Production Schedule
Date What needs to be done Location By Who Equipment Needed Examples of work…
Pre-
production
Pre-production Pre-
production
Pre-production Pre-production Pre-production
Week of 9th
November
 Genre Research using a
prezi.
 Initial ideas.
Ringwood
school
Eleanor Penfold Computer, blogge.
Week of 14th
November
 Music video analysis
 Ideas drafting
 Target audience
 Digipak and poster
analysis
Ringwood
School
Eleanor Penfold Computer, blogger.
The week of
21rd
November
 Annotated lyrics
 Scripts/storyboards
 Shot list
Ringwood
School
Eleanor Penfold Computer and
blogger.
The Week of
28th
November
 Reece photos
 Floor plan
 Costume, actors and
prop
Ringwood
School
Eleanor Penfold Computer and
blogger.
The Week of
5th
December
 Complete the layout for
this production schedule.
Ringwood
school
Eleanor Penfold Computer and
blogger.
Dead line of Dead line of the above is on Dead line of Dead line of the Dead line of the Dead line of the above is on Friday 9h
the above is
on Friday 9th
of
December.
Friday 9th
of December. the above is
on Friday 9h
of
December.
above is on Friday
9th
of December.
above is on Friday
9th
of December.
of December.
Production Production Production Production Production Production
Friday 6TH
of
January
Go to location Sandy Hill Eleanor Penfold Actors, script, floor
plan, and crew.
Saturday 7th
of January
Part one of filming Sandy Hill Eleanor Penfold Camera, lighting,
actors, script, floor
plan, and crew.
Costume… All
costume will be
required: dress,
jewellery, shoes,
smoke, wings and
makeup e.c.t
Sunday 8th
of
January
Part two of filming Bournemouth
Beach
Eleanor Penfold Camera, lighting,
actors, script, floor
plan, and crew.
Costume… All
costume will be
required: dress,
jewellery, shoes,
makeup e.c.t
Saturday 14th
of January
Part three of filming Studio Eleanor Penfold Camera, lighting,
actors, script, floor
plan, and crew.
Costume… All
costume will be
required: dress,
jewellery, shoes,
makeup e.c.t
Monday 11th
of January
Upload blog entries include:
 Video blog
 Images of filming
 Outtakes
 Rehearsals
Ringwood
School
Eleanor Penfold Blogger, camera,
stand, perhaps
actors, computer.
Post-
Production
Post-Production Post-
Production
Post-Production Post-Production Post-Production
Friday 13th
January
 Start editing all my work.
 Upload into blogger the
process and procedure
of what I am doing.
 Complete a step
breakdown of the editing
process and any special
effects I have added.
Ringwood
School
Eleanor Penfold Computer, blogger
and Adobe Premier
Pro
The week of
the 16th
of
January
 Continue with editing all
my video footage.
Complete a colour
grading test.
 Complete a step
breakdown of the editing
process and any special
effects I have added.
 Lip sync test
Ringwood
School
Eleanor Penfold Computer, blogger
and Adobe Premier
Pro
The week of
the 23th
of
January
 Continue with editing all
my media video footage.
 Complete a step
breakdown of the editing
process and any special
effects I have added.
 How you
made/inserted your
titles and fonts chosen
 Digipack analyses
Ringwood
School
Eleanor Penfold Computer, blogger
and Adobe Premier
Pro
The week of
the 5th
of
February
 Complete all editing in
regards to my creating
my film.
 Finalize my step
breakdown of the editing
process and any special
effects I have added.
Ringwood
School
Eleanor Penfold Computer and
blogger
Evaluation… Evaluation… Evaluation… Evaluation… Evaluation… Evaluation…
The week
beginning
13nd
of
February
 Design digipack
and poster
Ringwood
school
Eleanor Penfold Computer, blogger
and peer
involvement.
The week
beginning
27th
of
February
 Final watching of music
videos
 Upload music video onto
blogger
 Complete digipack and
poster
Ringwood
school
Eleanor Penfold Computer and
blogger
The week
beginning 6th
March
 Complete evaluation
question 1
 Complete digipack poster
and start evaluation
question one
Ringwood
School
Eleanor Penfold Computer and
blogger
The week
beginning
13th
of March
 Complete evaluation
question 2
Ringwood
School
Eleanor Penfold Computer and
blogger
The week
beginning
 Complete question 3 and Ringwood
School
Eleanor Penfold Computer and
blogger
20st
of March 4
Deadline by
24th
March
2016
Deadline by 24th
March 2016 Deadline by
24th
March
2016
Deadline by 24th
March 2016
Deadline by 24th
March 2016
Deadline by 24th
March 2016

Production schedule

  • 1.
    Production Schedule Date Whatneeds to be done Location By Who Equipment Needed Examples of work… Pre- production Pre-production Pre- production Pre-production Pre-production Pre-production Week of 9th November  Genre Research using a prezi.  Initial ideas. Ringwood school Eleanor Penfold Computer, blogge. Week of 14th November  Music video analysis  Ideas drafting  Target audience  Digipak and poster analysis Ringwood School Eleanor Penfold Computer, blogger.
  • 2.
    The week of 21rd November Annotated lyrics  Scripts/storyboards  Shot list Ringwood School Eleanor Penfold Computer and blogger. The Week of 28th November  Reece photos  Floor plan  Costume, actors and prop Ringwood School Eleanor Penfold Computer and blogger. The Week of 5th December  Complete the layout for this production schedule. Ringwood school Eleanor Penfold Computer and blogger. Dead line of Dead line of the above is on Dead line of Dead line of the Dead line of the Dead line of the above is on Friday 9h
  • 3.
    the above is onFriday 9th of December. Friday 9th of December. the above is on Friday 9h of December. above is on Friday 9th of December. above is on Friday 9th of December. of December. Production Production Production Production Production Production Friday 6TH of January Go to location Sandy Hill Eleanor Penfold Actors, script, floor plan, and crew. Saturday 7th of January Part one of filming Sandy Hill Eleanor Penfold Camera, lighting, actors, script, floor plan, and crew. Costume… All costume will be required: dress, jewellery, shoes, smoke, wings and makeup e.c.t Sunday 8th of January Part two of filming Bournemouth Beach Eleanor Penfold Camera, lighting, actors, script, floor plan, and crew. Costume… All costume will be required: dress, jewellery, shoes, makeup e.c.t
  • 4.
    Saturday 14th of January Partthree of filming Studio Eleanor Penfold Camera, lighting, actors, script, floor plan, and crew. Costume… All costume will be required: dress, jewellery, shoes, makeup e.c.t Monday 11th of January Upload blog entries include:  Video blog  Images of filming  Outtakes  Rehearsals Ringwood School Eleanor Penfold Blogger, camera, stand, perhaps actors, computer. Post- Production Post-Production Post- Production Post-Production Post-Production Post-Production Friday 13th January  Start editing all my work.  Upload into blogger the process and procedure of what I am doing.  Complete a step breakdown of the editing process and any special effects I have added. Ringwood School Eleanor Penfold Computer, blogger and Adobe Premier Pro The week of the 16th of January  Continue with editing all my video footage. Complete a colour grading test.  Complete a step breakdown of the editing process and any special effects I have added.  Lip sync test Ringwood School Eleanor Penfold Computer, blogger and Adobe Premier Pro
  • 5.
    The week of the23th of January  Continue with editing all my media video footage.  Complete a step breakdown of the editing process and any special effects I have added.  How you made/inserted your titles and fonts chosen  Digipack analyses Ringwood School Eleanor Penfold Computer, blogger and Adobe Premier Pro The week of the 5th of February  Complete all editing in regards to my creating my film.  Finalize my step breakdown of the editing process and any special effects I have added. Ringwood School Eleanor Penfold Computer and blogger Evaluation… Evaluation… Evaluation… Evaluation… Evaluation… Evaluation… The week beginning 13nd of February  Design digipack and poster Ringwood school Eleanor Penfold Computer, blogger and peer involvement. The week beginning 27th of February  Final watching of music videos  Upload music video onto blogger  Complete digipack and poster Ringwood school Eleanor Penfold Computer and blogger The week beginning 6th March  Complete evaluation question 1  Complete digipack poster and start evaluation question one Ringwood School Eleanor Penfold Computer and blogger The week beginning 13th of March  Complete evaluation question 2 Ringwood School Eleanor Penfold Computer and blogger The week beginning  Complete question 3 and Ringwood School Eleanor Penfold Computer and blogger
  • 6.
    20st of March 4 Deadlineby 24th March 2016 Deadline by 24th March 2016 Deadline by 24th March 2016 Deadline by 24th March 2016 Deadline by 24th March 2016 Deadline by 24th March 2016