager shall be on site in order to:
" Evaluate the general progress and quality of work.
" Verify that work is proceeding according to documented
drawings.
Final Inspection
! A Project Manager together with the client shall
conduct an inspection of furniture, fabric and finish
installations for final client approval.
! Upon client approval that the phase or project is
substantially complete, a certificate of substantial
completion for such items shall be issued for written
acceptance.
As-Built Drawing
PPPRRROOOJJJEEECCCTTT MMMAAANNNAAAGGGEEEMMMEEENNNTTT
Single Point of Accountability
Post Installation Audit
! A detailed report will be created to include:
" Outstanding punch list items.
" A detail any backordered or other open items.
Employee Orientation
! A field-support team will organize and lead employee orientation sessions.
Punchlist Report
Project Manager: Scott Jarzynka Issue Date: 19-Jul-02
* The items identified herein shall be corrected by the General Contractor or by their sub-contractor(s) prior to final acceptance of the w ork by the tenant and/or tenant's landlord/ow ner. Any omission of items
fromthis punchlist does not w aiver the General Contractor's responsibilities for finish quality w orkmanship, materials, quarantees, etc.
* If any of the items or parts listed are to be considered additional w ork (i.e., not part of the contract) by the General Contractor or sub-contractor(s) , the landlord/ow ner and tenant must be notified in w riting no
later than 10 days after issue date, identifying costs for such, prior to proceeding w ith the w ork.
* All repair w ork shall be done in an expeditious manner w ith due respect to tenant's w ork schedule and personnel. If required by the landlord/tenant, a schedule for repairs shall be submitted for use in
coordinating the same w ith the landlord/tenant.
* The General Contractor shall notify the Architect and Landlord/Ow ner of his completion of repairs in order that final approval inspection may be provided
Location / Punchlist Punchlist Date Approval
Date Room # Dwg Code Item Yor N Description Resource Completed Signature Comments
7/19 G-33 A Y Scratched mobile pedestal FMS 7/25/2002
G-35 B Y Loose end panel base FMS 7/25/2002
G-39 B Y Loose end panel base FMS 7/25/2002
G-21 B Y Loose end panel base FMS 7/25/2002
G-24 B Y Loose end panel base FMS 7/25/2002
G-7 B Y Loose end panel base FMS 7/25/2002
Borg Warner
3800 Automation Dr
Auburn Hills, MI 48326
Project Punchlist - Ground Floor West Side
Product Instruction Guides
Product Information
Employee Orientation
Manual

More Related Content

What's hot

PDave' Resume' (7)
PDave' Resume' (7)PDave' Resume' (7)
PDave' Resume' (7)
Prabodh Dave
 
Waji Ul Hassan_original
Waji Ul Hassan_originalWaji Ul Hassan_original
Waji Ul Hassan_original
waji waji
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2
Shze Hwa Lee
 
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTSFINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
Lenson Mhango
 
Anthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_ResumeAnthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_Resume
Anthony Vitola
 
SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)
Sunkara Gsk
 
Dec14CV
Dec14CVDec14CV
Sachin Mohelay
Sachin MohelaySachin Mohelay
Sachin Mohelay
sachin mohelay
 
Nguyen Tan Thanh 040076000124 new
Nguyen Tan Thanh 040076000124 newNguyen Tan Thanh 040076000124 new
Nguyen Tan Thanh 040076000124 new
Thanh Qn
 
Southwark Procurement Approach
Southwark Procurement ApproachSouthwark Procurement Approach
Southwark Procurement Approach
Foundations
 
WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1William Brown
 
Sachin Mohelay
Sachin MohelaySachin Mohelay
Sachin Mohelay
sachin mohelay
 
WDT Resume
WDT ResumeWDT Resume
WDT Resume
David Townsend
 
Assignment - Final Account
Assignment - Final AccountAssignment - Final Account
Assignment - Final Account
Kai Yun Pang
 
Resume
ResumeResume
David DiBiase Resume-2
David DiBiase Resume-2David DiBiase Resume-2
David DiBiase Resume-2
David DiBiase
 
Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015
Ravi Shankar
 
RESUME
RESUMERESUME
2016 Resume (3)
2016 Resume (3)2016 Resume (3)
2016 Resume (3)
Steve McClimon
 
Luvuyo Sankqela CV rev 2
Luvuyo Sankqela CV rev 2Luvuyo Sankqela CV rev 2
Luvuyo Sankqela CV rev 2
Luvuyo Sankqela
 

What's hot (20)

PDave' Resume' (7)
PDave' Resume' (7)PDave' Resume' (7)
PDave' Resume' (7)
 
Waji Ul Hassan_original
Waji Ul Hassan_originalWaji Ul Hassan_original
Waji Ul Hassan_original
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2
 
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTSFINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
 
Anthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_ResumeAnthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_Resume
 
SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)
 
Dec14CV
Dec14CVDec14CV
Dec14CV
 
Sachin Mohelay
Sachin MohelaySachin Mohelay
Sachin Mohelay
 
Nguyen Tan Thanh 040076000124 new
Nguyen Tan Thanh 040076000124 newNguyen Tan Thanh 040076000124 new
Nguyen Tan Thanh 040076000124 new
 
Southwark Procurement Approach
Southwark Procurement ApproachSouthwark Procurement Approach
Southwark Procurement Approach
 
WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1
 
Sachin Mohelay
Sachin MohelaySachin Mohelay
Sachin Mohelay
 
WDT Resume
WDT ResumeWDT Resume
WDT Resume
 
Assignment - Final Account
Assignment - Final AccountAssignment - Final Account
Assignment - Final Account
 
Resume
ResumeResume
Resume
 
David DiBiase Resume-2
David DiBiase Resume-2David DiBiase Resume-2
David DiBiase Resume-2
 
Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015
 
RESUME
RESUMERESUME
RESUME
 
2016 Resume (3)
2016 Resume (3)2016 Resume (3)
2016 Resume (3)
 
Luvuyo Sankqela CV rev 2
Luvuyo Sankqela CV rev 2Luvuyo Sankqela CV rev 2
Luvuyo Sankqela CV rev 2
 

Similar to Project Management Services

Project assign 2
Project assign 2Project assign 2
Project assign 2
Moses Seriki
 
Antara Dashboard-002.pptx
Antara Dashboard-002.pptxAntara Dashboard-002.pptx
Antara Dashboard-002.pptx
TalebAlfihan
 
Rajgir Sports Complex_Project Kick Off Presentation.pptx
Rajgir Sports Complex_Project Kick Off Presentation.pptxRajgir Sports Complex_Project Kick Off Presentation.pptx
Rajgir Sports Complex_Project Kick Off Presentation.pptx
syedaliabl2023
 
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
CCT International
 
Site%20 installation %20final_20070219
Site%20 installation %20final_20070219Site%20 installation %20final_20070219
Site%20 installation %20final_20070219
Quang Nguyễn
 
Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variation
Vj NiroSh
 
Presentacion asme seccion viii division 2 2013
Presentacion asme seccion viii division 2 2013Presentacion asme seccion viii division 2 2013
Presentacion asme seccion viii division 2 2013
leo040490
 
LGC PP-ABC Int
LGC PP-ABC IntLGC PP-ABC Int
LGC PP-ABC Int
Chris P. Lewis
 
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
Asia Master Training آسيا ماسترز للتدريب والتطوير
 
Method of works install stator generator+strand jack + 07 july2015
Method of works install stator generator+strand jack + 07 july2015Method of works install stator generator+strand jack + 07 july2015
Method of works install stator generator+strand jack + 07 july2015
HaGun Gunawan
 
Quality plan
Quality planQuality plan
General notes to building schedule of rates
General notes to building schedule of ratesGeneral notes to building schedule of rates
General notes to building schedule of rates
Vj NiroSh
 
General notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATESGeneral notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATES
R.R.G.S Bandara
 
HASSAN ALI CV1
HASSAN ALI CV1HASSAN ALI CV1
HASSAN ALI CV1
Hassan Ali(BOP)
 
Contract presentation
Contract presentation  Contract presentation
Contract presentation
amity university
 
Construction Administration Seminar
Construction Administration Seminar Construction Administration Seminar
Construction Administration Seminar
jenkinswilliamc
 
Construction Management Jump StartChapter 5Project Sta.docx
Construction Management Jump StartChapter 5Project Sta.docxConstruction Management Jump StartChapter 5Project Sta.docx
Construction Management Jump StartChapter 5Project Sta.docx
melvinjrobinson2199
 
ACH 216 Lecture 12 (Closeut & Turnover)
ACH 216 Lecture 12 (Closeut & Turnover)ACH 216 Lecture 12 (Closeut & Turnover)
ACH 216 Lecture 12 (Closeut & Turnover)
Anne Arundel Community College
 
ACH 216 Lecture 12 (Closeut & Turnover)
ACH 216 Lecture 12 (Closeut & Turnover)ACH 216 Lecture 12 (Closeut & Turnover)
ACH 216 Lecture 12 (Closeut & Turnover)
Anne Arundel Community College
 
Kandil_Sameh_CPMPart 4 _b
Kandil_Sameh_CPMPart 4 _bKandil_Sameh_CPMPart 4 _b

Similar to Project Management Services (20)

Project assign 2
Project assign 2Project assign 2
Project assign 2
 
Antara Dashboard-002.pptx
Antara Dashboard-002.pptxAntara Dashboard-002.pptx
Antara Dashboard-002.pptx
 
Rajgir Sports Complex_Project Kick Off Presentation.pptx
Rajgir Sports Complex_Project Kick Off Presentation.pptxRajgir Sports Complex_Project Kick Off Presentation.pptx
Rajgir Sports Complex_Project Kick Off Presentation.pptx
 
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
 
Site%20 installation %20final_20070219
Site%20 installation %20final_20070219Site%20 installation %20final_20070219
Site%20 installation %20final_20070219
 
Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variation
 
Presentacion asme seccion viii division 2 2013
Presentacion asme seccion viii division 2 2013Presentacion asme seccion viii division 2 2013
Presentacion asme seccion viii division 2 2013
 
LGC PP-ABC Int
LGC PP-ABC IntLGC PP-ABC Int
LGC PP-ABC Int
 
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
 
Method of works install stator generator+strand jack + 07 july2015
Method of works install stator generator+strand jack + 07 july2015Method of works install stator generator+strand jack + 07 july2015
Method of works install stator generator+strand jack + 07 july2015
 
Quality plan
Quality planQuality plan
Quality plan
 
General notes to building schedule of rates
General notes to building schedule of ratesGeneral notes to building schedule of rates
General notes to building schedule of rates
 
General notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATESGeneral notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATES
 
HASSAN ALI CV1
HASSAN ALI CV1HASSAN ALI CV1
HASSAN ALI CV1
 
Contract presentation
Contract presentation  Contract presentation
Contract presentation
 
Construction Administration Seminar
Construction Administration Seminar Construction Administration Seminar
Construction Administration Seminar
 
Construction Management Jump StartChapter 5Project Sta.docx
Construction Management Jump StartChapter 5Project Sta.docxConstruction Management Jump StartChapter 5Project Sta.docx
Construction Management Jump StartChapter 5Project Sta.docx
 
ACH 216 Lecture 12 (Closeut & Turnover)
ACH 216 Lecture 12 (Closeut & Turnover)ACH 216 Lecture 12 (Closeut & Turnover)
ACH 216 Lecture 12 (Closeut & Turnover)
 
ACH 216 Lecture 12 (Closeut & Turnover)
ACH 216 Lecture 12 (Closeut & Turnover)ACH 216 Lecture 12 (Closeut & Turnover)
ACH 216 Lecture 12 (Closeut & Turnover)
 
Kandil_Sameh_CPMPart 4 _b
Kandil_Sameh_CPMPart 4 _bKandil_Sameh_CPMPart 4 _b
Kandil_Sameh_CPMPart 4 _b
 

Project Management Services

  • 1. PPPRRROOOJJJEEECCCTTT MMMAAANNNAAAGGGEEEMMMEEENNNTTT Single Point of Accountability Move Process Diagram Revision 2.0 08/15/2001 Initial Request & Documentation Process 1.0 Service Provider Work Order Initiation Process 3.0 Space Readiness Approval Process 2.0 Schedule & Monitor Move Process 4.0 Closeout Process 5.0 Issue Resolution Process 5.1 Process 0.0 IT Work Order Initiation Process 3.1 Voice MAC - Moves Process 3.2 Non-GM or Non-NAO Funding Process 1.2 Out of MSC Scope Process 1.3 Strategic Space Planning & Review Process 1.1 INITIATION PREPARATION EXECUTION ASSURANCE Voice-Only MAC Process 1.4 Physical Move Process 3.3 Project Management services provide a step-by-step process that will control cost and pro-actively align the procurement and installation of the furniture with the clients desired occupancy schedule. The services outlined below provide an overview of the process that we follow: Scope of Work Analysis ! Determine project parameters. ! Define scope of work to be performed. ! Establish project documentation procedures. Site Inspection ! Review job site conditions. " Loading dock conditions. " Determine freight elevator location and size. " Review material handling and building protection. ! Assess construction progress. " Verify field dimensions. Site Observation Dock Conditions Observation Installation Observation
  • 2. PPPRRROOOJJJEEECCCTTT MMMAAANNNAAAGGGEEEMMMEEENNNTTT Single Point of Accountability Design and Product Application Consulting ! Review the furniture layout to assure: " Proper product application. " Fit and function. Financial Planning ! Reconcile project specifications to budget. ! Document and communicate variances. 8th Floor New Interior Partition to Ceiling - (3-5/8" @ 24" OC- 1/2" Drywall) Material Labor QTY U of M Amount Amount Total 454 LF $ 5,243.70 $ 10,646.30 $ 15,890.00 105 LF $ 1,212.75 $ 2,462.25 $ 3,675.00 134 LF $ 3,095.40 $ 6,284.60 $ 9,380.00 95 LF $ 2,194.50 $ 4,455.50 $ 6,650.00 3760 Sq Ft $ 564.00 $ 6,730.40 $ 7,294.40 Total $ 42,889.40 Application Guides Furniture Specifications Furniture Layout Detail Project Budget Professional Fees Description of Work U of M QTY Unit Rate Total Comments Interior Design SQ FT 47799 1.78$ 85,082.22$ FMG Architectural SQ FT 47799 1.21$ 57,836.79$ DBI Mechanical & Engineering SQ FT 47799 0.90$ 43,019.10$ EK Fox General Contractor SQ FT 47799 -$ -$ Included in Construction $ Furniture Lease % 296,724.38$ 25% Of Furniture Budget Legal Fees Lot -$ Insurance Lot Sub-Total 185,938.11$ Construction Description of Work U of M QTY Product Installation Total 8th Floor Lot * 9th Floor Lot 10th Floor Lot Sub-Total 762,940.00$ ME&P 325,640.00$ Sub-Total 1,088,580.00$ FF&E Description of Work U of M QTY Product Installation Total 8th Floor Lot 290,050.00$ 20,303.50$ 310,353.50$ 9th Floor Lot 425,050.00$ 29,753.50$ 454,803.50$ 10th Floor Lot 394,150.00$ 27,590.50$ 421,740.50$ Sub-Total 1,109,250.00$ 77,647.50$ 1,186,897.50$ Misc Description of Work U of M QTY Product Installation Total Move Management Lot 47,799.00$ 3,345.00$ 51,144.00$ AV Equipment Lot Incl. in Const. $ -$ -$ -$ Tele/Data Cabling Lot 95,598.00$ 6,691.86$ 102,289.86$ Security System Lot -$ -$ -$ Card Reader Lot -$ -$ -$ Artwork And Accessories Lot -$ -$ -$ Signage Lot 15,200.00$ 1,064.00$ 16,264.00$ Vending Machines Lot NIC -$ -$ -$ Kitchen Equipment Lot NIC -$ -$ -$ Coffee Equipment Lot NIC -$ -$ -$ Furniture Refurbishment Lot NIC -$ -$ -$ Sub-Total 158,597.00$ 11,100.86$ 118,553.86$ Estimated Project Budget 2,579,969.47$ Budget Summary Summary Project Budget Workstation Typical
  • 3. PPPRRROOOJJJEEECCCTTT MMMAAANNNAAAGGGEEEMMMEEENNNTTT Single Point of Accountability Project Schedule Project Scheduling ! Generate Critical Path Schedule to include: " Occupancy Date. " Construction schedule. " Furniture specification, order entry and manufacturing lead-times. Product Expediting ! Monitor and expedite production schedules. ! Generate weekly order status reports. Change Order Management ! Process all change orders advised by the client or designer due to: " Field changes. " Layout revisions. " Order modifications. Change Order A Layout Revision
  • 4. PPPRRROOOJJJEEECCCTTT MMMAAANNNAAAGGGEEEMMMEEENNNTTT Single Point of Accountability Site Inspection Delivery Schedule Pre-Installation Planning ! Secure necessary permits. ! Schedule loading docks, schedule elevators and coordinate job site security. ! Finalize crew deployment and material handling equipment. ! Schedule debris removal. ! Secure building protective material. ! Conduct a pre-installation punch list. Job Site Visits ! A Project Manager shall be on site in order to: " Evaluate the general progress and quality of work. " Verify that work is proceeding according to documented drawings. Final Inspection ! A Project Manager together with the client shall conduct an inspection of furniture, fabric and finish installations for final client approval. ! Upon client approval that the phase or project is substantially complete, a certificate of substantial completion for such items shall be issued for written acceptance. As-Built Drawing
  • 5. PPPRRROOOJJJEEECCCTTT MMMAAANNNAAAGGGEEEMMMEEENNNTTT Single Point of Accountability Post Installation Audit ! A detailed report will be created to include: " Outstanding punch list items. " A detail any backordered or other open items. Employee Orientation ! A field-support team will organize and lead employee orientation sessions. Punchlist Report Project Manager: Scott Jarzynka Issue Date: 19-Jul-02 * The items identified herein shall be corrected by the General Contractor or by their sub-contractor(s) prior to final acceptance of the w ork by the tenant and/or tenant's landlord/ow ner. Any omission of items fromthis punchlist does not w aiver the General Contractor's responsibilities for finish quality w orkmanship, materials, quarantees, etc. * If any of the items or parts listed are to be considered additional w ork (i.e., not part of the contract) by the General Contractor or sub-contractor(s) , the landlord/ow ner and tenant must be notified in w riting no later than 10 days after issue date, identifying costs for such, prior to proceeding w ith the w ork. * All repair w ork shall be done in an expeditious manner w ith due respect to tenant's w ork schedule and personnel. If required by the landlord/tenant, a schedule for repairs shall be submitted for use in coordinating the same w ith the landlord/tenant. * The General Contractor shall notify the Architect and Landlord/Ow ner of his completion of repairs in order that final approval inspection may be provided Location / Punchlist Punchlist Date Approval Date Room # Dwg Code Item Yor N Description Resource Completed Signature Comments 7/19 G-33 A Y Scratched mobile pedestal FMS 7/25/2002 G-35 B Y Loose end panel base FMS 7/25/2002 G-39 B Y Loose end panel base FMS 7/25/2002 G-21 B Y Loose end panel base FMS 7/25/2002 G-24 B Y Loose end panel base FMS 7/25/2002 G-7 B Y Loose end panel base FMS 7/25/2002 Borg Warner 3800 Automation Dr Auburn Hills, MI 48326 Project Punchlist - Ground Floor West Side Product Instruction Guides Product Information Employee Orientation Manual