SlideShare a Scribd company logo
Curriculum Vitae
MOHAMMAD
AZEEM
Civil Engineer
Mobile No. 0556244892/ 0501520299
E-mail: aziiim_jaan@yahoo.com
PERSONAL DETAILS:
Current/Last Employer : AL Shafar Civil Engineering LLC
Current Work Location : Dubai, United Arab Emirates
Proposed posts : Project engineer/ Site Engineer/Site Inspector
Reason for Career Move : Looking for a better career opportunity & new Challenges
Nationality : Pakistani
Total Experience : 8 Year, 6 Years in UAE
Date of Birth : January 01, 1988
Marital Status/Family Status : Married
Languages Spoken : English, Arabic, Urdu (Native)
Educational Qualification : Bachelor of Civil Engineering
D-A-E Diploma of Associate Engineer (Civil) GCT Rasul
Pakistan
Key Skills : Buildings, Villa’s, Power plants,
Computer Knowledge : MS. Office, AutoCAD
Experience in Brief
Experience of Construction (Architect/Civil) Construction of Villa’s, Buildings, Power Plants & Desalination
Plant, Reservoirs, High Rise Buildings, Residential Villas, Maintenance, Infrastructure & All Services
∝ Personal Skills
Page 1 of 8
Strong verbal and written communication skills, negotiation, convincing and controlling power, punctuality,
organization and coordination oriented, strong work ethic. Motivated and very team oriented.
Page 2 of 8
1.
AL Shafar Civil
Engineering LLC
P.O. Box 23206, Dubai,
UAE
October 2011 –
October 2014
Project Engineer
Project Name: Luxry Villa at AL Manara
Client : H.H
Consultant: MEECON (Middle East Engineering Consultant)
Responsibilities:
• Ensure the works being executed as per the drawings, specifications and comply
with the quality norms.
• Controls all construction work (Structural/Finishing) .
• Assigning responsibilities and job description to the site Foreman and Supervisors.
• Comply with all safety instructions and standing instructions.
• Verification of Interim Payment Certificates (IPC’s) submitted by Contractors.
• Assist in necessary project documentation.
• Compare tender and construction drawings to identify variations
• Identify variations to the original scope of works and opportunity for recovery from
the Client.
• Quantities take off for material procurement.
• Carry out other duties excluding construction / supervision tasks as required by
Project Management.
 Project Engineer
Project Name: Handing over of partially completed 409 luxury
villas, Package 4 & 4a Jumairah Park DUBAI.
Client : NAKHEEL
Consultant: Dar-Al-Handasah Shair and Partners
Responsibilities:
• Supervise the construction works as per approved drawings and specification
following the related BS and ISO codes of practice to maintain quality.
• Responsible for finishing/Civil activities.
• Study contract drawings, specifications and shop drawings to insure proper
coordination of built-in-items.
• Perform various responsibilities as assigned by the Contracting Projects Manager,
such as supervise certain subcontractor work activities to insure timely and accurate
performance of subcontractor work; performing certain subcontractor supervision
duties and reviewing their due payments.
• Assist in the preparation of final records for the project & Knowledge of all general
contract, subcontract documents, drawings, and specifications.
• Attending Necessary meeting with client, consultant.
Page 3 of 8
2.
Actco General
Contracting Co.
LLC (uae)
Dubai, UAE
December, 2008 -
October, 2011
• Snagging & De-Snagging Of Villa’s according to Consultant & Client Requirement.
• procurement of Material
• Preparation of Monthly weekly & Daily Progress Reports
Project Engineer
Project Name: Construction of 106 luxury villas,Package 5 &
5A1 Jumairah Park DUBAI.
Client : NAKHEEL
Consultant: Dar-Al-Handasah Shair and Partners
Responsibilities:
• To insure that materials and equipment's are released for construction in time to
meet the construction schedule.
• Responsible for civil/finishing activities
• Snagging & De-Snagging Of Villa’s according to Consultant & Client Requirement.
• Preparing Sub contractors payments.
• Management of Manpower & Machinery allocation.
• Responsible for carrying out a variety of basic field duties at the job site related to
the general construction.
• To maintain contact on the working level with subcontractor’s Foremen.
• Preparing daily construction reports & preparation of a work activities items list.
• Assist in the preparation of final records for the project & Knowledge of all general
contract, subcontract documents, drawings, specifications.
• Maintain all compliances, perform other duties as assigned.
• Preparing Sub contractors payments.
Site Engineer
Project Name: HABSHAN-5 UTILITEIS AND OFFSITES
PROJECT.
Client : (GASCO) ABU DHABI GAS IDUSTREIS LTD.
Main Contractor: HYUNDAI ENGINEERING AND
CONSTRUCTION CO.LTD
Construction of substation, steel structure buildings.
Page 4 of 8
Responsibilities:
• Responsible for all activities of civil works of substation, and Main Control Building,
sewage & oily drainage, Fire fighting Building
• Supervise the following activities i.e, layout, excavation, concrete work water
proofing, finishing work.
• Checking and approval of the form work and reinforcement prior to placing concrete.
• Supervise the construction works as per approved drawings and specification
following the related BS and ISO codes of practice to maintain quality.
• Ensure the standard specifications for civil works.
• Requisition of ITR (inspection test request) to concerned personal prior to placing
concrete.
• Safety measures to check all arrangement of safety.
Site Engineer/Quantity Surveyor
Project Name: JABAL ALI POWER AND DESALINATION
STATION “M” package “P”
Client : DEWA (DUBAI Electricity & Water Authority)
Consultant: FICHTNER Consulting Engineer Dubai
Main Contractor: DOOSAN Heavy Industries & Construction co.llc
Construction of power plant, substation, steel structure buildings, reservoirs,
Water treatment plants.
Responsibilities:
• Reviews and checks engineering drawings, reports for competence accuracy.
• Take Instruction From the manager and assist him in supervising and coordinating
structural and architectural work
• Construction of Reservoirs, Diesel oil (5 million GLN capacity 16 no’s), sewerage &
waste water treatment plants.
• Construction Central control Building, Local Electrical Buildings.
• Construction of GT gas turbine & Water treatment Building.
• Supervise the construction works as per approved drawings and specification
following the related BS and ISO codes of practice to maintain quality.
• Handling punch item list in each building prior to handing over for beneficial
occupation.
• Ensure the standard specifications for civil works.
• Requisition of ITR (inspection test request) to concerned personal prior to placing
Page 5 of 8
concrete.
• Furnish a daily program for the following working day before the close of site on each
day.
• Safety measures to check all arrangement of safety.
• Preparation of monthly invoices as per BOQ.
• Re measurement of all quantities of all project.
• Helping Sr. Quantity Surveyor for all routine quantity survey work.
Site Engineer
Project Name: 400/132/22 KV Sub Station At AL-REEM Island
Client : TRANSCO ABU- DHABI
Consultant: Lahmeyer International
Main Contractor: ABB Switzerland LTD
Construction of 400/132/22 KV Sub Station, Structural and Architecural Work .
Responsibilities:
• Plan and contribute ideas for over all construction function to the contractor as well
as the work assigned.
• Construction of shunt reactor building, Cable trenches, Pipe trenches.
• Construction of Fire Fighting & GIS Building.
• Checking and approval of the form work and reinforcement prior to placing concrete.
• Checking off all elements i.e, setting of lay out, form works, all type construction.
• Earth work (cutting and filling) for Roads.
• Internal Roads, walkways, street lighting.
• Settlement of manpower, materials, and equipments to be utilize at site.
• Inspection of Safety measurements during execution of civil works.
• Preparation of Daily & Monthly Progress Reports.
• Checking and evaluating of work accomplishment for approval of sub contractors
billing.
• Attending Weekly Coordination Meetings.
Site Engineer
Page 6 of 8
3.
Mian Assosiate
Enginee
r &
Govt.
Contract
or.
Pakistan
July, 2007 - November,
2008
4.
Qavi Engineers
(pvt) Limited.
Pakistan
July, 2006 - July , 2007
Project Name: Jarrar (Pakistan Army) Camp Rawalpindi
Consultant : Civil Works Organization (CWO) Pakistan
Construction of Villas, Hotels internal roads and internal services. Responsibilities:
Responsibilities:
• Internal roads, walkways, street lighting, HV and LV cable network.
• Supervise the following quantities i.e, layout, excavation, concrete work waterproofing,
and finishing work.
• Preparation of I.P.C.
• Preparation of Sub Contractor’s Bill.
• Preparation of Monthly weekly & Daily Progress Reports.
• Preparation of Monthly Working Plan.
• Bar Bending Schedule & Execution of Steel.
• Rate analysis Cost Control & Control of material wastage..
• Ensure project completion within specified time.
• Prepare and arrange for weekly schedule.
• Adopting latest standards to achieve good quality.
• Safety measures to check all arrangement of safety.
• Dealing with consultant client and other authorities.
Site Engineer
Project Name: Expo Center Lahore
Consultant : Civil Works Organization (CWO) Pakistan
Construction of exhibition halls ware houses steel structures internal roads & internal
services.
Responsibilities:
• Execution of Civil works.
• Leveling & Surveying.
• Preparation Bar Bending Schedule.
Page 7 of 8
Page 8 of 8

More Related Content

What's hot

Cost estimation
Cost estimationCost estimation
Cost estimation
Satyam Singh
 
B.arch Estimation and Costing
B.arch  Estimation and CostingB.arch  Estimation and Costing
B.arch Estimation and Costing
SamreenFatima29
 
Introduction to estimation
Introduction to estimationIntroduction to estimation
Introduction to estimation
DhavalMithaiwala
 
Quantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil EngineeringQuantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Aabid Ansar
 
Basics of estimation
Basics of estimation Basics of estimation
Basics of estimation
ddscte
 
Estimatingandcosting
EstimatingandcostingEstimatingandcosting
Estimatingandcosting
K.Manidhar Nani
 
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
Nafisa Nazneen Choudhury
 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing bookThomas Britto
 
estimate (interior design student work)
estimate (interior design student work)estimate (interior design student work)
estimate (interior design student work)
dezyneecole
 
Fundamentals of Estimating and Costing
 Fundamentals of Estimating and Costing Fundamentals of Estimating and Costing
Fundamentals of Estimating and Costing
Ganesh Tatikonda
 
Estimating and Costing
Estimating and CostingEstimating and Costing
Estimating and Costing
Ganesh Tatikonda
 
Types of estimates
Types of estimatesTypes of estimates
Types of estimates
Simarpreet Singh
 
Residential Building Preliminary Cost Estimate- Excel Template
Residential Building Preliminary Cost Estimate- Excel TemplateResidential Building Preliminary Cost Estimate- Excel Template
Residential Building Preliminary Cost Estimate- Excel Template
SHAZEBALIKHAN1
 
Estimating_costing_and_valuation
Estimating_costing_and_valuationEstimating_costing_and_valuation
Estimating_costing_and_valuation
Charotar Publishing House Pvt. Ltd.
 
type of cost Estimation
type of cost Estimationtype of cost Estimation
type of cost Estimation
Educational Learner
 
Construction Material Estimate with MS Excel file
Construction Material Estimate with MS Excel fileConstruction Material Estimate with MS Excel file
Construction Material Estimate with MS Excel file
SHAZEBALIKHAN1
 
Estimation & costing guide
Estimation & costing guideEstimation & costing guide
Estimation & costing guide
Hiren Thakkar
 
Planning and cost analysis of the commercial building
Planning and cost analysis of the commercial buildingPlanning and cost analysis of the commercial building
Planning and cost analysis of the commercial building
ila vamsi krishna
 
Unit-4_Specification
Unit-4_SpecificationUnit-4_Specification
Unit-4_Specification
Akash Bharti
 

What's hot (20)

Cost estimation
Cost estimationCost estimation
Cost estimation
 
Estimation
EstimationEstimation
Estimation
 
B.arch Estimation and Costing
B.arch  Estimation and CostingB.arch  Estimation and Costing
B.arch Estimation and Costing
 
Introduction to estimation
Introduction to estimationIntroduction to estimation
Introduction to estimation
 
Quantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil EngineeringQuantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
 
Basics of estimation
Basics of estimation Basics of estimation
Basics of estimation
 
Estimatingandcosting
EstimatingandcostingEstimatingandcosting
Estimatingandcosting
 
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing book
 
estimate (interior design student work)
estimate (interior design student work)estimate (interior design student work)
estimate (interior design student work)
 
Fundamentals of Estimating and Costing
 Fundamentals of Estimating and Costing Fundamentals of Estimating and Costing
Fundamentals of Estimating and Costing
 
Estimating and Costing
Estimating and CostingEstimating and Costing
Estimating and Costing
 
Types of estimates
Types of estimatesTypes of estimates
Types of estimates
 
Residential Building Preliminary Cost Estimate- Excel Template
Residential Building Preliminary Cost Estimate- Excel TemplateResidential Building Preliminary Cost Estimate- Excel Template
Residential Building Preliminary Cost Estimate- Excel Template
 
Estimating_costing_and_valuation
Estimating_costing_and_valuationEstimating_costing_and_valuation
Estimating_costing_and_valuation
 
type of cost Estimation
type of cost Estimationtype of cost Estimation
type of cost Estimation
 
Construction Material Estimate with MS Excel file
Construction Material Estimate with MS Excel fileConstruction Material Estimate with MS Excel file
Construction Material Estimate with MS Excel file
 
Estimation & costing guide
Estimation & costing guideEstimation & costing guide
Estimation & costing guide
 
Planning and cost analysis of the commercial building
Planning and cost analysis of the commercial buildingPlanning and cost analysis of the commercial building
Planning and cost analysis of the commercial building
 
Unit-4_Specification
Unit-4_SpecificationUnit-4_Specification
Unit-4_Specification
 

Similar to Muhammad Azeem -

UDATED CV-19032016
UDATED CV-19032016UDATED CV-19032016
UDATED CV-19032016Vic Carino
 
C.V of Project Manager Haider Ahmed Al Dure.PDF
C.V of Project Manager Haider Ahmed Al Dure.PDFC.V of Project Manager Haider Ahmed Al Dure.PDF
C.V of Project Manager Haider Ahmed Al Dure.PDFHaider Salman
 
Muthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMuthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdf
MUTHUKUMAR428109
 
engr ijaz 1 qc civil engineer I did civil engineering from University peshawar
engr ijaz 1 qc  civil engineer I did civil engineering from University peshawarengr ijaz 1 qc  civil engineer I did civil engineering from University peshawar
engr ijaz 1 qc civil engineer I did civil engineering from University peshawar
engrijaz727
 
TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015Teddy Fernando
 
CURRICULUM_VITAE (1)1
CURRICULUM_VITAE (1)1CURRICULUM_VITAE (1)1
CURRICULUM_VITAE (1)1rajesh thomas
 
Resume
ResumeResume
CV-Atif_Ashraf-4
CV-Atif_Ashraf-4CV-Atif_Ashraf-4
CV-Atif_Ashraf-4Atif Ashraf
 
Sheikh Mohammed Muntazer Resume
Sheikh Mohammed Muntazer Resume Sheikh Mohammed Muntazer Resume
Sheikh Mohammed Muntazer Resume Muntazir Sheikh
 
Sheikh Mohammed Muntazer- Resume - Final
Sheikh Mohammed Muntazer- Resume - FinalSheikh Mohammed Muntazer- Resume - Final
Sheikh Mohammed Muntazer- Resume - FinalMuntazir Sheikh
 
CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015Aminul Haque
 
ASMAA ATIA-Wuzzuf-CV
ASMAA ATIA-Wuzzuf-CVASMAA ATIA-Wuzzuf-CV
ASMAA ATIA-Wuzzuf-CVAsmaa Gouda
 

Similar to Muhammad Azeem - (20)

UDATED CV-19032016
UDATED CV-19032016UDATED CV-19032016
UDATED CV-19032016
 
C.V of Project Manager Haider Ahmed Al Dure.PDF
C.V of Project Manager Haider Ahmed Al Dure.PDFC.V of Project Manager Haider Ahmed Al Dure.PDF
C.V of Project Manager Haider Ahmed Al Dure.PDF
 
Muthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMuthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdf
 
engr ijaz 1 qc civil engineer I did civil engineering from University peshawar
engr ijaz 1 qc  civil engineer I did civil engineering from University peshawarengr ijaz 1 qc  civil engineer I did civil engineering from University peshawar
engr ijaz 1 qc civil engineer I did civil engineering from University peshawar
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
cv for Project Engineer
cv for Project Engineercv for Project Engineer
cv for Project Engineer
 
TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
 
Project Engineer
Project EngineerProject Engineer
Project Engineer
 
Steven qaqc insp
Steven qaqc inspSteven qaqc insp
Steven qaqc insp
 
CURRICULUM_VITAE (1)1
CURRICULUM_VITAE (1)1CURRICULUM_VITAE (1)1
CURRICULUM_VITAE (1)1
 
Resume
ResumeResume
Resume
 
Curriculum Vitae Of Khalid
Curriculum Vitae Of KhalidCurriculum Vitae Of Khalid
Curriculum Vitae Of Khalid
 
CV-Atif_Ashraf-4
CV-Atif_Ashraf-4CV-Atif_Ashraf-4
CV-Atif_Ashraf-4
 
Sheikh Mohammed Muntazer Resume
Sheikh Mohammed Muntazer Resume Sheikh Mohammed Muntazer Resume
Sheikh Mohammed Muntazer Resume
 
Sheikh Mohammed Muntazer- Resume - Final
Sheikh Mohammed Muntazer- Resume - FinalSheikh Mohammed Muntazer- Resume - Final
Sheikh Mohammed Muntazer- Resume - Final
 
CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015
 
ASMAA ATIA-Wuzzuf-CV
ASMAA ATIA-Wuzzuf-CVASMAA ATIA-Wuzzuf-CV
ASMAA ATIA-Wuzzuf-CV
 
CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)
 
CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)
 

Muhammad Azeem -

  • 1. Curriculum Vitae MOHAMMAD AZEEM Civil Engineer Mobile No. 0556244892/ 0501520299 E-mail: aziiim_jaan@yahoo.com PERSONAL DETAILS: Current/Last Employer : AL Shafar Civil Engineering LLC Current Work Location : Dubai, United Arab Emirates Proposed posts : Project engineer/ Site Engineer/Site Inspector Reason for Career Move : Looking for a better career opportunity & new Challenges Nationality : Pakistani Total Experience : 8 Year, 6 Years in UAE Date of Birth : January 01, 1988 Marital Status/Family Status : Married Languages Spoken : English, Arabic, Urdu (Native) Educational Qualification : Bachelor of Civil Engineering D-A-E Diploma of Associate Engineer (Civil) GCT Rasul Pakistan Key Skills : Buildings, Villa’s, Power plants, Computer Knowledge : MS. Office, AutoCAD Experience in Brief Experience of Construction (Architect/Civil) Construction of Villa’s, Buildings, Power Plants & Desalination Plant, Reservoirs, High Rise Buildings, Residential Villas, Maintenance, Infrastructure & All Services ∝ Personal Skills Page 1 of 8
  • 2. Strong verbal and written communication skills, negotiation, convincing and controlling power, punctuality, organization and coordination oriented, strong work ethic. Motivated and very team oriented. Page 2 of 8
  • 3. 1. AL Shafar Civil Engineering LLC P.O. Box 23206, Dubai, UAE October 2011 – October 2014 Project Engineer Project Name: Luxry Villa at AL Manara Client : H.H Consultant: MEECON (Middle East Engineering Consultant) Responsibilities: • Ensure the works being executed as per the drawings, specifications and comply with the quality norms. • Controls all construction work (Structural/Finishing) . • Assigning responsibilities and job description to the site Foreman and Supervisors. • Comply with all safety instructions and standing instructions. • Verification of Interim Payment Certificates (IPC’s) submitted by Contractors. • Assist in necessary project documentation. • Compare tender and construction drawings to identify variations • Identify variations to the original scope of works and opportunity for recovery from the Client. • Quantities take off for material procurement. • Carry out other duties excluding construction / supervision tasks as required by Project Management.  Project Engineer Project Name: Handing over of partially completed 409 luxury villas, Package 4 & 4a Jumairah Park DUBAI. Client : NAKHEEL Consultant: Dar-Al-Handasah Shair and Partners Responsibilities: • Supervise the construction works as per approved drawings and specification following the related BS and ISO codes of practice to maintain quality. • Responsible for finishing/Civil activities. • Study contract drawings, specifications and shop drawings to insure proper coordination of built-in-items. • Perform various responsibilities as assigned by the Contracting Projects Manager, such as supervise certain subcontractor work activities to insure timely and accurate performance of subcontractor work; performing certain subcontractor supervision duties and reviewing their due payments. • Assist in the preparation of final records for the project & Knowledge of all general contract, subcontract documents, drawings, and specifications. • Attending Necessary meeting with client, consultant. Page 3 of 8
  • 4. 2. Actco General Contracting Co. LLC (uae) Dubai, UAE December, 2008 - October, 2011 • Snagging & De-Snagging Of Villa’s according to Consultant & Client Requirement. • procurement of Material • Preparation of Monthly weekly & Daily Progress Reports Project Engineer Project Name: Construction of 106 luxury villas,Package 5 & 5A1 Jumairah Park DUBAI. Client : NAKHEEL Consultant: Dar-Al-Handasah Shair and Partners Responsibilities: • To insure that materials and equipment's are released for construction in time to meet the construction schedule. • Responsible for civil/finishing activities • Snagging & De-Snagging Of Villa’s according to Consultant & Client Requirement. • Preparing Sub contractors payments. • Management of Manpower & Machinery allocation. • Responsible for carrying out a variety of basic field duties at the job site related to the general construction. • To maintain contact on the working level with subcontractor’s Foremen. • Preparing daily construction reports & preparation of a work activities items list. • Assist in the preparation of final records for the project & Knowledge of all general contract, subcontract documents, drawings, specifications. • Maintain all compliances, perform other duties as assigned. • Preparing Sub contractors payments. Site Engineer Project Name: HABSHAN-5 UTILITEIS AND OFFSITES PROJECT. Client : (GASCO) ABU DHABI GAS IDUSTREIS LTD. Main Contractor: HYUNDAI ENGINEERING AND CONSTRUCTION CO.LTD Construction of substation, steel structure buildings. Page 4 of 8
  • 5. Responsibilities: • Responsible for all activities of civil works of substation, and Main Control Building, sewage & oily drainage, Fire fighting Building • Supervise the following activities i.e, layout, excavation, concrete work water proofing, finishing work. • Checking and approval of the form work and reinforcement prior to placing concrete. • Supervise the construction works as per approved drawings and specification following the related BS and ISO codes of practice to maintain quality. • Ensure the standard specifications for civil works. • Requisition of ITR (inspection test request) to concerned personal prior to placing concrete. • Safety measures to check all arrangement of safety. Site Engineer/Quantity Surveyor Project Name: JABAL ALI POWER AND DESALINATION STATION “M” package “P” Client : DEWA (DUBAI Electricity & Water Authority) Consultant: FICHTNER Consulting Engineer Dubai Main Contractor: DOOSAN Heavy Industries & Construction co.llc Construction of power plant, substation, steel structure buildings, reservoirs, Water treatment plants. Responsibilities: • Reviews and checks engineering drawings, reports for competence accuracy. • Take Instruction From the manager and assist him in supervising and coordinating structural and architectural work • Construction of Reservoirs, Diesel oil (5 million GLN capacity 16 no’s), sewerage & waste water treatment plants. • Construction Central control Building, Local Electrical Buildings. • Construction of GT gas turbine & Water treatment Building. • Supervise the construction works as per approved drawings and specification following the related BS and ISO codes of practice to maintain quality. • Handling punch item list in each building prior to handing over for beneficial occupation. • Ensure the standard specifications for civil works. • Requisition of ITR (inspection test request) to concerned personal prior to placing Page 5 of 8
  • 6. concrete. • Furnish a daily program for the following working day before the close of site on each day. • Safety measures to check all arrangement of safety. • Preparation of monthly invoices as per BOQ. • Re measurement of all quantities of all project. • Helping Sr. Quantity Surveyor for all routine quantity survey work. Site Engineer Project Name: 400/132/22 KV Sub Station At AL-REEM Island Client : TRANSCO ABU- DHABI Consultant: Lahmeyer International Main Contractor: ABB Switzerland LTD Construction of 400/132/22 KV Sub Station, Structural and Architecural Work . Responsibilities: • Plan and contribute ideas for over all construction function to the contractor as well as the work assigned. • Construction of shunt reactor building, Cable trenches, Pipe trenches. • Construction of Fire Fighting & GIS Building. • Checking and approval of the form work and reinforcement prior to placing concrete. • Checking off all elements i.e, setting of lay out, form works, all type construction. • Earth work (cutting and filling) for Roads. • Internal Roads, walkways, street lighting. • Settlement of manpower, materials, and equipments to be utilize at site. • Inspection of Safety measurements during execution of civil works. • Preparation of Daily & Monthly Progress Reports. • Checking and evaluating of work accomplishment for approval of sub contractors billing. • Attending Weekly Coordination Meetings. Site Engineer Page 6 of 8
  • 7. 3. Mian Assosiate Enginee r & Govt. Contract or. Pakistan July, 2007 - November, 2008 4. Qavi Engineers (pvt) Limited. Pakistan July, 2006 - July , 2007 Project Name: Jarrar (Pakistan Army) Camp Rawalpindi Consultant : Civil Works Organization (CWO) Pakistan Construction of Villas, Hotels internal roads and internal services. Responsibilities: Responsibilities: • Internal roads, walkways, street lighting, HV and LV cable network. • Supervise the following quantities i.e, layout, excavation, concrete work waterproofing, and finishing work. • Preparation of I.P.C. • Preparation of Sub Contractor’s Bill. • Preparation of Monthly weekly & Daily Progress Reports. • Preparation of Monthly Working Plan. • Bar Bending Schedule & Execution of Steel. • Rate analysis Cost Control & Control of material wastage.. • Ensure project completion within specified time. • Prepare and arrange for weekly schedule. • Adopting latest standards to achieve good quality. • Safety measures to check all arrangement of safety. • Dealing with consultant client and other authorities. Site Engineer Project Name: Expo Center Lahore Consultant : Civil Works Organization (CWO) Pakistan Construction of exhibition halls ware houses steel structures internal roads & internal services. Responsibilities: • Execution of Civil works. • Leveling & Surveying. • Preparation Bar Bending Schedule. Page 7 of 8