What is Process Validation?
Process Validation is defined as the collection
and evaluation of data, from the process
design stage throughout production, which
establishes scientific evidence that a process is
capable of consistently delivering quality
products
Definition
 Validation master Plan (VMP):
The validation master plan is a high level document that
establishes an umbrella validation plan for the entire project
and summarizes the manufacturers overall philosophy and
approach.
Qualification:
Documented evidence that premises, systems or equipments
are able to achieve the predefined specifications properly
installed, and/or work correctly and lead to the expected
results.
Validation:
Actions of proving and documenting that any process,
procedure or method actually and consistently lead to the
expected results.
Validation Master Plan (VMP)
1. Qualification and Validation
2. Planning for Validation
3. Documentation
4. Qualification
5. Process Validation
6. Cleaning Validation
7. Change Control
8. Revalidation
Elements Of Validation
Qualification is pre-requisite of validation. The qualification includes
the following:
1. Design Qualification (DQ):-
Mechanical drawings and design features provided by the
manufacturer of the equipment should be examined.
2. Installation Qualification (IQ):-
Installation qualification should be carried out on new or modified
facilities, systems and equipment. The following main points
should be includes in the installation qualification.
 Checking of installation of equipment, piping, services and
instrumentation.
 Collection of supplier’s operating working instructions and
maintenance requirements and their calibration requirements.
 Verification of materials of construction
 Sources of spares and maintenance
3. Operational Qualification (OQ):-
Operational qualification should include the following:
 Tests developed from the knowledge of the processes systems
and equipment
 Defining lower and upper operating limits,. Sometimes, these
are called ‘worst case’ conditions.
4. Performance Qualification (PQ):-
PQ should include the following:
 Tests using production materials, substitutes or simulated
product. These can be developed from the knowledge of the
process and facilities, systems or equipment.
 Tests to include conditions with upper and lower limits
Steps involved in the process validation
Types of Process Validation
 Prospective Validation: Prospective validation is performed in
a research and development lab on a small scale.
 Retrospective Validation: Retrospective validation is
performed after the dispatch of product in the market.
 Concurrent Validation: Concurrent validation is performed in
the production area after getting satisfying results of
prospective validation.
 Revalidation: This validation is conducted Whenever there are
changes in packaging, formulation, equipment or processes
which could have impact on product effectiveness or product
characteristics, there should be revalidation of the validated
process.
Prospective Validation
 Prospective validation is establishing
documented evidence that a system
performs as it is intended based on pre-
planned protocol.(Before process
implementation).
 Prospective validation is performed in a
research and development lab on a
small scale.
When To Perform
 Developing new products.
 Any change in the manufacturing process which
has a major effect on the product quality.
 before starting the routine batches of
production.
 stage of product development.
What to Do
 carried out in the research and development stage so its start from
developing formulation.
 Formulation of a new product is developed at this stage.
 Specification of raw materials are defined.
 Procedure for manufacturing is developed in the form of validation
protocol.
 Procedure for cleaning validation is defined.
 All the critical points are observed on risk based analysis.
 Process parameters like mixing time, drying time etc are defined and
adjusted to get desired results.
 Batch Manufacturing Record is prepared.
 Testing method for analyzing the product is developed.
 Sampling plan is prepared.
 Technology transfer documents are prepared.
 Environmental factors like temperature and humidity and storage
conditions are defined.
Results
 Usually three batches are manufactured at this stage
and all should produce desired results using the same
parameters.
 If we have to make changes in parameters of the first
batch to adjust the results, these changes are made
through proper change control procedure.
 The batch in which we make changes will not be
considered the validation batch.
 We will have to take the next three batches with the
same parameters to build confidence that our
procedures and methods are reliable.
Retrospective Validation
 Retrospective validation is documented evidence
that products manufactured in the pharmaceutical
industry using validated procedure maintain its
quality and purity in the market during the period
of its shelf life.
 Retrospective validation is performed after the
dispatch of product in the market.
What to Do?
 In the pharmaceutical industries the reference samples are withdrawn from
the finish product batches before its dispatch to the market.
 After the specified time period the sample is taken from the reference samples
and is tested.
 It is done to ensure that our product in the market is still meeting a quality
attribute during its shelf life.
 Following type of data is also collected during Retrospective validation,
 Number of batches manufactured for a defined period of time.
 Batch size
 Strength of the product.
 Manufacturing and expiry date of the product.
 Master documentation.
 List of deviations and corrective actions.
 Stability testing data for different batches.
 It is used for audits of validated processes.
Concurrent Validation
 The word concurrent can be remembered by a simple
word current, which means this type of validation is
performed on current production batches.
 Concurrent validation is performed in the production
area after getting satisfying results of prospective
validation.
 In concurrent validation the product is manufactured
in the production area using the production facility
and equipment.
When to Perform
 Product which has completed its prospective stage, is
validated in the production area during concurrent
validation.
 When there is a change in process which has no significant
effect on product quality.
 Change in a raw material source.
 Technical Transfer
 When there is change in equipment used.
 When there is only change in tablet strength and previous
strength was validated by the prospective validation and
change strength has the same ratio of API and Excipients.
What to Do?
 Before starting the concurrent validation it is ensured that
the operators involved in the manufacturing process are
trained.
 All the equipment, utility and systems are qualified.
 Three batches are manufactured to ensure the same
product quality.
 In concurrent validation all the critical parameters of
batches which are under manufacturing are observed.
 All the parameters are adjusted according to prospective
validation.
 Sampling plan is followed as provided by the product
development department.
Summery
 In concurrent validation we manufacture the
large scale batches using the same parameters
as manufactured in small scale during
prospective validation to ensure that our
process developed is capable of producing the
quality results.
 Samples are checked at specified time
intervals.
 Prospective validation is done for three
batches.
Re-Validation
 Validation is done once in the product life
cycle until there is no change in the product
manufacturing parameters.
 In some specific circumstances we have to
revalidate our products.
When To Re-validate
 change in critical parameters.
 change in product formulation.
 change in the product process.
 change in equipment.
 change in the facility.
 change in primary packaging.
 change in raw material density, particle size etc.
 Source change of API.
 Change in any process parameter like mixing time, drying temperature,
etc
 change in batch size.
 change in the plant.(Shifting from one plant to other)
 Periodically checking the validation results.
 When the product fails to meet the specification.

More Related Content

Similar to Process Validation.pptx

calibration-and-validation
calibration-and-validationcalibration-and-validation
calibration-and-validation
SUJITHA MARY
 
Vallidation
VallidationVallidation
Validation
ValidationValidation
Validation
Sripriyasekar1
 
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptx
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptxPharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptx
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptx
MariaSaifee
 
Pharmaceutical process validation (PV)
Pharmaceutical process validation (PV)  Pharmaceutical process validation (PV)
Pharmaceutical process validation (PV)
Guru Balaji .S
 
Pharmaceutical validation
Pharmaceutical validationPharmaceutical validation
Pharmaceutical validation
amol dighe
 
Pharmaceutical validation
Pharmaceutical validationPharmaceutical validation
Pharmaceutical validation
amol dighe
 
Seminar on validation by ranjeet singh
Seminar on validation by ranjeet singhSeminar on validation by ranjeet singh
Seminar on validation by ranjeet singh
Ranjeet Singh
 
Validation of pharmaceutical dosage form
Validation of pharmaceutical dosage formValidation of pharmaceutical dosage form
Validation of pharmaceutical dosage form
anurag chanda
 
Validation of Pharmaceutical Dosage Form
Validation of Pharmaceutical Dosage FormValidation of Pharmaceutical Dosage Form
Validation of Pharmaceutical Dosage Form
Diksha Kumari
 
Prospective Validation NSR.pdf
Prospective Validation NSR.pdfProspective Validation NSR.pdf
Process validation strategy
Process validation strategyProcess validation strategy
Process validation strategy
prashik shimpi
 
Process validation strategy
Process validation strategyProcess validation strategy
Process validation strategy
prashik shimpi
 
Process validation
Process validationProcess validation
Process validation
Md.Rakibul Islam
 
PHARMACEUTICAL VALIDATION
 PHARMACEUTICAL  VALIDATION PHARMACEUTICAL  VALIDATION
PHARMACEUTICAL VALIDATION
SACHIN C P
 
Pharmaceutical validation
Pharmaceutical validationPharmaceutical validation
Pharmaceutical validation
Mineeta Mahra
 
process validation anshul vishwakarma dra.pptx
process validation anshul vishwakarma  dra.pptxprocess validation anshul vishwakarma  dra.pptx
process validation anshul vishwakarma dra.pptx
Anshulvishwakarma10
 
Validation ( process validation, TT from R&D to pilot plant)
Validation ( process validation, TT from R&D to pilot plant)Validation ( process validation, TT from R&D to pilot plant)
Validation ( process validation, TT from R&D to pilot plant)
RushikeshPalkar1
 
VALIDATION BY DHIRAJ SHRESTHA
VALIDATION BY DHIRAJ SHRESTHAVALIDATION BY DHIRAJ SHRESTHA
VALIDATION BY DHIRAJ SHRESTHA
Dhiraj Shrestha
 
PHARMACEUTICAL VALIADATION
PHARMACEUTICAL VALIADATIONPHARMACEUTICAL VALIADATION
PHARMACEUTICAL VALIADATION
Yenda Manishankar
 

Similar to Process Validation.pptx (20)

calibration-and-validation
calibration-and-validationcalibration-and-validation
calibration-and-validation
 
Vallidation
VallidationVallidation
Vallidation
 
Validation
ValidationValidation
Validation
 
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptx
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptxPharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptx
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptx
 
Pharmaceutical process validation (PV)
Pharmaceutical process validation (PV)  Pharmaceutical process validation (PV)
Pharmaceutical process validation (PV)
 
Pharmaceutical validation
Pharmaceutical validationPharmaceutical validation
Pharmaceutical validation
 
Pharmaceutical validation
Pharmaceutical validationPharmaceutical validation
Pharmaceutical validation
 
Seminar on validation by ranjeet singh
Seminar on validation by ranjeet singhSeminar on validation by ranjeet singh
Seminar on validation by ranjeet singh
 
Validation of pharmaceutical dosage form
Validation of pharmaceutical dosage formValidation of pharmaceutical dosage form
Validation of pharmaceutical dosage form
 
Validation of Pharmaceutical Dosage Form
Validation of Pharmaceutical Dosage FormValidation of Pharmaceutical Dosage Form
Validation of Pharmaceutical Dosage Form
 
Prospective Validation NSR.pdf
Prospective Validation NSR.pdfProspective Validation NSR.pdf
Prospective Validation NSR.pdf
 
Process validation strategy
Process validation strategyProcess validation strategy
Process validation strategy
 
Process validation strategy
Process validation strategyProcess validation strategy
Process validation strategy
 
Process validation
Process validationProcess validation
Process validation
 
PHARMACEUTICAL VALIDATION
 PHARMACEUTICAL  VALIDATION PHARMACEUTICAL  VALIDATION
PHARMACEUTICAL VALIDATION
 
Pharmaceutical validation
Pharmaceutical validationPharmaceutical validation
Pharmaceutical validation
 
process validation anshul vishwakarma dra.pptx
process validation anshul vishwakarma  dra.pptxprocess validation anshul vishwakarma  dra.pptx
process validation anshul vishwakarma dra.pptx
 
Validation ( process validation, TT from R&D to pilot plant)
Validation ( process validation, TT from R&D to pilot plant)Validation ( process validation, TT from R&D to pilot plant)
Validation ( process validation, TT from R&D to pilot plant)
 
VALIDATION BY DHIRAJ SHRESTHA
VALIDATION BY DHIRAJ SHRESTHAVALIDATION BY DHIRAJ SHRESTHA
VALIDATION BY DHIRAJ SHRESTHA
 
PHARMACEUTICAL VALIADATION
PHARMACEUTICAL VALIADATIONPHARMACEUTICAL VALIADATION
PHARMACEUTICAL VALIADATION
 

Recently uploaded

2 December UAE National Day - United Arab Emirates
2 December UAE National Day - United Arab Emirates2 December UAE National Day - United Arab Emirates
2 December UAE National Day - United Arab Emirates
UAE Ppt
 
ACTIVE IMPLANTABLE MEDICAL DEVICE IN EUROPE
ACTIVE IMPLANTABLE MEDICAL DEVICE IN EUROPEACTIVE IMPLANTABLE MEDICAL DEVICE IN EUROPE
ACTIVE IMPLANTABLE MEDICAL DEVICE IN EUROPE
Charmi13
 
Disaster Management project for holidays homework and other uses
Disaster Management project for holidays homework and other usesDisaster Management project for holidays homework and other uses
Disaster Management project for holidays homework and other uses
RIDHIMAGARG21
 
Using-Presentation-Software-to-the-Fullf.pptx
Using-Presentation-Software-to-the-Fullf.pptxUsing-Presentation-Software-to-the-Fullf.pptx
Using-Presentation-Software-to-the-Fullf.pptx
kainatfatyma9
 
Prsentation for VIVA Welike project 1semester.pptx
Prsentation for VIVA Welike project 1semester.pptxPrsentation for VIVA Welike project 1semester.pptx
Prsentation for VIVA Welike project 1semester.pptx
prafulpawar29
 
Artificial Intelligence, Data and Competition – LIM – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – LIM – June 2024 OECD discussionArtificial Intelligence, Data and Competition – LIM – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – LIM – June 2024 OECD discussion
OECD Directorate for Financial and Enterprise Affairs
 
Genesis chapter 3 Isaiah Scudder.pptx
Genesis    chapter 3 Isaiah Scudder.pptxGenesis    chapter 3 Isaiah Scudder.pptx
Genesis chapter 3 Isaiah Scudder.pptx
FamilyWorshipCenterD
 
Pro-competitive Industrial Policy – OECD – June 2024 OECD discussion
Pro-competitive Industrial Policy – OECD – June 2024 OECD discussionPro-competitive Industrial Policy – OECD – June 2024 OECD discussion
Pro-competitive Industrial Policy – OECD – June 2024 OECD discussion
OECD Directorate for Financial and Enterprise Affairs
 
原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样
原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样
原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样
gpww3sf4
 
The Intersection between Competition and Data Privacy – OECD – June 2024 OECD...
The Intersection between Competition and Data Privacy – OECD – June 2024 OECD...The Intersection between Competition and Data Privacy – OECD – June 2024 OECD...
The Intersection between Competition and Data Privacy – OECD – June 2024 OECD...
OECD Directorate for Financial and Enterprise Affairs
 
The Intersection between Competition and Data Privacy – COLANGELO – June 2024...
The Intersection between Competition and Data Privacy – COLANGELO – June 2024...The Intersection between Competition and Data Privacy – COLANGELO – June 2024...
The Intersection between Competition and Data Privacy – COLANGELO – June 2024...
OECD Directorate for Financial and Enterprise Affairs
 
怎么办理(lincoln学位证书)英国林肯大学毕业证文凭学位证书原版一模一样
怎么办理(lincoln学位证书)英国林肯大学毕业证文凭学位证书原版一模一样怎么办理(lincoln学位证书)英国林肯大学毕业证文凭学位证书原版一模一样
怎么办理(lincoln学位证书)英国林肯大学毕业证文凭学位证书原版一模一样
kekzed
 
The Intersection between Competition and Data Privacy – KEMP – June 2024 OECD...
The Intersection between Competition and Data Privacy – KEMP – June 2024 OECD...The Intersection between Competition and Data Privacy – KEMP – June 2024 OECD...
The Intersection between Competition and Data Privacy – KEMP – June 2024 OECD...
OECD Directorate for Financial and Enterprise Affairs
 
The Intersection between Competition and Data Privacy – CAPEL – June 2024 OEC...
The Intersection between Competition and Data Privacy – CAPEL – June 2024 OEC...The Intersection between Competition and Data Privacy – CAPEL – June 2024 OEC...
The Intersection between Competition and Data Privacy – CAPEL – June 2024 OEC...
OECD Directorate for Financial and Enterprise Affairs
 
Gamify it until you make it Improving Agile Development and Operations with ...
Gamify it until you make it  Improving Agile Development and Operations with ...Gamify it until you make it  Improving Agile Development and Operations with ...
Gamify it until you make it Improving Agile Development and Operations with ...
Ben Linders
 
Artificial Intelligence, Data and Competition – OECD – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – OECD – June 2024 OECD discussionArtificial Intelligence, Data and Competition – OECD – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – OECD – June 2024 OECD discussion
OECD Directorate for Financial and Enterprise Affairs
 
Proposal: The Ark Project and The BEEP Inc
Proposal: The Ark Project and The BEEP IncProposal: The Ark Project and The BEEP Inc
Proposal: The Ark Project and The BEEP Inc
Raheem Muhammad
 
BRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdf
BRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdfBRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdf
BRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdf
Robin Haunschild
 
IEEE CIS Webinar Sustainable futures.pdf
IEEE CIS Webinar Sustainable futures.pdfIEEE CIS Webinar Sustainable futures.pdf
IEEE CIS Webinar Sustainable futures.pdf
Claudio Gallicchio
 
ServiceNow CIS-ITSM Exam Dumps & Questions [2024]
ServiceNow CIS-ITSM Exam Dumps & Questions [2024]ServiceNow CIS-ITSM Exam Dumps & Questions [2024]
ServiceNow CIS-ITSM Exam Dumps & Questions [2024]
SkillCertProExams
 

Recently uploaded (20)

2 December UAE National Day - United Arab Emirates
2 December UAE National Day - United Arab Emirates2 December UAE National Day - United Arab Emirates
2 December UAE National Day - United Arab Emirates
 
ACTIVE IMPLANTABLE MEDICAL DEVICE IN EUROPE
ACTIVE IMPLANTABLE MEDICAL DEVICE IN EUROPEACTIVE IMPLANTABLE MEDICAL DEVICE IN EUROPE
ACTIVE IMPLANTABLE MEDICAL DEVICE IN EUROPE
 
Disaster Management project for holidays homework and other uses
Disaster Management project for holidays homework and other usesDisaster Management project for holidays homework and other uses
Disaster Management project for holidays homework and other uses
 
Using-Presentation-Software-to-the-Fullf.pptx
Using-Presentation-Software-to-the-Fullf.pptxUsing-Presentation-Software-to-the-Fullf.pptx
Using-Presentation-Software-to-the-Fullf.pptx
 
Prsentation for VIVA Welike project 1semester.pptx
Prsentation for VIVA Welike project 1semester.pptxPrsentation for VIVA Welike project 1semester.pptx
Prsentation for VIVA Welike project 1semester.pptx
 
Artificial Intelligence, Data and Competition – LIM – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – LIM – June 2024 OECD discussionArtificial Intelligence, Data and Competition – LIM – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – LIM – June 2024 OECD discussion
 
Genesis chapter 3 Isaiah Scudder.pptx
Genesis    chapter 3 Isaiah Scudder.pptxGenesis    chapter 3 Isaiah Scudder.pptx
Genesis chapter 3 Isaiah Scudder.pptx
 
Pro-competitive Industrial Policy – OECD – June 2024 OECD discussion
Pro-competitive Industrial Policy – OECD – June 2024 OECD discussionPro-competitive Industrial Policy – OECD – June 2024 OECD discussion
Pro-competitive Industrial Policy – OECD – June 2024 OECD discussion
 
原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样
原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样
原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样
 
The Intersection between Competition and Data Privacy – OECD – June 2024 OECD...
The Intersection between Competition and Data Privacy – OECD – June 2024 OECD...The Intersection between Competition and Data Privacy – OECD – June 2024 OECD...
The Intersection between Competition and Data Privacy – OECD – June 2024 OECD...
 
The Intersection between Competition and Data Privacy – COLANGELO – June 2024...
The Intersection between Competition and Data Privacy – COLANGELO – June 2024...The Intersection between Competition and Data Privacy – COLANGELO – June 2024...
The Intersection between Competition and Data Privacy – COLANGELO – June 2024...
 
怎么办理(lincoln学位证书)英国林肯大学毕业证文凭学位证书原版一模一样
怎么办理(lincoln学位证书)英国林肯大学毕业证文凭学位证书原版一模一样怎么办理(lincoln学位证书)英国林肯大学毕业证文凭学位证书原版一模一样
怎么办理(lincoln学位证书)英国林肯大学毕业证文凭学位证书原版一模一样
 
The Intersection between Competition and Data Privacy – KEMP – June 2024 OECD...
The Intersection between Competition and Data Privacy – KEMP – June 2024 OECD...The Intersection between Competition and Data Privacy – KEMP – June 2024 OECD...
The Intersection between Competition and Data Privacy – KEMP – June 2024 OECD...
 
The Intersection between Competition and Data Privacy – CAPEL – June 2024 OEC...
The Intersection between Competition and Data Privacy – CAPEL – June 2024 OEC...The Intersection between Competition and Data Privacy – CAPEL – June 2024 OEC...
The Intersection between Competition and Data Privacy – CAPEL – June 2024 OEC...
 
Gamify it until you make it Improving Agile Development and Operations with ...
Gamify it until you make it  Improving Agile Development and Operations with ...Gamify it until you make it  Improving Agile Development and Operations with ...
Gamify it until you make it Improving Agile Development and Operations with ...
 
Artificial Intelligence, Data and Competition – OECD – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – OECD – June 2024 OECD discussionArtificial Intelligence, Data and Competition – OECD – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – OECD – June 2024 OECD discussion
 
Proposal: The Ark Project and The BEEP Inc
Proposal: The Ark Project and The BEEP IncProposal: The Ark Project and The BEEP Inc
Proposal: The Ark Project and The BEEP Inc
 
BRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdf
BRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdfBRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdf
BRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdf
 
IEEE CIS Webinar Sustainable futures.pdf
IEEE CIS Webinar Sustainable futures.pdfIEEE CIS Webinar Sustainable futures.pdf
IEEE CIS Webinar Sustainable futures.pdf
 
ServiceNow CIS-ITSM Exam Dumps & Questions [2024]
ServiceNow CIS-ITSM Exam Dumps & Questions [2024]ServiceNow CIS-ITSM Exam Dumps & Questions [2024]
ServiceNow CIS-ITSM Exam Dumps & Questions [2024]
 

Process Validation.pptx

  • 2. What is Process Validation? Process Validation is defined as the collection and evaluation of data, from the process design stage throughout production, which establishes scientific evidence that a process is capable of consistently delivering quality products
  • 3. Definition  Validation master Plan (VMP): The validation master plan is a high level document that establishes an umbrella validation plan for the entire project and summarizes the manufacturers overall philosophy and approach. Qualification: Documented evidence that premises, systems or equipments are able to achieve the predefined specifications properly installed, and/or work correctly and lead to the expected results. Validation: Actions of proving and documenting that any process, procedure or method actually and consistently lead to the expected results.
  • 4. Validation Master Plan (VMP) 1. Qualification and Validation 2. Planning for Validation 3. Documentation 4. Qualification 5. Process Validation 6. Cleaning Validation 7. Change Control 8. Revalidation
  • 5. Elements Of Validation Qualification is pre-requisite of validation. The qualification includes the following: 1. Design Qualification (DQ):- Mechanical drawings and design features provided by the manufacturer of the equipment should be examined. 2. Installation Qualification (IQ):- Installation qualification should be carried out on new or modified facilities, systems and equipment. The following main points should be includes in the installation qualification.  Checking of installation of equipment, piping, services and instrumentation.  Collection of supplier’s operating working instructions and maintenance requirements and their calibration requirements.  Verification of materials of construction  Sources of spares and maintenance
  • 6. 3. Operational Qualification (OQ):- Operational qualification should include the following:  Tests developed from the knowledge of the processes systems and equipment  Defining lower and upper operating limits,. Sometimes, these are called ‘worst case’ conditions. 4. Performance Qualification (PQ):- PQ should include the following:  Tests using production materials, substitutes or simulated product. These can be developed from the knowledge of the process and facilities, systems or equipment.  Tests to include conditions with upper and lower limits
  • 7. Steps involved in the process validation
  • 8. Types of Process Validation  Prospective Validation: Prospective validation is performed in a research and development lab on a small scale.  Retrospective Validation: Retrospective validation is performed after the dispatch of product in the market.  Concurrent Validation: Concurrent validation is performed in the production area after getting satisfying results of prospective validation.  Revalidation: This validation is conducted Whenever there are changes in packaging, formulation, equipment or processes which could have impact on product effectiveness or product characteristics, there should be revalidation of the validated process.
  • 9. Prospective Validation  Prospective validation is establishing documented evidence that a system performs as it is intended based on pre- planned protocol.(Before process implementation).  Prospective validation is performed in a research and development lab on a small scale.
  • 10. When To Perform  Developing new products.  Any change in the manufacturing process which has a major effect on the product quality.  before starting the routine batches of production.  stage of product development.
  • 11. What to Do  carried out in the research and development stage so its start from developing formulation.  Formulation of a new product is developed at this stage.  Specification of raw materials are defined.  Procedure for manufacturing is developed in the form of validation protocol.  Procedure for cleaning validation is defined.  All the critical points are observed on risk based analysis.  Process parameters like mixing time, drying time etc are defined and adjusted to get desired results.  Batch Manufacturing Record is prepared.  Testing method for analyzing the product is developed.  Sampling plan is prepared.  Technology transfer documents are prepared.  Environmental factors like temperature and humidity and storage conditions are defined.
  • 12. Results  Usually three batches are manufactured at this stage and all should produce desired results using the same parameters.  If we have to make changes in parameters of the first batch to adjust the results, these changes are made through proper change control procedure.  The batch in which we make changes will not be considered the validation batch.  We will have to take the next three batches with the same parameters to build confidence that our procedures and methods are reliable.
  • 13. Retrospective Validation  Retrospective validation is documented evidence that products manufactured in the pharmaceutical industry using validated procedure maintain its quality and purity in the market during the period of its shelf life.  Retrospective validation is performed after the dispatch of product in the market.
  • 14. What to Do?  In the pharmaceutical industries the reference samples are withdrawn from the finish product batches before its dispatch to the market.  After the specified time period the sample is taken from the reference samples and is tested.  It is done to ensure that our product in the market is still meeting a quality attribute during its shelf life.  Following type of data is also collected during Retrospective validation,  Number of batches manufactured for a defined period of time.  Batch size  Strength of the product.  Manufacturing and expiry date of the product.  Master documentation.  List of deviations and corrective actions.  Stability testing data for different batches.  It is used for audits of validated processes.
  • 15. Concurrent Validation  The word concurrent can be remembered by a simple word current, which means this type of validation is performed on current production batches.  Concurrent validation is performed in the production area after getting satisfying results of prospective validation.  In concurrent validation the product is manufactured in the production area using the production facility and equipment.
  • 16. When to Perform  Product which has completed its prospective stage, is validated in the production area during concurrent validation.  When there is a change in process which has no significant effect on product quality.  Change in a raw material source.  Technical Transfer  When there is change in equipment used.  When there is only change in tablet strength and previous strength was validated by the prospective validation and change strength has the same ratio of API and Excipients.
  • 17. What to Do?  Before starting the concurrent validation it is ensured that the operators involved in the manufacturing process are trained.  All the equipment, utility and systems are qualified.  Three batches are manufactured to ensure the same product quality.  In concurrent validation all the critical parameters of batches which are under manufacturing are observed.  All the parameters are adjusted according to prospective validation.  Sampling plan is followed as provided by the product development department.
  • 18. Summery  In concurrent validation we manufacture the large scale batches using the same parameters as manufactured in small scale during prospective validation to ensure that our process developed is capable of producing the quality results.  Samples are checked at specified time intervals.  Prospective validation is done for three batches.
  • 19. Re-Validation  Validation is done once in the product life cycle until there is no change in the product manufacturing parameters.  In some specific circumstances we have to revalidate our products.
  • 20. When To Re-validate  change in critical parameters.  change in product formulation.  change in the product process.  change in equipment.  change in the facility.  change in primary packaging.  change in raw material density, particle size etc.  Source change of API.  Change in any process parameter like mixing time, drying temperature, etc  change in batch size.  change in the plant.(Shifting from one plant to other)  Periodically checking the validation results.  When the product fails to meet the specification.