WILLIAM MICHAEL BROWN
281-470-2795 home
281-851-3728 cell
PIPE FABRICATOR – Extensive schooling and on the job training thru Pipefitters Local
Union 211 for five years provided me with excellent overall knowledge as a 1st
class pipefitter.
Training in mathematics and layout work including template making. Use of fabrication tools
such as tee squares, levels, tape measurers, flange alignment pins, pipe protractors and others.
Welding training in SMAW, GMAW & GTAW and other welding processes used in fabrication
of pipe and vessels. Identification of material such as fittings, flanges and pipe by matching
them with the appropriate MTR’s. Knowledge of different types of valves and their specific
installation functions and uses. Excellent blueprint reading skills including piping plan
drawings, P&IDs and isometric drawings and how to apply them using client specifications to
minimize fabrication and installation errors. Also capable of drawing piping spools and
diagrams as needed.
MECHANICAL FABRICATION – Built equipment such as pressure vessels, specialized filter
systems, gas fired furnaces and heaters and other specialized equipment. Also fabrication of
piping that is connected to compressors, pumps, blowers and other rotating equipment where
alignment and fit-up are critical to their operation and performance.
SUPERVISORY & MANAGEMENT – Supervised in the fabrication of skid-mounted high
density HDPE units as well as other smaller skid-mounted piping systems for various clients. By
working closely with the client was able to prioritize fabrication assembly to meet delivery
schedules. All other supervisory skills are listed in job history.
EXPERIENCE:
Project Controls / Quality Control Tellepsen Industrial 4/27/14 – 2/5/16
• Performed same duties as with Allied Technical Services
• Worked three separate projects with Tellepsen:
Noltex – Pasadena, TX - , Kuraray – La Porte, TX & Tenaris – Bay City, TX
Project Management Team – Allied Technical Services Quality Control 8/13/13 – 3/4/14
• Worked with Hess Project Management Team at Tioga, ND Natural Gas Plant
Expansion
• Walked down all piping systems validating what was complete and making list of items that
were incomplete
• Provided punch list and worked with mechanical contractor to finish work
• Checked piping spool installations and alignment including flanges
• Checked valve installation, alignment, flow direction and type as well as correct bolting and
gaskets
• Made sure all pipe shoes, supports and hangers were installed correctly.
• Checked all instrumentation installation and location including thermo wells, flow-meters,
temperature indicators, pressure gauges and all other instruments required per P&ID
drawings.
Project Controls - JV Industrial Co., LTD Field Piping Coordinator 5/6/13 – 7/28/13
• Targa LEP-1 Propane Export Project – Galena Park, TX
1 | P a g e
• Kept list of spool pieces received on job site by line and spool number and date received.
• Walked job daily to make note of spool installations
• Worked with foremen on updating progress
• Kept list of incomplete activities and gave directives of priorities in completing work
•
Project Controls – JV Industrial Co, LTD - Field Piping Coordinator 9/1/12 – 12/21/12
• Trinity EOR CO2 Compressor Station Upgrade – Wellman, TX
• Find and verify discrepancies between Engineering drawings and piping fabrication drawings
before spool pieces were delivered.
• Alert Construction Manager all discrepancies to get them resolved efficiently to keep job on
track
• Worked with fabrication shop regarding changes prior to shipping
• Recorded all rework, including pictures before and after, with timeline from notification of
discrepancy to completion of rework
• Turned over all paperwork to management for their records and backup documentation
Project Controls - JV Industrial Co., LTD Field Piping Coordinator 6/5/11 – 4/1/12
• Sandridge Century Plant – Ft. Stockton, TX
• Recorded piping and component installation progress with 10 foremen twice weekly
• Kept on-going spreadsheet of items completed and punch list for incomplete tasks
• Verified performance by walking down systems using P&IDs and Isometric drawings
• Created list of all missing fittings, valves, specialty items and other misc. components
• Worked with field supervision to create reports of field discrepancies to submit to client for
corrective action. Included RFIs, FCOs, change orders, etc.
• Worked with QA/QC to validate completed work for turnover packages
Project Controls - JV Industrial Co., LTD. Pre-Fabrication Checker 2008 – 2009
• Fab Shop, Lake Jackson, TX
• Checked all spool dwgs to client provided isometric dwgs and piping specs. Validated BOM
materials (flanges, pipe, fittings, bolts, nuts, valves, correct NDE, pipe specs, operating
temperatures.
• Validated all measurements and orientation of nozzles, supports and fittings
• Verified Shop Drawings prior to fabrication utilizing client specifications, isometrics, P&ID’s
and other contract documents
Shop Mgr. & Supervisor Resourceful, Ltd. Shop Mgr. & Supervisor 2004 – 2008
• Reviewed all client drawings and contract to determine scope of work
• Submitted bid package including construction schedule and labor & equipment rates
• Developed BOM and timely ordered material to expedite fabrication and construction
schedule
• Responsible for all NDE & hydro-testing required on project
• Communicated with client inspectors daily during fabrication until project was completed and
signed off.
Specialty Fabrication Shop Petsi, Inc. Shop Supervisor 1988 – 2004
• Pipe & Vessel Specialty Fabrication
• Fabrication of Chevron Phillips high-density polyethylene catalyst activation process system
• Helped write and structure quality control standards and procedures and documents for ISO
9001 certifications.
• Obtained and maintained ASME code stamps; U, PP & R and kept all records and
documents required.
2 | P a g e
• Provided material take-offs for all projects and made sure all material specs were followed
including all NDE & other testing required.
• Managed all scheduling for work in the shop and any equipment that needed to be
subcontracted
• Supervised all fabrication assembly including all welding activities and procedures
• Responsible for all QA/QC requirements to completion of projects and provided all
documentation to client.
• Petsi specialized in fabrication and welding of pipe and equipment; high alloy steel such as
312SS, Inconel 600 & 601 and other high alloy steels.
• Petsi had a license agreement with Phillips to manufacture and build their patented high
density polyethylene system for several of Phillips’ own clients.
• Clients included Phillips Refinery, Formosa Plastics, Ineos, Chevron, Sinopec (Shipped to
China) Solvey Polimers (in Belgium) as well as fuel gas skids for startups in various plants.
Pipe fitter / Fabricator Union / Non-Union 1975 – 1987
• American Metal Fab – Shop Fabrication – Was lead fabricator responsible for layout work,
nozzle fabrications and all fittings and flange fit-ups for partial and final assembly
• Southwest Fabrication – Shop Fabrication – Along with other fabricators, checked the
fabrication of piping bends as to their correct chord and angle
• Ebasco Constructors – Field Fabrication
• Brown & Root – Field Fabrication
• City Services – Louisiana – Field Fabrication
Pipe fitter Apprentice Pipe fitter’s Local 211 1970 - 1975
• M.W. Kellogg – Field Fabrication
• Morrison Construction – Field Fabrication
• Sam P Wallace Mechanical Contractors – Field Fabrication
• American Metal Fab – Shop Fabrication
EDUCATION:
• Spring Branch High School graduate 1967
• 5-year apprenticeship with Pipefitters Local Union 211
REFERENCES UPON REQUEST
3 | P a g e

WILLIAM MICHAEL BROWN R-1

  • 1.
    WILLIAM MICHAEL BROWN 281-470-2795home 281-851-3728 cell PIPE FABRICATOR – Extensive schooling and on the job training thru Pipefitters Local Union 211 for five years provided me with excellent overall knowledge as a 1st class pipefitter. Training in mathematics and layout work including template making. Use of fabrication tools such as tee squares, levels, tape measurers, flange alignment pins, pipe protractors and others. Welding training in SMAW, GMAW & GTAW and other welding processes used in fabrication of pipe and vessels. Identification of material such as fittings, flanges and pipe by matching them with the appropriate MTR’s. Knowledge of different types of valves and their specific installation functions and uses. Excellent blueprint reading skills including piping plan drawings, P&IDs and isometric drawings and how to apply them using client specifications to minimize fabrication and installation errors. Also capable of drawing piping spools and diagrams as needed. MECHANICAL FABRICATION – Built equipment such as pressure vessels, specialized filter systems, gas fired furnaces and heaters and other specialized equipment. Also fabrication of piping that is connected to compressors, pumps, blowers and other rotating equipment where alignment and fit-up are critical to their operation and performance. SUPERVISORY & MANAGEMENT – Supervised in the fabrication of skid-mounted high density HDPE units as well as other smaller skid-mounted piping systems for various clients. By working closely with the client was able to prioritize fabrication assembly to meet delivery schedules. All other supervisory skills are listed in job history. EXPERIENCE: Project Controls / Quality Control Tellepsen Industrial 4/27/14 – 2/5/16 • Performed same duties as with Allied Technical Services • Worked three separate projects with Tellepsen: Noltex – Pasadena, TX - , Kuraray – La Porte, TX & Tenaris – Bay City, TX Project Management Team – Allied Technical Services Quality Control 8/13/13 – 3/4/14 • Worked with Hess Project Management Team at Tioga, ND Natural Gas Plant Expansion • Walked down all piping systems validating what was complete and making list of items that were incomplete • Provided punch list and worked with mechanical contractor to finish work • Checked piping spool installations and alignment including flanges • Checked valve installation, alignment, flow direction and type as well as correct bolting and gaskets • Made sure all pipe shoes, supports and hangers were installed correctly. • Checked all instrumentation installation and location including thermo wells, flow-meters, temperature indicators, pressure gauges and all other instruments required per P&ID drawings. Project Controls - JV Industrial Co., LTD Field Piping Coordinator 5/6/13 – 7/28/13 • Targa LEP-1 Propane Export Project – Galena Park, TX 1 | P a g e
  • 2.
    • Kept listof spool pieces received on job site by line and spool number and date received. • Walked job daily to make note of spool installations • Worked with foremen on updating progress • Kept list of incomplete activities and gave directives of priorities in completing work • Project Controls – JV Industrial Co, LTD - Field Piping Coordinator 9/1/12 – 12/21/12 • Trinity EOR CO2 Compressor Station Upgrade – Wellman, TX • Find and verify discrepancies between Engineering drawings and piping fabrication drawings before spool pieces were delivered. • Alert Construction Manager all discrepancies to get them resolved efficiently to keep job on track • Worked with fabrication shop regarding changes prior to shipping • Recorded all rework, including pictures before and after, with timeline from notification of discrepancy to completion of rework • Turned over all paperwork to management for their records and backup documentation Project Controls - JV Industrial Co., LTD Field Piping Coordinator 6/5/11 – 4/1/12 • Sandridge Century Plant – Ft. Stockton, TX • Recorded piping and component installation progress with 10 foremen twice weekly • Kept on-going spreadsheet of items completed and punch list for incomplete tasks • Verified performance by walking down systems using P&IDs and Isometric drawings • Created list of all missing fittings, valves, specialty items and other misc. components • Worked with field supervision to create reports of field discrepancies to submit to client for corrective action. Included RFIs, FCOs, change orders, etc. • Worked with QA/QC to validate completed work for turnover packages Project Controls - JV Industrial Co., LTD. Pre-Fabrication Checker 2008 – 2009 • Fab Shop, Lake Jackson, TX • Checked all spool dwgs to client provided isometric dwgs and piping specs. Validated BOM materials (flanges, pipe, fittings, bolts, nuts, valves, correct NDE, pipe specs, operating temperatures. • Validated all measurements and orientation of nozzles, supports and fittings • Verified Shop Drawings prior to fabrication utilizing client specifications, isometrics, P&ID’s and other contract documents Shop Mgr. & Supervisor Resourceful, Ltd. Shop Mgr. & Supervisor 2004 – 2008 • Reviewed all client drawings and contract to determine scope of work • Submitted bid package including construction schedule and labor & equipment rates • Developed BOM and timely ordered material to expedite fabrication and construction schedule • Responsible for all NDE & hydro-testing required on project • Communicated with client inspectors daily during fabrication until project was completed and signed off. Specialty Fabrication Shop Petsi, Inc. Shop Supervisor 1988 – 2004 • Pipe & Vessel Specialty Fabrication • Fabrication of Chevron Phillips high-density polyethylene catalyst activation process system • Helped write and structure quality control standards and procedures and documents for ISO 9001 certifications. • Obtained and maintained ASME code stamps; U, PP & R and kept all records and documents required. 2 | P a g e
  • 3.
    • Provided materialtake-offs for all projects and made sure all material specs were followed including all NDE & other testing required. • Managed all scheduling for work in the shop and any equipment that needed to be subcontracted • Supervised all fabrication assembly including all welding activities and procedures • Responsible for all QA/QC requirements to completion of projects and provided all documentation to client. • Petsi specialized in fabrication and welding of pipe and equipment; high alloy steel such as 312SS, Inconel 600 & 601 and other high alloy steels. • Petsi had a license agreement with Phillips to manufacture and build their patented high density polyethylene system for several of Phillips’ own clients. • Clients included Phillips Refinery, Formosa Plastics, Ineos, Chevron, Sinopec (Shipped to China) Solvey Polimers (in Belgium) as well as fuel gas skids for startups in various plants. Pipe fitter / Fabricator Union / Non-Union 1975 – 1987 • American Metal Fab – Shop Fabrication – Was lead fabricator responsible for layout work, nozzle fabrications and all fittings and flange fit-ups for partial and final assembly • Southwest Fabrication – Shop Fabrication – Along with other fabricators, checked the fabrication of piping bends as to their correct chord and angle • Ebasco Constructors – Field Fabrication • Brown & Root – Field Fabrication • City Services – Louisiana – Field Fabrication Pipe fitter Apprentice Pipe fitter’s Local 211 1970 - 1975 • M.W. Kellogg – Field Fabrication • Morrison Construction – Field Fabrication • Sam P Wallace Mechanical Contractors – Field Fabrication • American Metal Fab – Shop Fabrication EDUCATION: • Spring Branch High School graduate 1967 • 5-year apprenticeship with Pipefitters Local Union 211 REFERENCES UPON REQUEST 3 | P a g e