In this video you will learn
1- What is a Project
2- What is a Project Management
3- EPS & OBS Purpose
4- How to Create a New Project in P6 Software
Welcome to Primavera Training-02 ’ E-course on Oracle’s Primavera P6 Professional (Project Management application).
CivilMDC.com is an Online learning platform, offers educational training courses in the fields of Designing, software, technology and creative skills. The company, through its instructional video tutorials, offers courses in the areas of CAD, design, Analysis,Civil Engineering education, Planning and many more e-learning courses.
To Build a relationship, Please CLICK THE SUBSCRIBE BUTTON..
For the download of the Primavera P6 Professional Software , follow the link below, get register yourself before downloading of software.
https://edelivery.oracle.com/osdc/faces/Home.jspx;jsessionid=4G19HLHB74aadvpYjWAkwe-GriiTyj2OUoSp8IaqFdpwhvgjSq4E!-1802076090
If you face any difficulty...... Feel free to contact.
Contact Details
www.civilmdc.com
Professional Trainers
Email ID: civilmdcgroup@gmail.com
Installation of primavera (optional)
Open primavera
Create EPS
Create your own project with minimum 30 activities(Live projects are preferable)
Data entry
Inserting activities
Assigning relationship
Activates codes
Basic formatting of Bars(Bar style, Bar label)
Inserting and modifying columns
Group by and short by
User defined filed
Interfering floats
Make 2 more of your self
Filters
New filters
Modify filters
Cases of Constraints
Case of difference between total float and free float
calendar
Import & Export
Live project Information
Filters ( 1-line, 2-line, 3-line Filters)
RESOURCE ASSIGNING AND LEVELLING
Resource Levelling
RESOURCE LOADING (Bell type, front loaded, back loaded, linear etc.)
EARNED VALUE ANALYSIS
Cost Account
Expenses
Reports
Role
User Defined fields
Admin Preferences
Renumbering Activities
Project Portfolio
Edit Columns
Save layout
Working with multiple projects
Activity Steps
Global change
Multiple Projects
USING WORK PRODUCTS AND DOCUMENTS
UPDATING PROJECT BY "AUTO ACTUALS" METHOD
UPDATING, SCHEDULING PROJECT - WITH SPOTLIGHT FEATURE
ASSIGN BASELINE
MAINTAIN BASELINE
PROJECT CODES
Installation of primavera (optional)
Open primavera
Create EPS
Create your own project with minimum 30 activities(Live projects are preferable)
Data entry
Inserting activities
Assigning relationship
Activates codes
Basic formatting of Bars(Bar style, Bar label)
Inserting and modifying columns
Group by and short by
User defined filed
Interfering floats
Make 2 more of your self
Filters
New filters
Modify filters
Cases of Constraints
Case of difference between total float and free float
calendar
Import & Export
Live project Information
Filters ( 1-line, 2-line, 3-line Filters)
RESOURCE ASSIGNING AND LEVELLING
Resource Levelling
RESOURCE LOADING (Bell type, front loaded, back loaded, linear etc.)
EARNED VALUE ANALYSIS
Cost Account
Expenses
Reports
Role
User Defined fields
Admin Preferences
Renumbering Activities
Project Portfolio
Edit Columns
Save layout
Working with multiple projects
Activity Steps
Global change
Multiple Projects
USING WORK PRODUCTS AND DOCUMENTS
UPDATING PROJECT BY "AUTO ACTUALS" METHOD
UPDATING, SCHEDULING PROJECT - WITH SPOTLIGHT FEATURE
ASSIGN BASELINE
MAINTAIN BASELINE
PROJECT CODES
The document has been developed keeping in mind the common challenges that a planner may face while
developing a schedule. I have also tried to cover in areas which is required for effective earned value
calculation. The document is been prepared considering that the reader has a basic understanding of Primavera P6.
In this presentation we have done earlier a project for Phillip Morris (Pakistan) for the access control system and canteen management system. It is the project presentation for our subject Planning and Scheduling. i hope it is the best for the understanding Project planning and scheduling.
Quick Guide: Understanding ISO Construction ClassificationsAssetWorks
ISO Construction Classes are determined based on the materials used in the construction of a building as well as the amount of time it can withstand a standard fire resistance test. This information can help risk managers better understand the risk profile of a particular structure on their property schedule.
PILLOLE DI PROJECT MANAGEMENT 5th - Time Management
L’area di conoscenza “Gestione dei tempi di progetto” include i processi necessari ad assicurare il completamento del progetto nei tempi previsti.
“Assicurare” è una parola un po’ forte. Il PMBOK ci dà degli strumenti necessari per cercare diportare a termine il nostro progetto. Ma occorre considerare che alla base del PMBOK ci sono tanti progetti, grandi e piccoli che siano, i quali hanno raggiunto un certo livello di successo nella gestione grazie all’applicazione di alcune metodologie che sono state poi standardizzate ed inserite nel PMBOK.
03 Construction Project Planning and Schedulingakashpadole
The presentation has prepared as per the syllabus of Mumbai University.
Go through the presentation, if you like it then share it with your friends and classmates.
Thank you :)
PVD Project Control Best Practices for Large ProjectsJeremie Averous
Discover key best practices of Project Control that are specific to Large, Complex Projects. This presentation summarizes key learning points and practices from several years on consulting.
Project Value Delivery is a leading global consultancy focusing on Large Complex Projects: "We Empower Organizations to be Reliably Successful in Large, Complex Projects"
Creating value from Software Development though Project managementCharles Muzonzini
A presentation on creating value from Software Development though Project management from Mr C Haparari at the Computer Society of Zimbabwe-Software Development Community June 2016 function.
The document has been developed keeping in mind the common challenges that a planner may face while
developing a schedule. I have also tried to cover in areas which is required for effective earned value
calculation. The document is been prepared considering that the reader has a basic understanding of Primavera P6.
In this presentation we have done earlier a project for Phillip Morris (Pakistan) for the access control system and canteen management system. It is the project presentation for our subject Planning and Scheduling. i hope it is the best for the understanding Project planning and scheduling.
Quick Guide: Understanding ISO Construction ClassificationsAssetWorks
ISO Construction Classes are determined based on the materials used in the construction of a building as well as the amount of time it can withstand a standard fire resistance test. This information can help risk managers better understand the risk profile of a particular structure on their property schedule.
PILLOLE DI PROJECT MANAGEMENT 5th - Time Management
L’area di conoscenza “Gestione dei tempi di progetto” include i processi necessari ad assicurare il completamento del progetto nei tempi previsti.
“Assicurare” è una parola un po’ forte. Il PMBOK ci dà degli strumenti necessari per cercare diportare a termine il nostro progetto. Ma occorre considerare che alla base del PMBOK ci sono tanti progetti, grandi e piccoli che siano, i quali hanno raggiunto un certo livello di successo nella gestione grazie all’applicazione di alcune metodologie che sono state poi standardizzate ed inserite nel PMBOK.
03 Construction Project Planning and Schedulingakashpadole
The presentation has prepared as per the syllabus of Mumbai University.
Go through the presentation, if you like it then share it with your friends and classmates.
Thank you :)
PVD Project Control Best Practices for Large ProjectsJeremie Averous
Discover key best practices of Project Control that are specific to Large, Complex Projects. This presentation summarizes key learning points and practices from several years on consulting.
Project Value Delivery is a leading global consultancy focusing on Large Complex Projects: "We Empower Organizations to be Reliably Successful in Large, Complex Projects"
Creating value from Software Development though Project managementCharles Muzonzini
A presentation on creating value from Software Development though Project management from Mr C Haparari at the Computer Society of Zimbabwe-Software Development Community June 2016 function.
This is a blog on how Earned Value Management can produce greater productivity and growth within an organization, and how Online Earned Value Management Training helps individuals be more creative and vibrant in executing a project on time and to budget. Get a clear overview of the most effective project management approaches used by various individuals and organizations to enhance their baseline and garner high output productivity. This technique is used by managers and can be incorporated in any kind of project to produce high performance and effective decision making. Problems faced by organizations include improper or unrealistic timelines, frequent project changes, & lack of goals, this could create poor bottom lines, improper time management, and a scope creep.
Topic 1: Overview of the Project Management Landscape
Definition of project, project portfolio and program
Classification of projects
Fundamental of project management
- Topic 2: Traditional Project Management (TPM)
What is Traditional Project Management?
Classification of TPM models
Complexity and Uncertainty in the Project Management Landscape
- Topic 3: Agile Project Management
- Topic 4: Extreme Project Management
- Topic 5: Comparison of TPM – Agile – Extreme Project Management
Does the thought of implementing a software new software solution in your enterprise make you shudder? Even though you know that such an implementation will provide significant benefits to the organization, the process of initiating change can overshadow the rewards those benefits bring. Implementation does not have to be a feared word! Let Essential Software be your guide to a successful project launch.
From Capability-Based Planning to Competitive Advantage: Assembling Your Bus...Iver Band
Many organizations are investing in capability-based planning, portfolio management, architecture and agile development processes. While they derive value from each practice, many struggle with getting all of them to work together. In rapidly evolving industries such as healthcare, businesses need to change continuously. Instead of programs and projects, they need transformation value networks that adapt to dynamic organizational and external drivers.
This presentation will use a unified framework and method to define and relate the ingredients for continuous transformation. The presenters will also demonstrate the value of standards-based visual modeling for integrating, expressing and improving business transformation practices. Visual models will show how American and European healthcare payers are improving quality and efficiency in response to demographic, economic and regulatory pressures.
Learning Objectives:
• Understand how to integrate capability-based planning, portfolio management, architecture and agile development processes
• Identify and position key frameworks for capability-based planning, portfolio management, architecture and agile development processes
• Understand core concepts and key applications of the ArchiMate language for visual modeling, an Open Group standard
• Understand the basics of visually modeling business strategy and organizational transformation
• Become familiar with the objectives and methods for an example of business transformation
• Understand how and when to integrate strategic guidance into agile development processes
System Analyst & Technical WRITER SOP.pptxssuser1fd02a1
Guideline and description how System Analyst and Tech Writer are working. mostly describe as procedure of how tech writer and system analyst working, it might as a team or individual.
Similar to Primavera training 02- Creating a new project (20)
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
2. CREATING A NEW PROJECT
LIST OF CONTENTS
► What is a Project
► What is a Project Management
► EPS & OBS Purpose
► Create a New Project
3. WHAT IS A PROJECT
A project is a sequence of unique, complex
and connected activities, having one goal or
purpose, and that must be completed by a
specific time, within budget and according to
specification.
4. WHAT IS A PROJECT
•Unique Activities
•Complex Activities
•Connected Activities
•One Goal
•Specified Time
•Within Budget
•According to Specifications
6. WHAT IS A PROJECT
MANAGEMENT
Project Management is the
application of the knowledge,
skills, tools and management
techniques to project activities
to meet project requirements.
7. ENTERPRISE PROJECT STRUCTURE
(EPS)
• The Enterprise Project Structure (EPS) is a hierarchy used
to organize projects.
• Each EPS node can be subdivided into multiple levels to
represent the work that needs to be done in your
organization/department.
9. ORGANIZATION BREAKDOWN
STRUCTURE (OBS)
•The Organization Breakdown Structure (OBS) is a
hierarchy used to organize responsibilities.
•OBS represents the responsible managers
assigned to different projects or work
assignments
10. OBS – HIERARCHY
CEO
John – Chief
Engineer
Sophia -
Manager
Emma -
Manager
Ali – Chief
Engineer
William -
Manager
Sarah -
Manager
Lynda – Chief
Engineer
David – Chief
Engineer
11. EPS AND OBS … MAPPING
CEO
John – Chief
Engineer
Sophia -
Manager
Emma -
Manager
Ali – Chief
Engineer
William -
Manager
Sarah -
Manager
Lynda – Chief
Engineer
David – Chief
Engineer
DESCON
CONSTRUCTION
Highways
Bridges
INFRASTRUCTURE
Residential
Industrial
MANUFACTURING MAINTENANCE
17. OBS
Chief Minister/ CEO of Company
Chancellor
UET Lahore
Vice-Chancellor
UET Faisalabad
Vice-Chancellor
Chief Engineer
Bridge Construction
Executive Engineer
Road Construction
Executive Engineer
20. CREATING A NEW PROJECT
LIST OF CONTENTS
► What is a Project
► What is a Project Management
► The Project Management Lifecycle
► EPS & OBS Purpose
► Create a New Project