Project Brief
Your Company Name
Content Project
Brief
Project
Description
Risk
Identification
Risk Management
Report
Project
Management Team
Project
Timeline
Risk
Assessment
Task
Matrix
Risk
Tracker
Activities
Sequence
Communication
Plan
Roles &
Responsibilities
Project Work
Plan
Project Progress
Summary
Project Management
Gantt Chart
Project
Task List
Project Management
Dashboard
2
Project Brief
Title Type Your Text Here Date MM/DD/YY
Clients/ Organization Details
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention. Text Here Text Here
Introduction/ Overview
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention. Text Here Text Here
Project Objectives
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention. Text Here Text Here
Project Scope
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention. Text Here Text Here
Target Audience
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention. Text Here Text Here
Success Factors
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention. Text Here Text Here
Budget Details The project budget is estimated to cost $20000 Text Here Text Here
3
Project Description
PROJECT TITLE:
01
02
03
04
05
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Description
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Description
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Description
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Description
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Description
4
Describe in detail,
what the project is
all about
Type Of Risk Jeopardy
Description of
the Risk
Expectation of
the Risk
Impact of the
Risk
(1 to 10)
Severity of the
Risk
(Expectation x
Impact)
Contigencies/
Plan of Acton
Delay of critical
resource
Budget Schedule
No Funds available
until XYZ individual
is located
Contact
organization to
locate XYZ
individual
Delay getting
additional data
Schedule
Contractor is
currently searching
for it
Focus on task not
additional
contingency
required
Extra Project Asset
Schedule
Resources
Can’t obtain any
extra Assest
Not necessary at
this time
Risk Identification
1 10
1 10
1 10
63
21
10
70
20
30
5 For effectively managing a
project, it is important to
identify all the possible risk
elements which might get
associated with it. Below is a
template which you can use to
list down all the possible types
of risk and mention there
possible impact on the project
Risk Management Report
6
Types of Risk Insignificant Minor Moderate Major Severe
Delay of critical resource
Delay in getting additional data
Schedule overruns
Poor Communication
Skills gap
High
Low
Medium
Critical
Once the identification of
risk is completed, you can
list down the level of impact
these risk factors would
have on the project using
this template below
Project Management Team
Put Text
Here
7
For effectively managing a project,
it is important to identify all the
possible risk elements which
might get associated with it. Below
is a template which you can use to
list down all the possible types of
risk and mention there possible
impact on the project
Roles & Responsibilities
Project
Deliverable
(or Activity)
R - Responsible A - Accountable C - Contributing I - Informed
Project Leadership Project Team Members Project Sub- Teams External Resources
Executive
Sponsor
Project
Sponsor
Steering
Committe
Advisory
Committe
Role #5
Project
Manager
Tech Lead
Functional
Lead
SME
Project
Team
Member
Developer
Administra
tive
Support
Business
Analyst
Role #4 Role #5 Consultant PMO Role #3 Role #4
Initial Phase Activities
Request Review by PMO A/C R/A R/A A/C C
Submit Project Request R A
Research Solution I R/A A/C A/C C C
Develop Business Case I A/C I I R/A C C C C C C
Plan Phase Activities
Create Project Charter C C R/A C C C C C
Create Schedule I I I I R/A C C C C C C I
Create Additional Plans as
Required
I I I R/A I I C I
Execute Phase Activities
Build Deliverables C/I C/I C/I C/I R/A R/A R/A R/A A/C
Create Status Report I I I I R/A R/A R/A R/A C I
Control Phase Activities
Perform Change
Management
C C C R A A A C I
Close Phase Activities
Create Lessions Learned C C C C R/A C C C C C C C C C
Create Project Closure
Report
I I I I R/A I I I I I I I I
R O L E
8
Mention the roles &
responsibilities of the
project team with respect
to all the project
deliverables using this
table
Project Work Plan
Month 2018
January
February
March
April
May
June
July
August
September
October
November
December
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
9
This slide covers the entire
work plan of the project
split across different
months and is also
highlighting the degree of
completion. You can alter
it as per your requirements
Project Management Gantt Chart
02-Jan
09-Jan
16-Jan
23-Jan
30-Jan
06-Feb
13-Feb
20-Feb
27-Feb
05-Mar
Task 1 1/2/12 35 26%
Sub Task 1.1 1/2/12 10 40%
Sub Task 1.2 1/12/12 25 20%
Task 2 1/2/12 66 88%
Sub Task 2.1 1/2/12 30 100%
Sub Task 2.2 2/1/12 25 80%
Sub Task 2.3 2/27/12 10 70%
Task 3 1/2/12 10 40%
Sub Task 3.1 1/2/12 10 40%
2018
Tasks Start Duration
(Days)
%
Complete
10
This a Gantt chart
representing the various
tasks to be performed
along with there duration
and degree of completion,
you can use it as per the
need
Project Management Gantt Chart (2/2)
Start Duration Budget Start Duration Budget Activity % 03 10 17 24 31 07 14 22 28 07 14 21 14 04 11 18
3-Jan 8 $963 3-Jan 4 $972 Activity 1 95%
11-Jan 11 $1,120 7-Jan 4 $1,516 Activity 2 34%
18-Jan 11 $1,582 19-Jan 2 $1,792 Activity 3 52%
21-Jan 2 $360 21-Jan 11 $339 Activity 4 29%
1-Feb 2 $100 1-Feb 13 $372 Activity 5 64%
3-Feb 9 $1,230 9-Feb 5 $1,340 Activity 6 19%
8-Feb 1 $280 20-Feb 6 $272 Activity 7 24%
11-Feb 7 $1,000 28-Feb 11 $864 Activity 8 30%
19-Feb 3 $480 11-Mar 4 $552 Activity 9 39%
28-Feb 2 $393 20-Mar 1 $366 Activity 10 12%
Plan Actual Jan Feb Mar Apr
2018
11
This a Gantt chart
representing the various
activities to be performed
along with there duration
and degree of completion,
you can use it as per the
need
Project Task List
Project Start ! 1/1/2017
Project Task Priority Start Plan End
Actual
End
%
Complet
e
Project
Start
Days To
Start
Complet
e
Incomple
te
Stop
Page
Plan Days
Project 1
Task 1
Description
High 1/5/2017 1/15/2017 1/15/2017 50% 1/1/2017 4 5 5 0 10
Task 2
Description
Medium 1/10/2017 1/17/2017 1/23/2017 100% 1/1/2017 9 7 0 6 7
Project 2
Task 1 Title Low 2/15/2017 2/28/2017 3/10/2017 30% 1/1/2017 45 3.9 9.1 10 13
Task 2 Title High 1/7/2017 2/1/2017 2/5/2017 50% 1/1/2017 6 12.5 12.5 4 25
Project 3
Task A Low 2/15/2017 2/18/2017 30% 1/1/2017 45 0.9 2.1 0 3
Task B Low 2/25/2017 3/7/2017 1/1/2017 55 0 10 0 10
Task C Low 3/10/2017 3/22/2017 1/1/2017 68 0 12 0 12
1/1/2017 0 0 0 0 0
1/1/2017 0 0 0 0 0
12
Project Task List
PROJECT 1
Task 1 Description
Task 2 Description
PROJECT 2
Task 1 Title
Task 2 Title
PROJECT 3
Task A
Task B
Task C
Complete Incomplete Slippage
Jan 1, 2018 Jan 29, 2018 Feb 26, 2018 Mar 26, 2018
13
Project Timeline
Task
Name
Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec
Task 1
Task 2
Task 3
Task 4
Task 5
Task 6
Milestones
Jan 10
1
Mar 7
2
Mar 10
3
Jun 29
4
Oct 20
5
Nov 30
6
Jan 5 - Mar 1
Oct 21 - Nov 15
Mar14 - May 2
Feb 2 - Mar14
Nov 16 - Dec 20
Mar 25 - Oct 20
14
This slide covers the
timeline of the entire
project, you can use it
as per your
requirements
Activities Sequence
ID Activity Description of Work
Follow WBS of schedule Activity Name
Description of activity in enough detail so
that the person(s) performing the work
understands what is required to complete it.
Text Here Text Here Text Here
Text Here Text Here Text Here
Text Here Text Here Text Here
Project Acronym
Customer Name
Activity List Worksheet
Project ID No.
Your Logo
15
Prepare an activity
sequence listing down
the work which needs to
be performed and its
description
Risk Assessment
Red area indicates ‘yes’, we need to
develop a Risk Management Plan
Yellow area indicates ‘iffy’,
answer on a case by case basis
Green area indicates ‘no’, don’t
develop a Risk Management Plan
Degree
of
Impact
Probability of Occurrence
Medium
High
High
Low
Medium
16
Assess the level of
impact the risk factors
would have and there
probability of
occurrence while
implementing the
project
Risk Tracker
Date of Last Review
ID
Description of
Risk
Impact Risk Response Risk Level Risk Owner Notes
1 Supplier Delay Pushes launch
Confirm Delivery
dates by phase 2
High Clarissa
2
Factory
Availability
Cost overruns
Stakeholder trip to
china
High
Dave, Rajesh &
Nina
3
Steerine
Committee
Unavailable
Delay launch
Marketing
Define Marketing
Plans in March
Low Tyrell
17
Below is the template
which could be used to
track the risk factors
and how we are
planning to overcome
the same
Communication Plan
Communicate what Purpose
Frequency/
Distribution
Communicate to
Team Stakeholders
Communication
method
Text Here Text Here Text Here Text Here Text Here Text Here
Text Here Text Here Text Here Text Here Text Here Text Here
Text Here Text Here Text Here Text Here Text Here Text Here
Text Here Text Here Text Here Text Here Text Here Text Here
18
This is another way of
maintain a
communication plan
for the project
Task Matrix
Function / Role Main Tasks Competencies Responsibilities
Client
Contribution to company development ,
point of project view
Project Assignment
Company’s interest (overall
responsibility), Compatibility of the
project with company strategy
Project Manager
Project planning & organization of the
project resources, coordination of tasks
Signature authority up to xxx dollar
(predefined max. amount
Schedule goals, cost targets & quality
objectives, Evaluation of results
Project Employee
Deadlines work package content,
Support of planning
Task related competence Professionalism
Project Committee
Expertise, Support of planning, Interface
Management
Recommendations, decisions, guidelines
Conflict & Problem Solving
Professionalism
19
List down all the tasks
and the responsibilities
in the below table
which would help in
the execution of the
project
Project Cost Estimate
WBS Items #Units/Hrs. Cost/Unit/Hr. Sub Totals
WBS Level 1
Totals
% of Total
Project Management $306,300 20%
Project Manager 960 $100 $96,000
Project Team members 1920 $75 $144,000
Contractors (10% of software development and testing) $66,300
Hardware $76,000 5%
Handheld devices 100 $600 $60,000
Servers 4 $4,000 $16,000
Software $614,000 40%
Licensed software 100 $200 $20,0000
Software development* $594,000
Testing (10% of total hardware & software costs) $69,000 $69,000 5%
Training and Support $202,400 13%
Trainee cost 100 $500 $50,000
Travel Cost 12 $700 $8,400
Project team members 1920 $75 $144,000
Reserves (20% of total estimate) $253,540 $253,540 17%
Total Project Cost estimate $1,521,240
20
This slide covers the cost
estimates split across different
sections which would be
involved while bringing the
project in to action. You can
modify these sections and
estimates as per the
requirements
Project Progress Summary
Project Deliverable(s) Cost/ Hours
Status Priority Deadline Task Assignee Description Deliverable % Done Fixed Cost Est. Hrs Actual Hrs
Project Name
X High 8/27/18 Task
Details of task
here
100% $
X High 8/27/18 Task 50% $
Low 10/11/18 Task 0% $
Project Name
Project Name
Project Name
21
This template covers the
broad summary of the entire
project to highlight the
completion level, its priority
and the cost associated with
these tasks. You can se this
as per your requirements
Project Management Dashboard
Overall
Task
Status
Complete
Overdue
In -Progress
Not Started
5
2
4
Decisions Actions Change
Requests
Pending Items
20,00030,00040,00050,00060,00070,00080,00090,000
Planned
Actual
Budget
Tasks Assigned To Priority Status
Set kick-off meeting Alex B. Complete
Agree on objectives Frank C. Complete
Detailed Reqs. Jacob S. Complete
Hardware Reqs. Jacob S. Overdue
Final Resource Plan Jacob S. In progress
Staffing Alex B. In progress
Technical Reqs. Frank C. Not started
Testing Kennedy K. Not started
Dev. Complete Jacob S. Not started
Hardware Config. Alex B. Not started
System Testing Kennedy K. Not started
Launch
9/2 9/7 9/12 9/17 9/22 9/27 10/2 10/7 10/12
Set Kick-off-Meeting
Agree on Objectives
Detailed Reqs.
Hard ward Reqs.
Final Resource Plan
Staffing
Technical Reqs.
Testing
Dev. Complete
Hard ward Config.
System Testing
Launch
22
This is a graphical
presentation to understand
the overall management of
the project and to analyse
the budget as well as the
timelines of the project
Project Issues Management
Issue Management Log
Project Name
<Optional>
National Center
<Required>
Project Manager Name
<Required>
Project Description
<Required>
ID
Current
Status
Priority Issue Description Assigned To Owner
Expected
Resolution Date
Escalation
Required (Y/N)
Open Critical
Example: Issues raised by board
members about the financial viability of
the project are preventing the project
from moving forward as planned
Yes
Work In
Progress
High
Example: The project is short on a
specific skill set
No
Closed Medium
Example: Negotiations with functional
managers in a n organization competing
for scarce human resources are
forecasted to delay project completion
Yes
Low
23
This is a graphical
presentation to understand
the overall management of
the project and to analyse
the budget as well as the
timelines of the project
Project Status Report
Project Manager Billy Bob Brother Project Sponsor Big Boss Man
Project Title Here
Project Start Date January 1, 2013 Project End Date December 31, 2013
Project Description/ Scope Statement This is the Description of the Project.
Project Path Yellow
Title Owner Due Status
Project Approval J. Bob 1-Jan-13 Complete
Planning R. Mack 1-Mar-13 Complete
Design D. Hoff 1-May-13 In Progress
Development S. Queue 1-Jul-13 Not Started
Training I. Manning 1-Sep-13 Not Started
Launch L. Dizzy 1-Oct-13 Not Started
Support J. Bob 1-Nov-13 Not Started
Project Close Out R. Mack 1-Dec-13 Not Started
Key Risks Green
Title Owner Due Status
Risk Description #1 J. Bob 25-May-13 In Progress
Risk Description #2 R. Mack 26-Jul-13 In Progress
Risk Description #3 D. Hoff 3-Nov-13 In Progress
Risk Description #4 I. Manning 15-Nov-13 In Progress
Risk Description #5 L. Dizzy 1-Dec-13 In Progress
Key Issues Green
Title Owner Due Status
Issue Description #1 S. Queue 1-Jul-13 In Progress
Issue Description #2 I. Manning 13-Aug-13 In Progress
Issue Description #3 L. Dizzy 17-Sep-13 In Progress
Issue Description #4 R. Mack 3-Oct-13 In Progress
Issue Description #5 D. Hoff 18-Oct-13 In Progress
24
This is a report capturing the
current status of the project. It
will help you in achieving
clarity about the completion of
the project & would enable
you to focus on the risk &
issues associated with the
project
Project Health Card
Schedule
The Project Schedule Is On Track
Resourcing Is Adequate.
Resourcing
Project Is Within Budget
Budget
Risks
All Project Risks Are In Control.
Project Issues Need Attention.
Issues
Project Benefits Are Off Track And Need To Be Fixed.
Benefits
Overall project
status is Green.
25
This covers the overall
project status of different
factors associated with the
project, you can alter them
as per your requirements
Coffee
Break
26
Project Brief Icon Slide
27
Chart &
Graphs
28
Clustered Column
20
35
26
46
0
10
20
30
40
50
Jan Feb Mar Apr
Profit
(In
percentage)
✓ Product 1
15
26
38
48
0
10
20
30
40
50
Jan Feb Mar Apr
Profit
(In
percentage)
✓ Product 2
This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”.
29
Stacked Column
40 40 60 80 100 120 140
180 200
90 110
140
170
206
230
260
270
370
0
50
100
150
200
250
300
350
400
450
500
550
600
FY 01 FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09
In
million
✓ Product 1 ✓ Product 2
This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”.
30
Scatter Bubble Chart
12
10
30
50
48
43
25
23
$0.00
$10.00
$20.00
$30.00
$40.00
$50.00
$60.00
0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50%
In
price
5%
15%
20%
22%
32%
40%
46%
35%
Highest
Sale
This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”.
✓ Product 1 ✓ Product 2
31
Filled Rader
0
5
10
15
20
25
30
35
05/02/2017
05/07/2017
05/12/2017
05/16/2017
05/22/2017
✓ Product 1
This slide is 100% editable. Adapt it to
your needs and capture your
audience's attention.
✓ Product 2
This slide is 100% editable. Adapt it to
your needs and capture your
audience's attention.
This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”.
32
Stacked Line
0
10
20
30
40
50
60
Task1 Task2 Task3 Task4 Task5 Task6 Task7 Task8 Task9 Task10 Task11 Task12
In
million
✓ Product 1
This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”.
33
Area Chart
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Dec
Nov
Oct
Sep
Aug
Jul
Jun
May
Apr
Mar
Feb
Jan
In
percentage
✓ Product 1
This slide is 100% editable. Adapt it to
your needs and capture your
audience's attention.
✓ Product 2
This slide is 100% editable. Adapt it to
your needs and capture your
audience's attention.
This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”.
34
Additional
Slides
35
Our Mission
Our Vision
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Our Mission
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Our Goal
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
36
37
Our
Team
Sofia
Banks
John
Smith
Tomas
Cross
General Manager
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
CEO
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Graphic Designer
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
38
About Us
This slide is 100% editable. Adapt it to
your needs and capture your
audience's attention.
Target Audiences
This slide is 100% editable. Adapt it to
your needs and capture your
audience's attention.
Preferred by Many
39
Our Main
Goal
✓ This slide is 100% editable. Adapt it to your needs and capture your
audience's attention.
✓ This slide is 100% editable. Adapt it to your needs and capture your
audience's attention.
✓ This slide is 100% editable. Adapt it to your needs and capture your
audience's attention.
Comparison
3 in 5 2 in 5
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Male This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Female
40
Dashboard
This slide is 100% editable.
Adapt it to your needs and
capture your audience's
attention.
80%
High
This slide is 100% editable.
Adapt it to your needs and
capture your audience's
attention.
65%
Medium
This slide is 100% editable.
Adapt it to your needs and
capture your audience's
attention.
40%
Medium
41
Location
40%
Canada
This slide is 100% editable.
Adapt it to your needs and
capture your audience's
attention.
80%
Africa
This slide is 100% editable.
Adapt it to your needs and
capture your audience's
attention.
50%
Russia
This slide is 100% editable.
Adapt it to your needs and
capture your audience's
attention.
20%
This slide is 100% editable.
Adapt it to your needs and
capture your audience's
attention.
42
In Order To Inspire
People, That’s Going To
Have To Come From
Somewhere Deep
Inside Of You.
…Jeff Weiner
Quotes
43
85%
This slide is 100% editable.
Adapt it to your needs and
capture your audience's
attention.
Maximum
75%
This slide is 100% editable.
Adapt it to your needs and
capture your audience's
attention.
Medium
60%
This slide is 100% editable.
Adapt it to your needs and
capture your audience's
attention.
Minimum
44
Financial
Timeline
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
01
05
02
06
03
07
04
2013
2014 2016 2018
2019
2017
2015
Start End
45
✓ This slide is 100% editable. Adapt it to your needs
and capture your audience's attention.
✓ This slide is 100% editable. Adapt it to your needs
and capture your audience's attention.
✓ This slide is 100% editable. Adapt it to your needs
and capture your audience's attention.
✓ This slide is 100% editable. Adapt it to your needs
and capture your audience's attention.
Target
46
Puzzle
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
01
04
03
02
47
Mind Map
83% 99%
This slide is 100% editable.
Adapt it to your needs and
capture your audience ‘s
attention.
This slide is 100% editable.
Adapt it to your needs and
capture your audience ‘s
attention.
48
Hierarchy
CEO
Marketing Head HR Head Finance Head
Team Leader
Staff
Asst. Manager Team Leader
Staff
Staff
Staff
Staff
Staff
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
49
Venn
This slide is 100% editable.
Adapt it to your needs and capture
your audience's attention.
This slide is 100% editable.
Adapt it to your needs and capture
your audience's attention.
This slide is 100% editable.
Adapt it to your needs and capture
your audience's attention.
25%
75%
35%
50
Silhouettes
This slide is 100% editable. Adapt it to
your needs and capture your audience's
attention.
This slide is 100% editable. Adapt it to
your needs and capture your audience's
attention.
This slide is 100% editable. Adapt it to
your needs and capture your audience's
attention.
This slide is 100% editable. Adapt it to
your needs and capture your audience's
attention.
This slide is 100% editable. Adapt it to
your needs and capture your audience's
attention.
This slide is 100% editable. Adapt it to
your needs and capture your audience's
attention.
Age 25-
43
Age 23-
42
Woman’s
Man’s
51
Post It
Text Here Text Here
Text Here Text Here
✓ This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
✓ This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
✓ This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
✓ This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
52
✓ This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
✓ This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
✓ This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
Magnifying
Glass
T e x t
H e r e
53
Idea or Bulb
✓ This slide is 100% editable. Adapt it to your needs and
capture your audience ‘s attention.
✓ This slide is 100% editable. Adapt it to your needs and
capture your audience ‘s attention.
✓ This slide is 100% editable. Adapt it to your needs and
capture your audience ‘s attention.
✓ This slide is 100% editable. Adapt it to your needs and
capture your audience ‘s attention.
54
Thank You
Address
# street number, city, state
Contact Numbers:
0123456789
Email Address:
emailaddress@gmail.com
55

Project Brief Powerpoint Presentation Slides

  • 1.
  • 2.
    Content Project Brief Project Description Risk Identification Risk Management Report Project ManagementTeam Project Timeline Risk Assessment Task Matrix Risk Tracker Activities Sequence Communication Plan Roles & Responsibilities Project Work Plan Project Progress Summary Project Management Gantt Chart Project Task List Project Management Dashboard 2
  • 3.
    Project Brief Title TypeYour Text Here Date MM/DD/YY Clients/ Organization Details This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Text Here Text Here Introduction/ Overview This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Text Here Text Here Project Objectives This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Text Here Text Here Project Scope This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Text Here Text Here Target Audience This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Text Here Text Here Success Factors This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Text Here Text Here Budget Details The project budget is estimated to cost $20000 Text Here Text Here 3
  • 4.
    Project Description PROJECT TITLE: 01 02 03 04 05 Thisslide is 100% editable. Adapt it to your needs and capture your audience's attention. Description This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Description This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Description This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Description This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Description 4 Describe in detail, what the project is all about
  • 5.
    Type Of RiskJeopardy Description of the Risk Expectation of the Risk Impact of the Risk (1 to 10) Severity of the Risk (Expectation x Impact) Contigencies/ Plan of Acton Delay of critical resource Budget Schedule No Funds available until XYZ individual is located Contact organization to locate XYZ individual Delay getting additional data Schedule Contractor is currently searching for it Focus on task not additional contingency required Extra Project Asset Schedule Resources Can’t obtain any extra Assest Not necessary at this time Risk Identification 1 10 1 10 1 10 63 21 10 70 20 30 5 For effectively managing a project, it is important to identify all the possible risk elements which might get associated with it. Below is a template which you can use to list down all the possible types of risk and mention there possible impact on the project
  • 6.
    Risk Management Report 6 Typesof Risk Insignificant Minor Moderate Major Severe Delay of critical resource Delay in getting additional data Schedule overruns Poor Communication Skills gap High Low Medium Critical Once the identification of risk is completed, you can list down the level of impact these risk factors would have on the project using this template below
  • 7.
    Project Management Team PutText Here 7 For effectively managing a project, it is important to identify all the possible risk elements which might get associated with it. Below is a template which you can use to list down all the possible types of risk and mention there possible impact on the project
  • 8.
    Roles & Responsibilities Project Deliverable (orActivity) R - Responsible A - Accountable C - Contributing I - Informed Project Leadership Project Team Members Project Sub- Teams External Resources Executive Sponsor Project Sponsor Steering Committe Advisory Committe Role #5 Project Manager Tech Lead Functional Lead SME Project Team Member Developer Administra tive Support Business Analyst Role #4 Role #5 Consultant PMO Role #3 Role #4 Initial Phase Activities Request Review by PMO A/C R/A R/A A/C C Submit Project Request R A Research Solution I R/A A/C A/C C C Develop Business Case I A/C I I R/A C C C C C C Plan Phase Activities Create Project Charter C C R/A C C C C C Create Schedule I I I I R/A C C C C C C I Create Additional Plans as Required I I I R/A I I C I Execute Phase Activities Build Deliverables C/I C/I C/I C/I R/A R/A R/A R/A A/C Create Status Report I I I I R/A R/A R/A R/A C I Control Phase Activities Perform Change Management C C C R A A A C I Close Phase Activities Create Lessions Learned C C C C R/A C C C C C C C C C Create Project Closure Report I I I I R/A I I I I I I I I R O L E 8 Mention the roles & responsibilities of the project team with respect to all the project deliverables using this table
  • 9.
    Project Work Plan Month2018 January February March April May June July August September October November December 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 9 This slide covers the entire work plan of the project split across different months and is also highlighting the degree of completion. You can alter it as per your requirements
  • 10.
    Project Management GanttChart 02-Jan 09-Jan 16-Jan 23-Jan 30-Jan 06-Feb 13-Feb 20-Feb 27-Feb 05-Mar Task 1 1/2/12 35 26% Sub Task 1.1 1/2/12 10 40% Sub Task 1.2 1/12/12 25 20% Task 2 1/2/12 66 88% Sub Task 2.1 1/2/12 30 100% Sub Task 2.2 2/1/12 25 80% Sub Task 2.3 2/27/12 10 70% Task 3 1/2/12 10 40% Sub Task 3.1 1/2/12 10 40% 2018 Tasks Start Duration (Days) % Complete 10 This a Gantt chart representing the various tasks to be performed along with there duration and degree of completion, you can use it as per the need
  • 11.
    Project Management GanttChart (2/2) Start Duration Budget Start Duration Budget Activity % 03 10 17 24 31 07 14 22 28 07 14 21 14 04 11 18 3-Jan 8 $963 3-Jan 4 $972 Activity 1 95% 11-Jan 11 $1,120 7-Jan 4 $1,516 Activity 2 34% 18-Jan 11 $1,582 19-Jan 2 $1,792 Activity 3 52% 21-Jan 2 $360 21-Jan 11 $339 Activity 4 29% 1-Feb 2 $100 1-Feb 13 $372 Activity 5 64% 3-Feb 9 $1,230 9-Feb 5 $1,340 Activity 6 19% 8-Feb 1 $280 20-Feb 6 $272 Activity 7 24% 11-Feb 7 $1,000 28-Feb 11 $864 Activity 8 30% 19-Feb 3 $480 11-Mar 4 $552 Activity 9 39% 28-Feb 2 $393 20-Mar 1 $366 Activity 10 12% Plan Actual Jan Feb Mar Apr 2018 11 This a Gantt chart representing the various activities to be performed along with there duration and degree of completion, you can use it as per the need
  • 12.
    Project Task List ProjectStart ! 1/1/2017 Project Task Priority Start Plan End Actual End % Complet e Project Start Days To Start Complet e Incomple te Stop Page Plan Days Project 1 Task 1 Description High 1/5/2017 1/15/2017 1/15/2017 50% 1/1/2017 4 5 5 0 10 Task 2 Description Medium 1/10/2017 1/17/2017 1/23/2017 100% 1/1/2017 9 7 0 6 7 Project 2 Task 1 Title Low 2/15/2017 2/28/2017 3/10/2017 30% 1/1/2017 45 3.9 9.1 10 13 Task 2 Title High 1/7/2017 2/1/2017 2/5/2017 50% 1/1/2017 6 12.5 12.5 4 25 Project 3 Task A Low 2/15/2017 2/18/2017 30% 1/1/2017 45 0.9 2.1 0 3 Task B Low 2/25/2017 3/7/2017 1/1/2017 55 0 10 0 10 Task C Low 3/10/2017 3/22/2017 1/1/2017 68 0 12 0 12 1/1/2017 0 0 0 0 0 1/1/2017 0 0 0 0 0 12
  • 13.
    Project Task List PROJECT1 Task 1 Description Task 2 Description PROJECT 2 Task 1 Title Task 2 Title PROJECT 3 Task A Task B Task C Complete Incomplete Slippage Jan 1, 2018 Jan 29, 2018 Feb 26, 2018 Mar 26, 2018 13
  • 14.
    Project Timeline Task Name Jan FebMar Apr May Jun July Aug Sept Oct Nov Dec Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Milestones Jan 10 1 Mar 7 2 Mar 10 3 Jun 29 4 Oct 20 5 Nov 30 6 Jan 5 - Mar 1 Oct 21 - Nov 15 Mar14 - May 2 Feb 2 - Mar14 Nov 16 - Dec 20 Mar 25 - Oct 20 14 This slide covers the timeline of the entire project, you can use it as per your requirements
  • 15.
    Activities Sequence ID ActivityDescription of Work Follow WBS of schedule Activity Name Description of activity in enough detail so that the person(s) performing the work understands what is required to complete it. Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Project Acronym Customer Name Activity List Worksheet Project ID No. Your Logo 15 Prepare an activity sequence listing down the work which needs to be performed and its description
  • 16.
    Risk Assessment Red areaindicates ‘yes’, we need to develop a Risk Management Plan Yellow area indicates ‘iffy’, answer on a case by case basis Green area indicates ‘no’, don’t develop a Risk Management Plan Degree of Impact Probability of Occurrence Medium High High Low Medium 16 Assess the level of impact the risk factors would have and there probability of occurrence while implementing the project
  • 17.
    Risk Tracker Date ofLast Review ID Description of Risk Impact Risk Response Risk Level Risk Owner Notes 1 Supplier Delay Pushes launch Confirm Delivery dates by phase 2 High Clarissa 2 Factory Availability Cost overruns Stakeholder trip to china High Dave, Rajesh & Nina 3 Steerine Committee Unavailable Delay launch Marketing Define Marketing Plans in March Low Tyrell 17 Below is the template which could be used to track the risk factors and how we are planning to overcome the same
  • 18.
    Communication Plan Communicate whatPurpose Frequency/ Distribution Communicate to Team Stakeholders Communication method Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here 18 This is another way of maintain a communication plan for the project
  • 19.
    Task Matrix Function /Role Main Tasks Competencies Responsibilities Client Contribution to company development , point of project view Project Assignment Company’s interest (overall responsibility), Compatibility of the project with company strategy Project Manager Project planning & organization of the project resources, coordination of tasks Signature authority up to xxx dollar (predefined max. amount Schedule goals, cost targets & quality objectives, Evaluation of results Project Employee Deadlines work package content, Support of planning Task related competence Professionalism Project Committee Expertise, Support of planning, Interface Management Recommendations, decisions, guidelines Conflict & Problem Solving Professionalism 19 List down all the tasks and the responsibilities in the below table which would help in the execution of the project
  • 20.
    Project Cost Estimate WBSItems #Units/Hrs. Cost/Unit/Hr. Sub Totals WBS Level 1 Totals % of Total Project Management $306,300 20% Project Manager 960 $100 $96,000 Project Team members 1920 $75 $144,000 Contractors (10% of software development and testing) $66,300 Hardware $76,000 5% Handheld devices 100 $600 $60,000 Servers 4 $4,000 $16,000 Software $614,000 40% Licensed software 100 $200 $20,0000 Software development* $594,000 Testing (10% of total hardware & software costs) $69,000 $69,000 5% Training and Support $202,400 13% Trainee cost 100 $500 $50,000 Travel Cost 12 $700 $8,400 Project team members 1920 $75 $144,000 Reserves (20% of total estimate) $253,540 $253,540 17% Total Project Cost estimate $1,521,240 20 This slide covers the cost estimates split across different sections which would be involved while bringing the project in to action. You can modify these sections and estimates as per the requirements
  • 21.
    Project Progress Summary ProjectDeliverable(s) Cost/ Hours Status Priority Deadline Task Assignee Description Deliverable % Done Fixed Cost Est. Hrs Actual Hrs Project Name X High 8/27/18 Task Details of task here 100% $ X High 8/27/18 Task 50% $ Low 10/11/18 Task 0% $ Project Name Project Name Project Name 21 This template covers the broad summary of the entire project to highlight the completion level, its priority and the cost associated with these tasks. You can se this as per your requirements
  • 22.
    Project Management Dashboard Overall Task Status Complete Overdue In-Progress Not Started 5 2 4 Decisions Actions Change Requests Pending Items 20,00030,00040,00050,00060,00070,00080,00090,000 Planned Actual Budget Tasks Assigned To Priority Status Set kick-off meeting Alex B. Complete Agree on objectives Frank C. Complete Detailed Reqs. Jacob S. Complete Hardware Reqs. Jacob S. Overdue Final Resource Plan Jacob S. In progress Staffing Alex B. In progress Technical Reqs. Frank C. Not started Testing Kennedy K. Not started Dev. Complete Jacob S. Not started Hardware Config. Alex B. Not started System Testing Kennedy K. Not started Launch 9/2 9/7 9/12 9/17 9/22 9/27 10/2 10/7 10/12 Set Kick-off-Meeting Agree on Objectives Detailed Reqs. Hard ward Reqs. Final Resource Plan Staffing Technical Reqs. Testing Dev. Complete Hard ward Config. System Testing Launch 22 This is a graphical presentation to understand the overall management of the project and to analyse the budget as well as the timelines of the project
  • 23.
    Project Issues Management IssueManagement Log Project Name <Optional> National Center <Required> Project Manager Name <Required> Project Description <Required> ID Current Status Priority Issue Description Assigned To Owner Expected Resolution Date Escalation Required (Y/N) Open Critical Example: Issues raised by board members about the financial viability of the project are preventing the project from moving forward as planned Yes Work In Progress High Example: The project is short on a specific skill set No Closed Medium Example: Negotiations with functional managers in a n organization competing for scarce human resources are forecasted to delay project completion Yes Low 23 This is a graphical presentation to understand the overall management of the project and to analyse the budget as well as the timelines of the project
  • 24.
    Project Status Report ProjectManager Billy Bob Brother Project Sponsor Big Boss Man Project Title Here Project Start Date January 1, 2013 Project End Date December 31, 2013 Project Description/ Scope Statement This is the Description of the Project. Project Path Yellow Title Owner Due Status Project Approval J. Bob 1-Jan-13 Complete Planning R. Mack 1-Mar-13 Complete Design D. Hoff 1-May-13 In Progress Development S. Queue 1-Jul-13 Not Started Training I. Manning 1-Sep-13 Not Started Launch L. Dizzy 1-Oct-13 Not Started Support J. Bob 1-Nov-13 Not Started Project Close Out R. Mack 1-Dec-13 Not Started Key Risks Green Title Owner Due Status Risk Description #1 J. Bob 25-May-13 In Progress Risk Description #2 R. Mack 26-Jul-13 In Progress Risk Description #3 D. Hoff 3-Nov-13 In Progress Risk Description #4 I. Manning 15-Nov-13 In Progress Risk Description #5 L. Dizzy 1-Dec-13 In Progress Key Issues Green Title Owner Due Status Issue Description #1 S. Queue 1-Jul-13 In Progress Issue Description #2 I. Manning 13-Aug-13 In Progress Issue Description #3 L. Dizzy 17-Sep-13 In Progress Issue Description #4 R. Mack 3-Oct-13 In Progress Issue Description #5 D. Hoff 18-Oct-13 In Progress 24 This is a report capturing the current status of the project. It will help you in achieving clarity about the completion of the project & would enable you to focus on the risk & issues associated with the project
  • 25.
    Project Health Card Schedule TheProject Schedule Is On Track Resourcing Is Adequate. Resourcing Project Is Within Budget Budget Risks All Project Risks Are In Control. Project Issues Need Attention. Issues Project Benefits Are Off Track And Need To Be Fixed. Benefits Overall project status is Green. 25 This covers the overall project status of different factors associated with the project, you can alter them as per your requirements
  • 26.
  • 27.
  • 28.
  • 29.
    Clustered Column 20 35 26 46 0 10 20 30 40 50 Jan FebMar Apr Profit (In percentage) ✓ Product 1 15 26 38 48 0 10 20 30 40 50 Jan Feb Mar Apr Profit (In percentage) ✓ Product 2 This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”. 29
  • 30.
    Stacked Column 40 4060 80 100 120 140 180 200 90 110 140 170 206 230 260 270 370 0 50 100 150 200 250 300 350 400 450 500 550 600 FY 01 FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 In million ✓ Product 1 ✓ Product 2 This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”. 30
  • 31.
    Scatter Bubble Chart 12 10 30 50 48 43 25 23 $0.00 $10.00 $20.00 $30.00 $40.00 $50.00 $60.00 0%5% 10% 15% 20% 25% 30% 35% 40% 45% 50% In price 5% 15% 20% 22% 32% 40% 46% 35% Highest Sale This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”. ✓ Product 1 ✓ Product 2 31
  • 32.
    Filled Rader 0 5 10 15 20 25 30 35 05/02/2017 05/07/2017 05/12/2017 05/16/2017 05/22/2017 ✓ Product1 This slide is 100% editable. Adapt it to your needs and capture your audience's attention. ✓ Product 2 This slide is 100% editable. Adapt it to your needs and capture your audience's attention. This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”. 32
  • 33.
    Stacked Line 0 10 20 30 40 50 60 Task1 Task2Task3 Task4 Task5 Task6 Task7 Task8 Task9 Task10 Task11 Task12 In million ✓ Product 1 This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”. 33
  • 34.
    Area Chart 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Dec Nov Oct Sep Aug Jul Jun May Apr Mar Feb Jan In percentage ✓ Product1 This slide is 100% editable. Adapt it to your needs and capture your audience's attention. ✓ Product 2 This slide is 100% editable. Adapt it to your needs and capture your audience's attention. This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”. 34
  • 35.
  • 36.
    Our Mission Our Vision Thisslide is 100% editable. Adapt it to your needs and capture your audience's attention. Our Mission This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Our Goal This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 36
  • 37.
    37 Our Team Sofia Banks John Smith Tomas Cross General Manager This slideis 100% editable. Adapt it to your needs and capture your audience's attention. CEO This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Graphic Designer This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
  • 38.
    38 About Us This slideis 100% editable. Adapt it to your needs and capture your audience's attention. Target Audiences This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Preferred by Many
  • 39.
    39 Our Main Goal ✓ Thisslide is 100% editable. Adapt it to your needs and capture your audience's attention. ✓ This slide is 100% editable. Adapt it to your needs and capture your audience's attention. ✓ This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
  • 40.
    Comparison 3 in 52 in 5 This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Male This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Female 40
  • 41.
    Dashboard This slide is100% editable. Adapt it to your needs and capture your audience's attention. 80% High This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 65% Medium This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 40% Medium 41
  • 42.
    Location 40% Canada This slide is100% editable. Adapt it to your needs and capture your audience's attention. 80% Africa This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 50% Russia This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 20% This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 42
  • 43.
    In Order ToInspire People, That’s Going To Have To Come From Somewhere Deep Inside Of You. …Jeff Weiner Quotes 43
  • 44.
    85% This slide is100% editable. Adapt it to your needs and capture your audience's attention. Maximum 75% This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Medium 60% This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Minimum 44 Financial
  • 45.
    Timeline This slide is100% editable. Adapt it to your needs and capture your audience's attention. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 01 05 02 06 03 07 04 2013 2014 2016 2018 2019 2017 2015 Start End 45
  • 46.
    ✓ This slideis 100% editable. Adapt it to your needs and capture your audience's attention. ✓ This slide is 100% editable. Adapt it to your needs and capture your audience's attention. ✓ This slide is 100% editable. Adapt it to your needs and capture your audience's attention. ✓ This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Target 46
  • 47.
    Puzzle This slide is100% editable. Adapt it to your needs and capture your audience's attention. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 01 04 03 02 47
  • 48.
    Mind Map 83% 99% Thisslide is 100% editable. Adapt it to your needs and capture your audience ‘s attention. This slide is 100% editable. Adapt it to your needs and capture your audience ‘s attention. 48
  • 49.
    Hierarchy CEO Marketing Head HRHead Finance Head Team Leader Staff Asst. Manager Team Leader Staff Staff Staff Staff Staff This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 49
  • 50.
    Venn This slide is100% editable. Adapt it to your needs and capture your audience's attention. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 25% 75% 35% 50
  • 51.
    Silhouettes This slide is100% editable. Adapt it to your needs and capture your audience's attention. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Age 25- 43 Age 23- 42 Woman’s Man’s 51
  • 52.
    Post It Text HereText Here Text Here Text Here ✓ This slide is 100% editable. Adapt it to your needs and capture your audience's attention. ✓ This slide is 100% editable. Adapt it to your needs and capture your audience's attention. ✓ This slide is 100% editable. Adapt it to your needs and capture your audience's attention. ✓ This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 52
  • 53.
    ✓ This slideis 100% editable. Adapt it to your needs and capture your audience's attention. ✓ This slide is 100% editable. Adapt it to your needs and capture your audience's attention. ✓ This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Magnifying Glass T e x t H e r e 53
  • 54.
    Idea or Bulb ✓This slide is 100% editable. Adapt it to your needs and capture your audience ‘s attention. ✓ This slide is 100% editable. Adapt it to your needs and capture your audience ‘s attention. ✓ This slide is 100% editable. Adapt it to your needs and capture your audience ‘s attention. ✓ This slide is 100% editable. Adapt it to your needs and capture your audience ‘s attention. 54
  • 55.