PRESENT BY:
ENG. W.A.D.N.SANDARUWAN
REVIEW ON MY WORK EXPERIENCE AS AT
31ST
DECEMBER 2015
Nilantha Sandaruwn
PROFESSIONAL TRAINING & EXPERIENCE
WORK ORGANIZATION/DURATION POSITION
HELD
WORK EXPERIENCE
1) 2007 Feb - 2007 July (5.5 months)
Maga Engineering Pvt Ltd.
 Ready-mix concrete batching
plant, Kelaniya
 Ceylinco Celestial Residencies
Project, Colombo 03. ( The Grand
Hyatt)
Engineering
Apprentice
• Supervision of laboratory
testing
• Supervision of trial mixes
• Visiting supply sites and
calculation of required concrete
quantities.
• Maintain daily records, progress
records
• Supervision of reinforcement
work on beams and slabs.
• Arranging reinforcement
inspections with consultant.
• Preparing bar bending
schedules
Nilantha Sandaruwn
Side & Front Elevations
Nilantha Sandaruwn
WORK ORGANIZATION/DURATION POSITION
HELD
WORK EXPERIENCE
2) June 2008 to Aug. 2010 (26 months)
China Geo Engineering
Corporation(contractor)
- Hambantota Water Supply Project,
Ambalantota.
(Project Value: US $16 million and
funded by ADB)
- Client : National Water Supply &
Drainage Board.
- Consultant: Ceywater Consultant Pvt
Ltd
• Construction of Raw water Intake
• Construction of water treatment plant,
raw water pumping main, treated
water pumping mains
• Construction of 3500m3
capacity clear
water tank, ancillary buildings
• 42km of DI pipe laying ( 200mm dia.
Site
Engineer
(treatmen
t plant &
Intake)
• Directed & Participated in
Surveying and setting out
of structures.
• Prepared construction
programs
• Inspected & supervised
site construction activities.
• Prepared progress reports
& progress monitoring
• Supervised and arranged
quality assurance tests.
• Arranging site inspections
• Preparing bar bending
schedules.
• Certifying material reorder
quantities
• Arranging machineries and
construction equipment
PROFESSIONAL TRAINING & EXPERIENCE (continued….)
Nilantha Sandaruwn
Aerator & Flocculator Decanter Building
Filtration plant- backwash pipes. Flocculator and clarifiers
Nilantha Sandaruwn
Sludge handling facility
Office Building
Yard Piping Control panels are installedNilantha Sandaruwn
Nilantha Sandaruwn
WORK ORGANIZATION/DURATION POSITION
HELD
WORK EXPERIENCE
3) Aug. 2010 to May 2011 (09 months)
Provincial Engineering
Organization, western province
- Horana Divisional Engineer’s Office
- Panadura Divisional Engineer’s
Office
• New administrative building,
Bulathsinghala base hospital
• Two storey school buildings for
Ingiriya, Handapangoda and
Geekiyanakana schools.
• Development of Udugalakanda GS
• Preliminary site clearing work for
new 4 storey ward complex,
Panadura base hospital.
• Renovation of Kethumathi hospital,
Panadura.
Civil
Engineer
II/II
• Construction and quality
assurance supervision
• Supervision of the preparation
of BOQ’s
• Assist for tender evaluation
• Verifying contractor’s claim by
site visiting and recommending
for payments.
• Preparing progress reports
• Attending progress meetings
• Attending DDC meetings
• Coordinating with divisional
secretaries, divisional education
directors, hospital authorities
regarding development projects,
bid evaluations and payments to
contractors.
PROFESSIONAL TRAINING & EXPERIENCE (continued….)
Nilantha Sandaruwn
PROFESSIONAL TRAINING & EXPERIENCE (continued….)
WORK ORGANIZATION/DURATION Project Components
4) June 2011 to May 2015 (48 months)
Greater Colombo Water
Rehabilitation Project (ICB 03)
Project values : US $ 4.0 million for
consultancy and US $ 20.0 million for
construction contracts.(funding by
JICA)
- Client: National Water Supply &
Drainage Board
- Consultant: Ceywater Consultant Pvt.
Ltd. In association with Nihon Suido
Consultant Co.Ltd.
- Structural Consultant : Dayananda
Associates Pvt Ltd.
- Contractor: China Geo Corporation
• Construction of 22000 m3
capacity
circular post-tensioned ground
reservoir at Colombo 10.
• Construction of Valve house and
rehabilitation of chlorine building
• 35000m3
and 12000m3
capacity
(square shape ) ground reservoirs
at Colombo 15.
• 1500m3
capacity Intz-type water
tower at Gothatuwa.
• Laying of 1200mm dia. 4.5km long
DI transmission main form
Ambatale to Gothatuwa.
• 500/300 mm dia. 3.475 km long DI
distribution mains at Kotikawatta –
Mulleriyawa.
Nilantha Sandaruwn
PROFESSIONAL TRAINING & EXPERIENCE (continued….)
WORK ORGANIZATION/DURATION POSITION
HELD
WORK EXPERIENCE
4) June 2011 to May 2015 (48 months)
Greater Colombo Water
Rehabilitation Project (ICB 03)
- Dayananda Associates Pvt Ltd
(June 2011 to December 2012 –
6.5 months)
Trainee
Design
Engineer
• Assist Chief Structural Engineer
for design changes of Elie House
reservoir (35000m3
capacity)
and roof slab design changes of
Maligakanda reservoir( 22000m3
capacity).
• Preparation of design drawings
and detailing drawings
• Design calculation for structural
elements such as slabs,
columns, beams, foundations
and staircases.
• Attending site visits and taking
site measurements
Nilantha Sandaruwn
WORK ORGANIZATION/DURATION POSITION
HELD
WORK EXPERIENCE
4) June 2011 to May 2015 (48 months)
Greater Colombo Water
Rehabilitation Project (ICB 03)
- Dayananda Associates Pvt Ltd
(December 2011 to July 2012 – 7.5
months)
Design
Engineer,
• Design of new office building
consisting of 4 floors with a total
floor area of 3168 m2
.
 Design Information
I. Fire rating of the building :1.0hr
II. Density of concrete 24kN/m3
III. Characteristic strength of
concrete , fcu = 25 N/mm2
IV. Characteristic strength of steel,
fy=460 N/mm2.
V. Cover to reinforcement 50mm in
structural elements below
ground and /or contact with
water. At all other areas, cover
=25mm.
VI. Allowable bearing capacity of
soil 200 kN/m2
.
PROFESSIONAL TRAINING & EXPERIENCE (continued….)
Nilantha Sandaruwn
Front Elevation Side Elevation
Typical Floor PlanNilantha Sandaruwn
WORK ORGANIZATION/DURATION POSITION
HELD
WORK EXPERIENCE
4) June 2011 to May 2015 (48
months)
Greater Colombo Water
Rehabilitation Project (ICB 03)
(July 2012 to May 2015 –
35months)
• Construction completion of
22000m3 capacity ground
reservoir.
• The reservoir was circular
reinforced concrete structure
with 500mm thick perimeter
wall on a ring foundation and
accompanied by 69 numbers of
bonded post-tension tendons.
Site
Engineer
(Maligaka
nda)
• Preparation of guidelines for post-
tensioning and grouting.
• Design of spiral reinforcement
• Preparation of lists of material,
equipment and compliance tests.
• Directed surveying and setting out
work.
• Construction supervision and issuing
site instructions
• Issuing variation orders up on
consultation with senior project
manager.
• Preparing physical and financial
progress reports.
• Progress monitoring and conducting
progress review meetings with
contractor
• Supervision of quality assurance
tests.
PROFESSIONAL TRAINING & EXPERIENCE (continued….)
Nilantha Sandaruwn
Excavation for base slab Screed concrete completed
Ring foundation on progress Base slab RF work
Nilantha Sandaruwn
MS strips for making ducts Rolls of strands
Bolsters Anchor platesNilantha Sandaruwn
Ducts & Air vents Wall Formwork
Trial Stressing of Strands Permanent StressingNilantha Sandaruwn
Grout mixing Grout Pumping
Pre-load testing prior to the roof slab. Polyurethane Injection for leak repair
Nilantha Sandaruwn
RF work for Roof slab
Roof slab panels
Cutting of an existing 800 mm dia pipeline
to connect new reservoir outlet. Outlet – after connected to the system.Nilantha Sandaruwn
PROFESSIONAL TRAINING & EXPERIENCE (continued….)
WORK ORGANIZATION/DURATION POSITION
HELD
WORK EXPERIENCE
5) May 2015 to Date (06 months)
Sheraton Hotel Project,
Colombo 03.
Project Value: US $ 100 m. Approx.
- Developer: Lanka Hotels &
Residencies Pvt Ltd
- Architect: Lakvidu Design
Consultant/ WS Atkins &
Partners.
- Structural Consultant :
Dayananda Associates Pvt Ltd
• Block A- Hotel tower with 22
floors and a basement.(300
guest rooms)
• Block B- Office tower with 25
floors+basement(150000 sq.ft.)
• Block C- 7 storey hotel
activities, banquet & pool
(40000 sq.ft)
Resident
Engineer
(Blocks B
& C)
• Supervised soil investigation for
blocks B and C
• Supervised Bored and cast in situ test
pile (800 mm dia.) and testing of
piles ( PIT and PDA tests)
• Supervised pile boring, termination
and concreting of 101 piles out of
130.
• Directed surveying and setting out of
piles.
• Preparing physical and financial
progress reports.
• Progress monitoring and conducting
progress review meetings with
contractor
• Supervision of quality assurance
tests.
• Certifying contractor’s bill
Nilantha Sandaruwn
Nilantha Sandaruwn
Pilling machine and tools Pile Reinforcement cadge
Testing of Bentonite De-sander on operationNilantha Sandaruwn
Pile Concreting Pile prepared for testing
PDA testing
wave forming during
PDA test
Monitoring Noise and Vibration
levels
Nilantha Sandaruwn
THANK YOU
Nilantha Sandaruwn

More Related Content

What's hot (20)

paramasivam resume
paramasivam resume paramasivam resume
paramasivam resume
 
Ravi Resume
Ravi ResumeRavi Resume
Ravi Resume
 
Rajinder kumar updated resume
Rajinder  kumar updated resumeRajinder  kumar updated resume
Rajinder kumar updated resume
 
Updated C.V of water & sewerage
Updated  C.V of water & sewerageUpdated  C.V of water & sewerage
Updated C.V of water & sewerage
 
Shiraz nawaz cv.
Shiraz nawaz cv.Shiraz nawaz cv.
Shiraz nawaz cv.
 
Abhishek Resume
Abhishek ResumeAbhishek Resume
Abhishek Resume
 
Brophy resume,8-2016
Brophy resume,8-2016Brophy resume,8-2016
Brophy resume,8-2016
 
Resume
ResumeResume
Resume
 
AS_CV
AS_CVAS_CV
AS_CV
 
Ronald saldanha (1)
Ronald saldanha (1)Ronald saldanha (1)
Ronald saldanha (1)
 
Anees Khan Resume from GK
Anees Khan Resume from GKAnees Khan Resume from GK
Anees Khan Resume from GK
 
CV-Goutam Sen
CV-Goutam SenCV-Goutam Sen
CV-Goutam Sen
 
Gen geot cs_sscanada_16.1
Gen geot cs_sscanada_16.1Gen geot cs_sscanada_16.1
Gen geot cs_sscanada_16.1
 
Clifton SC - CV 2017
Clifton SC - CV 2017Clifton SC - CV 2017
Clifton SC - CV 2017
 
RESUME_KALAM
RESUME_KALAMRESUME_KALAM
RESUME_KALAM
 
Sajeevresume_June-28-2015
Sajeevresume_June-28-2015Sajeevresume_June-28-2015
Sajeevresume_June-28-2015
 
Mohammad Ghayoor Khan CV oil
Mohammad Ghayoor Khan CV oilMohammad Ghayoor Khan CV oil
Mohammad Ghayoor Khan CV oil
 
CV NAEEM QURESHI 2014
CV NAEEM QURESHI 2014CV NAEEM QURESHI 2014
CV NAEEM QURESHI 2014
 
CV_Raja
CV_RajaCV_Raja
CV_Raja
 
Cv 01
Cv 01Cv 01
Cv 01
 

Similar to Presentation-Nilantha

Mech cv 1
Mech cv 1Mech cv 1
Mech cv 1Tata
 
HOW CV 20161129
HOW CV 20161129HOW CV 20161129
HOW CV 20161129Ling How
 
Resume updated
Resume updatedResume updated
Resume updatedbight anto
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsNirav Mistry
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015Partha Gorain
 
Muthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMuthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMUTHUKUMAR428109
 

Similar to Presentation-Nilantha (20)

Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Mech cv 1
Mech cv 1Mech cv 1
Mech cv 1
 
HOW CV 20161129
HOW CV 20161129HOW CV 20161129
HOW CV 20161129
 
My Resume.1
My Resume.1My Resume.1
My Resume.1
 
Ajesh Resume
Ajesh ResumeAjesh Resume
Ajesh Resume
 
Resume updated
Resume updatedResume updated
Resume updated
 
Rajbir Singh-2
Rajbir Singh-2Rajbir Singh-2
Rajbir Singh-2
 
Prakash cv update
Prakash cv updatePrakash cv update
Prakash cv update
 
Enrico S. Simon
Enrico S. SimonEnrico S. Simon
Enrico S. Simon
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
KN
KNKN
KN
 
Christoph Sinaga_CV 2015
Christoph Sinaga_CV 2015Christoph Sinaga_CV 2015
Christoph Sinaga_CV 2015
 
RESUME-1
RESUME-1RESUME-1
RESUME-1
 
CV (2)
CV (2)CV (2)
CV (2)
 
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
 
Muthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMuthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdf
 
CV-PM Ponraj
CV-PM PonrajCV-PM Ponraj
CV-PM Ponraj
 

Presentation-Nilantha

  • 1. PRESENT BY: ENG. W.A.D.N.SANDARUWAN REVIEW ON MY WORK EXPERIENCE AS AT 31ST DECEMBER 2015 Nilantha Sandaruwn
  • 2. PROFESSIONAL TRAINING & EXPERIENCE WORK ORGANIZATION/DURATION POSITION HELD WORK EXPERIENCE 1) 2007 Feb - 2007 July (5.5 months) Maga Engineering Pvt Ltd.  Ready-mix concrete batching plant, Kelaniya  Ceylinco Celestial Residencies Project, Colombo 03. ( The Grand Hyatt) Engineering Apprentice • Supervision of laboratory testing • Supervision of trial mixes • Visiting supply sites and calculation of required concrete quantities. • Maintain daily records, progress records • Supervision of reinforcement work on beams and slabs. • Arranging reinforcement inspections with consultant. • Preparing bar bending schedules Nilantha Sandaruwn
  • 3. Side & Front Elevations Nilantha Sandaruwn
  • 4. WORK ORGANIZATION/DURATION POSITION HELD WORK EXPERIENCE 2) June 2008 to Aug. 2010 (26 months) China Geo Engineering Corporation(contractor) - Hambantota Water Supply Project, Ambalantota. (Project Value: US $16 million and funded by ADB) - Client : National Water Supply & Drainage Board. - Consultant: Ceywater Consultant Pvt Ltd • Construction of Raw water Intake • Construction of water treatment plant, raw water pumping main, treated water pumping mains • Construction of 3500m3 capacity clear water tank, ancillary buildings • 42km of DI pipe laying ( 200mm dia. Site Engineer (treatmen t plant & Intake) • Directed & Participated in Surveying and setting out of structures. • Prepared construction programs • Inspected & supervised site construction activities. • Prepared progress reports & progress monitoring • Supervised and arranged quality assurance tests. • Arranging site inspections • Preparing bar bending schedules. • Certifying material reorder quantities • Arranging machineries and construction equipment PROFESSIONAL TRAINING & EXPERIENCE (continued….) Nilantha Sandaruwn
  • 5. Aerator & Flocculator Decanter Building Filtration plant- backwash pipes. Flocculator and clarifiers Nilantha Sandaruwn
  • 6. Sludge handling facility Office Building Yard Piping Control panels are installedNilantha Sandaruwn
  • 8. WORK ORGANIZATION/DURATION POSITION HELD WORK EXPERIENCE 3) Aug. 2010 to May 2011 (09 months) Provincial Engineering Organization, western province - Horana Divisional Engineer’s Office - Panadura Divisional Engineer’s Office • New administrative building, Bulathsinghala base hospital • Two storey school buildings for Ingiriya, Handapangoda and Geekiyanakana schools. • Development of Udugalakanda GS • Preliminary site clearing work for new 4 storey ward complex, Panadura base hospital. • Renovation of Kethumathi hospital, Panadura. Civil Engineer II/II • Construction and quality assurance supervision • Supervision of the preparation of BOQ’s • Assist for tender evaluation • Verifying contractor’s claim by site visiting and recommending for payments. • Preparing progress reports • Attending progress meetings • Attending DDC meetings • Coordinating with divisional secretaries, divisional education directors, hospital authorities regarding development projects, bid evaluations and payments to contractors. PROFESSIONAL TRAINING & EXPERIENCE (continued….) Nilantha Sandaruwn
  • 9. PROFESSIONAL TRAINING & EXPERIENCE (continued….) WORK ORGANIZATION/DURATION Project Components 4) June 2011 to May 2015 (48 months) Greater Colombo Water Rehabilitation Project (ICB 03) Project values : US $ 4.0 million for consultancy and US $ 20.0 million for construction contracts.(funding by JICA) - Client: National Water Supply & Drainage Board - Consultant: Ceywater Consultant Pvt. Ltd. In association with Nihon Suido Consultant Co.Ltd. - Structural Consultant : Dayananda Associates Pvt Ltd. - Contractor: China Geo Corporation • Construction of 22000 m3 capacity circular post-tensioned ground reservoir at Colombo 10. • Construction of Valve house and rehabilitation of chlorine building • 35000m3 and 12000m3 capacity (square shape ) ground reservoirs at Colombo 15. • 1500m3 capacity Intz-type water tower at Gothatuwa. • Laying of 1200mm dia. 4.5km long DI transmission main form Ambatale to Gothatuwa. • 500/300 mm dia. 3.475 km long DI distribution mains at Kotikawatta – Mulleriyawa. Nilantha Sandaruwn
  • 10. PROFESSIONAL TRAINING & EXPERIENCE (continued….) WORK ORGANIZATION/DURATION POSITION HELD WORK EXPERIENCE 4) June 2011 to May 2015 (48 months) Greater Colombo Water Rehabilitation Project (ICB 03) - Dayananda Associates Pvt Ltd (June 2011 to December 2012 – 6.5 months) Trainee Design Engineer • Assist Chief Structural Engineer for design changes of Elie House reservoir (35000m3 capacity) and roof slab design changes of Maligakanda reservoir( 22000m3 capacity). • Preparation of design drawings and detailing drawings • Design calculation for structural elements such as slabs, columns, beams, foundations and staircases. • Attending site visits and taking site measurements Nilantha Sandaruwn
  • 11. WORK ORGANIZATION/DURATION POSITION HELD WORK EXPERIENCE 4) June 2011 to May 2015 (48 months) Greater Colombo Water Rehabilitation Project (ICB 03) - Dayananda Associates Pvt Ltd (December 2011 to July 2012 – 7.5 months) Design Engineer, • Design of new office building consisting of 4 floors with a total floor area of 3168 m2 .  Design Information I. Fire rating of the building :1.0hr II. Density of concrete 24kN/m3 III. Characteristic strength of concrete , fcu = 25 N/mm2 IV. Characteristic strength of steel, fy=460 N/mm2. V. Cover to reinforcement 50mm in structural elements below ground and /or contact with water. At all other areas, cover =25mm. VI. Allowable bearing capacity of soil 200 kN/m2 . PROFESSIONAL TRAINING & EXPERIENCE (continued….) Nilantha Sandaruwn
  • 12. Front Elevation Side Elevation Typical Floor PlanNilantha Sandaruwn
  • 13. WORK ORGANIZATION/DURATION POSITION HELD WORK EXPERIENCE 4) June 2011 to May 2015 (48 months) Greater Colombo Water Rehabilitation Project (ICB 03) (July 2012 to May 2015 – 35months) • Construction completion of 22000m3 capacity ground reservoir. • The reservoir was circular reinforced concrete structure with 500mm thick perimeter wall on a ring foundation and accompanied by 69 numbers of bonded post-tension tendons. Site Engineer (Maligaka nda) • Preparation of guidelines for post- tensioning and grouting. • Design of spiral reinforcement • Preparation of lists of material, equipment and compliance tests. • Directed surveying and setting out work. • Construction supervision and issuing site instructions • Issuing variation orders up on consultation with senior project manager. • Preparing physical and financial progress reports. • Progress monitoring and conducting progress review meetings with contractor • Supervision of quality assurance tests. PROFESSIONAL TRAINING & EXPERIENCE (continued….) Nilantha Sandaruwn
  • 14. Excavation for base slab Screed concrete completed Ring foundation on progress Base slab RF work Nilantha Sandaruwn
  • 15. MS strips for making ducts Rolls of strands Bolsters Anchor platesNilantha Sandaruwn
  • 16. Ducts & Air vents Wall Formwork Trial Stressing of Strands Permanent StressingNilantha Sandaruwn
  • 17. Grout mixing Grout Pumping Pre-load testing prior to the roof slab. Polyurethane Injection for leak repair Nilantha Sandaruwn
  • 18. RF work for Roof slab Roof slab panels Cutting of an existing 800 mm dia pipeline to connect new reservoir outlet. Outlet – after connected to the system.Nilantha Sandaruwn
  • 19. PROFESSIONAL TRAINING & EXPERIENCE (continued….) WORK ORGANIZATION/DURATION POSITION HELD WORK EXPERIENCE 5) May 2015 to Date (06 months) Sheraton Hotel Project, Colombo 03. Project Value: US $ 100 m. Approx. - Developer: Lanka Hotels & Residencies Pvt Ltd - Architect: Lakvidu Design Consultant/ WS Atkins & Partners. - Structural Consultant : Dayananda Associates Pvt Ltd • Block A- Hotel tower with 22 floors and a basement.(300 guest rooms) • Block B- Office tower with 25 floors+basement(150000 sq.ft.) • Block C- 7 storey hotel activities, banquet & pool (40000 sq.ft) Resident Engineer (Blocks B & C) • Supervised soil investigation for blocks B and C • Supervised Bored and cast in situ test pile (800 mm dia.) and testing of piles ( PIT and PDA tests) • Supervised pile boring, termination and concreting of 101 piles out of 130. • Directed surveying and setting out of piles. • Preparing physical and financial progress reports. • Progress monitoring and conducting progress review meetings with contractor • Supervision of quality assurance tests. • Certifying contractor’s bill Nilantha Sandaruwn
  • 21. Pilling machine and tools Pile Reinforcement cadge Testing of Bentonite De-sander on operationNilantha Sandaruwn
  • 22. Pile Concreting Pile prepared for testing PDA testing wave forming during PDA test Monitoring Noise and Vibration levels Nilantha Sandaruwn