Mohammad Azeem is a civil engineer from Pakistan with over 8 years of experience, including 6 years working in the UAE. He is seeking a new position as a project engineer, site engineer, or site inspector. His experience includes working on projects such as luxury villas, power plants, desalination plants, and high-rise buildings. He has strong communication, negotiation, and teamwork skills.
In this presentation, the process of building construction is explained. It is mainly divided into pre-construction and during construction steps. Each and every step with it's importance has been well explained in this presentation.
In this presentation, the process of building construction is explained. It is mainly divided into pre-construction and during construction steps. Each and every step with it's importance has been well explained in this presentation.
Estimating is the technique of calculating/computing the various quantities and the expected expenditure to be incurred on a particular work/ project. For all engineering works it is required to know beforehand the probable cost of construction known as the estimated cost. Necessary for preparing an estimate are drawings like plan, elevation and sections of important point’s, detailed specifications about workmanship & properties of materials, Standard schedule of rates of the current year. Estimate is required to invite the tenders and Quotations and to arrange contract, also required to control the expenditure during the execution of work. Construction projects require huge amounts of capital and have many risk factors due to the unique industry characteristics. For a project to be successful, accurate cost estimation during the design phase is very important. Estimate decides whether the proposed plan matches the funds available or not. In this project we estimate the quantities required for the construction of the Tailor shop and later calculate the cost by preparing the abstract of cost.
ESTIMATION AND COSTING
1. Introduction
2. Measurement of materials and works
3. Types of estimates
4. Detailed and abstract estimate of buildings
5. Specification and analysis of rates
6. Earthwork calculations
7. Detailed estimates
Brief description is given about different types of estimates of buildings in civil engineering with basic technical terminology used in civil engineering field
Residential Building Preliminary Cost Estimate- Excel TemplateSHAZEBALIKHAN1
The article simplifies the preliminary cost estimate for a residential building. The excel template (hyperlinked in the article) takes the basic inputs and estimates a residential building cost estimate. The estimate also breaks up the cost into 11 heads
PART I : PROFESSIONAL PRACTICE AND QUANTITY
SURVEYING
1 : Introduction
2 : Types of estimates
3 : Taking Out Quantities
4 : Modes and units of measurements
5 : Specifications
6 : Market su rvey
7 : Rate analysis
8 : Estimates of various Types of buildings
9 : Estimates of different R.C.C. Structures
and formwork
10 : Estimates of roofs and steel structures
11 : Estimates of water supply and sanitary
works
12 : ESTIMATES OF BRIDGES, CULVERTS AND PIERS
13 : Estimates of Irrigation Works
14 : Estimates of Road works
15 : Contracts and tenders
16 : Conditi ons of Contract
17 : Arbitration
18 : Accounts
19 : CONSTRUCTION MANAGEMENT AND PLANNING
PART II : VALUATION
20 : Cost, price And Value
21 : Mortgage , freehold and lease hold properties
22 : Outgoings and Net income
23 : Easements
24 : Valuation of Licenced premises
25 : Depreciation
26 : Sta nda rd rent
27 : Methods of Valuation
28 : Miscellaneous topics
29 : Valuation tables
Appendix: practical questions
Index
I will describe those things in the documents--
Types of Cost Estimates Used in Construction
Following are the different types of cost estimates used in construction,
Preliminary Cost Estimate
Plinth Area Cost Estimate
Cube Rate Cost Estimate
Approximate Quantity Method Cost Estimate
Detailed Cost Estimate
Revised Cost Estimate
Supplementary Cost Estimate
Annual Repair Cost Estimate
Construction Material Estimate with MS Excel fileSHAZEBALIKHAN1
Learn the material estimation for PCC, RCC, Brick Masonry, and Plaster. A ready to use excel file is available to download through a hyperlink in the pdf.
Estimating is the technique of calculating/computing the various quantities and the expected expenditure to be incurred on a particular work/ project. For all engineering works it is required to know beforehand the probable cost of construction known as the estimated cost. Necessary for preparing an estimate are drawings like plan, elevation and sections of important point’s, detailed specifications about workmanship & properties of materials, Standard schedule of rates of the current year. Estimate is required to invite the tenders and Quotations and to arrange contract, also required to control the expenditure during the execution of work. Construction projects require huge amounts of capital and have many risk factors due to the unique industry characteristics. For a project to be successful, accurate cost estimation during the design phase is very important. Estimate decides whether the proposed plan matches the funds available or not. In this project we estimate the quantities required for the construction of the Tailor shop and later calculate the cost by preparing the abstract of cost.
ESTIMATION AND COSTING
1. Introduction
2. Measurement of materials and works
3. Types of estimates
4. Detailed and abstract estimate of buildings
5. Specification and analysis of rates
6. Earthwork calculations
7. Detailed estimates
Brief description is given about different types of estimates of buildings in civil engineering with basic technical terminology used in civil engineering field
Residential Building Preliminary Cost Estimate- Excel TemplateSHAZEBALIKHAN1
The article simplifies the preliminary cost estimate for a residential building. The excel template (hyperlinked in the article) takes the basic inputs and estimates a residential building cost estimate. The estimate also breaks up the cost into 11 heads
PART I : PROFESSIONAL PRACTICE AND QUANTITY
SURVEYING
1 : Introduction
2 : Types of estimates
3 : Taking Out Quantities
4 : Modes and units of measurements
5 : Specifications
6 : Market su rvey
7 : Rate analysis
8 : Estimates of various Types of buildings
9 : Estimates of different R.C.C. Structures
and formwork
10 : Estimates of roofs and steel structures
11 : Estimates of water supply and sanitary
works
12 : ESTIMATES OF BRIDGES, CULVERTS AND PIERS
13 : Estimates of Irrigation Works
14 : Estimates of Road works
15 : Contracts and tenders
16 : Conditi ons of Contract
17 : Arbitration
18 : Accounts
19 : CONSTRUCTION MANAGEMENT AND PLANNING
PART II : VALUATION
20 : Cost, price And Value
21 : Mortgage , freehold and lease hold properties
22 : Outgoings and Net income
23 : Easements
24 : Valuation of Licenced premises
25 : Depreciation
26 : Sta nda rd rent
27 : Methods of Valuation
28 : Miscellaneous topics
29 : Valuation tables
Appendix: practical questions
Index
I will describe those things in the documents--
Types of Cost Estimates Used in Construction
Following are the different types of cost estimates used in construction,
Preliminary Cost Estimate
Plinth Area Cost Estimate
Cube Rate Cost Estimate
Approximate Quantity Method Cost Estimate
Detailed Cost Estimate
Revised Cost Estimate
Supplementary Cost Estimate
Annual Repair Cost Estimate
Construction Material Estimate with MS Excel fileSHAZEBALIKHAN1
Learn the material estimation for PCC, RCC, Brick Masonry, and Plaster. A ready to use excel file is available to download through a hyperlink in the pdf.
11 years experience in Residential Villa , Precast structures, Petrol compact stations, Water pipe line project, Industrial projects like ( Thermal power plant, Oil & refinery plant). And Material coordinator & procurement, SAP, Piling, sheet piling,
Hii, this is ramanjaneyulu i had overall 3+ years of experience in Construction industry. I had worked in medium raised, High raised Buildings in various countries. Currently i'm working in sekar developers as an Engineer - Civil, it's located in Bangalore.
1. Curriculum Vitae
MOHAMMAD
AZEEM
Civil Engineer
Mobile No. 0556244892/ 0501520299
E-mail: aziiim_jaan@yahoo.com
PERSONAL DETAILS:
Current/Last Employer : AL Shafar Civil Engineering LLC
Current Work Location : Dubai, United Arab Emirates
Proposed posts : Project engineer/ Site Engineer/Site Inspector
Reason for Career Move : Looking for a better career opportunity & new Challenges
Nationality : Pakistani
Total Experience : 8 Year, 6 Years in UAE
Date of Birth : January 01, 1988
Marital Status/Family Status : Married
Languages Spoken : English, Arabic, Urdu (Native)
Educational Qualification : Bachelor of Civil Engineering
D-A-E Diploma of Associate Engineer (Civil) GCT Rasul
Pakistan
Key Skills : Buildings, Villa’s, Power plants,
Computer Knowledge : MS. Office, AutoCAD
Experience in Brief
Experience of Construction (Architect/Civil) Construction of Villa’s, Buildings, Power Plants & Desalination
Plant, Reservoirs, High Rise Buildings, Residential Villas, Maintenance, Infrastructure & All Services
∝ Personal Skills
Page 1 of 8
2. Strong verbal and written communication skills, negotiation, convincing and controlling power, punctuality,
organization and coordination oriented, strong work ethic. Motivated and very team oriented.
Page 2 of 8
3. 1.
AL Shafar Civil
Engineering LLC
P.O. Box 23206, Dubai,
UAE
October 2011 –
October 2014
Project Engineer
Project Name: Luxry Villa at AL Manara
Client : H.H
Consultant: MEECON (Middle East Engineering Consultant)
Responsibilities:
• Ensure the works being executed as per the drawings, specifications and comply
with the quality norms.
• Controls all construction work (Structural/Finishing) .
• Assigning responsibilities and job description to the site Foreman and Supervisors.
• Comply with all safety instructions and standing instructions.
• Verification of Interim Payment Certificates (IPC’s) submitted by Contractors.
• Assist in necessary project documentation.
• Compare tender and construction drawings to identify variations
• Identify variations to the original scope of works and opportunity for recovery from
the Client.
• Quantities take off for material procurement.
• Carry out other duties excluding construction / supervision tasks as required by
Project Management.
Project Engineer
Project Name: Handing over of partially completed 409 luxury
villas, Package 4 & 4a Jumairah Park DUBAI.
Client : NAKHEEL
Consultant: Dar-Al-Handasah Shair and Partners
Responsibilities:
• Supervise the construction works as per approved drawings and specification
following the related BS and ISO codes of practice to maintain quality.
• Responsible for finishing/Civil activities.
• Study contract drawings, specifications and shop drawings to insure proper
coordination of built-in-items.
• Perform various responsibilities as assigned by the Contracting Projects Manager,
such as supervise certain subcontractor work activities to insure timely and accurate
performance of subcontractor work; performing certain subcontractor supervision
duties and reviewing their due payments.
• Assist in the preparation of final records for the project & Knowledge of all general
contract, subcontract documents, drawings, and specifications.
• Attending Necessary meeting with client, consultant.
Page 3 of 8
4. 2.
Actco General
Contracting Co.
LLC (uae)
Dubai, UAE
December, 2008 -
October, 2011
• Snagging & De-Snagging Of Villa’s according to Consultant & Client Requirement.
• procurement of Material
• Preparation of Monthly weekly & Daily Progress Reports
Project Engineer
Project Name: Construction of 106 luxury villas,Package 5 &
5A1 Jumairah Park DUBAI.
Client : NAKHEEL
Consultant: Dar-Al-Handasah Shair and Partners
Responsibilities:
• To insure that materials and equipment's are released for construction in time to
meet the construction schedule.
• Responsible for civil/finishing activities
• Snagging & De-Snagging Of Villa’s according to Consultant & Client Requirement.
• Preparing Sub contractors payments.
• Management of Manpower & Machinery allocation.
• Responsible for carrying out a variety of basic field duties at the job site related to
the general construction.
• To maintain contact on the working level with subcontractor’s Foremen.
• Preparing daily construction reports & preparation of a work activities items list.
• Assist in the preparation of final records for the project & Knowledge of all general
contract, subcontract documents, drawings, specifications.
• Maintain all compliances, perform other duties as assigned.
• Preparing Sub contractors payments.
Site Engineer
Project Name: HABSHAN-5 UTILITEIS AND OFFSITES
PROJECT.
Client : (GASCO) ABU DHABI GAS IDUSTREIS LTD.
Main Contractor: HYUNDAI ENGINEERING AND
CONSTRUCTION CO.LTD
Construction of substation, steel structure buildings.
Page 4 of 8
5. Responsibilities:
• Responsible for all activities of civil works of substation, and Main Control Building,
sewage & oily drainage, Fire fighting Building
• Supervise the following activities i.e, layout, excavation, concrete work water
proofing, finishing work.
• Checking and approval of the form work and reinforcement prior to placing concrete.
• Supervise the construction works as per approved drawings and specification
following the related BS and ISO codes of practice to maintain quality.
• Ensure the standard specifications for civil works.
• Requisition of ITR (inspection test request) to concerned personal prior to placing
concrete.
• Safety measures to check all arrangement of safety.
Site Engineer/Quantity Surveyor
Project Name: JABAL ALI POWER AND DESALINATION
STATION “M” package “P”
Client : DEWA (DUBAI Electricity & Water Authority)
Consultant: FICHTNER Consulting Engineer Dubai
Main Contractor: DOOSAN Heavy Industries & Construction co.llc
Construction of power plant, substation, steel structure buildings, reservoirs,
Water treatment plants.
Responsibilities:
• Reviews and checks engineering drawings, reports for competence accuracy.
• Take Instruction From the manager and assist him in supervising and coordinating
structural and architectural work
• Construction of Reservoirs, Diesel oil (5 million GLN capacity 16 no’s), sewerage &
waste water treatment plants.
• Construction Central control Building, Local Electrical Buildings.
• Construction of GT gas turbine & Water treatment Building.
• Supervise the construction works as per approved drawings and specification
following the related BS and ISO codes of practice to maintain quality.
• Handling punch item list in each building prior to handing over for beneficial
occupation.
• Ensure the standard specifications for civil works.
• Requisition of ITR (inspection test request) to concerned personal prior to placing
Page 5 of 8
6. concrete.
• Furnish a daily program for the following working day before the close of site on each
day.
• Safety measures to check all arrangement of safety.
• Preparation of monthly invoices as per BOQ.
• Re measurement of all quantities of all project.
• Helping Sr. Quantity Surveyor for all routine quantity survey work.
Site Engineer
Project Name: 400/132/22 KV Sub Station At AL-REEM Island
Client : TRANSCO ABU- DHABI
Consultant: Lahmeyer International
Main Contractor: ABB Switzerland LTD
Construction of 400/132/22 KV Sub Station, Structural and Architecural Work .
Responsibilities:
• Plan and contribute ideas for over all construction function to the contractor as well
as the work assigned.
• Construction of shunt reactor building, Cable trenches, Pipe trenches.
• Construction of Fire Fighting & GIS Building.
• Checking and approval of the form work and reinforcement prior to placing concrete.
• Checking off all elements i.e, setting of lay out, form works, all type construction.
• Earth work (cutting and filling) for Roads.
• Internal Roads, walkways, street lighting.
• Settlement of manpower, materials, and equipments to be utilize at site.
• Inspection of Safety measurements during execution of civil works.
• Preparation of Daily & Monthly Progress Reports.
• Checking and evaluating of work accomplishment for approval of sub contractors
billing.
• Attending Weekly Coordination Meetings.
Site Engineer
Page 6 of 8
7. 3.
Mian Assosiate
Enginee
r &
Govt.
Contract
or.
Pakistan
July, 2007 - November,
2008
4.
Qavi Engineers
(pvt) Limited.
Pakistan
July, 2006 - July , 2007
Project Name: Jarrar (Pakistan Army) Camp Rawalpindi
Consultant : Civil Works Organization (CWO) Pakistan
Construction of Villas, Hotels internal roads and internal services. Responsibilities:
Responsibilities:
• Internal roads, walkways, street lighting, HV and LV cable network.
• Supervise the following quantities i.e, layout, excavation, concrete work waterproofing,
and finishing work.
• Preparation of I.P.C.
• Preparation of Sub Contractor’s Bill.
• Preparation of Monthly weekly & Daily Progress Reports.
• Preparation of Monthly Working Plan.
• Bar Bending Schedule & Execution of Steel.
• Rate analysis Cost Control & Control of material wastage..
• Ensure project completion within specified time.
• Prepare and arrange for weekly schedule.
• Adopting latest standards to achieve good quality.
• Safety measures to check all arrangement of safety.
• Dealing with consultant client and other authorities.
Site Engineer
Project Name: Expo Center Lahore
Consultant : Civil Works Organization (CWO) Pakistan
Construction of exhibition halls ware houses steel structures internal roads & internal
services.
Responsibilities:
• Execution of Civil works.
• Leveling & Surveying.
• Preparation Bar Bending Schedule.
Page 7 of 8