SlideShare a Scribd company logo
EleuteriusEvansAnjaruTrikshyean
+6287879517590
eleuteriusevans@hotmail.com
CURRICULUM VITAE
PERSONAL DATA
Full name : Eleuterius Evans Anjaru Trikshyean
Surname : Evans
Date of Birth : Jakarta, 15th
April 1991
Nationality : Indonesian
Sex : Male
Address : Jl. Cendrawasih XIV B/523, Duta Kranji, Bekasi Barat 17134, Indonesia
Email Address : eleuteriusevans@hotmail.com or trikshyean@gmail.com
Mobile Phone : +6287879517590
EDUCATIONAL BACKGROUND
1. Parahyangan Catholic University
Faculty of Engineering, Department of Civil Engineering, Bandung 2009 – 2013
2. Pangudi Luhur II Servatius
Senior High School, Bekasi 2006 – 2009
3. Strada Bhakti Wiyata
Junior High School, Bekasi 2003 – 2006
4. Strada Bhakti Wiyata I
Elementary School, Bekasi 1997 – 2003
ORGANIZATIONAL EXPERIENCES
1. Internal Inspector of Parahyangan Catholic University Student Representative Assembly
(2012-2013)
2. Nominee as a best student at Dies Natalis Faculty of Engineering (2012)
3. Staff of Program and Concept Division at Student Board Department of Civil Engineering
Education Training (2012)
4. Deputy Coordinator of Human Competencies and Skills Development Division in Student
Board Department of Civil Engineering, (2010-2012)
5. Chief of Pangudi Luhur II Servatius Senior High School Student Body (2007-2008)
WORK EXPERIENCES
1. Civil Engineer at BITA ENARCON ENGINEERING
August 2013 – February 2015
2. Project Engineer at Taihan Electric Wire Co., Ltd
March 2015 – present
EleuteriusEvansAnjaruTrikshyean
+6287879517590
eleuteriusevans@hotmail.com
SKILL AND COMPETENCIES
1. Microsoft Office
2. Microsoft Project
3. Primavera Project Management
4. AutoCAD
5. SAP2000
6. Contractual Agreement
7. Foundation Design
8. Structural Design
TRAINING AND WORKSHOP
1. Deep Excavation Seminar
Location : Bandung
Organizer : Oriental Sheet Piling
Date : October 2013
2. Design Philosophy
Location : Bandung
Organizer : BITA Enarcon Engineering
Date : February 2014
3. Steel Connection Seminar
Location : Bandung
Organizer : BITA Enarcon Engineering
Date : February 2014
4. Shear and Torsion Reinforcement
Location : Bandung
Organizer : BITA Enarcon Engineering
Date : May 2014
5. Primavera Project Planning and Management 101 by EDP Media
Location : Jakarta
Organizer : EDP Media
Date : December 2014
PROJECTS HANDLED
1. Japan Gasoline Co. (LOBP Monas Project)
Project Location : Marunda Center
Project Period : September 2013 – December 2013
Position : Civil Engineer
Annotation
 Soil Investigation Analysis:
Analyzing soil laboratory test, N-SPT, CPT in order to calculate (dimension, length, depth,
capacity, lateral force, settlement) the pile foundation for all structural building.
 Structural Design:
Designing foundation, slab and upper structure for several buildings : Filling Building,
Compressor Building, Fire & Water Pump Shed, Boiler Shed by using SAP2000.
EleuteriusEvansAnjaruTrikshyean
+6287879517590
eleuteriusevans@hotmail.com
2. Shell Indonesia (Regional Distribution Center)
Project Location : Marunda Center
Project Period : September 2013 – March 2014
Position : Civil Engineer
Annotation
 Soil Investigation Analysis:
Analyzing soil laboratory test, N-SPT, CPT in order to calculate (dimension, length, depth,
capacity, lateral force, settlement) the pile foundation for all structural building.
 Civil Design
Designing drainage, road, pavement and rainwater analysis.
 Structural Design
Designing structural building which are Fuel Tank and Ground Water Tank.
 Project Planner
Creating master schedule including design stage, tendering stage, procurement stage and
construction stage by using Primavera as well as assigned resources for all activities.
 ITT Contract Document
Preparing tender document contract for contractor, which contains Design Basis, Rule and
Condition, Detail Design, HSSE, Scope of Work and Construction Method
3. Waste Water Treatment Plant III
Project Location : MM2100 Industrial State
Project Period : January 2014 – January 2015
Position : Civil Engineer
Annotation
 Soil Investigation Analysis:
Analyzingsoil laboratorytest,N-SPT,CPTinordertocalculateshallowfoundationforplanted
reactor area.
 Structural Design:
Designing foundation, slab and upper structure for several buildings : Main Technology
Building, Pre Treatment Building, and Pipe Rack by using SAP2000.
 Project Planner
Creatingmasterscheduleduringtheconstructionstage tosynchronizethe mechanical works,
electrical works, civil works, and system works.
4. Cargill, PT. Sorini Agro Asia (Sunrise Project)
Project Location : Modern Cikande Industrial State
Project Period : April 2014 – August 2014
Position : Civil Engineer
Annotation
 Soil Investigation Analysis:
Analyzing soil laboratory test, N-SPT, CPT in order to calculate (dimension, length, depth,
capacity, lateral force, settlement) the pile foundation for all structural building.
 Structural Design
Designingstructural buildingwhichare Saccharification, WaterTreatment,andNaOH& HCl
Storage.
EleuteriusEvansAnjaruTrikshyean
+6287879517590
eleuteriusevans@hotmail.com
 Project Planner
Creating master schedule including design stage, tendering stage, procurement stage and
construction stage by using Microsoft Project.
5. Cargill, PT. Sorini Agro Asia (Sunrise Project)
Project Location : Modern Cikande Industrial State
Project Period : August 2014 – February 2014
Position : Site Supervision Engineer
Annotation
 Site Supervision:
Supervise the construction stage on Site periodically every week. To give advices for the
construction method and interpret the implementation of Detailed Engineering Design
Drawing to the actual on site project.
6. PT Indofood CBP, Pembangunan New Noodle Factory
Project Location : Cirebon, Jawa Barat
Project Period : July 2014 – February 2015
Position : Civil Engineer
Annotation
 Soil Investigation Analysis:
Analyzing soil laboratory test, N-SPT, CPT in order to calculate (dimension, length, depth,
capacity, lateral force, settlement) the pile foundation and shallow foundation for all
structural building.
 Civil Design
Designing drainage, road, pavement and rainwater analysis.
 Structural Design
Designing foundation, slab and upper structure for several buildings : Tank Yard, Security
Office, Boiler, WTP, and Pipe Rack by using SAP2000.
7. Pembangunan SKTT 150 kV Priok – Pelindo II (Sirkit 1)
Project Location : Pelindo Area
Project Period : September 2015 – December 2015
Position : Project Engineer
Annotation
As a Project Engineer, have the responsibilities to:
1. Develops project objectives by reviewing project proposals and plans; conferring with
management.
2. Determines project specifications by studying product design, customer requirements,
and performance standards; completing technical studies; preparing cost estimates.
3. Determinesprojectschedule bystudyingprojectplanandspecifications;calculatingtime
requirements; sequencing project elements.
4. Maintains project schedule by monitoring project progress; coordinating activities;
resolving problems.
5. Controlsprojectplanbyreviewingdesign,specifications,andplanandschedule changes;
recommending actions.
EleuteriusEvansAnjaruTrikshyean
+6287879517590
eleuteriusevans@hotmail.com
6. Preparesprojectstatusreportsbycollecting,analyzing,andsummarizinginformationand
trends; recommending actions.
7. Contributes to team effort by accomplishing related results as needed.
8. Package 2: 150 kV Underground Cable (UGC) for Gedung Pola-Manggarai, Manggarai-
Dukuh Atas, Ketapang-Mangga Besar, and Kemang Incomer
Project Location : Jakarta Area
Project Period : March 2015 – present
Position : Project Engineer
Annotation
As a Project Engineer, have the responsibilities to:
1. Develops project objectives by reviewing project proposals and plans; conferring with
management.
2. Determines project specifications by studying product design, customer requirements,
and performance standards; completing technical studies; preparing cost estimates.
3. Determinesprojectschedule bystudyingprojectplanandspecifications;calculatingtime
requirements; sequencing project elements.
4. Maintains project schedule by monitoring project progress; coordinating activities;
resolving problems.
5. Controlsprojectplanbyreviewingdesign,specifications,andplanandschedule changes;
recommending actions.
6. Preparesproject statusreportsbycollecting,analyzing,andsummarizinginformationand
trends; recommending actions.
7. Contributes to team effort by accomplishing related results as needed.

More Related Content

What's hot

Suresh Profile
Suresh ProfileSuresh Profile
Suresh Profile
Suresh Kaliappan
 
CV-PM Ponraj
CV-PM PonrajCV-PM Ponraj
CV-PM Ponraj
Ponraj Ramaswamy
 
Rudy Wick Resume
Rudy Wick ResumeRudy Wick Resume
Rudy Wick Resume
Rudy Wick
 
My Resume
My ResumeMy Resume
GIRIRAJAN
GIRIRAJANGIRIRAJAN
CV -TRV-Civil Engg. Credentials
CV -TRV-Civil Engg. CredentialsCV -TRV-Civil Engg. Credentials
CV -TRV-Civil Engg. Credentials
Venkatesh Tumkur Ramarao
 
CV.FAHRUDIN ASMAN
CV.FAHRUDIN ASMANCV.FAHRUDIN ASMAN
CV.FAHRUDIN ASMAN
fahrudin asman
 
Jahangir.Contractor
Jahangir.ContractorJahangir.Contractor
Jahangir.Contractor
Jahangir R. Contractor
 
CV Bambang Eko Hermawan
CV Bambang Eko HermawanCV Bambang Eko Hermawan
CV Bambang Eko Hermawan
Fx.Bambang Eko Hermawan
 
Sahrum Idrus, ST
Sahrum Idrus, STSahrum Idrus, ST
Sahrum Idrus, ST
Sahrum Idrus
 
KASHIF DADA - Projects List
KASHIF DADA - Projects ListKASHIF DADA - Projects List
KASHIF DADA - Projects List
Kashif Dada, PMP, P.Eng
 
NARESH 3+
NARESH 3+NARESH 3+
NARESH 3+
Naresh Tirumani
 
CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_
VEERAKAMU C
 
Curriculum Vitae Dermawan LG - Project Manager
Curriculum Vitae Dermawan LG - Project ManagerCurriculum Vitae Dermawan LG - Project Manager
Curriculum Vitae Dermawan LG - Project Manager
Dermawan Lumban Gaol
 
INDIAZI CV
INDIAZI CVINDIAZI CV
Edumac Resume part 3333333
Edumac Resume part 3333333Edumac Resume part 3333333
Edumac Resume part 3333333
Eduardo Jr. Macapobre
 
CV-Pon
CV-PonCV-Pon
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEERResume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
arie hidayati jumari marjono
 
Thomas Mensah - CV GE
Thomas Mensah - CV  GEThomas Mensah - CV  GE
Thomas Mensah - CV GE
Thomas Mensah, MGhIE
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years Exp
SURENDRA BABU
 

What's hot (20)

Suresh Profile
Suresh ProfileSuresh Profile
Suresh Profile
 
CV-PM Ponraj
CV-PM PonrajCV-PM Ponraj
CV-PM Ponraj
 
Rudy Wick Resume
Rudy Wick ResumeRudy Wick Resume
Rudy Wick Resume
 
My Resume
My ResumeMy Resume
My Resume
 
GIRIRAJAN
GIRIRAJANGIRIRAJAN
GIRIRAJAN
 
CV -TRV-Civil Engg. Credentials
CV -TRV-Civil Engg. CredentialsCV -TRV-Civil Engg. Credentials
CV -TRV-Civil Engg. Credentials
 
CV.FAHRUDIN ASMAN
CV.FAHRUDIN ASMANCV.FAHRUDIN ASMAN
CV.FAHRUDIN ASMAN
 
Jahangir.Contractor
Jahangir.ContractorJahangir.Contractor
Jahangir.Contractor
 
CV Bambang Eko Hermawan
CV Bambang Eko HermawanCV Bambang Eko Hermawan
CV Bambang Eko Hermawan
 
Sahrum Idrus, ST
Sahrum Idrus, STSahrum Idrus, ST
Sahrum Idrus, ST
 
KASHIF DADA - Projects List
KASHIF DADA - Projects ListKASHIF DADA - Projects List
KASHIF DADA - Projects List
 
NARESH 3+
NARESH 3+NARESH 3+
NARESH 3+
 
CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_
 
Curriculum Vitae Dermawan LG - Project Manager
Curriculum Vitae Dermawan LG - Project ManagerCurriculum Vitae Dermawan LG - Project Manager
Curriculum Vitae Dermawan LG - Project Manager
 
INDIAZI CV
INDIAZI CVINDIAZI CV
INDIAZI CV
 
Edumac Resume part 3333333
Edumac Resume part 3333333Edumac Resume part 3333333
Edumac Resume part 3333333
 
CV-Pon
CV-PonCV-Pon
CV-Pon
 
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEERResume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
 
Thomas Mensah - CV GE
Thomas Mensah - CV  GEThomas Mensah - CV  GE
Thomas Mensah - CV GE
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years Exp
 

Similar to CURRICULUM VITAE

1.CV-Fachmy Dwiyanuar
1.CV-Fachmy Dwiyanuar1.CV-Fachmy Dwiyanuar
1.CV-Fachmy Dwiyanuar
Fachmy Dwi Yanuar
 
Resume HNP Updated
Resume HNP UpdatedResume HNP Updated
Resume HNP Updated
Harshal Pimpalkar
 
CV. Syech Rieffan MB
CV. Syech Rieffan MBCV. Syech Rieffan MB
CV. Syech Rieffan MB
S Rieffan
 
CV. Syech Rieffan MB
CV. Syech Rieffan MBCV. Syech Rieffan MB
CV. Syech Rieffan MB
S Rieffan
 
Goutam-update
Goutam-updateGoutam-update
Goutam-update
Goutam Kumar Mondal
 
CV of JERSON ODUCAYEN_naukri
CV of JERSON ODUCAYEN_naukriCV of JERSON ODUCAYEN_naukri
CV of JERSON ODUCAYEN_naukri
Engr Jerson Oducayen
 
CV_REZA-English_-_2 (1)
CV_REZA-English_-_2 (1)CV_REZA-English_-_2 (1)
CV_REZA-English_-_2 (1)
Mohamad Adhireza
 
CV_REZA_2016
CV_REZA_2016CV_REZA_2016
CV_REZA_2016
Mohamad Adhireza
 
CV Yantori
CV YantoriCV Yantori
CV Yantori
yantori sucipto
 
CV Ibnu Sodik.xlsx
CV  Ibnu Sodik.xlsxCV  Ibnu Sodik.xlsx
CV Ibnu Sodik.xlsx
Ibnu Sodik
 
CV Neni
CV NeniCV Neni
CV Neni
Neni Susanti
 
Remi Lumbo_12082016
Remi Lumbo_12082016Remi Lumbo_12082016
Remi Lumbo_12082016
Remedios Lumbo
 
Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)
RAJA KUMAR .R
 
RONNY_MT
RONNY_MTRONNY_MT
RONNY_MT
ronnyjawir
 
My Resume.1
My Resume.1My Resume.1
CV (2)
CV (2)CV (2)
CV (2)
Abdul Waheed
 
Resume Tanawat
Resume TanawatResume Tanawat
Resume Tanawat
Tanawat Siriangkanon
 
Meade Belle CV 2015.01
Meade Belle CV 2015.01Meade Belle CV 2015.01
Meade Belle CV 2015.01
Meade Belle Bernal-Apelo
 
subhash__cv
subhash__cvsubhash__cv
ASHWIN A_Senior planning Engineer_
ASHWIN A_Senior planning Engineer_ASHWIN A_Senior planning Engineer_
ASHWIN A_Senior planning Engineer_
#win(ashwin) Work
 

Similar to CURRICULUM VITAE (20)

1.CV-Fachmy Dwiyanuar
1.CV-Fachmy Dwiyanuar1.CV-Fachmy Dwiyanuar
1.CV-Fachmy Dwiyanuar
 
Resume HNP Updated
Resume HNP UpdatedResume HNP Updated
Resume HNP Updated
 
CV. Syech Rieffan MB
CV. Syech Rieffan MBCV. Syech Rieffan MB
CV. Syech Rieffan MB
 
CV. Syech Rieffan MB
CV. Syech Rieffan MBCV. Syech Rieffan MB
CV. Syech Rieffan MB
 
Goutam-update
Goutam-updateGoutam-update
Goutam-update
 
CV of JERSON ODUCAYEN_naukri
CV of JERSON ODUCAYEN_naukriCV of JERSON ODUCAYEN_naukri
CV of JERSON ODUCAYEN_naukri
 
CV_REZA-English_-_2 (1)
CV_REZA-English_-_2 (1)CV_REZA-English_-_2 (1)
CV_REZA-English_-_2 (1)
 
CV_REZA_2016
CV_REZA_2016CV_REZA_2016
CV_REZA_2016
 
CV Yantori
CV YantoriCV Yantori
CV Yantori
 
CV Ibnu Sodik.xlsx
CV  Ibnu Sodik.xlsxCV  Ibnu Sodik.xlsx
CV Ibnu Sodik.xlsx
 
CV Neni
CV NeniCV Neni
CV Neni
 
Remi Lumbo_12082016
Remi Lumbo_12082016Remi Lumbo_12082016
Remi Lumbo_12082016
 
Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)
 
RONNY_MT
RONNY_MTRONNY_MT
RONNY_MT
 
My Resume.1
My Resume.1My Resume.1
My Resume.1
 
CV (2)
CV (2)CV (2)
CV (2)
 
Resume Tanawat
Resume TanawatResume Tanawat
Resume Tanawat
 
Meade Belle CV 2015.01
Meade Belle CV 2015.01Meade Belle CV 2015.01
Meade Belle CV 2015.01
 
subhash__cv
subhash__cvsubhash__cv
subhash__cv
 
ASHWIN A_Senior planning Engineer_
ASHWIN A_Senior planning Engineer_ASHWIN A_Senior planning Engineer_
ASHWIN A_Senior planning Engineer_
 

CURRICULUM VITAE

  • 1. EleuteriusEvansAnjaruTrikshyean +6287879517590 eleuteriusevans@hotmail.com CURRICULUM VITAE PERSONAL DATA Full name : Eleuterius Evans Anjaru Trikshyean Surname : Evans Date of Birth : Jakarta, 15th April 1991 Nationality : Indonesian Sex : Male Address : Jl. Cendrawasih XIV B/523, Duta Kranji, Bekasi Barat 17134, Indonesia Email Address : eleuteriusevans@hotmail.com or trikshyean@gmail.com Mobile Phone : +6287879517590 EDUCATIONAL BACKGROUND 1. Parahyangan Catholic University Faculty of Engineering, Department of Civil Engineering, Bandung 2009 – 2013 2. Pangudi Luhur II Servatius Senior High School, Bekasi 2006 – 2009 3. Strada Bhakti Wiyata Junior High School, Bekasi 2003 – 2006 4. Strada Bhakti Wiyata I Elementary School, Bekasi 1997 – 2003 ORGANIZATIONAL EXPERIENCES 1. Internal Inspector of Parahyangan Catholic University Student Representative Assembly (2012-2013) 2. Nominee as a best student at Dies Natalis Faculty of Engineering (2012) 3. Staff of Program and Concept Division at Student Board Department of Civil Engineering Education Training (2012) 4. Deputy Coordinator of Human Competencies and Skills Development Division in Student Board Department of Civil Engineering, (2010-2012) 5. Chief of Pangudi Luhur II Servatius Senior High School Student Body (2007-2008) WORK EXPERIENCES 1. Civil Engineer at BITA ENARCON ENGINEERING August 2013 – February 2015 2. Project Engineer at Taihan Electric Wire Co., Ltd March 2015 – present
  • 2. EleuteriusEvansAnjaruTrikshyean +6287879517590 eleuteriusevans@hotmail.com SKILL AND COMPETENCIES 1. Microsoft Office 2. Microsoft Project 3. Primavera Project Management 4. AutoCAD 5. SAP2000 6. Contractual Agreement 7. Foundation Design 8. Structural Design TRAINING AND WORKSHOP 1. Deep Excavation Seminar Location : Bandung Organizer : Oriental Sheet Piling Date : October 2013 2. Design Philosophy Location : Bandung Organizer : BITA Enarcon Engineering Date : February 2014 3. Steel Connection Seminar Location : Bandung Organizer : BITA Enarcon Engineering Date : February 2014 4. Shear and Torsion Reinforcement Location : Bandung Organizer : BITA Enarcon Engineering Date : May 2014 5. Primavera Project Planning and Management 101 by EDP Media Location : Jakarta Organizer : EDP Media Date : December 2014 PROJECTS HANDLED 1. Japan Gasoline Co. (LOBP Monas Project) Project Location : Marunda Center Project Period : September 2013 – December 2013 Position : Civil Engineer Annotation  Soil Investigation Analysis: Analyzing soil laboratory test, N-SPT, CPT in order to calculate (dimension, length, depth, capacity, lateral force, settlement) the pile foundation for all structural building.  Structural Design: Designing foundation, slab and upper structure for several buildings : Filling Building, Compressor Building, Fire & Water Pump Shed, Boiler Shed by using SAP2000.
  • 3. EleuteriusEvansAnjaruTrikshyean +6287879517590 eleuteriusevans@hotmail.com 2. Shell Indonesia (Regional Distribution Center) Project Location : Marunda Center Project Period : September 2013 – March 2014 Position : Civil Engineer Annotation  Soil Investigation Analysis: Analyzing soil laboratory test, N-SPT, CPT in order to calculate (dimension, length, depth, capacity, lateral force, settlement) the pile foundation for all structural building.  Civil Design Designing drainage, road, pavement and rainwater analysis.  Structural Design Designing structural building which are Fuel Tank and Ground Water Tank.  Project Planner Creating master schedule including design stage, tendering stage, procurement stage and construction stage by using Primavera as well as assigned resources for all activities.  ITT Contract Document Preparing tender document contract for contractor, which contains Design Basis, Rule and Condition, Detail Design, HSSE, Scope of Work and Construction Method 3. Waste Water Treatment Plant III Project Location : MM2100 Industrial State Project Period : January 2014 – January 2015 Position : Civil Engineer Annotation  Soil Investigation Analysis: Analyzingsoil laboratorytest,N-SPT,CPTinordertocalculateshallowfoundationforplanted reactor area.  Structural Design: Designing foundation, slab and upper structure for several buildings : Main Technology Building, Pre Treatment Building, and Pipe Rack by using SAP2000.  Project Planner Creatingmasterscheduleduringtheconstructionstage tosynchronizethe mechanical works, electrical works, civil works, and system works. 4. Cargill, PT. Sorini Agro Asia (Sunrise Project) Project Location : Modern Cikande Industrial State Project Period : April 2014 – August 2014 Position : Civil Engineer Annotation  Soil Investigation Analysis: Analyzing soil laboratory test, N-SPT, CPT in order to calculate (dimension, length, depth, capacity, lateral force, settlement) the pile foundation for all structural building.  Structural Design Designingstructural buildingwhichare Saccharification, WaterTreatment,andNaOH& HCl Storage.
  • 4. EleuteriusEvansAnjaruTrikshyean +6287879517590 eleuteriusevans@hotmail.com  Project Planner Creating master schedule including design stage, tendering stage, procurement stage and construction stage by using Microsoft Project. 5. Cargill, PT. Sorini Agro Asia (Sunrise Project) Project Location : Modern Cikande Industrial State Project Period : August 2014 – February 2014 Position : Site Supervision Engineer Annotation  Site Supervision: Supervise the construction stage on Site periodically every week. To give advices for the construction method and interpret the implementation of Detailed Engineering Design Drawing to the actual on site project. 6. PT Indofood CBP, Pembangunan New Noodle Factory Project Location : Cirebon, Jawa Barat Project Period : July 2014 – February 2015 Position : Civil Engineer Annotation  Soil Investigation Analysis: Analyzing soil laboratory test, N-SPT, CPT in order to calculate (dimension, length, depth, capacity, lateral force, settlement) the pile foundation and shallow foundation for all structural building.  Civil Design Designing drainage, road, pavement and rainwater analysis.  Structural Design Designing foundation, slab and upper structure for several buildings : Tank Yard, Security Office, Boiler, WTP, and Pipe Rack by using SAP2000. 7. Pembangunan SKTT 150 kV Priok – Pelindo II (Sirkit 1) Project Location : Pelindo Area Project Period : September 2015 – December 2015 Position : Project Engineer Annotation As a Project Engineer, have the responsibilities to: 1. Develops project objectives by reviewing project proposals and plans; conferring with management. 2. Determines project specifications by studying product design, customer requirements, and performance standards; completing technical studies; preparing cost estimates. 3. Determinesprojectschedule bystudyingprojectplanandspecifications;calculatingtime requirements; sequencing project elements. 4. Maintains project schedule by monitoring project progress; coordinating activities; resolving problems. 5. Controlsprojectplanbyreviewingdesign,specifications,andplanandschedule changes; recommending actions.
  • 5. EleuteriusEvansAnjaruTrikshyean +6287879517590 eleuteriusevans@hotmail.com 6. Preparesprojectstatusreportsbycollecting,analyzing,andsummarizinginformationand trends; recommending actions. 7. Contributes to team effort by accomplishing related results as needed. 8. Package 2: 150 kV Underground Cable (UGC) for Gedung Pola-Manggarai, Manggarai- Dukuh Atas, Ketapang-Mangga Besar, and Kemang Incomer Project Location : Jakarta Area Project Period : March 2015 – present Position : Project Engineer Annotation As a Project Engineer, have the responsibilities to: 1. Develops project objectives by reviewing project proposals and plans; conferring with management. 2. Determines project specifications by studying product design, customer requirements, and performance standards; completing technical studies; preparing cost estimates. 3. Determinesprojectschedule bystudyingprojectplanandspecifications;calculatingtime requirements; sequencing project elements. 4. Maintains project schedule by monitoring project progress; coordinating activities; resolving problems. 5. Controlsprojectplanbyreviewingdesign,specifications,andplanandschedule changes; recommending actions. 6. Preparesproject statusreportsbycollecting,analyzing,andsummarizinginformationand trends; recommending actions. 7. Contributes to team effort by accomplishing related results as needed.