Curriculum Vitae
MOHAMMAD
AZEEM
Civil Engineer
Mobile No. 0556244892/ 0501520299
E-mail: aziiim_jaan@yahoo.com
PERSONAL DETAILS:
Current/Last Employer : AL Shafar Civil Engineering LLC
Current Work Location : Dubai, United Arab Emirates
Proposed posts : Project engineer/ Site Engineer/Site Inspector
Reason for Career Move : Looking for a better career opportunity & new Challenges
Nationality : Pakistani
Total Experience : 8 Year, 6 Years in UAE
Date of Birth : January 01, 1988
Marital Status/Family Status : Married
Languages Spoken : English, Arabic, Urdu (Native)
Educational Qualification : Bachelor of Civil Engineering
D-A-E Diploma of Associate Engineer (Civil) GCT Rasul
Pakistan
Key Skills : Buildings, Villa’s, Power plants,
Computer Knowledge : MS. Office, AutoCAD
Experience in Brief
Experience of Construction (Architect/Civil) Construction of Villa’s, Buildings, Power Plants & Desalination
Plant, Reservoirs, High Rise Buildings, Residential Villas, Maintenance, Infrastructure & All Services
∝ Personal Skills
Page 1 of 8
Strong verbal and written communication skills, negotiation, convincing and controlling power, punctuality,
organization and coordination oriented, strong work ethic. Motivated and very team oriented.
Page 2 of 8
1.
AL Shafar Civil
Engineering LLC
P.O. Box 23206, Dubai,
UAE
October 2011 –
October 2014
Project Engineer
Project Name: Luxry Villa at AL Manara
Client : H.H
Consultant: MEECON (Middle East Engineering Consultant)
Responsibilities:
• Ensure the works being executed as per the drawings, specifications and comply
with the quality norms.
• Controls all construction work (Structural/Finishing) .
• Assigning responsibilities and job description to the site Foreman and Supervisors.
• Comply with all safety instructions and standing instructions.
• Verification of Interim Payment Certificates (IPC’s) submitted by Contractors.
• Assist in necessary project documentation.
• Compare tender and construction drawings to identify variations
• Identify variations to the original scope of works and opportunity for recovery from
the Client.
• Quantities take off for material procurement.
• Carry out other duties excluding construction / supervision tasks as required by
Project Management.
 Project Engineer
Project Name: Handing over of partially completed 409 luxury
villas, Package 4 & 4a Jumairah Park DUBAI.
Client : NAKHEEL
Consultant: Dar-Al-Handasah Shair and Partners
Responsibilities:
• Supervise the construction works as per approved drawings and specification
following the related BS and ISO codes of practice to maintain quality.
• Responsible for finishing/Civil activities.
• Study contract drawings, specifications and shop drawings to insure proper
coordination of built-in-items.
• Perform various responsibilities as assigned by the Contracting Projects Manager,
such as supervise certain subcontractor work activities to insure timely and accurate
performance of subcontractor work; performing certain subcontractor supervision
duties and reviewing their due payments.
• Assist in the preparation of final records for the project & Knowledge of all general
contract, subcontract documents, drawings, and specifications.
• Attending Necessary meeting with client, consultant.
Page 3 of 8
2.
Actco General
Contracting Co.
LLC (uae)
Dubai, UAE
December, 2008 -
October, 2011
• Snagging & De-Snagging Of Villa’s according to Consultant & Client Requirement.
• procurement of Material
• Preparation of Monthly weekly & Daily Progress Reports
Project Engineer
Project Name: Construction of 106 luxury villas,Package 5 &
5A1 Jumairah Park DUBAI.
Client : NAKHEEL
Consultant: Dar-Al-Handasah Shair and Partners
Responsibilities:
• To insure that materials and equipment's are released for construction in time to
meet the construction schedule.
• Responsible for civil/finishing activities
• Snagging & De-Snagging Of Villa’s according to Consultant & Client Requirement.
• Preparing Sub contractors payments.
• Management of Manpower & Machinery allocation.
• Responsible for carrying out a variety of basic field duties at the job site related to
the general construction.
• To maintain contact on the working level with subcontractor’s Foremen.
• Preparing daily construction reports & preparation of a work activities items list.
• Assist in the preparation of final records for the project & Knowledge of all general
contract, subcontract documents, drawings, specifications.
• Maintain all compliances, perform other duties as assigned.
• Preparing Sub contractors payments.
Site Engineer
Project Name: HABSHAN-5 UTILITEIS AND OFFSITES
PROJECT.
Client : (GASCO) ABU DHABI GAS IDUSTREIS LTD.
Main Contractor: HYUNDAI ENGINEERING AND
CONSTRUCTION CO.LTD
Construction of substation, steel structure buildings.
Page 4 of 8
Responsibilities:
• Responsible for all activities of civil works of substation, and Main Control Building,
sewage & oily drainage, Fire fighting Building
• Supervise the following activities i.e, layout, excavation, concrete work water
proofing, finishing work.
• Checking and approval of the form work and reinforcement prior to placing concrete.
• Supervise the construction works as per approved drawings and specification
following the related BS and ISO codes of practice to maintain quality.
• Ensure the standard specifications for civil works.
• Requisition of ITR (inspection test request) to concerned personal prior to placing
concrete.
• Safety measures to check all arrangement of safety.
Site Engineer/Quantity Surveyor
Project Name: JABAL ALI POWER AND DESALINATION
STATION “M” package “P”
Client : DEWA (DUBAI Electricity & Water Authority)
Consultant: FICHTNER Consulting Engineer Dubai
Main Contractor: DOOSAN Heavy Industries & Construction co.llc
Construction of power plant, substation, steel structure buildings, reservoirs,
Water treatment plants.
Responsibilities:
• Reviews and checks engineering drawings, reports for competence accuracy.
• Take Instruction From the manager and assist him in supervising and coordinating
structural and architectural work
• Construction of Reservoirs, Diesel oil (5 million GLN capacity 16 no’s), sewerage &
waste water treatment plants.
• Construction Central control Building, Local Electrical Buildings.
• Construction of GT gas turbine & Water treatment Building.
• Supervise the construction works as per approved drawings and specification
following the related BS and ISO codes of practice to maintain quality.
• Handling punch item list in each building prior to handing over for beneficial
occupation.
• Ensure the standard specifications for civil works.
• Requisition of ITR (inspection test request) to concerned personal prior to placing
Page 5 of 8
concrete.
• Furnish a daily program for the following working day before the close of site on each
day.
• Safety measures to check all arrangement of safety.
• Preparation of monthly invoices as per BOQ.
• Re measurement of all quantities of all project.
• Helping Sr. Quantity Surveyor for all routine quantity survey work.
Site Engineer
Project Name: 400/132/22 KV Sub Station At AL-REEM Island
Client : TRANSCO ABU- DHABI
Consultant: Lahmeyer International
Main Contractor: ABB Switzerland LTD
Construction of 400/132/22 KV Sub Station, Structural and Architecural Work .
Responsibilities:
• Plan and contribute ideas for over all construction function to the contractor as well
as the work assigned.
• Construction of shunt reactor building, Cable trenches, Pipe trenches.
• Construction of Fire Fighting & GIS Building.
• Checking and approval of the form work and reinforcement prior to placing concrete.
• Checking off all elements i.e, setting of lay out, form works, all type construction.
• Earth work (cutting and filling) for Roads.
• Internal Roads, walkways, street lighting.
• Settlement of manpower, materials, and equipments to be utilize at site.
• Inspection of Safety measurements during execution of civil works.
• Preparation of Daily & Monthly Progress Reports.
• Checking and evaluating of work accomplishment for approval of sub contractors
billing.
• Attending Weekly Coordination Meetings.
Site Engineer
Page 6 of 8
3.
Mian Assosiate
Enginee
r &
Govt.
Contract
or.
Pakistan
July, 2007 - November,
2008
4.
Qavi Engineers
(pvt) Limited.
Pakistan
July, 2006 - July , 2007
Project Name: Jarrar (Pakistan Army) Camp Rawalpindi
Consultant : Civil Works Organization (CWO) Pakistan
Construction of Villas, Hotels internal roads and internal services. Responsibilities:
Responsibilities:
• Internal roads, walkways, street lighting, HV and LV cable network.
• Supervise the following quantities i.e, layout, excavation, concrete work waterproofing,
and finishing work.
• Preparation of I.P.C.
• Preparation of Sub Contractor’s Bill.
• Preparation of Monthly weekly & Daily Progress Reports.
• Preparation of Monthly Working Plan.
• Bar Bending Schedule & Execution of Steel.
• Rate analysis Cost Control & Control of material wastage..
• Ensure project completion within specified time.
• Prepare and arrange for weekly schedule.
• Adopting latest standards to achieve good quality.
• Safety measures to check all arrangement of safety.
• Dealing with consultant client and other authorities.
Site Engineer
Project Name: Expo Center Lahore
Consultant : Civil Works Organization (CWO) Pakistan
Construction of exhibition halls ware houses steel structures internal roads & internal
services.
Responsibilities:
• Execution of Civil works.
• Leveling & Surveying.
• Preparation Bar Bending Schedule.
Page 7 of 8
Page 8 of 8

Muhammad Azeem -

  • 1.
    Curriculum Vitae MOHAMMAD AZEEM Civil Engineer MobileNo. 0556244892/ 0501520299 E-mail: aziiim_jaan@yahoo.com PERSONAL DETAILS: Current/Last Employer : AL Shafar Civil Engineering LLC Current Work Location : Dubai, United Arab Emirates Proposed posts : Project engineer/ Site Engineer/Site Inspector Reason for Career Move : Looking for a better career opportunity & new Challenges Nationality : Pakistani Total Experience : 8 Year, 6 Years in UAE Date of Birth : January 01, 1988 Marital Status/Family Status : Married Languages Spoken : English, Arabic, Urdu (Native) Educational Qualification : Bachelor of Civil Engineering D-A-E Diploma of Associate Engineer (Civil) GCT Rasul Pakistan Key Skills : Buildings, Villa’s, Power plants, Computer Knowledge : MS. Office, AutoCAD Experience in Brief Experience of Construction (Architect/Civil) Construction of Villa’s, Buildings, Power Plants & Desalination Plant, Reservoirs, High Rise Buildings, Residential Villas, Maintenance, Infrastructure & All Services ∝ Personal Skills Page 1 of 8
  • 2.
    Strong verbal andwritten communication skills, negotiation, convincing and controlling power, punctuality, organization and coordination oriented, strong work ethic. Motivated and very team oriented. Page 2 of 8
  • 3.
    1. AL Shafar Civil EngineeringLLC P.O. Box 23206, Dubai, UAE October 2011 – October 2014 Project Engineer Project Name: Luxry Villa at AL Manara Client : H.H Consultant: MEECON (Middle East Engineering Consultant) Responsibilities: • Ensure the works being executed as per the drawings, specifications and comply with the quality norms. • Controls all construction work (Structural/Finishing) . • Assigning responsibilities and job description to the site Foreman and Supervisors. • Comply with all safety instructions and standing instructions. • Verification of Interim Payment Certificates (IPC’s) submitted by Contractors. • Assist in necessary project documentation. • Compare tender and construction drawings to identify variations • Identify variations to the original scope of works and opportunity for recovery from the Client. • Quantities take off for material procurement. • Carry out other duties excluding construction / supervision tasks as required by Project Management.  Project Engineer Project Name: Handing over of partially completed 409 luxury villas, Package 4 & 4a Jumairah Park DUBAI. Client : NAKHEEL Consultant: Dar-Al-Handasah Shair and Partners Responsibilities: • Supervise the construction works as per approved drawings and specification following the related BS and ISO codes of practice to maintain quality. • Responsible for finishing/Civil activities. • Study contract drawings, specifications and shop drawings to insure proper coordination of built-in-items. • Perform various responsibilities as assigned by the Contracting Projects Manager, such as supervise certain subcontractor work activities to insure timely and accurate performance of subcontractor work; performing certain subcontractor supervision duties and reviewing their due payments. • Assist in the preparation of final records for the project & Knowledge of all general contract, subcontract documents, drawings, and specifications. • Attending Necessary meeting with client, consultant. Page 3 of 8
  • 4.
    2. Actco General Contracting Co. LLC(uae) Dubai, UAE December, 2008 - October, 2011 • Snagging & De-Snagging Of Villa’s according to Consultant & Client Requirement. • procurement of Material • Preparation of Monthly weekly & Daily Progress Reports Project Engineer Project Name: Construction of 106 luxury villas,Package 5 & 5A1 Jumairah Park DUBAI. Client : NAKHEEL Consultant: Dar-Al-Handasah Shair and Partners Responsibilities: • To insure that materials and equipment's are released for construction in time to meet the construction schedule. • Responsible for civil/finishing activities • Snagging & De-Snagging Of Villa’s according to Consultant & Client Requirement. • Preparing Sub contractors payments. • Management of Manpower & Machinery allocation. • Responsible for carrying out a variety of basic field duties at the job site related to the general construction. • To maintain contact on the working level with subcontractor’s Foremen. • Preparing daily construction reports & preparation of a work activities items list. • Assist in the preparation of final records for the project & Knowledge of all general contract, subcontract documents, drawings, specifications. • Maintain all compliances, perform other duties as assigned. • Preparing Sub contractors payments. Site Engineer Project Name: HABSHAN-5 UTILITEIS AND OFFSITES PROJECT. Client : (GASCO) ABU DHABI GAS IDUSTREIS LTD. Main Contractor: HYUNDAI ENGINEERING AND CONSTRUCTION CO.LTD Construction of substation, steel structure buildings. Page 4 of 8
  • 5.
    Responsibilities: • Responsible forall activities of civil works of substation, and Main Control Building, sewage & oily drainage, Fire fighting Building • Supervise the following activities i.e, layout, excavation, concrete work water proofing, finishing work. • Checking and approval of the form work and reinforcement prior to placing concrete. • Supervise the construction works as per approved drawings and specification following the related BS and ISO codes of practice to maintain quality. • Ensure the standard specifications for civil works. • Requisition of ITR (inspection test request) to concerned personal prior to placing concrete. • Safety measures to check all arrangement of safety. Site Engineer/Quantity Surveyor Project Name: JABAL ALI POWER AND DESALINATION STATION “M” package “P” Client : DEWA (DUBAI Electricity & Water Authority) Consultant: FICHTNER Consulting Engineer Dubai Main Contractor: DOOSAN Heavy Industries & Construction co.llc Construction of power plant, substation, steel structure buildings, reservoirs, Water treatment plants. Responsibilities: • Reviews and checks engineering drawings, reports for competence accuracy. • Take Instruction From the manager and assist him in supervising and coordinating structural and architectural work • Construction of Reservoirs, Diesel oil (5 million GLN capacity 16 no’s), sewerage & waste water treatment plants. • Construction Central control Building, Local Electrical Buildings. • Construction of GT gas turbine & Water treatment Building. • Supervise the construction works as per approved drawings and specification following the related BS and ISO codes of practice to maintain quality. • Handling punch item list in each building prior to handing over for beneficial occupation. • Ensure the standard specifications for civil works. • Requisition of ITR (inspection test request) to concerned personal prior to placing Page 5 of 8
  • 6.
    concrete. • Furnish adaily program for the following working day before the close of site on each day. • Safety measures to check all arrangement of safety. • Preparation of monthly invoices as per BOQ. • Re measurement of all quantities of all project. • Helping Sr. Quantity Surveyor for all routine quantity survey work. Site Engineer Project Name: 400/132/22 KV Sub Station At AL-REEM Island Client : TRANSCO ABU- DHABI Consultant: Lahmeyer International Main Contractor: ABB Switzerland LTD Construction of 400/132/22 KV Sub Station, Structural and Architecural Work . Responsibilities: • Plan and contribute ideas for over all construction function to the contractor as well as the work assigned. • Construction of shunt reactor building, Cable trenches, Pipe trenches. • Construction of Fire Fighting & GIS Building. • Checking and approval of the form work and reinforcement prior to placing concrete. • Checking off all elements i.e, setting of lay out, form works, all type construction. • Earth work (cutting and filling) for Roads. • Internal Roads, walkways, street lighting. • Settlement of manpower, materials, and equipments to be utilize at site. • Inspection of Safety measurements during execution of civil works. • Preparation of Daily & Monthly Progress Reports. • Checking and evaluating of work accomplishment for approval of sub contractors billing. • Attending Weekly Coordination Meetings. Site Engineer Page 6 of 8
  • 7.
    3. Mian Assosiate Enginee r & Govt. Contract or. Pakistan July,2007 - November, 2008 4. Qavi Engineers (pvt) Limited. Pakistan July, 2006 - July , 2007 Project Name: Jarrar (Pakistan Army) Camp Rawalpindi Consultant : Civil Works Organization (CWO) Pakistan Construction of Villas, Hotels internal roads and internal services. Responsibilities: Responsibilities: • Internal roads, walkways, street lighting, HV and LV cable network. • Supervise the following quantities i.e, layout, excavation, concrete work waterproofing, and finishing work. • Preparation of I.P.C. • Preparation of Sub Contractor’s Bill. • Preparation of Monthly weekly & Daily Progress Reports. • Preparation of Monthly Working Plan. • Bar Bending Schedule & Execution of Steel. • Rate analysis Cost Control & Control of material wastage.. • Ensure project completion within specified time. • Prepare and arrange for weekly schedule. • Adopting latest standards to achieve good quality. • Safety measures to check all arrangement of safety. • Dealing with consultant client and other authorities. Site Engineer Project Name: Expo Center Lahore Consultant : Civil Works Organization (CWO) Pakistan Construction of exhibition halls ware houses steel structures internal roads & internal services. Responsibilities: • Execution of Civil works. • Leveling & Surveying. • Preparation Bar Bending Schedule. Page 7 of 8
  • 8.